CN202969345U - Dam body integrally poured with concrete faceplates and rock filled concrete - Google Patents

Dam body integrally poured with concrete faceplates and rock filled concrete Download PDF

Info

Publication number
CN202969345U
CN202969345U CN 201220696674 CN201220696674U CN202969345U CN 202969345 U CN202969345 U CN 202969345U CN 201220696674 CN201220696674 CN 201220696674 CN 201220696674 U CN201220696674 U CN 201220696674U CN 202969345 U CN202969345 U CN 202969345U
Authority
CN
China
Prior art keywords
concrete
rock
filling
template
enrockment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220696674
Other languages
Chinese (zh)
Inventor
李风亮
宋军
王光纶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING HUASHI SHUIMU TECHNOLOGY CO LTD
Original Assignee
BEIJING HUASHI SHUIMU TECHNOLOGY CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING HUASHI SHUIMU TECHNOLOGY CO LTD filed Critical BEIJING HUASHI SHUIMU TECHNOLOGY CO LTD
Priority to CN 201220696674 priority Critical patent/CN202969345U/en
Application granted granted Critical
Publication of CN202969345U publication Critical patent/CN202969345U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model provides a dam body integrally poured with concrete faceplates and rock filled concrete. Common concrete is poured both between filling rocks and an upper-stream template, and between filling rocks and a lower-stream template. Self-compaction concrete is poured inside the filling rocks, and the filling rocks and the self-compaction concrete form the rock filled concrete. The common concrete on the inner side of the upper-stream template forms an upper-stream common concrete faceplate, and the common concrete on the inner side of the lower-stream temperate forms a lower-stream common concrete faceplate. The filling rocks which are not poured are used as the templates, the process of constructing the templates on the inner sides of the faceplates is saved, expense is lowered, construction processes are simplified, and construction progress is improved. People do not need to wait for disassembling of the templates of the common concrete of the faceplates, can make overall arrangement and conduct rock filling in advance or conduct rock filling during the pouring process of the common concrete faceplates. Therefore, rock filling at the edges of the templates is avoided, the problem that rock filling at the edges of the templates during a rock filled concrete construction process is difficult is solved, use of manual labor in the construction process is reduced, and construction speed of the dam body is improved.

Description

The integrated dam body of building of concrete slab and rock-fill concrete
Technical field
The utility model relates to a kind of concrete slab and the integrated dam body of building of rock-fill concrete, belongs to the dam body technical field.
Background technology
Panel is the topping of a dam, and dam body seepage, dam structure safe operation are played vital effect.Generally, because panel is different from the dam concrete performance requirement, the cast of panel concrete and dam concrete need to separately be carried out.
The rock-fill concrete technology is the new a kind of novel construction technology of mass concrete work that produces in recent years, and this technology is utilized special-purpose self-compacting concrete stone filling space, forms complete closely knit concrete in mass.In the design of rock-fill concrete dam body, can adopt the self-compacting concrete of filling rockfill as panel.In practice of construction, first prop up vertical appearance template, then enrockment, reserve positions of panels in the enrockment construction, then pours into a mould self-compacting concrete, realizes the one cast of panel and rock-fill concrete dam body.Long effluent storehouse, Zhongshan City, Guangdong Province reconstruction works has just adopted the integrated pouring construction of self-compacting concrete panel and dam body rock-fill concrete, and easy construction is quick.In practice of construction, because the self-compacting concrete unit price is high, most engineerings do not adopt self-compacting concrete to carry out the panel construction, are conventional concrete slab and select the panel designs with dam body.
In the dam construction of conventional concrete slab and rock-fill concrete, according to existing job practices, need first both sides formwork erection inside and outside the upstream and downstream panel, complete building of conventional concrete slab; After waiting for the panel form removable, then carry out the dam body enrockment, complete at last building of dam body rock-fill concrete.This job practices, not only inside and outside both sides need branching standing template, and the enrockment operation can only just can carry out after the panel formwork for placing is removed, long construction period, and workload is large, cost is high.
Summary of the invention
The purpose of this utility model is the problem that long construction period, workload are large, cost is high that exists in order to solve prior art, and then a kind of concrete slab and the integrated dam body of building of rock-fill concrete are provided.
The purpose of this utility model is achieved through the following technical solutions:
the integrated dam body of building of a kind of concrete slab and rock-fill concrete, comprise: the upstream template, the downstream template, enrockment, conventional concrete and self-compacting concrete, one side of described enrockment is fixed with the upstream template, the opposite side of enrockment is fixed with the downstream template, between enrockment and upstream template, all built conventional concrete between enrockment and downstream template, self-compacting concrete has been built in enrockment inside, enrockment and self-compacting concrete form rock-fill concrete, the conventional concrete of template inboard, upstream forms the conventional concrete slab in upstream, the conventional concrete of template inboard, downstream forms the conventional concrete slab in downstream, rock-fill concrete, the conventional concrete slab of the conventional concrete slab in upstream and downstream forms integrated dam body.
The utlity model has following advantage: 1, the utility model relies on the enrockment of not building as template, has saved upstream panel inner side template and has propped up die process, has reduced expense, has simplified construction sequence, has improved construction speed.2, the utility model need not be waited for the time of conventional concrete form removal, but overall arrangement, and in advance enrockment or carry out enrockment in conventional concrete slab casting process, improved construction speed.3, the utility model has been avoided at the template edge enrockment, solved the large problem of rock-fill concrete template in construction process edge enrockment difficulty, has reduced use artificial in the work progress, has reduced cost, has improved construction speed.4, the utility model has realized that conventional concrete slab and the integrated of rock-fill concrete dam body build, and has improved the dam structure speed of application.
Description of drawings
Fig. 1 is the utility model rock-fill concrete dam body design zoning plan;
Fig. 2 is the utility model formwork erection and the enrockment schematic diagram after complete;
Fig. 3 is the schematic diagram that the conventional concrete slab of the utility model is built;
To be that the utility model is integrated build complete rear schematic diagram to Fig. 4.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is described in further detail: the present embodiment is implemented under take technical solutions of the utility model as prerequisite, has provided detailed embodiment, but protection domain of the present utility model is not limited to following embodiment.
as Fig. 1~shown in Figure 4, the integrated dam body of building of a kind of concrete slab that the present embodiment is related and rock-fill concrete, comprise: upstream template 4, downstream template 5, enrockment 6, conventional concrete seven and self-compacting concrete 8, one side of described enrockment 6 is fixed with upstream template 4, the opposite side of enrockment 6 is fixed with downstream template 5, between enrockment 6 and upstream template 4, all built conventional concrete seven between enrockment 6 and downstream template 5, self-compacting concrete 8 has been built in enrockment 6 inside, enrockment 6 forms rock-fill concrete 1 with self-compacting concrete 8, the conventional concrete seven of upstream template 4 inboards forms the conventional concrete slab 2 in upstream, the conventional concrete seven of downstream template 5 inboards forms the conventional concrete slab 3 in downstream, rock-fill concrete 1, the conventional concrete slab 3 in the conventional concrete slab 2 in upstream and downstream forms integrated dam body.
The integrated job practices of building dam body of concrete slab and rock-fill concrete comprises the following steps:
1. on request face basis, storehouse is cleared up; 2. carry out upstream and downstream outboard template formwork erection according to code requirement; 3. dam body part enrockment, at the required width of upstream and downstream template place's conventional concrete slab of reservation, carrying out enrockment (as shown in Figure 2) by excavator or crane with the stone that meets the demands near the upstream and downstream faceplate part according to designing requirement; 4. the conventional concreting of upstream and downstream, rely on enrockment to serve as inner side template, because conventional concrete flowability is relatively poor, creep into inboard crack of stone although have part when vibrating, but can be not a lot, the enrockment physical efficiency is served as the template of conventional concreting, and can not affect the filling compactness (as shown in Figure 3) of rockfill; 4. the middle part rock-fill concrete is built, when building of conventional concrete front and back panel closed on end, the notice agitator is replaced by special-purpose mix parameters of high-strength self-compacting concrete with match ratio, the template that the conventional concrete slab that dependence has been built is built as rock-fill concrete, carry out self-compacting concrete and build (should progressively build to the centre from the two ends of enrockment) (as shown in Figure 4), thereby realize that conventional concrete slab and the integrated of rock-fill concrete dam body build.
The utility model has been simplified construction sequence, has reduced the input of manpower, has reduced cost, effectively accelerating construction progress.
The above; it is only the better specific embodiment of the utility model; these specific embodiment all are based on the different implementations under the utility model general idea; and protection domain of the present utility model is not limited to this; anyly be familiar with those skilled in the art in the technical scope that the utility model discloses; the variation that can expect easily or replacement are within all should being encompassed in protection domain of the present utility model.Therefore, protection domain of the present utility model should be as the criterion with the protection domain of claims.

Claims (1)

1. a concrete slab and the integrated dam body of building of rock-fill concrete, comprise: upstream template (4), downstream template (5), enrockment (6), conventional concrete (7) and self-compacting concrete (8), one side of described enrockment (6) is fixed with upstream template (4), the opposite side of enrockment (6) is fixed with downstream template (5), it is characterized in that, between enrockment (6) and upstream template (4), all built conventional concrete (7) between enrockment (6) and downstream template (5), self-compacting concrete (8) has been built in enrockment (6) inside, enrockment (6) forms rock-fill concrete (1) with self-compacting concrete (8), the inboard conventional concrete (7) of upstream template (4) forms the conventional concrete slab (2) in upstream, the inboard conventional concrete (7) of downstream template (5) forms the conventional concrete slab (3) in downstream, rock-fill concrete (1), the conventional concrete slab (2) in upstream and integrated the building of the conventional concrete slab (3) in downstream, form dam body.
CN 201220696674 2012-12-17 2012-12-17 Dam body integrally poured with concrete faceplates and rock filled concrete Expired - Fee Related CN202969345U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220696674 CN202969345U (en) 2012-12-17 2012-12-17 Dam body integrally poured with concrete faceplates and rock filled concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220696674 CN202969345U (en) 2012-12-17 2012-12-17 Dam body integrally poured with concrete faceplates and rock filled concrete

Publications (1)

Publication Number Publication Date
CN202969345U true CN202969345U (en) 2013-06-05

Family

ID=48510439

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220696674 Expired - Fee Related CN202969345U (en) 2012-12-17 2012-12-17 Dam body integrally poured with concrete faceplates and rock filled concrete

Country Status (1)

Country Link
CN (1) CN202969345U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107354917A (en) * 2017-07-28 2017-11-17 昆明理工大学 A kind of gravity rock and its construction method
CN110512571A (en) * 2019-08-01 2019-11-29 南通大学 A kind of RCC dam and its construction method containing rock-fill concrete core-wall
CN110820696A (en) * 2019-11-22 2020-02-21 北京金河水务建设集团有限公司 Synchronous pouring construction method for rock-fill concrete pond dam
CN111088804A (en) * 2019-10-25 2020-05-01 中国水利水电第一工程局有限公司 Construction method of high-flow-state fine-aggregate concrete rock-fill dam in high-temperature area of equator
CN112962537A (en) * 2021-03-08 2021-06-15 中国水电基础局有限公司 Integrated pouring method for self-compacting rock-fill concrete dam body

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107354917A (en) * 2017-07-28 2017-11-17 昆明理工大学 A kind of gravity rock and its construction method
CN110512571A (en) * 2019-08-01 2019-11-29 南通大学 A kind of RCC dam and its construction method containing rock-fill concrete core-wall
CN111088804A (en) * 2019-10-25 2020-05-01 中国水利水电第一工程局有限公司 Construction method of high-flow-state fine-aggregate concrete rock-fill dam in high-temperature area of equator
CN110820696A (en) * 2019-11-22 2020-02-21 北京金河水务建设集团有限公司 Synchronous pouring construction method for rock-fill concrete pond dam
CN112962537A (en) * 2021-03-08 2021-06-15 中国水电基础局有限公司 Integrated pouring method for self-compacting rock-fill concrete dam body

Similar Documents

Publication Publication Date Title
CN202969345U (en) Dam body integrally poured with concrete faceplates and rock filled concrete
CN2893055Y (en) Super high wall body three-section form
CN103194971B (en) A kind of hollow pier binds construction method
CN203905467U (en) Building formwork chapiter dismounted early
CN204098486U (en) The concrete of building basement roof ater-casting hangs mould
CN104790381B (en) Lining wall concrete pouring inversing method based on UEA micro-expanding agent
CN203270627U (en) Construction joint structure of shear wall
CN203835403U (en) Clearance strengthening system for serious cracking of existing tunnel lining arch
CN106320373A (en) Supporting system at position of post-pouring belt of underground garage roof and construction method
CN105041340A (en) Structure and construction method for increasing arch crown concrete pouring speed in tunnel engineering
CN103603677A (en) Secondary lining casting device and secondary lining casting method for tunnels
CN204551172U (en) A kind of prefabricated road surface of assembled steel reinforced concrete hollow
CN204941567U (en) A kind of structure accelerating construction of tunnel vault pouring concrete speed
CN207512790U (en) A kind of trapezoidal bottom plate rear pouring tape and special-shaped steel plate for sealing water anti-leakage structure
CN206319404U (en) A kind of building precast exterior sheathing
CN206254306U (en) A kind of small-sized water conservancy project prefabricated components Demoding auxiliary device
CN104032741A (en) Rapid construction method for large-size temperature control in water conservancy project
CN204532374U (en) The multi-functional chassis of metro station construction
CN104141321A (en) Basement side wall late poured band blocking method and used blocking steel plate
CN203514341U (en) Mold supporting structure for concrete foundation hole of large device
CN106914984A (en) A kind of construction method of prefabricated composite construction board
CN207808036U (en) Trapezoidal special prefabricated board makes shaping equipment
CN203004045U (en) Hopper for concrete falling
CN202117319U (en) End formwork
CN205777500U (en) A kind of for secondary structure constructional column stigma concrete shaping mould plate

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130605

Termination date: 20151217

EXPY Termination of patent right or utility model