CN106545034B CN201510592006.7A CN201510592006A CN106545034B CN 106545034 B CN106545034 B CN 106545034B CN 201510592006 A CN201510592006 A CN 201510592006A CN 106545034 B CN106545034 B CN 106545034B
Authority
CN
China
Prior art keywords
exterior wall
water
template
hole
steel plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510592006.7A
Other languages
Chinese (zh)
Other versions
CN106545034A (en
Inventor
王洋
曹杨
谭志斌
王湫
宋威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201510592006.7A priority Critical patent/CN106545034B/en
Publication of CN106545034A publication Critical patent/CN106545034A/en
Application granted granted Critical
Publication of CN106545034B publication Critical patent/CN106545034B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to contrary sequence method external wall constructions.A kind of contrary sequence method exterior wall horizontal construction joint steel plate water stopper concreting method, comprising: in the upper plate exterior wall formwork stage, in outer wall template bottom interval 2~3m horizontal distance reserving hole;It makes corresponding size and does not include the upper plate outer wall template bottom of three face flitch boxes filling of interior outside, bottom side, and fixed with outer template;Next plate outer wall template supporting stage, in hole periphery supporting brake shoulder template, template inner distance hole 3~5cm of avris;After the completion of formwork, when pouring next plate exterior wall concrete from hole, concrete obliquely flow, cooperation is vibrated, and makes outer space in the closely knit steel plate for sealing water of Concrete Filled;The local sealing in place is stayed at hole, is realized using smearing water-stop glue or expansion water-stop band;After next plate exterior wall concrete reaches certain coagulation result, form removal completes upper and lower plate exterior wall concrete horizontal construction joint steel plate water-stopping belt construction.More preferably, cost savings are considerable for water-stagnating effect of the present invention.

Description

Contrary sequence method exterior wall horizontal construction joint steel plate water stopper concreting method
Technical field
The present invention relates to the construction methods of contrary sequence method external wall construction more particularly to contrary sequence method exterior wall horizontal construction joint.
Background technique
For contrary sequence method underground engineering construction, if applied using steel plate water stopper as upper and lower two board walls joining place level Before work seam waterproof measure includes lower plate wall form supporting, need in addition to be arranged elongated brake shoulder the pouring as concrete of horizontal direction Mouthful, and brake shoulder top surface should be higher by the certain elevation in lower plate wall top face, and it is poor with the concrete pressure for guaranteeing certain, by lower concrete " extruding " enters on the outside of steel plate for sealing water, makes concrete and steel plate for sealing water collective effect, and then reaches and prevent external Groundwater infiltration Purpose.As can be seen that concreting, quality of vibrating quality are directly related on the outside of steel plate for sealing water for common process The water-stagnating effect of steel plate water stopper.In common process operating process, since space limits, vibrating head can not be inserted into steel plate for sealing water Outside carries out concrete vibrating, and brake shoulder height goes out pressure provided by next plate exterior wall elevation of top surface and is difficult sufficiently to press concrete Enter on the outside of steel plate for sealing water, the compactness of outside concrete and its hardly result in guarantee with effective bond effect of steel plate for sealing water, And then influence the waterproof effect of steel plate water stopper.Actual practice shows that common process water-stagnating effect is bad.
Summary of the invention
Present invention seek to address that the defect of the prior art, it is mixed to provide a kind of contrary sequence method exterior wall horizontal construction joint steel plate water stopper Solidifying soil casting method.More preferably, cost savings are considerable for water-stagnating effect of the present invention.
The present invention is implemented as follows: a kind of contrary sequence method exterior wall horizontal construction joint steel plate water stopper concreting method, It includes:
Step 1, in the upper plate exterior wall formwork stage, in outer wall template bottom interval 2~3m horizontal distance reserve 40cm × 40cm or 50cm × 50cm wide high hole;
Step 2 makes corresponding 40cm × 40cm or 50cm × 50cm wide height and does not include the three faces wood of interior outside, bottom side Square box inserts upper plate outer wall template bottom, and fixes with outer template;
Step 3, next plate outer wall template supporting stage, at hole periphery supporting brake shoulder template, template inner distance hole 3~5cm of avris;
Step 4 after the completion of formwork, when pouring next plate exterior wall concrete from hole, makes concrete under Gravitative Loads Obliquely flow, cooperation are vibrated to a certain degree, make outer space in the closely knit steel plate for sealing water of Concrete Filled;
The local sealing in place is stayed at step 5, hole, can be real using the traditional approach such as water-stop glue or expansion water-stop band are smeared It is existing;
Step 6, after next plate exterior wall concrete reaches certain coagulation result, it is mixed to complete upper and lower plate exterior wall for form removal Solidifying soil horizontal construction joint steel plate water-stopping belt construction.
Water-stagnating effect of the present invention is more preferably: so that steel plate water stopper sensitive part --- concreting matter on the outside of steel plate for sealing water Amount is guaranteed, and realizes more preferable water-stagnating effect.Cost savings are considerable: so that between common process is continuous, elongated setting brake shoulder is changed to Every, local setting brake shoulder, concrete, template cost are saved;Better water-stagnating effect saves later period leaking-stopping measure cost.
Specific embodiment
A kind of contrary sequence method exterior wall horizontal construction joint steel plate water stopper concreting method, it includes:
Step 1, in the upper plate exterior wall formwork stage, in outer wall template bottom interval 2~3m horizontal distance reserve 40cm × 40cm or 50cm × 50cm wide high hole;
Step 2 makes corresponding 40cm × 40cm or 50cm × 50cm wide height and does not include the three faces wood of interior outside, bottom side Square box inserts upper plate outer wall template bottom, and fixes with outer template;
Step 3, next plate outer wall template supporting stage, at hole periphery supporting brake shoulder template, template inner distance hole 3~5cm of avris;
Step 4 after the completion of formwork, when pouring next plate exterior wall concrete from hole, makes concrete under Gravitative Loads Obliquely flow, cooperation are vibrated to a certain degree, make outer space in the closely knit steel plate for sealing water of Concrete Filled;
The local sealing in place is stayed at step 5, hole, can be real using the traditional approach such as water-stop glue or expansion water-stop band are smeared It is existing;
Step 6, after next plate exterior wall concrete reaches certain coagulation result, it is mixed to complete upper and lower plate exterior wall for form removal Solidifying soil horizontal construction joint steel plate water-stopping belt construction.

Claims (1)

1. a kind of contrary sequence method exterior wall horizontal construction joint steel plate water stopper concreting method, which is characterized in that it includes:
Step 1 reserved 40cm × 40cm in outer wall template bottom interval 2~3m horizontal distance in the upper plate exterior wall formwork stage Or the hole that 50cm × 50cm wide is high;
Step 2 makes corresponding 40cm × 40cm or 50cm × 50cm wide height and does not include three face flitch boxes of interior outside, bottom side Upper plate outer wall template bottom is inserted, and is fixed with outer template;
Step 3, next plate outer wall template supporting stage, in hole periphery supporting brake shoulder template, template inner distance hole avris 3~5cm;
Step 4 after the completion of formwork, when pouring next plate exterior wall concrete from hole, keeps concrete oblique under Gravitative Loads Flowing, cooperation are vibrated to a certain degree, make outer space in the closely knit steel plate for sealing water of Concrete Filled;
Step 5, hole are stayed the local sealing in place, are realized using water-stop glue or expansion water-stop is smeared with mode;
Step 6, after next plate exterior wall concrete reaches certain coagulation result, form removal completes upper and lower plate exterior wall concrete Horizontal construction joint steel plate water-stopping belt construction.
CN201510592006.7A 2015-09-17 2015-09-17 Contrary sequence method exterior wall horizontal construction joint steel plate water stopper concreting method Active CN106545034B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510592006.7A CN106545034B (en) 2015-09-17 2015-09-17 Contrary sequence method exterior wall horizontal construction joint steel plate water stopper concreting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510592006.7A CN106545034B (en) 2015-09-17 2015-09-17 Contrary sequence method exterior wall horizontal construction joint steel plate water stopper concreting method

Publications (2)

Publication Number Publication Date
CN106545034A CN106545034A (en) 2017-03-29
CN106545034B true CN106545034B (en) 2019-01-11

Family

ID=58362793

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510592006.7A Active CN106545034B (en) 2015-09-17 2015-09-17 Contrary sequence method exterior wall horizontal construction joint steel plate water stopper concreting method

Country Status (1)

Country Link
CN (1) CN106545034B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5826123A (en) * 1981-08-07 1983-02-16 Toshiba Corp Construction of water-proof concrete wall
CN102409701A (en) * 2011-08-12 2012-04-11 天津二十冶建设有限公司 Concrete wall construction joint processing method and structure
CN103161181A (en) * 2013-04-02 2013-06-19 中建城市建设发展有限公司 Underground outer wall construction joint water-stopping structure and construction method thereof
CN204298860U (en) * 2014-10-30 2015-04-29 中国建筑第八工程局有限公司 Lid digs the inverse side wall construction joint waterproofing node that does and constructs
CN104790381A (en) * 2013-11-26 2015-07-22 中冶天工集团有限公司 Lining wall concrete pouring inversing method based on UEA micro-expanding agent

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5826123A (en) * 1981-08-07 1983-02-16 Toshiba Corp Construction of water-proof concrete wall
CN102409701A (en) * 2011-08-12 2012-04-11 天津二十冶建设有限公司 Concrete wall construction joint processing method and structure
CN103161181A (en) * 2013-04-02 2013-06-19 中建城市建设发展有限公司 Underground outer wall construction joint water-stopping structure and construction method thereof
CN104790381A (en) * 2013-11-26 2015-07-22 中冶天工集团有限公司 Lining wall concrete pouring inversing method based on UEA micro-expanding agent
CN204298860U (en) * 2014-10-30 2015-04-29 中国建筑第八工程局有限公司 Lid digs the inverse side wall construction joint waterproofing node that does and constructs

Also Published As

Publication number Publication date
CN106545034A (en) 2017-03-29

Similar Documents

Publication Publication Date Title
CN106223360A (en) Use the open cut cast in place and precast construction subway station construction method of stake supporting system
CN102758456B (en) Construction method of basement waterproofing projects
CN106499070B (en) The construction method of connecting sewing between assembled architecture component and component
CN104458532B (en) Device and method for testing water permeability resistance of concrete joint under action of controllable lateral restriction
CN205557856U (en) Leakage structure is prevented at building expansion joint
CN106120870A (en) The advanced enclosed construction of poured band of outer wall of basement and construction method
CN106545034B (en) Contrary sequence method exterior wall horizontal construction joint steel plate water stopper concreting method
CN204059417U (en) A kind of complete inverse impervious node structure of method wall beam
CN206769180U (en) A kind of shaped steel hole prefabricated section through walls
CN108590680A (en) A kind of construction method that launching shaft foundation pit vertical section pours
CN104878741B (en) Post-grouting waterproof structure for wall joint of underground diaphragm wall and waterproof method thereof
CN201901941U (en) Building system combining precast concrete member and cast-in-place concrete template
CN207739281U (en) A kind of prefabricated piping lane device
CN104074354A (en) Plate-insertion type cast-in-place staircase template and use method of plate-insertion type cast-in-place staircase template
CN104746434B (en) Closure segment formwork system without dismantling outer formwork
CN106284999A (en) Assembled architecture haydite concrete batten of internal partition mounting process
CN207794610U (en) The support device corniced for installing exterior wall
CN107989070A (en) A kind of prefabricated piping lane device and its construction method
CN106381883B (en) Bar Seepage method through walls
CN207794321U (en) Monoblock type fills walling steel tie bar embedded part
CN208949729U (en) Concrete beam mould board device
CN208815562U (en) A kind of capping beam rapid construction device
CN104727557A (en) Method and structure for constructing concrete distributer in aluminum-alloy template system
CN202766970U (en) Cast-in-place outer vertical face seamless seal anchor structure
CN104131697B (en) Tool type formwork system for kitchen and bath concrete waterproof guide wall and construction method of tool type formwork system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant