CN105133575B - Suspended formwork supporting device for casting lining on surface of underground continuous wall and construction method - Google Patents

Suspended formwork supporting device for casting lining on surface of underground continuous wall and construction method Download PDF

Info

Publication number
CN105133575B
CN105133575B CN201510470723.2A CN201510470723A CN105133575B CN 105133575 B CN105133575 B CN 105133575B CN 201510470723 A CN201510470723 A CN 201510470723A CN 105133575 B CN105133575 B CN 105133575B
Authority
CN
China
Prior art keywords
hanging
wall body
liner
reinforcing bar
diaphram wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510470723.2A
Other languages
Chinese (zh)
Other versions
CN105133575A (en
Inventor
何超然
姚平
陈鸣
王晓夫
郑红杰
彭波
李宁
张勇
李开心
唐孝全
唐炫
陈培帅
黄维
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cccc Wuhan Chi Heng International Engineering Consulting Co ltd
CCCC Second Harbor Engineering Co
CCCC Highway Long Bridge Construction National Engineering Research Center Co Ltd
Original Assignee
Zhongjiao Wuhan Zhixing International Engineering Consulting Co Ltd
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongjiao Wuhan Zhixing International Engineering Consulting Co Ltd, CCCC Second Harbor Engineering Co filed Critical Zhongjiao Wuhan Zhixing International Engineering Consulting Co Ltd
Priority to CN201510470723.2A priority Critical patent/CN105133575B/en
Publication of CN105133575A publication Critical patent/CN105133575A/en
Application granted granted Critical
Publication of CN105133575B publication Critical patent/CN105133575B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a suspended formwork supporting device for casting a lining on the surface of an underground continuous wall and a construction method. The device is arranged below the cast lining. The suspended formwork supporting device comprises a side formwork arranged vertically on the outer side of the cast lining and a bottom formwork parallel to the bottom face of the cast lining and making contact with the underground continuous wall. A horn opening for pouring concrete is formed in the upper portion of the side formwork. A powder spraying pile for supporting the bottom formwork is arranged below the side, close to the underground continuous wall, of the bottom formwork. Suspending steel bars for suspending the bottom formwork are arranged on the side, away from the underground continuous wall, of the bottom formwork. The suspended formwork supporting device has the technical beneficial effects of being good in construction operability, high in construction effect, safe, reliable, good in quality controllability and the like.

Description

Hang mould suspension device and construction method what diaphram wall body surface face poured liner
Technical field
The invention belongs to diaphram wall body construction device field.It is more particularly related to one kind is in underground even What continuous surface of wall poured liner hangs mould suspension device and construction method.
Background technology
At present diaphram wall is widely used in Analysis of Suspension Bridges ' Anchorage, subway station etc. and constructs with reference to the deep basal pit of liner supporting Thing.Using the reverse construction of from up to down placement layer by layer more than reinforced concrete structure liner supporting.In Coastal Area of Guangdong Province stream Plasticity sludge soft stratum, liner pours the subject matter facing is how to process liner to pour basis, and its technical barrier includes:
1st, deep & thick silt layer engineering geology extreme difference, the new mud that excavates is in liquid-plastic state, and characteristic load bearing capacity is less than 40kpa, when liner pours, total subsidence is difficult to control to.
2nd, saturation mud moisture content is high, often assembles in lining base and descends open fire in large quantities, cause substrate during excavation of foundation pit Difficult treatment.
3rd, be reduce foundation pit deformation, pattern foundation pit supporting structure to dig soon soon to support as principle, the operation such as liner reinforcing bar binding, formwork erection Efficiency of construction need to be ensured.
The soft base substrate treating method of existing liner changes for excavation to be dosed solid, is become by the sedimentation that ballast test draws substrate Shape parameter, determines to change and fills out area and change and fill out depth.Program strengths and weaknesses analysis are as follows:
1st, excavate to change and fill out the drainage problem that can alleviate basis to a certain extent;The strong mud of deep stream plasticity is controlled Foundation settlement effect processed is undesirable.
2nd, excavate to change in mud and fill out that workload is big, low construction efficiency, do not meet the principle that pattern foundation pit supporting structure digs soon soon supports.
In sum, the liner bed die in coastal sludge soft soil layer is reinforced not yet effective method.
Existing hang mould suspension device all using suspension type what diaphram wall body surface face poured liner, that is, adopt two Hanging reinforcing bar is fixed it is contemplated that diaphram wall body is a loop configuration, if each piece of end template is adopted to end template Hung with two hanging reinforcing bars, construction cost is a huge burden, therefore to the improvement hanging mould suspension device, subtracts Few construction cost is an extremely urgent problem.
Existing diaphram wall body surface face pour liner hang mould suspension device construction when, need added from foundation ditch If scaffold, workman stands in and is constructed on scaffold, and so resulting in workman needs movable Scaffold ability displacement, and moves The process of scaffold will necessarily slow down construction speed, and indirectly increased the danger of workman.
Content of the invention
It is an object of the invention to solving at least the above and defect, and provide the advantage that will be described later.
A further object of the invention be a kind of hang mould suspension device what diaphram wall body surface face poured liner, pass through It is provided with the powder-spray pile supporting described end template in described end template near a side-lower of diaphram wall body, in described end template Side away from diaphram wall body is provided with the hanging reinforcing bar hanging described end template;So that hanging mould suspension device by merely hanging Hanging become half support semimounted structure, decrease construction cost.
A further object of the invention is by being provided with multiple trivets, described trivet in bell-mouthed outside With described side form bolt, two neighboring described trivet is horizontally disposed with scaffold board, pours as a concrete that suspended on Build platform, alleviate the difficulty of construction of construction worker.
It is a still further object of the present invention to provide one kind is using hanging mould suspension device in diaphram wall body surface face pours The method of lining, by digging foundation ditch, leveling powder-spray pile, hanging the steps such as hanging reinforcing bar, decreases the engineering time, reduces construction difficult Degree.
Part is embodied by the further advantage of the present invention, target and feature by description below, and part also will be by this Invention research and practice and be understood by the person skilled in the art.
The invention provides a kind of hang mould suspension device what diaphram wall body surface face poured liner, it is arranged on and pours The lower section of liner, described hang mould suspension device include along described poured the side template that liner arranges elevationally outward and with described Pour liner bottom surface is parallel and end template that contact with described diaphram wall body, described side template top is provided with pouring coagulation The horn mouth of soil,
Described end template is provided with, near a side-lower of diaphram wall body, the powder-spray pile supporting described end template;
Described end template is provided with, away from the side of diaphram wall body, the hanging reinforcing bar hanging described end template;
Wherein, described powder-spray pile is contacted with described diaphram wall body, the top surface of described powder-spray pile with described poured in The bottom surface of lining is parallel;
Wherein, described hanging bar connecting described in end template and described pour liner, described hanging reinforcing bar along described Pour the inner side that liner arranges elevationally outward and is located at described side template;
Wherein, described bell-mouthed outside is provided with multiple trivets, described trivet and described side template bolt, It is horizontally disposed with scaffold board on two neighboring described trivet.
Preferably, also include: some horizontally disposed reinforcing steel bar of pull rods, it connects described side template and described underground is continuous Body of wall, has certain difference in height between the adjacent described reinforcing steel bar of pull rod of any two.
Preferably, described side template is detachably connected with any one described reinforcing steel bar of pull rod.
Preferably, described end template includes from top to bottom:
Bamboo slab rubber, its with treat casting concrete and contact;
Wooden a tree, used in making timber for boats, it is arranged on described bamboo slab rubber bottom along the direction parallel to described diaphram wall body;And
The Two bors d's oeuveres channel-section steel of square tubular shape, described Two bors d's oeuveres channel-section steel one end apertured is to wear described hanging reinforcing bar, the other end and institute State the contact of diaphram wall body.
The present invention also provide a kind of using hanging the method that mould suspension device pours liner in diaphram wall body surface face, underground Continuous body of wall is ring-type body of wall, and the region that described diaphram wall body is gone along with sb. to guard him is foundation ditch, and in described diaphram wall body, side ring sets Powder-spray pile, described powder-spray pile is the dado structure of injection during early stage diaphram wall body construction, comprises the following steps:
S1, by foundation ditch near diaphram wall body part dig to the height pouring between liner be 3.5m-4m, Several embedded sleeve barrels are dug out on the surface of diaphram wall body, and the horizontal range between two neighboring described embedded sleeve barrel is 60- 80cm, vertical distance is 1m;
S2, using Miniature digging machine excavate powder-spray pile, the pile crown of the powder-spray pile excavating out is carried out leveling process using pneumatic pick, Described pile crown exceeds described foundation ditch bottom surface 0.5-0.8m, and the top surface of powder-spray pile is polishing to put down with the top surface pouring liner OK;
S3, using the reserved hanging joint pouring interior substrate surface, vertical hang a hanging reinforcing bar, described reserved hanging Joint pouring interior lining circumferentially spaced-apart 0.6m arrangement, the level of described reserved hanging joint and described diaphram wall body away from From for 1.3m, by the two ends thread of described hanging reinforcing bar to overlap nut, the upper end of described hanging reinforcing bar and described reserving are hung Hanging joint adopts straight screw sleeve to connect, and lower end is as the suspension strut point of bed die girder, the lower end of described hanging reinforcing bar and institute The top surface stating powder-spray pile is in sustained height;
S4, in described hanging reinforcing bar lower end, end template is installed, described end template include from top to bottom the thick bamboo slab rubber of 2cm, Be paved with wooden a tree, used in making timber for boats and the Two bors d's oeuveres channel-section steel of described bamboo slab rubber bottom surface, described Two bors d's oeuveres channel-section steel near one end of described diaphram wall body by Described powder-spray pile supporting, the other end of described Two bors d's oeuveres channel-section steel, by described hanging reinforcing bar hanging, runs through described in described hanging reinforcing bar Reserved hanging joint is installed in the lower end of Two bors d's oeuveres channel-section steel;
S5, described hanging reinforcing bar outside install side template, the lower end of described side template is contacted with described end template, arbitrarily A reinforcing steel bar of pull rod, the level interval of adjacent two described reinforcing steel bar of pull rods is connected in the horizontal direction at one described embedded sleeve barrel 60-80cm, level interval 1m, as the ruggedized construction of described side template;
S6, the top outside side template are bolted trivet, the level of two neighboring described trivet Spacing is 1m, described side template is vertically arranged on the outside of described hanging reinforcing bar, two neighboring described after installation Scaffold board is kept flat on trivet contact using as concrete casting platform and with described hanging reinforcing bar, any one described pull bar Reinforcing bar runs through described side template;
S7, to casting concrete in the space of the liner to be poured being made up of side template and end template.
Preferably, the step of described casting concrete includes: concrete slump is controlled in 14-16cm, pump truck pumps Concrete auxiliary pours, and inner lining concrete pours lift height and controls 70cm, strengthens vibrating treating coagulation during top layer concreting Soil removes after reaching 75% design strength and hangs mould.Concrete slump is controlled in 14-16cm, pump truck pump concrete auxiliary is poured Build, inner lining concrete pours lift height and controls 70cm, strengthen vibrating during top layer concreting treating that concrete reaches 75% and sets Remove after meter intensity and hang mould.
Preferably, described wood a tree, used in making timber for boats is the square structure of 10cm for the length of side.
Beneficial effects of the present invention
1. application operability is strong: hangs when mould is installed and hangs sky completely, is not required to carry out techniques of bottom die base process, hanging reinforcing bar, load-bearing Girder, distribution beam all using dissipating the part that pieces together, lighter in weight, are manually operated beneficial to inside foundation ditch.
2. construction efficiency is high: hanging mould structure avoids changing of traditional foundation stabilization and fills out operation, can effectively improve operation work Effect.
3. safe and reliable: to hang intensity, the rigidity that mould design according to concrete load, can be adjusted as required by structure And stability, reach the purpose ensureing structure safety.
4. quality controllability is good: because hanging reinforcing bar, Two bors d's oeuveres channel-section steel deformation values in regime of elastic deformation are more stable, can protect Bond quality between card levels inner lining concrete.
Brief description
Fig. 1: the present invention pours the structural representation hanging mould suspension device of liner in diaphram wall body surface face;
Fig. 2: the present invention pours showing of step 1 in the method for liner using hanging mould suspension device in diaphram wall body surface face It is intended to;
Fig. 3: the present invention pours showing of step 2 in the method for liner using hanging mould suspension device in diaphram wall body surface face It is intended to;
Fig. 4: the present invention pours showing of step 4 in the method for liner using hanging mould suspension device in diaphram wall body surface face It is intended to;
Fig. 5: the present invention pours showing of step 4 in the method for liner using hanging mould suspension device in diaphram wall body surface face It is intended to;
Fig. 6: the present invention pours showing of step 5 in the method for liner using hanging mould suspension device in diaphram wall body surface face It is intended to;
Fig. 7: the present invention pours showing of step 6 in the method for liner using hanging mould suspension device in diaphram wall body surface face It is intended to;
Fig. 8: the present invention pours showing of step 7 in the method for liner using hanging mould suspension device in diaphram wall body surface face It is intended to;
Specific embodiment
The present invention is described in further detail below in conjunction with the accompanying drawings, to make those skilled in the art with reference to description literary composition Word can be implemented according to this.
It should be appreciated that used herein such as " have ", "comprising" and " inclusion " term do not allot one or many The presence of individual other element or a combination thereof or interpolation.
As shown in figure 1, the invention provides a kind of hang mould suspension device what diaphram wall body 0 surface poured liner, It is arranged on the lower section pouring liner 1, the described mould suspension device that hangs includes having poured, along described, the side that liner 1 is arranged elevationally outward Template 2 and end template 3 that is parallel with the described bottom surface having poured liner 1 and contacting with described diaphram wall body 0, described side form Plate 2 top is provided with the horn mouth of placing concrete, wherein,
Described end template 3 is provided with, near a side-lower of diaphram wall body 0, the powder-spray pile 4 supporting described end template 3;
Described end template 3 is provided with, away from the side of diaphram wall body 0, the hanging reinforcing bar 5 hanging described end template 3;Pass through So setting, so that hanging mould suspension device to become half support semimounted structure by merely suspension type, decreases and is constructed into This.
Wherein, described powder-spray pile 4 is contacted with described diaphram wall body 0, and the top surface of described powder-spray pile 4 is poured with described The bottom surface of liner 1 is parallel, and powder-spray pile 4 is to be in close contact with pouring liner 1, more stably to support end template 3.
Wherein, described hanging reinforcing bar 5 connect described end template 3 and described poured liner 1, described hanging reinforcing bar 5 is along institute State and pour the inner side that liner 1 arranges elevationally outward and is located at described side template 2;
Wherein, described bell-mouthed outside is provided with multiple trivets 9, described trivet 9 and described side template 2 bolt Connect, two neighboring described trivet 9 is horizontally disposed with scaffold board, arranged by such, make trivet and scaffold board composition One concrete casting platform that suspended on, alleviates the difficulty of construction of construction worker.
In another scheme, present invention additionally comprises: some horizontally disposed reinforcing steel bar of pull rods 8, it connects described side form Plate 2 and described diaphram wall body 0, have certain difference in height, by this between the adjacent described reinforcing steel bar of pull rod 8 of any two Sample is arranged so that side template 2 can be firmly secured on end template 3, will not be deformed easily in placing concrete, with When these reinforcing steel bar of pull rods 8 potentially act as the skeleton of concrete, make liner firmer.
In another scheme, described side template 2 is detachably connected with any one described reinforcing steel bar of pull rod 8, by this The setting of sample is so that side template 2 can serve as a contrast recycling after construction finishes within a segment, by presetting adjacent two reinforcing steel bar of pull rods 8 The distance between, setting side template 2 is used for wear the spacing between the hole of reinforcing steel bar of pull rod 8, can preferably complete side template 2 Being detachably connected and reinforcing steel bar of pull rod 8 between.
In another scheme, described end template 3 includes from top to bottom:
Bamboo slab rubber 301, its with treat casting concrete and contact;
Wooden a tree, used in making timber for boats 302, it is arranged on described bamboo slab rubber 301 bottom along the direction parallel to described diaphram wall body 0, described Wooden a tree, used in making timber for boats 302 is as the horizontal braces of end template 3;And
The Two bors d's oeuveres channel-section steel 303 of square tubular shape, described Two bors d's oeuveres channel-section steel 303 one end apertured is to wear described hanging reinforcing bar 5, another End is contacted with described diaphram wall body 0, and described Two bors d's oeuveres channel-section steel 303 is as longitudinal distribution beam of end template 3.By so setting Put, make Two bors d's oeuveres channel-section steel 303 as the brace rod of end template 3, wooden a tree, used in making timber for boats 302 vertically paves double along with Two bors d's oeuveres channel-section steel 303 direction Spell on channel-section steel 303, as the longitudinal force distribution beam of end template 3, in this programme, end template is using the scattered part that pieces together, easy to disassemble, energy Enough recyclings.
The present invention also provide a kind of using hanging the method that mould suspension device pours liner on diaphram wall body 0 surface, ground Continuous body of wall 0 is ring-type body of wall down, and the region that described diaphram wall body 0 is gone along with sb. to guard him is foundation ditch, inside described diaphram wall body 0 Ring sets powder-spray pile 4, and described powder-spray pile 4 is the dado structure of injection when early stage diaphram wall body 0 is constructed it is characterised in that wrapping Include following steps:
S1 as shown in Fig. 2 dig to the height pouring between liner 1 foundation ditch near the part of diaphram wall body 0 For 3.5m-4m, dig out several embedded sleeve barrels 6 on the surface of diaphram wall body 0, between two neighboring described embedded sleeve barrel 6 Horizontal range is 60-80cm, and vertical distance is 1m;
S2, as shown in figure 3, excavating powder-spray pile 4 using Miniature digging machine, the pile crown of the powder-spray pile excavating out 4 is adopted pneumatic pick Carry out leveling process, described pile crown exceeds described foundation ditch bottom surface 0.5-0.8m, and by the top surface of described powder-spray pile 4 be polishing to The top surface pouring liner 1 is parallel;
S3 is as shown in figure 4, using the reserved hanging joint 7 pouring liner 1 bottom surface, vertically hang a hanging reinforcing bar 5, described reserved hanging joint 7 circumferentially spaced-apart 0.6m arrangement on pouring liner 1, described reserved hanging joint 7 with describedly The horizontal range of continuous body of wall 0 is 1.3m down, by the two ends thread of described hanging reinforcing bar 5 to overlap nut, by described hanging steel The upper end of muscle 5 is connected using straight screw sleeve with reserved hanging joint 7, and lower end, as the suspension strut point of end template, provides bottom Mould outside-supporting counter-force, end template and casting concrete load is delivered to lower end and the institute hanging reinforcing bar 5 described in hanging reinforcing bar The top surface stating powder-spray pile 4 is in sustained height;
S4 is as shown in figure 5, install end template 3 in described hanging reinforcing bar 5 lower end, described end template 3 includes from top to bottom The thick bamboo slab rubber 301 of 2cm, the wooden a tree, used in making timber for boats 302 being paved with described bamboo slab rubber 301 bottom surface and Two bors d's oeuveres channel-section steel 303, described Two bors d's oeuveres channel-section steel 303 are supported by described powder-spray pile 4 near one end of described diaphram wall body 0, and the other end of described Two bors d's oeuveres channel-section steel 303 is by described Hanging reinforcing bar 5 is hung, and reserved hanging reinforcing bar 5 joint is installed in the lower end running through described Two bors d's oeuveres channel-section steel 303 in described hanging reinforcing bar 5;
S5 is as shown in fig. 6, install side template, the lower end of described side template and described bottom outside described hanging reinforcing bar in office Template contacts, connect a reinforcing steel bar of pull rod 8, adjacent two described pull bars in the horizontal direction at any one of embedded sleeve barrel 6 Level interval 60-80cm of reinforcing bar 8, level interval 1m, as the ruggedized construction of described side template 2;
S6 as shown in fig. 7, being bolted trivet 9 on the top in side template 2 outside, two neighboring described three The level interval of angle-iron frame is 1m, described side template 2 is vertically arranged on the outside of described hanging reinforcing bar 5, after installation Scaffold board is kept flat on two neighboring described trivet 9 contact using as concrete casting platform and with described hanging reinforcing bar 5, Any one described reinforcing steel bar of pull rod 8 runs through described side template 2;
S7 is as shown in figure 8, to casting concrete in the space of the liner to be poured being made up of side template 2 and end template 3.
In another scheme, the step of casting concrete includes: concrete slump is controlled in 14-16cm, pump truck Pump concrete auxiliary pours, and inner lining concrete pours lift height and controls 70cm, strengthens vibrating treating during top layer concreting Concrete removes after reaching 75% design strength and hangs mould.
In another scheme, described wood a tree, used in making timber for boats 302 is the square structure of 10cm for the length of side.
Although embodiment of the present invention is disclosed as above, it is not restricted to listed in description and embodiment With.It can be applied to various suitable the field of the invention completely.For those skilled in the art, can be easily Realize other modification.Therefore under the general concept being limited without departing substantially from claim and equivalency range, the present invention does not limit In specific details with shown here as the legend with description.

Claims (3)

1. a kind of using hanging the method that mould suspension device pours liner in diaphram wall body surface face, diaphram wall body is ring-type Body of wall, the region that described diaphram wall body is gone along with sb. to guard him is foundation ditch, and in described diaphram wall body, side ring sets powder-spray pile, described powder spray Stake is the dado structure of injection during early stage diaphram wall body construction it is characterised in that comprising the following steps:
S1, by foundation ditch near diaphram wall body part dig to the height pouring between liner be 3.5m-4m, in underground Several embedded sleeve barrels are dug out on the surface of continuous body of wall, and the horizontal range between two neighboring described embedded sleeve barrel is 60-80cm, erects It is 1m to distance;
S2, using Miniature digging machine excavate powder-spray pile, the pile crown of the powder-spray pile excavating out is carried out leveling process using pneumatic pick, described Pile crown exceeds described foundation ditch bottom surface 0.5-0.8m, and the top surface of powder-spray pile is polishing to parallel with the top surface pouring liner;
S3, using the reserved hanging joint pouring interior substrate surface, vertical hang a hanging reinforcing bar, described reserved hanging joint Arrange pouring the circumferentially spaced-apart 0.6m of interior lining, described reserved hanging joint with the horizontal range of described diaphram wall body is 1.3m, by the two ends thread of described hanging reinforcing bar to overlap nut, the upper end of described hanging reinforcing bar has been poured liner with upper strata Reserved hanging joint adopt straight screw sleeve connect, lower end as the suspension strut point of bed die girder, under described hanging reinforcing bar End is in sustained height with the top surface of described powder-spray pile;
S4, in described hanging reinforcing bar lower end, end template is installed, described end template includes the thick bamboo slab rubber of 2cm from top to bottom, is paved with The wooden a tree, used in making timber for boats of described bamboo slab rubber bottom surface and Two bors d's oeuveres channel-section steel, described Two bors d's oeuveres channel-section steel is near one end of described diaphram wall body by described Powder-spray pile supports, and the other end of described Two bors d's oeuveres channel-section steel, by described hanging reinforcing bar hanging, runs through described Two bors d's oeuveres in described hanging reinforcing bar Reserved hanging joint is installed in the lower end of channel-section steel;
S5, outside described hanging reinforcing bar, side template is installed, the lower end of described side template contacted with described end template, any one A reinforcing steel bar of pull rod, level interval 60- of adjacent two described reinforcing steel bar of pull rods is connected in the horizontal direction at described embedded sleeve barrel 80cm, level interval 1m, as the ruggedized construction of described side template;
S6, the top outside side template are bolted trivet, the level interval of two neighboring described trivet For 1m, described side template is vertically arranged on the outside of described hanging reinforcing bar, in two neighboring described triangle after installation Scaffold board is kept flat on brandreth contact using as concrete casting platform and with described hanging reinforcing bar, any one described reinforcing steel bar of pull rod Run through described side template;
S7, to casting concrete in the space of the liner to be poured being made up of side template and end template.
2., as claimed in claim 1 using hanging the method that mould suspension device pours liner in diaphram wall body surface face, it is special Levy and be, the step of described casting concrete includes: concrete slump is controlled in 14-16cm, pump truck pump concrete is auxiliary Help and pour, inner lining concrete pours lift height and controls 70cm, strengthen vibrating during top layer concreting treating that concrete reaches Remove after 75% design strength and hang mould.
3., as claimed in claim 1 using hanging the method that mould suspension device pours liner in diaphram wall body surface face, it is special Levy and be, described wood a tree, used in making timber for boats is the square structure of 10cm for the length of side.
CN201510470723.2A 2015-08-04 2015-08-04 Suspended formwork supporting device for casting lining on surface of underground continuous wall and construction method Active CN105133575B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510470723.2A CN105133575B (en) 2015-08-04 2015-08-04 Suspended formwork supporting device for casting lining on surface of underground continuous wall and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510470723.2A CN105133575B (en) 2015-08-04 2015-08-04 Suspended formwork supporting device for casting lining on surface of underground continuous wall and construction method

Publications (2)

Publication Number Publication Date
CN105133575A CN105133575A (en) 2015-12-09
CN105133575B true CN105133575B (en) 2017-01-18

Family

ID=54719123

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510470723.2A Active CN105133575B (en) 2015-08-04 2015-08-04 Suspended formwork supporting device for casting lining on surface of underground continuous wall and construction method

Country Status (1)

Country Link
CN (1) CN105133575B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109975109B (en) * 2019-04-25 2021-07-13 华北理工大学 Device and method for circumferential support of sleeve and arrangement of displacement meter for test
CN110552370A (en) * 2019-08-30 2019-12-10 中国一冶集团有限公司 Reverse construction method based annular lining wall integral single-side formwork construction method
CN111558193A (en) * 2020-06-12 2020-08-21 中国建筑第五工程局有限公司 Template structure of special-shaped space curved surface diving platform and construction method of structural layer
CN113585276B (en) * 2021-04-07 2023-07-14 中国建筑一局(集团)有限公司 Construction method of deep foundation pit reverse-acting lining wall bottom film mounting and dismounting device
CN113700037B (en) * 2021-09-07 2023-07-28 浙江交工地下工程有限公司 Reverse construction method underground super-thick side wall pouring construction device and method
CN114457830A (en) * 2022-01-19 2022-05-10 上海市基础工程集团有限公司 Bottom die device for reverse construction of impervious wall

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5911015B2 (en) * 1980-07-05 1984-03-13 清水建設株式会社 How to install shoring in the reverse winding method
CN201433391Y (en) * 2009-07-21 2010-03-31 中冶天工建设有限公司 Hanging mold supporting device in top down construction method adopted construction of underground wall body structure
CN201943086U (en) * 2010-12-29 2011-08-24 中铁四局集团有限公司市政工程分公司 Underground building wall body
CN103174294A (en) * 2013-03-18 2013-06-26 中天建设集团有限公司 Method for wall one-sided form erecting construction at deformation joint position
CN104790381B (en) * 2013-11-26 2017-01-11 中冶天工集团有限公司 Lining wall concrete pouring inversing method based on UEA micro-expanding agent

Also Published As

Publication number Publication date
CN105133575A (en) 2015-12-09

Similar Documents

Publication Publication Date Title
CN105133575B (en) Suspended formwork supporting device for casting lining on surface of underground continuous wall and construction method
CN106758841B (en) A kind of whole construction process of the double rope face low-pylon cable-stayed bridges of double tower
CN108086340A (en) Open caisson construction structure and its construction method
CN104018490B (en) A kind of Z-shaped square-section friction pile and construction method thereof
CN102864781A (en) Foundation pit supporting method utilizing inclined piles
CN103541352B (en) A kind of at ground, sandy soil stratum major diameter Vertical spots underground continuous construction method
CN208072415U (en) Deep foundation pit reinforced concrete support part changes structure
CN107119699A (en) A kind of friction pile and its construction method based on the beam of uniform strength
CN105672450A (en) Laying method for large-aperture water draining pipeline parallel to upper part of existing metro tunnel structure
CN203411993U (en) Simple and fast retaining wall
CN107841953A (en) Across the cast-in-place section construction support in high-altitude obliquely-intersected beams abrupt slope side and construction method
CN106065668B (en) A kind of construction techniques
CN205917601U (en) Integrally lift up device of bridge arch rib
CN205934931U (en) Lid is in same direction as foundation ditch structure of digging way of doing things construction
CN208472811U (en) A kind of improved soil body hole-forming device
CN106592598A (en) Same-layer double-beam large-diameter steel pipe support and deep foundation pit combined inner support formed thereby
CN106245673A (en) A kind of rib stake formula peg board retaining wall and construction method thereof
CN106149732B (en) A kind of deep basal pit faces side large scale hoisting machinery construction method for hanging
CN102817376B (en) Settlement joint construction method for big-volume slabstone concrete
CN204919531U (en) Hang mould supporting device what inside lining was pour to underground continuous wall body surface face
CN105756078B (en) One kind extends out lamination type and draws digging spread foundation and its construction method
CN210066763U (en) Foundation pit side wall structure reinforcing and supporting device
CN209603153U (en) A kind of vertical barricade slope retaining construction of prefabricated anchor pole rib column formula frid
CN106761815A (en) A kind of novel shaft borehole wall combined supporting bracing means
CN209585098U (en) A kind of substation equipment bracket novel steel tube short column pile foundation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210907

Address after: 430048 No. 11 Jinyinhu Road, Dongxihu District, Wuhan City, Hubei Province

Patentee after: CCCC SECOND HARBOR ENGINEERING Co.,Ltd.

Patentee after: CCCC WUHAN CHI HENG INTERNATIONAL ENGINEERING CONSULTING Co.,Ltd.

Patentee after: CCCC HIGHWAY BRIDGES NATIONAL ENGINEERING RESEARCH CENTER Co.,Ltd.

Address before: 430048 No. 11 Jinyinhu Road, Dongxihu District, Wuhan City, Hubei Province

Patentee before: CCCC SECOND HARBOR ENGINEERING Co.,Ltd.

Patentee before: CCCC WUHAN CHI HENG INTERNATIONAL ENGINEERING CONSULTING Co.,Ltd.

TR01 Transfer of patent right