CN106120870A CN201610664350.7A CN201610664350A CN106120870A CN 106120870 A CN106120870 A CN 106120870A CN 201610664350 A CN201610664350 A CN 201610664350A CN 106120870 A CN106120870 A CN 106120870A
Authority
CN
China
Prior art keywords
wall
basement
steel plate
post
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610664350.7A
Other languages
Chinese (zh)
Other versions
CN106120870B (en
Inventor
钱永军
陈添鹤
杨再岗
路远
钱兵成
李月彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jiashi (group) Co Ltd
Original Assignee
Shanghai Jiashi (group) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jiashi (group) Co Ltd filed Critical Shanghai Jiashi (group) Co Ltd
Priority to CN201610664350.7A priority Critical patent/CN106120870B/en
Publication of CN106120870A publication Critical patent/CN106120870A/en
Application granted granted Critical
Publication of CN106120870B publication Critical patent/CN106120870B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The present invention relates to a kind of advanced enclosed construction of poured band of outer wall of basement it is characterized in that, including closing plate (4), brick setting overcoat (5), waterproof layer (6), mortar levelling layer (7), junction steel plate (8), steel plate for sealing water (9), connecting peg (10) etc.;Close plate (4) mortar levelling layer (7) outside is assembled, by the raised item (43) of its upper and lower side with groove (44) is nested with one another and is linked as entirety by dowel (45) in vertical direction;Junction steel plate (8) one end snaps in the draw-in groove (48) closed on plate (4), which is provided with reinforcing bar through hole, penetrates horizontal bar and weld, and the other end is provided with alter-pouring strips mould plate fixing connection screw rod (15).The invention belongs to industry and outer wall of basement and post empiricism field in civil buildings agent structure, there is advanced water-stopping, keep off native effective, that speed of application is fast feature, there is preferable technical economic benefit.

Description

The advanced enclosed construction of poured band of outer wall of basement and construction method
Technical field
The present invention relates to the advanced enclosed construction of poured band of outer wall of basement and construction method, belong to industry and civil buildings master Outer wall of basement and post empiricism field in body structure, be mainly used in advanced protection and the later stage of poured band of outer wall of basement Post-cast strip concrete pouring construction in.
Background technology
In the construction of outer wall of basement, due to single construction body of wall length restriction and construction in Deformation control want Ask, outer wall of basement needs arrange post-cast strip.The construction operation carried out before poured band of outer wall of basement is closed is not only There is potential safety hazard, and foreign material, rainwater are easily accessible in basement with construction water before post-cast strip is closed, and affect post-cast strip Pouring quality and normal construction.Poured band of outer wall of basement concreting time interval is longer, it is generally required to underground body junction Just carry out the pouring construction of post-cast strip after structure construction, therefore if do not carried out the advanced closing of post-cast strip, outdoor backfill can be made Operation can not be carried out, and installs the place providing necessary also can not to agent structure and equipment.
At present poured band of outer wall of basement is closed the concrete prefabricated closing plate of employing in advance and is constructed, its enclosed construction and Construction method document " card slot type formwork construction technology outside poured band of outer wall of basement (and " construction technology ", 2015,44 (23), disclosed in: 85-87) ", which solve the gear soil antiseepage problem of the advanced enclosed construction in post-cast strip, but still there are the following problems: (1) enclosed construction is assembled by polylith precoated plate, easily tilts, shifts in construction, closes when causing later stage post-cast strip to pour Structure serious displacement impact construction under malformation;(2) enclosed construction itself does not have barrier properties, becomes due to construction in outside When shape is bigger, waterproof layer tears and destroys, the waterproof of enclosed construction can not work;(3) outer wall of basement and post-cast strip coagulation It is complicated that soil pours formwork.
Summary of the invention
Present invention aims to the technical problem that the advanced enclosed construction of existing poured band of outer wall of basement exists, carry Go out the advanced enclosed construction in a kind of post-cast strip and construction method, use band draw-in groove and the closing plate on-site consolidation of watertight rubber bar And it is linked as entirety by dowel, steel plate for sealing water and accessory structure are set on closing plate simultaneously, reach sealing, gear soil, formwork Deng technique effect.
In order to realize above-mentioned technical purpose, present invention employs techniques below scheme:
A kind of advanced enclosed construction of poured band of outer wall of basement, it is characterised in that include closing plate, brick setting overcoat, waterproof Layer, mortar levelling layer, junction steel plate, steel plate for sealing water, connection peg, described brick setting overcoat builds by laying bricks or stones in campshed side within the walls, Outside lower outdoor wall, described waterproof layer is arranged on brick setting overcoat, arranges mortar levelling layer, described junction steel plate outside it Being provided with reinforcing bar through hole, the horizontal bar of framework of steel reinforcement is through reinforcing bar through hole and is welded on junction steel plate, described closing plate Upper and lower side raised item and groove is nested with one another and is linked as entirety, described junction steel plate one end by dowel in vertical direction Snap in the draw-in groove closed on plate, and filling flexible sealing material.
Described closing plate is made up of supported on both sides plate and panel;One layer of isolating membrane is set in gripper shoe;Close plate upper and lower side Being respectively provided with groove and raised item, groove surfaces is embedded with rubber strip, and rubber strip upper surface exceeds groove surfaces 2mm;Gripper shoe and Draw-in groove it is provided with between panel;Pre-buried pvc pipe in gripper shoe vertical direction, upper end is provided with cavity.
Described junction steel plate is L-shaped, and on its long limit, steel plate for sealing water and the connection peg of welding are respectively protruding into first to pour and execute In the post-cast strip of the outer wall of basement of work and after-pouring construction, its minor face is provided with the through hole of screw rod.
Utilize the method that the advanced enclosed construction of above-mentioned poured band of outer wall of basement carries out poured band of outer wall of basement construction, its Being characterised by, construction procedure is as follows:
Step one, brick setting overcoat building construction: along outer wall of basement build by laying bricks or stones with the outside of post-cast strip together with brick setting protection Layer;
Step 2, construction of waterproof layer: brick setting overcoat surface base cleaning is clean, smooth, the uniform application cold end in basic unit Seed oil, pastes waterproof roll to form waterproof layer;
Step 3, mortar levelling layer are constructed: one layer of mortar levelling layer of constructing on waterproof layer;
Step 4, closing plate are installed: prefabricated closing plate lifting put in place, and dowel passes closes the pvc pipe reserved on plate, Closing plate by bolt by every layer to fasten, the bolt after fastening is placed in cavity, and gripper shoe is pasted one layer of isolating membrane;
Step 5, tie with reinforcing bar and junction steel plate are fixed: the framework of steel reinforcement of colligation outer wall of basement, at outer wall of basement and The intersection of post-cast strip, the main muscle of horizontal full-length through the reserving hole on junction steel plate, junction steel plate is welded with steel plate for sealing water and Connecting peg, junction steel plate one end snaps in groove, and filling flexible sealing material, pre-through on junction steel plate minor face of screw rod Hole of boxing out is welded on framework of steel reinforcement;
Step 6, outer wall of basement inner side template are installed and casting concrete: outer wall of basement inner side template uses single side formwork Method is installed, and adopts and is bolted on screw rod, and casting concrete;
Step 7, backfill layer construction: after outer wall of basement concrete strength reaches requirement, brick setting overcoat and campshed wall it Between fill backfill layer, and remove outer wall of basement inner side template;
Step 8, post-cast strip inner side template are installed: main structure construction is complete and after stabilization, carries out post empiricism, clearly Except the framework of steel reinforcement surface rusty stain of post-cast strip, post-cast strip inner side template is installed;
Step 9, post-cast strip concreting: pour the concrete of post-cast strip, and vibration compacting;
Step 10, post-cast strip concrete curing form removal: after the concrete curing of post-cast strip, intensity reaches strength of mould stripping, waters after dismounting Band inner side template.
Further, in step 8, inner side template is made by plywood, uses level stupefied and perpendicular stupefied as shuttering supporting bone Frame, will erect stupefied being anchored on junction steel plate minor face by fastening bolt and screw rod.
The invention have the characteristics that and beneficial effect:
(1) band draw-in groove and the closing plate of watertight rubber bar are used and by the fastening of dowel, it is ensured that enclosed construction forms gear soil Support entirety, and itself there is sealing barrier properties, be prevented effectively from the outer muddy water of wall and infiltrate on the impact constructed;
(2) gripper shoe at plate two ends and outside brick setting overcoat (including waterproof layer and mortar levelling layer) are closed outside basement Using as outboard template during wall concreting, after construction completes, soil pressure and the hydraulic pressure of the soil that fillered after closing plate pass Passing on outer wall of basement, the existence of isolating membrane simultaneously ensures can be certainly in vertical direction between enclosed construction and outer wall of basement Deformed by dislocation;
(3) junction steel plate is provided with steel plate for sealing water and connects peg, it is ensured that strengthen basement while outer wall of basement barrier properties Bonding strength between exterior wall and post-cast strip, junction steel plate snaps in the interior also filling flexible sealing material of draw-in groove of enclosed construction, enters one Step improves the impermeability of post-cast strip;
(4) minor face of junction steel plate is provided with fixing link bolt hole and the screw rod of alter-pouring strips mould plate, facilitates propping up of alter-pouring strips mould plate If.
Accompanying drawing explanation
Fig. 1 is poured band of outer wall of basement advanced enclosed construction plane graph;
Fig. 2 is that post-cast strip is closed plate in advance and connects schematic three dimensional views;
Fig. 3 is node 1 detail;
Fig. 4 is node 2 thin portion three-dimensional detail drawing.
In figure: 1-outer wall of basement, 2-post-cast strip, 3-framework of steel reinforcement, 4-closes plate, and 5-brick setting overcoat, 6-is waterproof Layer, 7-mortar levelling layer, 8-junction steel plate, 9-steel plate for sealing water, 10-connects peg, 11-inner side template, and 12-level is stupefied, and 13-erects Stupefied, 14-fastening bolt, 15-screw rod, 16-flexibility sealing material, 17-backfills layer, 18-campshed wall, 19-water-stop curtain, 20-every From film, 41-gripper shoe, 42-panel, 43-raised item, 44-groove, 45-dowel, 46-cavity, 47-rubber strip, 48-draw-in groove, 49-PVC manages.
Detailed description of the invention
Being described in further detail the present invention below in conjunction with the accompanying drawings and by embodiment, following example are to the present invention Explanation be not limited to following example.
Fig. 1 is poured band of outer wall of basement advanced enclosed construction plane graph, and Fig. 2 is that post-cast strip is closed plate in advance and connects three Dimension schematic diagram, Fig. 3 is node 1 detail, and Fig. 3 is node 2 thin portion three-dimensional detail drawing.
With reference to shown in Fig. 1 ~ 3, this post-cast strip width 800mm, outer wall of basement thickness 300mm, advanced enclosed construction includes Close plate 4, brick setting overcoat 5, waterproof layer 6, mortar levelling layer 7, junction steel plate 8, steel plate for sealing water 9, connect peg 10 etc.
Closing plate 4 outer profile size is length 1200mm, highly 500mm, thickness 200mm, by supported on both sides plate 41 and panel 42 Constitute;Closing plate 4 upper and lower side and be respectively provided with groove 44 and raised item 43, groove 44 surface is embedded with rubber strip 47, on rubber strip 47 Surface exceeds groove 44 surface 2mm;Draw-in groove 48 it is provided with between gripper shoe 41 and panel 42;In gripper shoe 41 vertical direction pre-buried Pvc pipe 49, upper end is provided with cavity 46.
Brick setting overcoat 5 thickness 120mm, builds by laying bricks or stones inside campshed wall 18, outside outer wall of basement 1, and brick setting protects The waterproof layer 6 of a layer thickness 3mm is set inside layer 5, waterproof layer 6 arranges the mortar levelling layer 7 of 10mm.
Junction steel plate 8 thickness 6mm, which is provided with reinforcing bar through hole, and the horizontal bar of framework of steel reinforcement 3 is through reinforcing bar through hole also It is welded on junction steel plate 8.
Close the raised item 43 of the upper and lower side of plate 4 and groove 44 is nested with one another and is linked as in vertical direction by dowel 45 Entirety, described junction steel plate 8 one end snaps in the draw-in groove 48 closed on plate 4, and filling flexible sealing material 16.
Junction steel plate 8 is L-shaped, and steel plate for sealing water 9 and the connection peg 10 of welding on its long limit are respectively protruding into first to pour and execute In the post-cast strip 2 of the outer wall of basement 1 of work and after-pouring construction, its minor face is provided with the through hole of screw rod 15.
The construction procedure utilizing this advanced enclosed construction to carry out poured band of outer wall of basement 2 is as follows:
Step one, brick setting overcoat 5 building construction: together with building by laying bricks or stones along the outside of outer wall of basement 1 with post-cast strip 2, brick setting is prevented Sheath 5;
Step 2, waterproof layer 6 are constructed: brick setting overcoat 5 surface base cleaning is clean, smooth, and in basic unit, uniform application is cold Bottom oil, pastes waterproof roll to form waterproof layer 6;
Step 3, mortar levelling layer 7 are constructed: one layer of mortar levelling layer 7 of constructing on waterproof layer 6;
Step 4, closing plate 4 and install: prefabricated closing plate 4 lifting put in place, dowel 45 is reserved through closing on plate 4 Pvc pipe 49, is fastened every layer of closing plate 4 by bolt, and the bolt after fastening is placed in cavity 46, viscous one layer of note in gripper shoe 41 Isolating membrane 20;
Step 5, framework of steel reinforcement 3 colligation and junction steel plate 8 are fixed: the framework of steel reinforcement 3 of colligation outer wall of basement 1, outside basement Wall 1 and the intersection of post-cast strip 2, the main muscle of horizontal full-length, through the reserving hole on junction steel plate 8, junction steel plate 8 is only welded with Water steel plate 9 and connection peg 10, junction steel plate 8 one end snaps in groove 44, and filling flexible sealing material 16, and screw rod 15 passes Reserving hole on the minor face of junction steel plate 8 is welded on framework of steel reinforcement 3;
Step 6, outer wall of basement 1 inner side template are installed and casting concrete: outer wall of basement 1 inner side template uses one side Modulus method is installed, and adopts and is bolted on screw rod 15, and casting concrete;
Step 7, backfill layer 17 are constructed: after outer wall of basement 1 concrete strength reaches requirement, at brick setting overcoat 5 and campshed Fill backfill layer 17 between wall 18, and remove outer wall of basement 1 inner side template;
Step 8, post-cast strip 2 inner side template 11 are installed: main structure construction is complete and after stabilization, carries out post-cast strip 2 and executes Work, removes the framework of steel reinforcement 3 surface rusty stain of post-cast strip 2, installs post-cast strip 2 inner side template 11;
Step 9, post-cast strip 2 concreting: pour the concrete of post-cast strip 2, and vibration compacting;
Step 10, post-cast strip 2 concrete curing form removal: after the concrete curing of post-cast strip 2, intensity reaches strength of mould stripping, after dismounting Water band 2 inner side template 11.

Claims (5)

1. the advanced enclosed construction of poured band of outer wall of basement, it is characterised in that include closing plate (4), brick setting overcoat (5), waterproof layer (6), mortar levelling layer (7), junction steel plate (8), steel plate for sealing water (9), connect peg (10), described brick setting prevent Sheath (5) is built by laying bricks or stones in campshed wall (18) inner side, outer wall of basement (1) outside, and described waterproof layer (6) is arranged at brick setting overcoat (5) on, arranging mortar levelling layer (7) outside it, described junction steel plate (8) is provided with reinforcing bar through hole, the water of framework of steel reinforcement (3) Flat muscle through reinforcing bar through hole being welded on junction steel plate (8), the raised item (43) of the upper and lower side of described closing plate (4) and recessed Groove (44) is nested with one another and is linked as entirety by dowel (45) in vertical direction, and described junction steel plate (8) one end snaps in closing In draw-in groove (48) on plate (4), and filling flexible sealing material (16).
The advanced enclosed construction of poured band of outer wall of basement the most according to claim 1, it is characterised in that described closing plate (4) it is made up of supported on both sides plate (41) and panel (42);One layer of isolating membrane (20) is set in gripper shoe (41);Close on plate (4) Lower end is respectively provided with groove (44) and raised item (43), and groove (44) surface is embedded with rubber strip (47), rubber strip (47) upper surface Beyond groove (44) surface 2mm;Draw-in groove (48) it is provided with between gripper shoe (41) and panel (42);In gripper shoe (41) vertical direction Pre-buried pvc pipe (49), upper end is provided with cavity (46).
The advanced enclosed construction of poured band of outer wall of basement the most according to claim 1, it is characterised in that described junction steel plate (8) L-shaped, the steel plate for sealing water (9) that its long limit is welded and connection peg (10) are respectively protruding into the basement of first pouring construction In the post-cast strip (2) of exterior wall (1) and after-pouring construction, its minor face is provided with the through hole of screw rod (15).
4. utilize the claim 1-3 advanced enclosed construction of arbitrary described poured band of outer wall of basement to carry out poured band of outer wall of basement (2) method constructed, it is characterised in that construction procedure is as follows:
Step one, brick setting overcoat (5) building construction: one brick is built in the outside along outer wall of basement (1) and post-cast strip (2) by laying bricks or stones Masonry overcoat (5);
Step 2, waterproof layer (6) are constructed: brick setting overcoat (5) surface base cleaning is clean, smooth, is uniformly coated with in basic unit Smear adhesive bitument primer, paste waterproof roll to form waterproof layer (6);
Step 3, mortar levelling layer (7) are constructed: waterproof layer (6) one layer of mortar levelling layer (7) of upper construction;
Step 4, closing plate (4) are installed: prefabricated closing plate (4) lifting being put in place, dowel (45) is through closing plate (4) Upper reserved pvc pipe (49), closes plate (4) by bolt by every layer and fastens, and the bolt after fastening is placed in cavity (46), supports Plate (41) is upper pastes one layer of isolating membrane (20);
Step 5, framework of steel reinforcement (3) colligation and junction steel plate (8) are fixing: the framework of steel reinforcement (3) of colligation outer wall of basement (1), Outer wall of basement (1) and the intersection of post-cast strip (2), the main muscle of horizontal full-length, through the reserving hole on junction steel plate (8), connects Being welded with steel plate for sealing water (9) on steel plate (8) and connect peg (10), junction steel plate (8) one end snaps in groove (44), and fills soft Property sealing material (16), screw rod (15) is welded on framework of steel reinforcement (3) through the reserving hole on junction steel plate (8) minor face;
Step 6, outer wall of basement (1) inner side template are installed and casting concrete: outer wall of basement (1) inner side template uses single Collateral modulus method is installed, and adopts and is bolted on screw rod (15), and casting concrete;
Step 7, backfill layer (17) construction: after outer wall of basement (1) concrete strength reaches requirement, in brick setting overcoat (5) And between campshed wall (18), fill backfill layer (17), and remove outer wall of basement (1) inner side template;
Step 8, post-cast strip (2) inner side template (11) are installed: main structure construction is complete and after stabilization, carries out post-cast strip (2) construction, removes framework of steel reinforcement (3) the surface rusty stain of post-cast strip (2), installs post-cast strip (2) inner side template (11);
Step 9, post-cast strip (2) concreting: pour the concrete of post-cast strip (2), and vibration compacting;
Step 10, post-cast strip (2) concrete curing form removal: after post-cast strip (2) concrete curing, intensity reaches strength of mould stripping, tears open Except post-cast strip (2) inner side template (11).
Method the most according to claim 4, it is characterised in that in step 8, inner side template (11) is made by plywood, adopts With level stupefied (12) and perpendicular stupefied (13) as shuttering supporting skeleton, by fastening bolt (14) and screw rod (15) by tight to perpendicular stupefied (13) It is fixed on junction steel plate (8) minor face.
CN201610664350.7A 2016-08-12 2016-08-12 The advanced enclosed construction of poured band of outer wall of basement and construction method Active CN106120870B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610664350.7A CN106120870B (en) 2016-08-12 2016-08-12 The advanced enclosed construction of poured band of outer wall of basement and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610664350.7A CN106120870B (en) 2016-08-12 2016-08-12 The advanced enclosed construction of poured band of outer wall of basement and construction method

Publications (2)

Publication Number Publication Date
CN106120870A true CN106120870A (en) 2016-11-16
CN106120870B CN106120870B (en) 2018-03-16

Family

ID=57258814

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610664350.7A Active CN106120870B (en) 2016-08-12 2016-08-12 The advanced enclosed construction of poured band of outer wall of basement and construction method

Country Status (1)

Country Link
CN (1) CN106120870B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759843A (en) * 2016-12-27 2017-05-31 宁波二十冶建设有限公司 A kind of outer wall of basement waterproof construction and its construction method
CN108842827A (en) * 2018-08-07 2018-11-20 广东建星建造集团有限公司 Sidewall of basement backfill soil structure and sidewall of basement backfill shift to an earlier date construction method
CN110512657A (en) * 2019-09-26 2019-11-29 中国建筑第七工程局有限公司 A kind of prefab-form installed for poured band of outer wall of basement
CN110644538A (en) * 2019-10-22 2020-01-03 中联建设集团股份有限公司 Basement side wall extra front and back pouring belt periphery protection structure
CN111074950A (en) * 2019-12-31 2020-04-28 浙江世润建创科技发展有限公司 Pre-closed advanced water stop post-cast strip for basement outer wall and construction method
CN111424725A (en) * 2020-04-27 2020-07-17 浙江天苑景观建设有限公司 Basement post-cast strip erecting prefabricated template with protection structure
CN111749458A (en) * 2020-06-30 2020-10-09 武汉一冶建筑安装工程有限责任公司 Post-cast strip inner frame formwork construction method and support system
CN112411771A (en) * 2020-10-24 2021-02-26 北京中易房建筑工程有限公司 Steel plate mounting structure of basement outer wall post-cast strip and construction method
CN115162417A (en) * 2022-07-12 2022-10-11 浙江国兴建设集团有限公司 Seamless connection structure of basement outer wall and fender post and construction method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19526255C2 (en) * 1995-07-19 1998-07-02 Michael Sattlberger Corner connection for buildings constructed in block construction
CN101666125A (en) * 2009-09-15 2010-03-10 中建四局第三建筑工程有限公司 Sealing method and structure of late poured band of basement
JP4755359B2 (en) * 2001-05-09 2011-08-24 大成建設株式会社 Joint structure of reinforced concrete structure
CN202000380U (en) * 2011-01-27 2011-10-05 中建三局建设工程股份有限公司 Basement outer wall post-pouring belt backfill protective plate
CN104088304A (en) * 2014-07-03 2014-10-08 成都市第三建筑工程公司 Concrete member and underground outdoor wall post-cast strip construction method
CN204418229U (en) * 2014-12-26 2015-06-24 中誉远发国际建设集团有限公司 Poured band of outer wall of basement concrete draw-in groove
CN205954707U (en) * 2016-08-12 2017-02-15 上海嘉实(集团)有限公司 Leading enclosed construction in basement outer wall post -cast strip

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19526255C2 (en) * 1995-07-19 1998-07-02 Michael Sattlberger Corner connection for buildings constructed in block construction
JP4755359B2 (en) * 2001-05-09 2011-08-24 大成建設株式会社 Joint structure of reinforced concrete structure
CN101666125A (en) * 2009-09-15 2010-03-10 中建四局第三建筑工程有限公司 Sealing method and structure of late poured band of basement
CN202000380U (en) * 2011-01-27 2011-10-05 中建三局建设工程股份有限公司 Basement outer wall post-pouring belt backfill protective plate
CN104088304A (en) * 2014-07-03 2014-10-08 成都市第三建筑工程公司 Concrete member and underground outdoor wall post-cast strip construction method
CN204418229U (en) * 2014-12-26 2015-06-24 中誉远发国际建设集团有限公司 Poured band of outer wall of basement concrete draw-in groove
CN205954707U (en) * 2016-08-12 2017-02-15 上海嘉实(集团)有限公司 Leading enclosed construction in basement outer wall post -cast strip

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759843A (en) * 2016-12-27 2017-05-31 宁波二十冶建设有限公司 A kind of outer wall of basement waterproof construction and its construction method
CN108842827A (en) * 2018-08-07 2018-11-20 广东建星建造集团有限公司 Sidewall of basement backfill soil structure and sidewall of basement backfill shift to an earlier date construction method
CN110512657A (en) * 2019-09-26 2019-11-29 中国建筑第七工程局有限公司 A kind of prefab-form installed for poured band of outer wall of basement
CN110644538A (en) * 2019-10-22 2020-01-03 中联建设集团股份有限公司 Basement side wall extra front and back pouring belt periphery protection structure
CN111074950A (en) * 2019-12-31 2020-04-28 浙江世润建创科技发展有限公司 Pre-closed advanced water stop post-cast strip for basement outer wall and construction method
CN111074950B (en) * 2019-12-31 2021-08-13 浙江世润建创科技发展有限公司 Pre-closed advanced water stop post-cast strip for basement outer wall and construction method
CN111424725A (en) * 2020-04-27 2020-07-17 浙江天苑景观建设有限公司 Basement post-cast strip erecting prefabricated template with protection structure
CN111749458A (en) * 2020-06-30 2020-10-09 武汉一冶建筑安装工程有限责任公司 Post-cast strip inner frame formwork construction method and support system
CN112411771A (en) * 2020-10-24 2021-02-26 北京中易房建筑工程有限公司 Steel plate mounting structure of basement outer wall post-cast strip and construction method
CN115162417A (en) * 2022-07-12 2022-10-11 浙江国兴建设集团有限公司 Seamless connection structure of basement outer wall and fender post and construction method thereof

Also Published As

Publication number Publication date
CN106120870B (en) 2018-03-16

Similar Documents

Publication Publication Date Title
CN106120870A (en) The advanced enclosed construction of poured band of outer wall of basement and construction method
CN107326940B (en) basement advanced water stop post-cast strip structure and construction method thereof
CN105178357A (en) Prefabricated subsurface structure under foundation trench open cutting condition and construction method for prefabricated subsurface structure under foundation trench open cutting condition
CN205653820U (en) Basement post -cast strip advances plugging device
CN208167956U (en) A kind of basement inwall using reverse construction
CN105484391A (en) Construction method for manufacturing heat-preservation waterproof wall through light heat-preservation GRC disassembling-free formworks
CN107190782A (en) A kind of poured band of outer wall of basement structure and its construction method
CN111335490A (en) Crack-resistant structure at joint of filler wall and shear wall under full-concrete outer wall window and construction method of crack-resistant structure
CN210597399U (en) Post-cast strip structure applied to basement outer wall
CN105134009A (en) Sill coping concrete structure of frame structure infilled wall and construction method
CN106499070A (en) The construction method of connecting sewing between assembled architecture component and component
CN205954707U (en) Leading enclosed construction in basement outer wall post -cast strip
CN110080308A (en) A kind of novel late poured band structure and its construction method
CN107524174A (en) A kind of diaphragm wall I-shaped steel joint provided with water expandable waterstop
CN108951840A (en) Based on setting bracket single side formwork basement arc external wall construction method
CN205712204U (en) A kind of multiple waterstop and waterproof construction thereof
CN207110214U (en) A kind of prefabricated interior fill concrete wallboard
CN105821908A (en) Multiple water stop belt, waterproof structure and construction method of waterproof structure
CN210421182U (en) Basement roof post-cast strip seals structure in advance
CN107237448A (en) A kind of prefabricated interior fill concrete wallboard and its manufacture method
CN216787229U (en) Basement outer wall post-cast strip assembled shutoff steel sheet structure
CN212223970U (en) Prefabricated apron post-cast strip stagnant water temporary enclosed construction
CN105421725B (en) Exempt from formwork one-shot forming construction method in reserved residential ventilation road
CN205382595U (en) Integral shear force wall of steel pipe concrete edge constraint coincide
KR101774865B1 (en) A double wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant