CN104790381B - Lining wall concrete pouring inversing method based on UEA micro-expanding agent - Google Patents
Lining wall concrete pouring inversing method based on UEA micro-expanding agent Download PDFInfo
- Publication number
- CN104790381B CN104790381B CN201510141541.0A CN201510141541A CN104790381B CN 104790381 B CN104790381 B CN 104790381B CN 201510141541 A CN201510141541 A CN 201510141541A CN 104790381 B CN104790381 B CN 104790381B
- Authority
- CN
- China
- Prior art keywords
- concrete
- inwall
- lining wall
- cast
- upper strata
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/20—Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/02—Handling of bulk concrete specially for foundation or hydraulic engineering purposes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- Revetment (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The invention relates to a lining wall concrete pouring inversing method based on a UEA micro-expanding agent. The method includes the following steps of firstly, completing underground continuous wall construction; secondly, completing foundation floor construction; thirdly, completing upper floor construction; fourthly, erecting a formwork, pouring upper layer lining wall concrete, and embedding steel pipes in the upper layer lining wall concrete, wherein the interval of the steel pipes ranges from 2 m to 3 m, and the lower ends of the embedded steel pipes are arranged on the tops of reverse grooves in the lower portion of an upper layer lining wall where pouring has been conducted; fifthly, erecting a lower layer lining wall formwork, directly connecting the formwork with the upper layer lining wall from the bottom face of a foundation floor, adopting closed type installation, inserting a pumper concrete conveying pipe pouring lower layer lining wall concrete into each embedded steel pipe, unceasingly conducting pouring, compacting the concrete through vibration, adding the micro-expanding agent, and completing pouring of the lining wall concrete. The method is simple in operation process, compactness of the concrete poured to the rear portion of the lining wall can be fully ensured, the construction progress is accelerated, and the construction efficiency is improved.
Description
The application be number of patent application be 201310612772.6, patent name is continuous based on underground
The inwall concrete cast of wall is inverse makees method, the divisional application of filing date 2013.11.26.
Technical field
The invention belongs to inwall concrete cast field, especially a kind of based on UEA micro-expanding agent
The cast of inwall concrete inverse make method.
Background technology
In building field deep foundation pit construction, through frequently with diaphram wall as building enclosure, and
Within it inner lining construction wall becomes the exterior wall of underground engineering.Sometimes inwall uses with underground structure
Contrary sequence method is constructed, and the method for inwall concrete cast is typically: basis bottom application work below
After complete, install to stay between the inwall that wall side form, template and top have poured and set certain space,
Template is the most tiltedly chosen, does funnel, then carry out concrete cast.This method is poured into a mould
Complex process, stretches out the concrete outside wall and to cut after form removal, be cast in by this method simultaneously
There is blind area of vibrating in novel concrete junction, has air to be difficult to discharge, form space, cause infiltration
Phenomenon.
Summary of the invention
It is an object of the invention to overcome the deficiencies in the prior art, it is provided that a kind of based on UEA microdilatancy
The inwall concrete cast of agent is inverse makees method, and the cast of this inwall concrete is inverse makees method operation letter
It is single, it is possible to efficiently solve inverse work of inwall and pour into a mould uncompacted problem, shorten the engineering time,
Accelerate construction speed, improve efficiency of construction.
The present invention solves its technical problem and is achieved through the following technical solutions:
The cast of a kind of inwall concrete based on UEA micro-expanding agent is inverse makees method, and its this cast is inverse
Comprise the steps: as method
(1), that construction of diaphragm wall is complete;
(2), basis floor slab construction is complete;
(3), upper strata floor slab construction is complete;
(4), install upper strata inwall mould bases, pour into a mould upper strata inwall concrete, and in this upper strata
At interval of the pre-buried steel pipe of 2-3 rice in chemise concrete, the lower end of every embedded steel tube is arranged at
Water the inverted groove top of inwall bottom, upper strata;
(5), installing lower floor's inwall mould bases, this mould bases is direct and upper strata liner from basis soffit
Wall connects, and uses closed installation, the pump truck concrete delivery pipe of cast lower floor inwall concrete
Insert from embedded steel tube, be carried out continuously cast, under workmen is from the reserved pre-buried steel mouth of pipe
Put vibrating head by concrete jolt ramming, in the range of lower floor's inwall top 150mm, the coagulation of cast
Adding micro-expanding agent in soil, inwall concrete is poured.
And, described embedded steel tube includes lower vibrating spear steel pipe, aerofluxus steel pipe and lower ash steel
Pipe, this lower vibrating spear steel pipe, aerofluxus steel pipe and lower ash steel pipe are alternately arranged at upper strata inwall
In concrete.
And, described micro-expanding agent is UEA micro-expanding agent.
Advantages of the present invention and having the beneficial effect that
The present invention uses in the inwall concrete of upper strata at interval of the pre-buried steel pipe of 2-3 rice, every
The lower end of embedded steel tube is arranged at the mode at the inverted groove top watering inwall bottom, upper strata, adopts
Using closed installation, the pump truck concrete delivery pipe of cast lower floor inwall concrete is from embedded steel tube
Middle insertion, is carried out continuously cast, and workmen transfers vibrating head from the reserved pre-buried steel mouth of pipe will
Concrete jolt ramming, in the range of lower floor's inwall top 150mm, adds micro-in the concrete of cast
Extender, the method operating procedure is simple, can fully ensure that the closely knit of pouring concrete after inwall,
Accelerate construction speed, improve efficiency of construction.
Accompanying drawing explanation
Fig. 1 is present configuration schematic diagram.
Detailed description of the invention
Below by specific embodiment, the invention will be further described, and following example simply describe
Property, it not determinate, it is impossible to limit protection scope of the present invention with this.
The cast of a kind of inwall concrete based on UEA micro-expanding agent is inverse makees method, and its this cast is inverse
Comprise the steps: as method
(1), diaphram wall 5 is constructed complete;
(2), basis floor 6 is constructed complete;
(3), upper strata floor 7 is constructed complete;
(4), install upper strata inwall mould bases, pour into a mould upper strata inwall concrete 1, and in this upper strata
At interval of the pre-buried steel pipe 2 of 2-3 rice in chemise concrete, the lower end of every embedded steel tube is arranged at
Water the inverted groove top of inwall bottom, upper strata;Embedded steel tube includes lower vibrating spear steel pipe,
Aerofluxus steel pipe and lower ash steel pipe, this lower vibrating spear steel pipe, aerofluxus steel pipe and lower ash steel pipe are handed over
For being arranged in the inwall concrete of upper strata.
(5), installing lower floor's inwall mould bases 4, this mould bases is direct and upper strata liner from basis soffit
Wall connects, and uses closed installation, the pump truck concrete conveyance of cast lower floor inwall concrete 3
Pipe inserts from embedded steel tube, is carried out continuously cast, and workmen is from the reserved pre-buried steel mouth of pipe
Transfer vibrating head by concrete jolt ramming, in the range of lower floor's inwall top 150mm, cast mixed
Adding micro-expanding agent in solidifying soil, micro-expanding agent is UEA micro-expanding agent, and inwall concrete pours
Finish.
The present invention uses closed installation to eliminate template the most tiltedly to be chosen, do funnel and carry out
The operation that cast cuts the most again, use manpower and material resources sparingly financial resources, improves efficiency of construction and construction matter
Amount.Use embedded steel tube to carry out lower ash, aerofluxus, vibrate, improve concrete casting quality, increase
Add concrete compaction degree, improve construction quality.
Claims (2)
1. inwall concrete based on UEA micro-expanding agent cast is inverse makees a method, and its feature exists
In: this cast is inverse to be comprised the steps: as method
(1), that construction of diaphragm wall is complete;
(2), basis floor slab construction is complete;
(3), upper strata floor slab construction is complete;
(4), install upper strata inwall mould bases, pour into a mould upper strata inwall concrete, and in this upper strata
At interval of the pre-buried steel pipe of 2-3 rice in chemise concrete, the lower end of every embedded steel tube is arranged at
Water the inverted groove top of inwall bottom, upper strata;
(5), installing lower floor's inwall mould bases, this mould bases is direct and upper strata liner from basis soffit
Wall connects, and uses closed installation, the pump truck concrete delivery pipe of cast lower floor inwall concrete
Insert from embedded steel tube, be carried out continuously cast, under workmen is from the reserved pre-buried steel mouth of pipe
Put vibrating head by concrete jolt ramming, in the range of lower floor's inwall top 150mm, the coagulation of cast
Adding UEA micro-expanding agent in soil, inwall concrete is poured.
Inwall concrete based on UEA micro-expanding agent the most according to claim 1 cast is inverse
Make method, it is characterised in that: described embedded steel tube includes lower vibrating spear steel pipe, aerofluxus steel pipe
And lower ash steel pipe, this lower vibrating spear steel pipe, aerofluxus steel pipe and lower ash steel pipe be alternately arranged at
In the inwall concrete of upper strata.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510141541.0A CN104790381B (en) | 2013-11-26 | 2013-11-26 | Lining wall concrete pouring inversing method based on UEA micro-expanding agent |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510141541.0A CN104790381B (en) | 2013-11-26 | 2013-11-26 | Lining wall concrete pouring inversing method based on UEA micro-expanding agent |
CN201310612772.6A CN103614998B (en) | 2013-11-26 | 2013-11-26 | Inwall pouring concrete based on diaphragm wall is inverse makes method |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310612772.6A Division CN103614998B (en) | 2013-11-26 | 2013-11-26 | Inwall pouring concrete based on diaphragm wall is inverse makes method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104790381A CN104790381A (en) | 2015-07-22 |
CN104790381B true CN104790381B (en) | 2017-01-11 |
Family
ID=50165713
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310612772.6A Active CN103614998B (en) | 2013-11-26 | 2013-11-26 | Inwall pouring concrete based on diaphragm wall is inverse makes method |
CN201510141541.0A Active CN104790381B (en) | 2013-11-26 | 2013-11-26 | Lining wall concrete pouring inversing method based on UEA micro-expanding agent |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310612772.6A Active CN103614998B (en) | 2013-11-26 | 2013-11-26 | Inwall pouring concrete based on diaphragm wall is inverse makes method |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN103614998B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103614998B (en) * | 2013-11-26 | 2015-08-19 | 中冶天工集团有限公司 | Inwall pouring concrete based on diaphragm wall is inverse makes method |
CN105133575B (en) * | 2015-08-04 | 2017-01-18 | 中交第二航务工程局有限公司 | Suspended formwork supporting device for casting lining on surface of underground continuous wall and construction method |
CN106545034B (en) * | 2015-09-17 | 2019-01-11 | 中国二十冶集团有限公司 | Contrary sequence method exterior wall horizontal construction joint steel plate water stopper concreting method |
CN110952585B (en) * | 2019-12-30 | 2021-08-31 | 金匠建设集团有限公司 | Construction method for integrally poured building house |
CN112144571B (en) * | 2020-09-24 | 2022-01-04 | 深圳市建工建设集团有限公司 | Excavation-free construction process for green urban underground structure |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09268583A (en) * | 1996-03-29 | 1997-10-14 | Tokyu Koken Kk | Structural steel embedded half precast concrete member and construction method of underground structure using the same member |
KR20090094971A (en) * | 2008-03-04 | 2009-09-09 | 깨뱉시스템주식회사 | Under ground top-down method |
CN201588207U (en) * | 2009-07-21 | 2010-09-22 | 中冶天工建设有限公司 | Concreting device at construction joints |
CN102116035A (en) * | 2009-12-30 | 2011-07-06 | 上海市机械施工有限公司 | Process for constructing underground structural walls without linings |
KR101331261B1 (en) * | 2013-04-05 | 2013-11-20 | 주식회사 아라엔텍 | Underground prefabricated precast concrete rainwater recycling facility using precast concrete continuous wall in strut structure or earth anchor and construction method of the same |
CN203200745U (en) * | 2013-05-06 | 2013-09-18 | 中建保华建筑有限责任公司 | Underground continuous wall's reinforcement support in reverse construction method construction |
CN103614998B (en) * | 2013-11-26 | 2015-08-19 | 中冶天工集团有限公司 | Inwall pouring concrete based on diaphragm wall is inverse makes method |
-
2013
- 2013-11-26 CN CN201310612772.6A patent/CN103614998B/en active Active
- 2013-11-26 CN CN201510141541.0A patent/CN104790381B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN104790381A (en) | 2015-07-22 |
CN103614998B (en) | 2015-08-19 |
CN103614998A (en) | 2014-03-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104790381B (en) | Lining wall concrete pouring inversing method based on UEA micro-expanding agent | |
CN103498486B (en) | A kind of sleeve pipe that adopts implements the method for shutoff to ater-casting precipitation pipe well | |
CN102561402B (en) | Treatment method for construction joint between top plate and wall of individual underground civil air defense project constructed by covered top-down excavation method | |
CN206346209U (en) | A kind of quick solution dewatering well piping plugging structure | |
CN105927249B (en) | A kind of construction method for pouring tunnel double-lining self-compacting concrete | |
CN105804410A (en) | Sub-cabin pressure grouting method for vertical connection of prefabricated concrete structure | |
CN110173272B (en) | Method for receiving subway station access channel in rectangular pipe jacking machine construction operation | |
CN107023032A (en) | A kind of cast-in-place method of pipe gallery | |
CN109113068A (en) | A kind of inverse construction joint structure for building construction of deep basal pit | |
CN107989049A (en) | A kind of construction method of frame bank protection | |
CN103741949B (en) | Treatment of juncture between vertical structure and horizontal structure | |
CN105065040B (en) | A kind of prefabricated underground space tunneling construction method of top plate | |
CN103741651B (en) | A kind of concrete teeth groove stiling basin and construction method thereof | |
CN109610842A (en) | A kind of concrete jacking pump send construction method | |
CN206829163U (en) | A kind of high artesian section construction Yield rainfall relation device | |
CN203741792U (en) | Concrete tooth groove stilling basin | |
CN108222656A (en) | The construction method of Prefabricated enclosure wall | |
CN105041340A (en) | Structure and construction method for increasing arch crown concrete pouring speed in tunnel engineering | |
CN203514332U (en) | Casing for blocking dewatering tube well of post-cast strip | |
CN103334771A (en) | Concrete pouring method of side wall and joint of middle plate and vault by means of underground excavation reverse construction method | |
CN104963364A (en) | Disposing method for topdown structural slab lower side wall construction joint | |
CN107778029B (en) | Concrete curing method for buried pipe in structure | |
CN209066442U (en) | A kind of inverse construction joint structure for building construction of deep basal pit | |
CN207568634U (en) | Soap-free emulsion polymeization ring anchor pre-stress lining structure anchorage slot concrete backfill device | |
CN109707446B (en) | Tunnel center drainage ditch template assembly, drainage ditch structure and construction method of drainage ditch structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |