Prior art keywords
screed
column
expansion head
brick layer
brick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610284990.5A
Other languages
Chinese (zh)
Other versions
CN105756078A (en
Inventor
禹峰
蓝天鹏
黄兴怀
胡孔飞
何礼秋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Engineering Group Anhui Electric Power Design Institute Co Ltd
Original Assignee
China Energy Engineering Group Anhui Electric Power Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Energy Engineering Group Anhui Electric Power Design Institute Co Ltd filed Critical China Energy Engineering Group Anhui Electric Power Design Institute Co Ltd
Priority to CN201610284990.5A priority Critical patent/CN105756078B/en
Publication of CN105756078A publication Critical patent/CN105756078A/en
Application granted granted Critical
Publication of CN105756078B publication Critical patent/CN105756078B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/44Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with enlarged footing or enlargements at the bottom of the pile

Abstract

Lamination type is extended out the present invention relates to one kind draw and dig spread foundation and its construction method, solve to draw compared with prior art and dig spread foundation and easily occur the defects of crater wall is caved in the construction process.The expansion head of the present invention includes upper expansion head and lower expansion head, and upper expansion is diagonally-installed on lower expansion head;The lower outer wall for expanding head is followed successively by lower screed and lower brick layer from outside to inside, the upper outer wall for expanding head is followed successively by screed and upper brick layer from outside to inside, Rock And Soil on the outside of the upper following screed of screed is puted forth effort to support as its oblique downslide, and the joining place of the upper following screed of brick layer and lower brick layer is puted forth effort to support as its oblique downslide.This invention ensures that drawing the safety and stability for digging spread foundation construction, the use scope drawn and dig spread foundation is expanded, ensure that the success rate of pore-forming.

Description

One kind extends out lamination type and draws digging spread foundation and its construction method
Technical field
The present invention relates to transmission line tower foundation technical field, specifically one kind, which extends out lamination type and draws, digs base expanding and base expanding base Plinth and its construction method.
Background technology
The stress of transmission line tower foundation has its industry characteristic, and pole and tower foundation is in the process of running not only by lower pressure Effect, also acted on by two kinds of power of uplift force and lateral moment of flexure.In the design work of pole and tower foundation, reasonable design is needed Base form, certain withdrawal resistance is provided while bearing capacity is met.As shown in Figure 1, it is wherein to draw digging spread foundation A kind of form.
It draws digging spread foundation to be widely used in High Voltage Transmission Line Engineering, construction method is using mechanically or manually in day So directly dug in soil(It bores)Into required foundation pit, framework of steel reinforcement and concrete are directly poured in being formed in foundation pit.The basic type Formula makes undisturbed soil form vertical constraint to basis, so as to provide basis required withdrawal resistance by expanding bottom part aperture diameter.This base The process that plinth eliminates template and backfill saves material, accelerates engineering construction progress, reduces cost.However the base Plinth is in actual application, and the shortcomings that crater wall is easily caved in when drawing digging there is enlarged footing part, the principle that crater wall is caved in is such as Shown in Fig. 2.It draws and digs spread foundation since its expanded head part point is relatively large in diameter, the crater wall inclination angle that reaming is formed is larger.When crater wall rock When soil body cohesive strength is larger, it is ensured that its base expanding and base expanding effect;And when crater wall soil body cohesive strength is smaller or in seasonal rainwater When causing crater wall soaked under effect, crater wall will occur and cave in.Crater wall is caved in light then so that basis can not use, and causes engineering wave Take;It is heavy then injure the worker in bottom hole operation by a crashing object, engineering safety accident occurs, directly affect the foundation pattern applies model It encloses.
At present, draw dig spread foundation straight hole part generally using cement concrete carry out retaining wall, and base expanding and base expanding partially due to Without ripe construction technology, and without retaining wall.This construction method significantly limits the use scope drawn and dig spread foundation, , using the tower position for digging spread foundation is drawn, itself the quality accidents that crater wall is caved in easily occur again for basis simultaneously.
Therefore, how to design a kind of brick retaining wall for being exclusively used in electric power line pole tower draw dig spread foundation have become urgent need The technical issues of solution.
Invention content
The purpose of the present invention is to solve draw to dig spread foundation and easily occur crater wall in the construction process and collapse in the prior art The defects of collapsing provides one kind and extends out lamination type and draw and dig spread foundation and its construction method to solve the above problems.
To achieve these goals, technical scheme is as follows:
One kind extends out lamination type and draws digging spread foundation, including column and expands head, and column, which is mounted on, to be expanded above head, and steel reinforcement cage is inserted It is fixed in column and expansion head and by concreting,
The expansion head includes upper expansion head and lower expansion head, and upper expansion is diagonally-installed on lower expansion head;Outside the lower expansion head Wall is followed successively by lower screed and lower brick layer from outside to inside, and the upper outer wall for expanding head is followed successively by screed and upper brick from outside to inside Layer, the Rock And Soil on the outside of the upper following screed of screed are puted forth effort to support as its oblique downslide, the upper following screed of brick layer and The joining place of lower brick layer is puted forth effort to support as its oblique downslide.
The column is frustum cone structure.
The lower screed is cement mortar, and the brick body of the lower brick layer is clay brick.
The column includes bottom column and middle part column, and middle part column is diagonally-installed in bottom column;The bottom The outer wall of portion's column is followed successively by screed A and brick layer A from outside to inside, and the outer wall of the middle part column is followed successively by mortar from outside to inside Layer B and brick layer B, screed A more thans screed and the joining place of Rock And Soil on the outside of upper screed are puted forth effort as its oblique downslide Support, brick layer A more thans screed and the joining place of upper brick layer are puted forth effort to support as its oblique downslide, and screed B is with screed A The Rock And Soil in outside is puted forth effort to support as its oblique downslide, and brick layer B is oblique as it using the joining place of screed A and brick layer A Put forth effort to support to downslide.
The column further includes top column, and top column is diagonally-installed on the column of middle part;The top column Outer wall is followed successively by screed C and brick layer C from outside to inside, and screed C is using the Rock And Soil on the outside of screed B as its oblique downslide Put forth effort to support, brick layer C puts forth effort to support using the joining place of screed B and brick layer B as its oblique downslide.
The longitudinal length of the brick layer A is 115mm-345mm.
A kind of lamination type that extends out draws the construction method for digging spread foundation, includes the following steps:
The construction of column portion carries out the construction of top column, middle part column and bottom column successively;
The construction of expanded head part point carries out expanding head and the lower construction for expanding head successively;
The upper construction procedure for expanding head includes:Downward oblique reaming is deep-cut on the basis of bottom column;In upper expansion head upper edge Its sideline first reuses that clay brick blended cement mortar is secondary to build retaining wall by laying bricks or stones using cement mortar retaining wall, ensure clay brick mutually it Between formed arching after, then carry out it is lower expand head construction;
The lower construction procedure for expanding head includes:Oblique reaming downwards is deep-cut on the basis of upper expansion head;Lower expansion head upper edge its Sideline first reuses that clay brick blended cement mortar is secondary to build retaining wall by laying bricks or stones using cement mortar retaining wall, the lower retaining wall clay brick for expanding head It should be fitted closely with the lower bottom hole for expanding head;Treat that the lower retaining wall clay for expanding head and cement mortar brick adhesion strength reach design strength institute After the curing age needed, steel reinforcement cage is put into, carries out pouring for concrete, after meeting concrete maintaining age, basis input makes With.
The construction method of the top column includes the following steps:
On the basis of tower leg Center stake position is according to design stake diameter extend out and oblique draw digging operation;
After drawing digging depth and reaching 0.5m-1.5m, on top, column is first reused viscous along its sideline using cement mortar retaining wall Cob brick blended cement mortar is secondary to build retaining wall by laying bricks or stones, is built by laying bricks or stones always to the aperture of top column;
After the curing age that the adhesion strength between the clay brick in top column sideline reaches needed for design strength, still further below It is oblique to draw digging reaming, carry out the construction of middle part column.
Advantageous effect
One kind of the present invention extends out lamination type and draws digging spread foundation and its construction method, ensure that draw compared with prior art The safety and stability of spread foundation construction is dug, the use scope drawn and dig spread foundation is expanded, ensure that the success of pore-forming Rate reduces quality accidents, reduces project cost.
Description of the drawings
Fig. 1 is the structure diagram of the prior art drawn and dig spread foundation;
Fig. 2 is to draw the structure diagram dug when spread foundation crater wall is caved in the prior art;
Fig. 3 is the structure diagram of the present invention;
Fig. 4 is the structure diagram of middle and upper part column of the present invention;
Fig. 5 is the structure diagram of middle and upper part column of the present invention and middle part column portion;
Fig. 6 is the structure diagram of central post of the present invention and expanded head part point;
Fig. 7 is that the present invention places the structure diagram after steel reinforcement cage;
Wherein, 1- columns, 2- expansions head, 3- Rock And Soils, 4- steel reinforcement cages, 5- concrete, 11- bottom columns, 12- middle parts are vertical Column, 13- tops column, 111- screed A, 112- brick layer A, 121- screed B, 122- brick layer B, 131- screed C, 132- bricks Brick layer under screed, 222- under the upper screeds of layer C, 211-, the upper brick layer of 212-, 221-.
Specific embodiment
The effect of to make to structure feature of the invention and being reached, has a better understanding and awareness, to preferable Embodiment and attached drawing cooperation detailed description, are described as follows:
As shown in figure 3, one kind of the present invention, which extends out lamination type, draws digging spread foundation, including column 1 and expand head 2, stand Column 1 is mounted in the way of the prior art expands 2 top of head.Steel reinforcement cage 4 is inserted in column 1 and expands in head 2 and poured by concrete 5 It is fixed, so as to basis of formation.
As shown in Figure 3 and Figure 6, expand head 2 and include upper expansion head 21 and lower expansion head 22, upper expansion head 21 is diagonally-installed in lower expansion head 22 On, upper expansion head 21 is in the formula that extends out on the basis of lower expansion head 22, and upper expansion head 21 is pressed in lower 22 top of expansion head, is formed and is laminated knot Structure.The lower lowest level for expanding head 22 and being located at entire basis, conventional foundation side of the prior art may be used in the lower lower part for expanding head 22 Formula can also be directly installed on Rock And Soil 3.The lower outer wall for expanding head 22 is followed successively by lower screed 221 and lower brick layer from outside to inside 222, lower screed 221 can be cement mortar, and the brick body of lower brick layer 222 can be clay brick.It is lower sand i.e. close to Rock And Soil 3 Pulp layer 221 carries out retaining wall for Rock And Soil 3 using lower screed 221, reuses lower brick layer 222 and lower screed 221 is protected Wall.Equally, the upper outer wall for expanding head 21 is followed successively by screed 211 and upper brick layer 212 from outside to inside.Due to upper expansion 21 oblique peace of head Mounted in lower expansion head 22, for the two to extend out lamination type, the Rock And Soil 3 in upper screed screed 221 below 211 outside is oblique as its That glides puts forth effort to support, i.e., the lower part of upper screed 211 is located on the Rock And Soil 3 in lower 221 outside of screed, and due to upper sand Pulp layer 211 is oblique structure, therefore the lower part of upper screed 211 is against on the Rock And Soil 3 in lower 221 outside of screed.Similarly, on Brick layer screed 221 below 212 and the joining place of lower brick layer 222 are puted forth effort to support as its oblique downslide, under upper brick layer 212 Portion is against lower screed 221 and the joining place of lower brick layer 222.By upper screed 211, upper brick layer 212 and lower screed 221, The levels design of lower brick layer 222 realizes the lamination for expanding head 21 on lower expansion head 22, and due under upper expansion head 21 dislocation It is pressed on lower expansion head 22, also forms extending out in structure.
As shown in Fig. 3, Fig. 4 and Fig. 5, column 1 be frustum cone structure, i.e., up-narrow and down-wide structure.Column 1 includes bottom column 11 With middle part column 12, middle part column 12 is diagonally-installed in bottom column 11, and bottom column 11 and middle part column 12 are also formed outside Expand lamination type.Similarly, the outer wall of bottom column 11 is followed successively by screed A111 and brick layer A112 from outside to inside, middle part column 12 Outer wall is followed successively by screed B121 and brick layer B122 from outside to inside.Expand head 21 as lower support in this more than 11 bottom column, sand Pulp layer A111 more thans screed 211 and the joining place of upper 211 outside Rock And Soil 3 of screed are puted forth effort to prop up as its oblique downslide Support, brick layer A112 more thans screed 211 and the joining place of upper brick layer 212 are puted forth effort to support as its oblique downslide, therefore, bottom Column 11 forms extending out in structure based on upper expansion head 21 and is laminated.Similarly, screed B121 with screed A111 on the outside of Rock And Soil 3 is puted forth effort to support as its oblique downslide, brick layer B122 using the joining place of screed A111 and brick layer A112 as Its oblique downslide is puted forth effort to support, and therefore, middle part column 12 forms extending out in structure based on bottom column 11 and is laminated. This, the longitudinal length of brick layer A112 can be 115mm-345mm, i.e. brick layer A112 can be superimposed by 1-5 blocks brick and be formed.
According to digging in-situ needs, column 1 can also include top column 13, and top column 13 is diagonally-installed to be stood at middle part On column 12, top column 13 is based on the formation of middle part column 12 and extends out lamination type.Similarly, the outer wall of top column 13 from outside to inside according to Secondary is screed C131 and brick layer C132, and screed C131 is using the Rock And Soil 3 on the outside of screed B121 as its oblique downslide Put forth effort to support, brick layer C132 puts forth effort to support using the joining place of screed B121 and brick layer B122 as its oblique downslide.
A kind of lamination type that extends out also is provided herein and draws the construction method for digging spread foundation, in construction method of the present invention, first The excavation construction of 1 part of column is carried out, then expand the excavation construction of 2 part of head, is included the following steps:
The first step, the construction of 1 part of column carry out applying for top column 13, middle part column 12 and bottom column 11 successively Work.Due to the structure all same of top column 13, middle part column 12 and bottom column 11, top column 13 is elaborated herein Construction method, middle part column 12 and bottom column 11 are carried out with reference to the construction method of top column 13, i.e. middle part column 12 and bottom The construction method of portion's column 11 is identical with the construction method of top column 13.
As shown in figure 4, the construction method of top column 13 includes the following steps:
(1)On the basis of tower leg Center stake position is according to design stake diameter extend out it is oblique draw digging operation, what is extended out is specific Size is calculated according to implementation on-site soil environment, required withdrawal resistance by calculation of the prior art.
(2)After drawing digging depth and reaching 0.5m-1.5m, on top, column 13 is first made again along its sideline using cement mortar retaining wall Retaining wall is built by laying bricks or stones with clay brick blended cement mortar is secondary, is built by laying bricks or stones always to the aperture of top column 13.
(3)After the curing age that the adhesion strength between the clay brick in 13 sideline of top column reaches needed for design strength, The oblique construction drawn digging reaming, carry out middle part column 12 still further below.
Second step expands the construction of 2 part of head, after the completion for the treatment of that bottom column 11 is constructed, carries out expanding head 21 and lower expansion successively First 22 construction.
(1)The upper construction procedure for expanding head 21 includes:Downward oblique reaming is deep-cut on the basis of bottom column 11.Equally, It first reuses that clay brick blended cement mortar is secondary to build retaining wall by laying bricks or stones using cement mortar retaining wall in upper expansion 21 upper edge of head its sideline, protects After card clay brick forms arching between each other, then carry out the lower construction for expanding head 22.
(2)The lower construction procedure for expanding head 22 includes:Oblique reaming downwards is deep-cut on the basis of upper expansion head 21.Equally, exist Lower expansion 22 upper edge of head its sideline first reuses that clay brick blended cement mortar is secondary to build retaining wall, lower expansion by laying bricks or stones using cement mortar retaining wall First 22 retaining wall clay brick should be fitted closely with the lower bottom hole for expanding head 22.Treat that the lower retaining wall clay for expanding head 22 and cement mortar brick glue After knotting strength reaches the curing age needed for design strength, steel reinforcement cage 4 is put into, pouring for concrete 5 is carried out, meets concrete 5 After maintaining age, which comes into operation.
Basic principle, main feature and the advantages of the present invention of the present invention has been shown and described above.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and what is described in the above embodiment and the description is only the present invention Principle, various changes and improvements may be made to the invention without departing from the spirit and scope of the present invention, these variation and Improvement is both fallen in the range of claimed invention.The present invention claims protection domain by appended claims and its Equivalent defines.

Claims (7)

1. one kind extends out lamination type and draws digging spread foundation, including column(1)With expansion head(2), column(1)Mounted on expansion head(2)On Side, steel reinforcement cage(4)It is inserted in column(1)With expansion head(2)It is interior and pass through concrete(5)Pour fixation, it is characterised in that:
The expansion head(2)Including upper expansion head(21)With lower expansion head(22), upper expansion head(21)It is diagonally-installed in lower expansion head(22)On; The lower expansion head(22)Outer wall be followed successively by lower screed from outside to inside(221)With lower brick layer(222), the upper expansion head(21)'s Outer wall is followed successively by screed from outside to inside(211)With upper brick layer(212), upper screed(211)Following screed(221)Outside Rock And Soil(3)Put forth effort to support as its oblique downslide, upper brick layer(212)Following screed(221)With lower brick layer(222)'s Joining place is puted forth effort to support as its oblique downslide;
The column(1)Including bottom column(11)With middle part column(12), middle part column(12)It is diagonally-installed to be stood in bottom Column(11)On;The bottom column(11)Outer wall be followed successively by screed A from outside to inside(111)With brick layer A(112), in described Portion's column(12)Outer wall be followed successively by screed B from outside to inside(121)With brick layer B(122), screed A(111)More than screed (211)With upper screed(211)Outside Rock And Soil(3)Joining place put forth effort to support as its oblique downslide, brick layer A(112) More than screed(211)With upper brick layer(212)Joining place put forth effort to support as its oblique downslide, screed B(121)With sand Pulp layer A(111)The Rock And Soil in outside(3)Put forth effort to support as its oblique downslide, brick layer B(122)With screed A(111)With Brick layer A(112)Joining place to put forth effort to support as its oblique downslide.
2. one kind according to claim 1 extends out lamination type and draws digging spread foundation, it is characterised in that:The column(1) For frustum cone structure.
3. one kind according to claim 1 extends out lamination type and draws digging spread foundation, it is characterised in that:The lower screed (221)For cement mortar, the lower brick layer(222)Brick body be clay brick.
4. one kind according to claim 1 extends out lamination type and draws digging spread foundation, it is characterised in that:The column(1) Further include top column(13), top column(13)It is diagonally-installed in middle part column(12)On;The top column(13)It is outer Wall is followed successively by screed C from outside to inside(131)With brick layer C(132), screed C(131)With screed B(121)The ground in outside Body(3)Put forth effort to support as its oblique downslide, brick layer C(132)With screed B(121)With brick layer B(122)Joining place make Put forth effort to support for its oblique downslide.
5. one kind according to claim 1 extends out lamination type and draws digging spread foundation, it is characterised in that:The brick layer A (112)Longitudinal length be 115mm-345mm.
6. a kind of lamination type that extends out according to claim 4 draws the construction method for digging spread foundation, which is characterized in that including Following steps:
61)Column(1)Partial construction carries out top column successively(13), middle part column(12)And bottom column(11)Apply Work;
62)Expand head(2)Partial construction carries out expansion head successively(21)With lower expansion head(22)Construction;
Upper expansion head(21)Construction procedure include:In bottom column(11)On the basis of downwards oblique reaming deep-cut;In upper expansion head (21)Its sideline of upper edge first reuses that clay brick blended cement mortar is secondary to build retaining wall by laying bricks or stones using cement mortar retaining wall, ensures clay After brick forms arching between each other, then carry out lower expansion head(22)Construction;
Lower expansion head(22)Construction procedure include:In upper expansion head(21)On the basis of downwards oblique reaming deep-cut;In lower expansion head (22)Its sideline of upper edge first reuses that clay brick blended cement mortar is secondary to build retaining wall, lower expansion head by laying bricks or stones using cement mortar retaining wall (22)Retaining wall clay brick should be with lower expansion head(22)Bottom hole fit closely;Treat lower expansion head(22)Retaining wall clay and cement mortar After brick adhesion strength reaches the curing age needed for design strength, it is put into steel reinforcement cage(4), carry out concrete(5)Pour, meet Concrete(5)After maintaining age, which comes into operation.
7. a kind of lamination type that extends out according to claim 6 draws the construction method for digging spread foundation, which is characterized in that described Top column(13)Construction method include the following steps:
71)On the basis of tower leg Center stake position is according to design stake diameter extend out and oblique draw digging operation;
72)After drawing digging depth and reaching 0.5m-1.5m, in top column(13)It is first reused along its sideline using cement mortar retaining wall Clay brick blended cement mortar is secondary to build retaining wall by laying bricks or stones, is built by laying bricks or stones always to top column(13)Aperture;
73)Treat top column(13)After adhesion strength between the clay brick in sideline reaches the curing age needed for design strength, then It is oblique downwards to draw digging reaming, carry out middle part column(12)Construction.
CN201610284990.5A 2016-04-27 2016-04-27 One kind extends out lamination type and draws digging spread foundation and its construction method Active CN105756078B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610284990.5A CN105756078B (en) 2016-04-27 2016-04-27 One kind extends out lamination type and draws digging spread foundation and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610284990.5A CN105756078B (en) 2016-04-27 2016-04-27 One kind extends out lamination type and draws digging spread foundation and its construction method

Publications (2)

Publication Number Publication Date
CN105756078A CN105756078A (en) 2016-07-13
CN105756078B true CN105756078B (en) 2018-06-19

Family

ID=56323267

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610284990.5A Active CN105756078B (en) 2016-04-27 2016-04-27 One kind extends out lamination type and draws digging spread foundation and its construction method

Country Status (1)

Country Link
CN (1) CN105756078B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111622215A (en) * 2020-06-05 2020-09-04 宁波市鄞州建筑有限公司 Building pile foundation construction method
CN113445510B (en) * 2021-08-06 2022-05-03 江苏兰馨园林有限公司 Method for opening high-compactness building foundation pit

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1111308A (en) * 1993-06-18 1995-11-08 孟凡林 Design and construction method for large calibre poured pile and large-diameter bottom-enlarging pier
CN2871648Y (en) * 2005-12-02 2007-02-21 郑百翔 Manhole-pile expanding head
CN203440814U (en) * 2013-09-13 2014-02-19 湖北省工业建筑集团有限公司 Manually excavated pile structure
CN104343130A (en) * 2013-07-25 2015-02-11 五冶集团上海有限公司 Large-diameter manual hole digging expanded base pile foundation construction method
CN204570667U (en) * 2015-01-05 2015-08-19 江苏建筑职业技术学院 Hand excavated pile aperture safety device
CN205636774U (en) * 2016-04-27 2016-10-12 中国能源建设集团安徽省电力设计院有限公司 It draws to dig and expands subbottom plinth to expand lamination formula outward

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1111308A (en) * 1993-06-18 1995-11-08 孟凡林 Design and construction method for large calibre poured pile and large-diameter bottom-enlarging pier
CN2871648Y (en) * 2005-12-02 2007-02-21 郑百翔 Manhole-pile expanding head
CN104343130A (en) * 2013-07-25 2015-02-11 五冶集团上海有限公司 Large-diameter manual hole digging expanded base pile foundation construction method
CN203440814U (en) * 2013-09-13 2014-02-19 湖北省工业建筑集团有限公司 Manually excavated pile structure
CN204570667U (en) * 2015-01-05 2015-08-19 江苏建筑职业技术学院 Hand excavated pile aperture safety device
CN205636774U (en) * 2016-04-27 2016-10-12 中国能源建设集团安徽省电力设计院有限公司 It draws to dig and expands subbottom plinth to expand lamination formula outward

Also Published As

Publication number Publication date
CN105756078A (en) 2016-07-13

Similar Documents

Publication Publication Date Title
CN103993611B (en) A kind of deep layer rotating spraying cement-soil plate and anchor pole combine the construction method of anti-floating pile raft structure
CN103993598B (en) One is drawn hole and is implanted cloth bag crushed stone grouting pile and construction method
CN206396816U (en) A kind of blower foundation various dimensions ruggedized construction
CN102864781A (en) Foundation pit supporting method utilizing inclined piles
CN103541352B (en) A kind of at ground, sandy soil stratum major diameter Vertical spots underground continuous construction method
CN102071698B (en) Construction method of beddings of foundation downward overturn beam and pile cap
CN103510510A (en) Reinforced long spiral drilling concrete grouting pile and construction method thereof
CN107842046A (en) A kind of strengthening of foundation error-correction structure and the method for strengthening of foundation correction
CN105133575A (en) Suspended formwork supporting device for casting lining on surface of underground continuous wall and construction method
CN105756078B (en) One kind extends out lamination type and draws digging spread foundation and its construction method
CN108797578A (en) Crushed stone grouting pile and its construction method with classification enlarged footing
CN108316328A (en) A kind of pressurization sinking device and its construction method for open caisson construction
CN104131566B (en) A kind of basement is without the construction method of horizontal support foundation ditch
CN205954638U (en) Half semi -rigid flexible supporting construction of deep basal pit lateral wall
CN102134861B (en) Method for testing precast pile in soil body
CN106480878A (en) A kind of upper and lower part expansion type soil cement is combined pile tube
CN203866852U (en) Anti-floating pile structure composited by deep spiral-spraying cement soil plate and anchor rod
CN104005416B (en) The processing method of large diameter hole stake collapse hole under the conditions of a kind of plain fill back-pressure for high gradient slope
CN103938651B (en) The stake of Large stone porous concrete and treatment process of composite foundation thereof under water
CN105421477A (en) Construction method for tower crane foundation
CN105421488B (en) The construction method of sole plate support replacement in the combined fender construction system of underground
CN106193120A (en) Basement is encorbelmented, and base plate is inverse makees structure and construction method
CN205636774U (en) It draws to dig and expands subbottom plinth to expand lamination formula outward
CN103498476B (en) Major-diameter hole-forming pile pier foundation and net foundation slab reverse building construction method
CN106284397B (en) A kind of diagonal brace concrete column solid protection deep-excavation tower crane base apparatus

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant