CN111749458A - Post-cast strip inner frame formwork construction method and support system - Google Patents

Post-cast strip inner frame formwork construction method and support system Download PDF

Info

Publication number
CN111749458A
CN111749458A CN202010618752.XA CN202010618752A CN111749458A CN 111749458 A CN111749458 A CN 111749458A CN 202010618752 A CN202010618752 A CN 202010618752A CN 111749458 A CN111749458 A CN 111749458A
Authority
CN
China
Prior art keywords
post
cast strip
template
sides
battens
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010618752.XA
Other languages
Chinese (zh)
Inventor
周越
侯俊伟
杨飞
方颖昊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Yiye Construction Engineering Co ltd
Original Assignee
Wuhan Yiye Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Yiye Construction Engineering Co ltd filed Critical Wuhan Yiye Construction Engineering Co ltd
Priority to CN202010618752.XA priority Critical patent/CN111749458A/en
Publication of CN111749458A publication Critical patent/CN111749458A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention discloses a post-cast strip inner frame template construction method and a support system, wherein the post-cast strip inner frame template support system is arranged and comprises support columns erected below a post-cast strip, lifting top supports arranged at the top ends of the support columns and templates with the same width as the post-cast strip, battens flush with the side edges are thickened on two sides of the bottom surface of the template, and the battens are supported on the lifting top supports along the line; before pouring concrete on two sides of the post-cast strip, the template is lifted to the bottom of the plate steel bar, and the battens are connected with the steel wire mesh in a seamless mode; after the concrete on the two sides of the post-cast strip is finally solidified, the template is lowered to be below the templates on the two sides, and the garbage in the post-cast strip is quickly cleaned; when post-cast strip concrete is poured in the later stage, the templates are flush with the templates on the two sides of the post-cast strip, and flexible plugging materials are filled between the templates and the templates on the two sides of the post-cast strip, so that cement paste is prevented from overflowing during pouring. The invention avoids the problem that the water overflows into the post-cast strip when pouring at the two sides of the post-cast strip, and reduces the trouble of cleaning the opening.

Description

Post-cast strip inner frame formwork construction method and support system
Technical Field
The invention relates to the field of building construction, in particular to a post-cast strip inner frame template construction method and a support system.
Technical Field
At present, when a post-cast strip is constructed, a template system is integrally erected, and two sides of the post-cast strip are blocked by steel wire meshes. The existing construction method cannot effectively ensure that the steel wire meshes on the two sides are effectively contacted with the templates, a large gap is reserved, cement paste is easy to overflow into a later zone, time and labor are wasted in later-period cleaning, the construction period is delayed, reinforcing steel bars are easy to disturb, even part of template frame bodies possibly need to be removed, and the construction quality of the later-poured zone is seriously influenced.
Disclosure of Invention
The invention aims to provide a construction method and a support system for a post-cast strip inner frame template, which avoid the phenomenon that the post-cast strip overflows into the post-cast strip when two sides of the post-cast strip are cast, reduce the trouble of clearing and cleaning a hole, shorten the construction period, and have simple operation and convenient construction.
The technical scheme adopted by the invention is as follows:
a post-cast strip inner frame template construction method comprises the following steps:
s1, before concrete on two sides of the post-cast strip is poured, arranging a post-cast strip inner frame template supporting system, wherein the post-cast strip inner frame template supporting system comprises supporting columns erected below the post-cast strip, lifting jacking supports arranged at the top ends of the supporting columns and templates with the same width as the post-cast strip, wood strips which are flush with the side edges are thickened on two sides of the bottom surface of each template, and the wood strips are supported on the lifting jacking supports along the lines; then adjusting the lifting jacking to enable the template to ascend to the bottom of the plate at the position of the steel bar and enable the battens to be in seamless connection with the steel wire mesh;
s2, pouring concrete on two sides of the post-cast strip, and enabling the battens and the steel wire mesh to be in seamless connection to prevent cement paste from overflowing into the post-cast strip;
s3, after the concrete on the two sides of the post-cast strip is finally solidified, adjusting the lifting jacking to enable the template to descend below the templates on the two sides, and quickly cleaning the garbage in the post-cast strip;
s4, when post-cast strip concrete is poured in the later period, adjusting the lifting jacking to enable the template to be flush with the templates on the two sides of the post-cast strip, and filling flexible plugging materials between the template and the templates on the two sides of the post-cast strip to ensure that cement paste cannot overflow during pouring;
and S5, after the post-cast strip is poured and reaches the standard, removing the post-cast strip inner frame formwork support system, and storing or constructing the next post-cast strip.
Further, lift top support includes base and the top support through threaded connection, and the support is put on the support column top to base bottom card, and the top of top support is equipped with the stuff standing groove.
Further, the width of the template is 800cm, and the battens are 5cm by 5cm battens.
Further, the support column adopts a steel pipe.
The utility model provides a post-cast strip inner tower template support system, is including setting up support column, the lift of establishing in the support column top of post-cast strip below the post-cast strip and the template of being the same width with the post-cast strip, and template bottom surface both sides thickening has the stuff that flushes with the side, and the stuff supports along the line on the lift holds in the palm.
Further, lift top support includes base and the top support through threaded connection, and the support is put on the support column top to base bottom card, and the top of top support is equipped with the stuff standing groove.
Further, the width of the template is 800cm, and the battens are 5cm by 5cm battens.
Further, the support column adopts a steel pipe.
The invention has the beneficial effects that:
the invention avoids overflowing into the post-cast strip when two sides of the post-cast strip are cast, avoids cleaning mud of the post-cast strip in the later period, does not need post-chiseling, can directly adjust the lifting jacking if certain garbage exists before the post-cast strip is constructed, cleans the garbage, reduces the trouble of cleaning the opening, ensures the casting quality and shortens the construction period; the invention has simple operation, convenient construction, recycling use, economy and reasonability.
Drawings
Fig. 1 is a first schematic diagram of the operation of the embodiment of the present invention.
Fig. 2 is a second operation diagram of the embodiment of the present invention.
In the figure: 1-a support column; 2-a base; 3-jacking; 4-battens; 5-template; 6-flexible plugging material; 7-steel wire mesh.
Detailed Description
The invention is further described below with reference to the figures and examples.
As shown in fig. 1 and 2, a post-cast strip inner frame formwork construction method includes the steps of:
s1, before concrete on two sides of the post-cast strip is poured, arranging a post-cast strip inner frame template supporting system, wherein the post-cast strip inner frame template supporting system comprises a supporting column 1 erected below the post-cast strip, a lifting jacking arranged at the top end of the supporting column 1 and a template 5 with the same width as the post-cast strip, wood strips 4 which are flush with the side edges are thickened on two sides of the bottom surface of the template 5, and the wood strips 4 are supported on the lifting jacking along the line; then adjusting the lifting jacking to enable the template 5 to ascend to the bottom of the plate at the position of the steel bar and the battens 4 to be in seamless connection with the steel wire mesh 7;
s2, pouring concrete on two sides of the post-cast strip, and enabling the battens 4 and the steel wire meshes 7 to be in seamless connection to prevent cement paste from overflowing into the post-cast strip;
s3, after the concrete on the two sides of the post-cast strip is finally solidified, adjusting the lifting jacking to enable the template 5 to descend below the templates on the two sides, and quickly cleaning the garbage in the post-cast strip;
s4, adjusting the lifting jacking to enable the template 5 to be flush with the templates on the two sides of the post-cast strip when the post-cast strip concrete is poured in the later period, and filling flexible plugging materials 6 between the template 5 and the templates on the two sides of the post-cast strip to ensure that cement paste does not overflow during pouring;
and S5, after the post-cast strip is poured and reaches the standard, removing the post-cast strip inner frame formwork support system, and storing or constructing the next post-cast strip.
The invention avoids overflowing into the post-cast strip when two sides of the post-cast strip are cast, avoids cleaning mud of the post-cast strip in the later period, does not need post-chiseling, can directly adjust the lifting jacking if certain garbage exists before the post-cast strip is constructed, cleans the garbage, reduces the trouble of cleaning the opening, ensures the casting quality and shortens the construction period; the invention has simple operation, convenient construction, recycling use, economy and reasonability.
As shown in fig. 1 and fig. 2, in this embodiment, the lifting top support includes a base 2 and a top support 3 connected by a screw thread, the bottom of the base 2 is clamped and supported on the top of the support column 1, and the top of the top support 3 is provided with a holding groove for holding a batten 4.
As shown in fig. 2, in the present embodiment, the template 5 has a width of 800cm, and the wooden bar 4 is a 5cm by 5cm square.
In this embodiment, the support column 1 is a steel pipe.
It will be understood that modifications and variations can be made by persons skilled in the art in light of the above teachings and all such modifications and variations are intended to be included within the scope of the invention as defined in the appended claims.

Claims (8)

1. A post-cast strip inner frame template construction method is characterized in that: comprises the steps of (a) carrying out,
s1, before concrete on two sides of the post-cast strip is poured, arranging a post-cast strip inner frame template supporting system, wherein the post-cast strip inner frame template supporting system comprises supporting columns erected below the post-cast strip, lifting jacking supports arranged at the top ends of the supporting columns and templates with the same width as the post-cast strip, wood strips which are flush with the side edges are thickened on two sides of the bottom surface of each template, and the wood strips are supported on the lifting jacking supports along the lines; then adjusting the lifting jacking to enable the template to ascend to the bottom of the plate at the position of the steel bar and enable the battens to be in seamless connection with the steel wire mesh;
s2, pouring concrete on two sides of the post-cast strip, and enabling the battens and the steel wire mesh to be in seamless connection to prevent cement paste from overflowing into the post-cast strip;
s3, after the concrete on the two sides of the post-cast strip is finally solidified, adjusting the lifting jacking to enable the template to descend below the templates on the two sides, and quickly cleaning the garbage in the post-cast strip;
s4, when post-cast strip concrete is poured in the later period, adjusting the lifting jacking to enable the template to be flush with the templates on the two sides of the post-cast strip, and filling flexible plugging materials between the template and the templates on the two sides of the post-cast strip to ensure that cement paste cannot overflow during pouring;
and S5, after the post-cast strip is poured and reaches the standard, removing the post-cast strip inner frame formwork support system, and storing or constructing the next post-cast strip.
2. The post-cast strip inner frame formwork construction method according to claim 1, characterized in that: the lifting top support comprises a base and a top support which are connected through threads, the bottom of the base is clamped and supported on the top end of the support column, and a batten placing groove is formed in the top of the top support.
3. The post-cast strip inner frame formwork construction method according to claim 1, characterized in that: the width of the template is 800cm, and the battens are 5cm by 5cm battens.
4. The post-cast strip inner frame formwork construction method according to claim 1, characterized in that: the support column is made of steel pipes.
5. The utility model provides a post-cast strip inner tower template support system which characterized in that: the post-cast strip lifting support comprises a support column arranged below a post-cast strip, a lifting support arranged at the top end of the support column and a template which is as wide as the post-cast strip, wherein battens which are flush with the side edges are thickened on two sides of the bottom surface of the template, and the battens are supported on the lifting support along the line.
6. The post-cast strip framed formwork support system of claim 1, wherein: the lifting top support comprises a base and a top support which are connected through threads, the bottom of the base is clamped and supported on the top end of the support column, and a batten placing groove is formed in the top of the top support.
7. The post-cast strip framed formwork support system of claim 1, wherein: the width of the template is 800cm, and the battens are 5cm by 5cm battens.
8. The post-cast strip framed formwork support system of claim 1, wherein: the support column is made of steel pipes.
CN202010618752.XA 2020-06-30 2020-06-30 Post-cast strip inner frame formwork construction method and support system Pending CN111749458A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010618752.XA CN111749458A (en) 2020-06-30 2020-06-30 Post-cast strip inner frame formwork construction method and support system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010618752.XA CN111749458A (en) 2020-06-30 2020-06-30 Post-cast strip inner frame formwork construction method and support system

Publications (1)

Publication Number Publication Date
CN111749458A true CN111749458A (en) 2020-10-09

Family

ID=72678607

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010618752.XA Pending CN111749458A (en) 2020-06-30 2020-06-30 Post-cast strip inner frame formwork construction method and support system

Country Status (1)

Country Link
CN (1) CN111749458A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2650757A1 (en) * 2008-01-16 2009-07-16 Marc Gosselin Floor
CN201531035U (en) * 2009-09-18 2010-07-21 上海市第四建筑有限公司 Foundation slab late poured band and construction joint steel wire mesh isolating device
CN103615053A (en) * 2013-11-27 2014-03-05 温州宏源水电建设有限公司 Construction method for post-cast belt of cast-in-place reinforced concrete structure
CN106120870A (en) * 2016-08-12 2016-11-16 上海嘉实(集团)有限公司 The advanced enclosed construction of poured band of outer wall of basement and construction method
CN107227843A (en) * 2017-07-28 2017-10-03 北京城建七建设工程有限公司 A kind of alter-pouring strips mould plate support system and construction method
CN110439270A (en) * 2019-08-08 2019-11-12 上海宝冶集团南京建筑有限公司 A kind of post-cast strip exempts to tear support system construction method open

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2650757A1 (en) * 2008-01-16 2009-07-16 Marc Gosselin Floor
CN201531035U (en) * 2009-09-18 2010-07-21 上海市第四建筑有限公司 Foundation slab late poured band and construction joint steel wire mesh isolating device
CN103615053A (en) * 2013-11-27 2014-03-05 温州宏源水电建设有限公司 Construction method for post-cast belt of cast-in-place reinforced concrete structure
CN106120870A (en) * 2016-08-12 2016-11-16 上海嘉实(集团)有限公司 The advanced enclosed construction of poured band of outer wall of basement and construction method
CN107227843A (en) * 2017-07-28 2017-10-03 北京城建七建设工程有限公司 A kind of alter-pouring strips mould plate support system and construction method
CN110439270A (en) * 2019-08-08 2019-11-12 上海宝冶集团南京建筑有限公司 A kind of post-cast strip exempts to tear support system construction method open

Similar Documents

Publication Publication Date Title
CN214498376U (en) Independent supporting structure of post-cast strip template
CN208534025U (en) Floor slab back casting band separate support formwork erecting structure
CN106368430A (en) Aluminum formwork installation process
CN105952154B (en) A kind of concrete-pouring template stent
CN211313477U (en) Post-cast cantilever plate's triangular supports template structure
CN109797969B (en) Construction method of post-cast strip tool type advanced formwork lifting system
CN105064500B (en) Balcony beam slab inner side filling wall body and main body structure integral casting construction method
CN111749458A (en) Post-cast strip inner frame formwork construction method and support system
CN211396591U (en) Concrete shear wall root reinforcing apparatus
CN210289118U (en) Tower concrete structure sharp roof template system
CN218233146U (en) Supporting device for pouring drainage side ditch
CN215926719U (en) Reinforcing structure of aluminum alloy template reverse ridge hanging die
CN211816454U (en) Post-cast strip top-pulling composite side mould
CN214245848U (en) Post-cast strip template component
CN213742298U (en) Convenient supporting device
CN213710401U (en) Can dismantle bottom plate support of steel bar quilting frame building carrier plate
CN114215345A (en) Construction method for independent support bracket template of post-cast strip of top plate of reservoir
CN210947661U (en) Installation device of socket type overhanging scaffold
CN209874469U (en) Floor construction joint side template
CN113482327A (en) Parapet formwork supporting method
CN210134641U (en) Construction structures is pour to concrete link plate secondary under roof beam
CN207525964U (en) A kind of prefabricated composite wallboard pitched roof system
CN220487094U (en) Erecting structure of wallboard concrete pouring template of sewage treatment pond
CN211285428U (en) Concrete guardrail link plate assembled template
CN215830007U (en) Floor post-cast strip concrete placement template bearing structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20201009