CN106120870A - The advanced enclosed construction of poured band of outer wall of basement and construction method - Google Patents
The advanced enclosed construction of poured band of outer wall of basement and construction method Download PDFInfo
- Publication number
- CN106120870A CN106120870A CN201610664350.7A CN201610664350A CN106120870A CN 106120870 A CN106120870 A CN 106120870A CN 201610664350 A CN201610664350 A CN 201610664350A CN 106120870 A CN106120870 A CN 106120870A
- Authority
- CN
- China
- Prior art keywords
- wall
- basement
- steel plate
- post
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/16—Arrangement or construction of joints in foundation structures
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/02—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Hydrology & Water Resources (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The present invention relates to a kind of advanced enclosed construction of poured band of outer wall of basement it is characterized in that, including closing plate (4), brick setting overcoat (5), waterproof layer (6), mortar levelling layer (7), junction steel plate (8), steel plate for sealing water (9), connecting peg (10) etc.;Close plate (4) mortar levelling layer (7) outside is assembled, by the raised item (43) of its upper and lower side with groove (44) is nested with one another and is linked as entirety by dowel (45) in vertical direction;Junction steel plate (8) one end snaps in the draw-in groove (48) closed on plate (4), which is provided with reinforcing bar through hole, penetrates horizontal bar and weld, and the other end is provided with alter-pouring strips mould plate fixing connection screw rod (15).The invention belongs to industry and outer wall of basement and post empiricism field in civil buildings agent structure, there is advanced water-stopping, keep off native effective, that speed of application is fast feature, there is preferable technical economic benefit.
Description
Technical field
The present invention relates to the advanced enclosed construction of poured band of outer wall of basement and construction method, belong to industry and civil buildings master
Outer wall of basement and post empiricism field in body structure, be mainly used in advanced protection and the later stage of poured band of outer wall of basement
Post-cast strip concrete pouring construction in.
Background technology
In the construction of outer wall of basement, due to single construction body of wall length restriction and construction in Deformation control want
Ask, outer wall of basement needs arrange post-cast strip.The construction operation carried out before poured band of outer wall of basement is closed is not only
There is potential safety hazard, and foreign material, rainwater are easily accessible in basement with construction water before post-cast strip is closed, and affect post-cast strip
Pouring quality and normal construction.Poured band of outer wall of basement concreting time interval is longer, it is generally required to underground body junction
Just carry out the pouring construction of post-cast strip after structure construction, therefore if do not carried out the advanced closing of post-cast strip, outdoor backfill can be made
Operation can not be carried out, and installs the place providing necessary also can not to agent structure and equipment.
At present poured band of outer wall of basement is closed the concrete prefabricated closing plate of employing in advance and is constructed, its enclosed construction and
Construction method document " card slot type formwork construction technology outside poured band of outer wall of basement (and " construction technology ", 2015,44
(23), disclosed in: 85-87) ", which solve the gear soil antiseepage problem of the advanced enclosed construction in post-cast strip, but still there are the following problems:
(1) enclosed construction is assembled by polylith precoated plate, easily tilts, shifts in construction, closes when causing later stage post-cast strip to pour
Structure serious displacement impact construction under malformation;(2) enclosed construction itself does not have barrier properties, becomes due to construction in outside
When shape is bigger, waterproof layer tears and destroys, the waterproof of enclosed construction can not work;(3) outer wall of basement and post-cast strip coagulation
It is complicated that soil pours formwork.
Summary of the invention
Present invention aims to the technical problem that the advanced enclosed construction of existing poured band of outer wall of basement exists, carry
Go out the advanced enclosed construction in a kind of post-cast strip and construction method, use band draw-in groove and the closing plate on-site consolidation of watertight rubber bar
And it is linked as entirety by dowel, steel plate for sealing water and accessory structure are set on closing plate simultaneously, reach sealing, gear soil, formwork
Deng technique effect.
In order to realize above-mentioned technical purpose, present invention employs techniques below scheme:
A kind of advanced enclosed construction of poured band of outer wall of basement, it is characterised in that include closing plate, brick setting overcoat, waterproof
Layer, mortar levelling layer, junction steel plate, steel plate for sealing water, connection peg, described brick setting overcoat builds by laying bricks or stones in campshed side within the walls,
Outside lower outdoor wall, described waterproof layer is arranged on brick setting overcoat, arranges mortar levelling layer, described junction steel plate outside it
Being provided with reinforcing bar through hole, the horizontal bar of framework of steel reinforcement is through reinforcing bar through hole and is welded on junction steel plate, described closing plate
Upper and lower side raised item and groove is nested with one another and is linked as entirety, described junction steel plate one end by dowel in vertical direction
Snap in the draw-in groove closed on plate, and filling flexible sealing material.
Described closing plate is made up of supported on both sides plate and panel;One layer of isolating membrane is set in gripper shoe;Close plate upper and lower side
Being respectively provided with groove and raised item, groove surfaces is embedded with rubber strip, and rubber strip upper surface exceeds groove surfaces 2mm;Gripper shoe and
Draw-in groove it is provided with between panel;Pre-buried pvc pipe in gripper shoe vertical direction, upper end is provided with cavity.
Described junction steel plate is L-shaped, and on its long limit, steel plate for sealing water and the connection peg of welding are respectively protruding into first to pour and execute
In the post-cast strip of the outer wall of basement of work and after-pouring construction, its minor face is provided with the through hole of screw rod.
Utilize the method that the advanced enclosed construction of above-mentioned poured band of outer wall of basement carries out poured band of outer wall of basement construction, its
Being characterised by, construction procedure is as follows:
Step one, brick setting overcoat building construction: along outer wall of basement build by laying bricks or stones with the outside of post-cast strip together with brick setting protection
Layer;
Step 2, construction of waterproof layer: brick setting overcoat surface base cleaning is clean, smooth, the uniform application cold end in basic unit
Seed oil, pastes waterproof roll to form waterproof layer;
Step 3, mortar levelling layer are constructed: one layer of mortar levelling layer of constructing on waterproof layer;
Step 4, closing plate are installed: prefabricated closing plate lifting put in place, and dowel passes closes the pvc pipe reserved on plate,
Closing plate by bolt by every layer to fasten, the bolt after fastening is placed in cavity, and gripper shoe is pasted one layer of isolating membrane;
Step 5, tie with reinforcing bar and junction steel plate are fixed: the framework of steel reinforcement of colligation outer wall of basement, at outer wall of basement and
The intersection of post-cast strip, the main muscle of horizontal full-length through the reserving hole on junction steel plate, junction steel plate is welded with steel plate for sealing water and
Connecting peg, junction steel plate one end snaps in groove, and filling flexible sealing material, pre-through on junction steel plate minor face of screw rod
Hole of boxing out is welded on framework of steel reinforcement;
Step 6, outer wall of basement inner side template are installed and casting concrete: outer wall of basement inner side template uses single side formwork
Method is installed, and adopts and is bolted on screw rod, and casting concrete;
Step 7, backfill layer construction: after outer wall of basement concrete strength reaches requirement, brick setting overcoat and campshed wall it
Between fill backfill layer, and remove outer wall of basement inner side template;
Step 8, post-cast strip inner side template are installed: main structure construction is complete and after stabilization, carries out post empiricism, clearly
Except the framework of steel reinforcement surface rusty stain of post-cast strip, post-cast strip inner side template is installed;
Step 9, post-cast strip concreting: pour the concrete of post-cast strip, and vibration compacting;
Step 10, post-cast strip concrete curing form removal: after the concrete curing of post-cast strip, intensity reaches strength of mould stripping, waters after dismounting
Band inner side template.
Further, in step 8, inner side template is made by plywood, uses level stupefied and perpendicular stupefied as shuttering supporting bone
Frame, will erect stupefied being anchored on junction steel plate minor face by fastening bolt and screw rod.
The invention have the characteristics that and beneficial effect:
(1) band draw-in groove and the closing plate of watertight rubber bar are used and by the fastening of dowel, it is ensured that enclosed construction forms gear soil
Support entirety, and itself there is sealing barrier properties, be prevented effectively from the outer muddy water of wall and infiltrate on the impact constructed;
(2) gripper shoe at plate two ends and outside brick setting overcoat (including waterproof layer and mortar levelling layer) are closed outside basement
Using as outboard template during wall concreting, after construction completes, soil pressure and the hydraulic pressure of the soil that fillered after closing plate pass
Passing on outer wall of basement, the existence of isolating membrane simultaneously ensures can be certainly in vertical direction between enclosed construction and outer wall of basement
Deformed by dislocation;
(3) junction steel plate is provided with steel plate for sealing water and connects peg, it is ensured that strengthen basement while outer wall of basement barrier properties
Bonding strength between exterior wall and post-cast strip, junction steel plate snaps in the interior also filling flexible sealing material of draw-in groove of enclosed construction, enters one
Step improves the impermeability of post-cast strip;
(4) minor face of junction steel plate is provided with fixing link bolt hole and the screw rod of alter-pouring strips mould plate, facilitates propping up of alter-pouring strips mould plate
If.
Accompanying drawing explanation
Fig. 1 is poured band of outer wall of basement advanced enclosed construction plane graph;
Fig. 2 is that post-cast strip is closed plate in advance and connects schematic three dimensional views;
Fig. 3 is node 1 detail;
Fig. 4 is node 2 thin portion three-dimensional detail drawing.
In figure: 1-outer wall of basement, 2-post-cast strip, 3-framework of steel reinforcement, 4-closes plate, and 5-brick setting overcoat, 6-is waterproof
Layer, 7-mortar levelling layer, 8-junction steel plate, 9-steel plate for sealing water, 10-connects peg, 11-inner side template, and 12-level is stupefied, and 13-erects
Stupefied, 14-fastening bolt, 15-screw rod, 16-flexibility sealing material, 17-backfills layer, 18-campshed wall, 19-water-stop curtain, 20-every
From film, 41-gripper shoe, 42-panel, 43-raised item, 44-groove, 45-dowel, 46-cavity, 47-rubber strip, 48-draw-in groove,
49-PVC manages.
Detailed description of the invention
Being described in further detail the present invention below in conjunction with the accompanying drawings and by embodiment, following example are to the present invention
Explanation be not limited to following example.
Fig. 1 is poured band of outer wall of basement advanced enclosed construction plane graph, and Fig. 2 is that post-cast strip is closed plate in advance and connects three
Dimension schematic diagram, Fig. 3 is node 1 detail, and Fig. 3 is node 2 thin portion three-dimensional detail drawing.
With reference to shown in Fig. 1 ~ 3, this post-cast strip width 800mm, outer wall of basement thickness 300mm, advanced enclosed construction includes
Close plate 4, brick setting overcoat 5, waterproof layer 6, mortar levelling layer 7, junction steel plate 8, steel plate for sealing water 9, connect peg 10 etc.
Closing plate 4 outer profile size is length 1200mm, highly 500mm, thickness 200mm, by supported on both sides plate 41 and panel 42
Constitute;Closing plate 4 upper and lower side and be respectively provided with groove 44 and raised item 43, groove 44 surface is embedded with rubber strip 47, on rubber strip 47
Surface exceeds groove 44 surface 2mm;Draw-in groove 48 it is provided with between gripper shoe 41 and panel 42;In gripper shoe 41 vertical direction pre-buried
Pvc pipe 49, upper end is provided with cavity 46.
Brick setting overcoat 5 thickness 120mm, builds by laying bricks or stones inside campshed wall 18, outside outer wall of basement 1, and brick setting protects
The waterproof layer 6 of a layer thickness 3mm is set inside layer 5, waterproof layer 6 arranges the mortar levelling layer 7 of 10mm.
Junction steel plate 8 thickness 6mm, which is provided with reinforcing bar through hole, and the horizontal bar of framework of steel reinforcement 3 is through reinforcing bar through hole also
It is welded on junction steel plate 8.
Close the raised item 43 of the upper and lower side of plate 4 and groove 44 is nested with one another and is linked as in vertical direction by dowel 45
Entirety, described junction steel plate 8 one end snaps in the draw-in groove 48 closed on plate 4, and filling flexible sealing material 16.
Junction steel plate 8 is L-shaped, and steel plate for sealing water 9 and the connection peg 10 of welding on its long limit are respectively protruding into first to pour and execute
In the post-cast strip 2 of the outer wall of basement 1 of work and after-pouring construction, its minor face is provided with the through hole of screw rod 15.
The construction procedure utilizing this advanced enclosed construction to carry out poured band of outer wall of basement 2 is as follows:
Step one, brick setting overcoat 5 building construction: together with building by laying bricks or stones along the outside of outer wall of basement 1 with post-cast strip 2, brick setting is prevented
Sheath 5;
Step 2, waterproof layer 6 are constructed: brick setting overcoat 5 surface base cleaning is clean, smooth, and in basic unit, uniform application is cold
Bottom oil, pastes waterproof roll to form waterproof layer 6;
Step 3, mortar levelling layer 7 are constructed: one layer of mortar levelling layer 7 of constructing on waterproof layer 6;
Step 4, closing plate 4 and install: prefabricated closing plate 4 lifting put in place, dowel 45 is reserved through closing on plate 4
Pvc pipe 49, is fastened every layer of closing plate 4 by bolt, and the bolt after fastening is placed in cavity 46, viscous one layer of note in gripper shoe 41
Isolating membrane 20;
Step 5, framework of steel reinforcement 3 colligation and junction steel plate 8 are fixed: the framework of steel reinforcement 3 of colligation outer wall of basement 1, outside basement
Wall 1 and the intersection of post-cast strip 2, the main muscle of horizontal full-length, through the reserving hole on junction steel plate 8, junction steel plate 8 is only welded with
Water steel plate 9 and connection peg 10, junction steel plate 8 one end snaps in groove 44, and filling flexible sealing material 16, and screw rod 15 passes
Reserving hole on the minor face of junction steel plate 8 is welded on framework of steel reinforcement 3;
Step 6, outer wall of basement 1 inner side template are installed and casting concrete: outer wall of basement 1 inner side template uses one side
Modulus method is installed, and adopts and is bolted on screw rod 15, and casting concrete;
Step 7, backfill layer 17 are constructed: after outer wall of basement 1 concrete strength reaches requirement, at brick setting overcoat 5 and campshed
Fill backfill layer 17 between wall 18, and remove outer wall of basement 1 inner side template;
Step 8, post-cast strip 2 inner side template 11 are installed: main structure construction is complete and after stabilization, carries out post-cast strip 2 and executes
Work, removes the framework of steel reinforcement 3 surface rusty stain of post-cast strip 2, installs post-cast strip 2 inner side template 11;
Step 9, post-cast strip 2 concreting: pour the concrete of post-cast strip 2, and vibration compacting;
Step 10, post-cast strip 2 concrete curing form removal: after the concrete curing of post-cast strip 2, intensity reaches strength of mould stripping, after dismounting
Water band 2 inner side template 11.
Claims (5)
1. the advanced enclosed construction of poured band of outer wall of basement, it is characterised in that include closing plate (4), brick setting overcoat
(5), waterproof layer (6), mortar levelling layer (7), junction steel plate (8), steel plate for sealing water (9), connect peg (10), described brick setting prevent
Sheath (5) is built by laying bricks or stones in campshed wall (18) inner side, outer wall of basement (1) outside, and described waterproof layer (6) is arranged at brick setting overcoat
(5) on, arranging mortar levelling layer (7) outside it, described junction steel plate (8) is provided with reinforcing bar through hole, the water of framework of steel reinforcement (3)
Flat muscle through reinforcing bar through hole being welded on junction steel plate (8), the raised item (43) of the upper and lower side of described closing plate (4) and recessed
Groove (44) is nested with one another and is linked as entirety by dowel (45) in vertical direction, and described junction steel plate (8) one end snaps in closing
In draw-in groove (48) on plate (4), and filling flexible sealing material (16).
The advanced enclosed construction of poured band of outer wall of basement the most according to claim 1, it is characterised in that described closing plate
(4) it is made up of supported on both sides plate (41) and panel (42);One layer of isolating membrane (20) is set in gripper shoe (41);Close on plate (4)
Lower end is respectively provided with groove (44) and raised item (43), and groove (44) surface is embedded with rubber strip (47), rubber strip (47) upper surface
Beyond groove (44) surface 2mm;Draw-in groove (48) it is provided with between gripper shoe (41) and panel (42);In gripper shoe (41) vertical direction
Pre-buried pvc pipe (49), upper end is provided with cavity (46).
The advanced enclosed construction of poured band of outer wall of basement the most according to claim 1, it is characterised in that described junction steel plate
(8) L-shaped, the steel plate for sealing water (9) that its long limit is welded and connection peg (10) are respectively protruding into the basement of first pouring construction
In the post-cast strip (2) of exterior wall (1) and after-pouring construction, its minor face is provided with the through hole of screw rod (15).
4. utilize the claim 1-3 advanced enclosed construction of arbitrary described poured band of outer wall of basement to carry out poured band of outer wall of basement
(2) method constructed, it is characterised in that construction procedure is as follows:
Step one, brick setting overcoat (5) building construction: one brick is built in the outside along outer wall of basement (1) and post-cast strip (2) by laying bricks or stones
Masonry overcoat (5);
Step 2, waterproof layer (6) are constructed: brick setting overcoat (5) surface base cleaning is clean, smooth, is uniformly coated with in basic unit
Smear adhesive bitument primer, paste waterproof roll to form waterproof layer (6);
Step 3, mortar levelling layer (7) are constructed: waterproof layer (6) one layer of mortar levelling layer (7) of upper construction;
Step 4, closing plate (4) are installed: prefabricated closing plate (4) lifting being put in place, dowel (45) is through closing plate (4)
Upper reserved pvc pipe (49), closes plate (4) by bolt by every layer and fastens, and the bolt after fastening is placed in cavity (46), supports
Plate (41) is upper pastes one layer of isolating membrane (20);
Step 5, framework of steel reinforcement (3) colligation and junction steel plate (8) are fixing: the framework of steel reinforcement (3) of colligation outer wall of basement (1),
Outer wall of basement (1) and the intersection of post-cast strip (2), the main muscle of horizontal full-length, through the reserving hole on junction steel plate (8), connects
Being welded with steel plate for sealing water (9) on steel plate (8) and connect peg (10), junction steel plate (8) one end snaps in groove (44), and fills soft
Property sealing material (16), screw rod (15) is welded on framework of steel reinforcement (3) through the reserving hole on junction steel plate (8) minor face;
Step 6, outer wall of basement (1) inner side template are installed and casting concrete: outer wall of basement (1) inner side template uses single
Collateral modulus method is installed, and adopts and is bolted on screw rod (15), and casting concrete;
Step 7, backfill layer (17) construction: after outer wall of basement (1) concrete strength reaches requirement, in brick setting overcoat (5)
And between campshed wall (18), fill backfill layer (17), and remove outer wall of basement (1) inner side template;
Step 8, post-cast strip (2) inner side template (11) are installed: main structure construction is complete and after stabilization, carries out post-cast strip
(2) construction, removes framework of steel reinforcement (3) the surface rusty stain of post-cast strip (2), installs post-cast strip (2) inner side template (11);
Step 9, post-cast strip (2) concreting: pour the concrete of post-cast strip (2), and vibration compacting;
Step 10, post-cast strip (2) concrete curing form removal: after post-cast strip (2) concrete curing, intensity reaches strength of mould stripping, tears open
Except post-cast strip (2) inner side template (11).
Method the most according to claim 4, it is characterised in that in step 8, inner side template (11) is made by plywood, adopts
With level stupefied (12) and perpendicular stupefied (13) as shuttering supporting skeleton, by fastening bolt (14) and screw rod (15) by tight to perpendicular stupefied (13)
It is fixed on junction steel plate (8) minor face.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610664350.7A CN106120870B (en) | 2016-08-12 | 2016-08-12 | The advanced enclosed construction of poured band of outer wall of basement and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610664350.7A CN106120870B (en) | 2016-08-12 | 2016-08-12 | The advanced enclosed construction of poured band of outer wall of basement and construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106120870A true CN106120870A (en) | 2016-11-16 |
CN106120870B CN106120870B (en) | 2018-03-16 |
Family
ID=57258814
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610664350.7A Active CN106120870B (en) | 2016-08-12 | 2016-08-12 | The advanced enclosed construction of poured band of outer wall of basement and construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106120870B (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106759843A (en) * | 2016-12-27 | 2017-05-31 | 宁波二十冶建设有限公司 | A kind of outer wall of basement waterproof construction and its construction method |
CN108842827A (en) * | 2018-08-07 | 2018-11-20 | 广东建星建造集团有限公司 | Sidewall of basement backfill soil structure and sidewall of basement backfill shift to an earlier date construction method |
CN110512657A (en) * | 2019-09-26 | 2019-11-29 | 中国建筑第七工程局有限公司 | A kind of prefab-form installed for poured band of outer wall of basement |
CN110644538A (en) * | 2019-10-22 | 2020-01-03 | 中联建设集团股份有限公司 | Basement side wall extra front and back pouring belt periphery protection structure |
CN111074950A (en) * | 2019-12-31 | 2020-04-28 | 浙江世润建创科技发展有限公司 | Pre-closed advanced water stop post-cast strip for basement outer wall and construction method |
CN111424725A (en) * | 2020-04-27 | 2020-07-17 | 浙江天苑景观建设有限公司 | Basement post-cast strip erecting prefabricated template with protection structure |
CN111749458A (en) * | 2020-06-30 | 2020-10-09 | 武汉一冶建筑安装工程有限责任公司 | Post-cast strip inner frame formwork construction method and support system |
CN112411771A (en) * | 2020-10-24 | 2021-02-26 | 北京中易房建筑工程有限公司 | Steel plate mounting structure of basement outer wall post-cast strip and construction method |
CN115162417A (en) * | 2022-07-12 | 2022-10-11 | 浙江国兴建设集团有限公司 | Seamless connection structure of basement outer wall and fender post and construction method thereof |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19526255C2 (en) * | 1995-07-19 | 1998-07-02 | Michael Sattlberger | Corner connection for buildings constructed in block construction |
CN101666125A (en) * | 2009-09-15 | 2010-03-10 | 中建四局第三建筑工程有限公司 | Sealing method and structure of late poured band of basement |
JP4755359B2 (en) * | 2001-05-09 | 2011-08-24 | 大成建設株式会社 | Joint structure of reinforced concrete structure |
CN202000380U (en) * | 2011-01-27 | 2011-10-05 | 中建三局建设工程股份有限公司 | Basement outer wall post-pouring belt backfill protective plate |
CN104088304A (en) * | 2014-07-03 | 2014-10-08 | 成都市第三建筑工程公司 | Concrete member and underground outdoor wall post-cast strip construction method |
CN204418229U (en) * | 2014-12-26 | 2015-06-24 | 中誉远发国际建设集团有限公司 | Poured band of outer wall of basement concrete draw-in groove |
CN205954707U (en) * | 2016-08-12 | 2017-02-15 | 上海嘉实(集团)有限公司 | Leading enclosed construction in basement outer wall post -cast strip |
-
2016
- 2016-08-12 CN CN201610664350.7A patent/CN106120870B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19526255C2 (en) * | 1995-07-19 | 1998-07-02 | Michael Sattlberger | Corner connection for buildings constructed in block construction |
JP4755359B2 (en) * | 2001-05-09 | 2011-08-24 | 大成建設株式会社 | Joint structure of reinforced concrete structure |
CN101666125A (en) * | 2009-09-15 | 2010-03-10 | 中建四局第三建筑工程有限公司 | Sealing method and structure of late poured band of basement |
CN202000380U (en) * | 2011-01-27 | 2011-10-05 | 中建三局建设工程股份有限公司 | Basement outer wall post-pouring belt backfill protective plate |
CN104088304A (en) * | 2014-07-03 | 2014-10-08 | 成都市第三建筑工程公司 | Concrete member and underground outdoor wall post-cast strip construction method |
CN204418229U (en) * | 2014-12-26 | 2015-06-24 | 中誉远发国际建设集团有限公司 | Poured band of outer wall of basement concrete draw-in groove |
CN205954707U (en) * | 2016-08-12 | 2017-02-15 | 上海嘉实(集团)有限公司 | Leading enclosed construction in basement outer wall post -cast strip |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106759843A (en) * | 2016-12-27 | 2017-05-31 | 宁波二十冶建设有限公司 | A kind of outer wall of basement waterproof construction and its construction method |
CN108842827A (en) * | 2018-08-07 | 2018-11-20 | 广东建星建造集团有限公司 | Sidewall of basement backfill soil structure and sidewall of basement backfill shift to an earlier date construction method |
CN110512657A (en) * | 2019-09-26 | 2019-11-29 | 中国建筑第七工程局有限公司 | A kind of prefab-form installed for poured band of outer wall of basement |
CN110644538A (en) * | 2019-10-22 | 2020-01-03 | 中联建设集团股份有限公司 | Basement side wall extra front and back pouring belt periphery protection structure |
CN111074950A (en) * | 2019-12-31 | 2020-04-28 | 浙江世润建创科技发展有限公司 | Pre-closed advanced water stop post-cast strip for basement outer wall and construction method |
CN111074950B (en) * | 2019-12-31 | 2021-08-13 | 浙江世润建创科技发展有限公司 | Pre-closed advanced water stop post-cast strip for basement outer wall and construction method |
CN111424725A (en) * | 2020-04-27 | 2020-07-17 | 浙江天苑景观建设有限公司 | Basement post-cast strip erecting prefabricated template with protection structure |
CN111749458A (en) * | 2020-06-30 | 2020-10-09 | 武汉一冶建筑安装工程有限责任公司 | Post-cast strip inner frame formwork construction method and support system |
CN112411771A (en) * | 2020-10-24 | 2021-02-26 | 北京中易房建筑工程有限公司 | Steel plate mounting structure of basement outer wall post-cast strip and construction method |
CN115162417A (en) * | 2022-07-12 | 2022-10-11 | 浙江国兴建设集团有限公司 | Seamless connection structure of basement outer wall and fender post and construction method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN106120870B (en) | 2018-03-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106120870A (en) | The advanced enclosed construction of poured band of outer wall of basement and construction method | |
CN107326940B (en) | basement advanced water stop post-cast strip structure and construction method thereof | |
CN105178357A (en) | Prefabricated subsurface structure under foundation trench open cutting condition and construction method for prefabricated subsurface structure under foundation trench open cutting condition | |
CN205653820U (en) | Basement post -cast strip advances plugging device | |
CN208167956U (en) | A kind of basement inwall using reverse construction | |
CN105484391A (en) | Construction method for manufacturing heat-preservation waterproof wall through light heat-preservation GRC disassembling-free formworks | |
CN107190782A (en) | A kind of poured band of outer wall of basement structure and its construction method | |
CN111335490A (en) | Crack-resistant structure at joint of filler wall and shear wall under full-concrete outer wall window and construction method of crack-resistant structure | |
CN210597399U (en) | Post-cast strip structure applied to basement outer wall | |
CN105134009A (en) | Sill coping concrete structure of frame structure infilled wall and construction method | |
CN106499070A (en) | The construction method of connecting sewing between assembled architecture component and component | |
CN205954707U (en) | Leading enclosed construction in basement outer wall post -cast strip | |
CN110080308A (en) | A kind of novel late poured band structure and its construction method | |
CN107524174A (en) | A kind of diaphragm wall I-shaped steel joint provided with water expandable waterstop | |
CN108951840A (en) | Based on setting bracket single side formwork basement arc external wall construction method | |
CN205712204U (en) | A kind of multiple waterstop and waterproof construction thereof | |
CN207110214U (en) | A kind of prefabricated interior fill concrete wallboard | |
CN105821908A (en) | Multiple water stop belt, waterproof structure and construction method of waterproof structure | |
CN210421182U (en) | Basement roof post-cast strip seals structure in advance | |
CN107237448A (en) | A kind of prefabricated interior fill concrete wallboard and its manufacture method | |
CN216787229U (en) | Basement outer wall post-cast strip assembled shutoff steel sheet structure | |
CN212223970U (en) | Prefabricated apron post-cast strip stagnant water temporary enclosed construction | |
CN105421725B (en) | Exempt from formwork one-shot forming construction method in reserved residential ventilation road | |
CN205382595U (en) | Integral shear force wall of steel pipe concrete edge constraint coincide | |
KR101774865B1 (en) | A double wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |