CN210134641U - Construction structures is pour to concrete link plate secondary under roof beam - Google Patents

Construction structures is pour to concrete link plate secondary under roof beam Download PDF

Info

Publication number
CN210134641U
CN210134641U CN201920482399.XU CN201920482399U CN210134641U CN 210134641 U CN210134641 U CN 210134641U CN 201920482399 U CN201920482399 U CN 201920482399U CN 210134641 U CN210134641 U CN 210134641U
Authority
CN
China
Prior art keywords
hanging plate
link plate
template
reinforcing
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920482399.XU
Other languages
Chinese (zh)
Inventor
葛铁柱
梁伟
吴楠楠
于琇
孙贵林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DALIAN SANCHUAN CONSTRUCTION GROUP Co Ltd
Original Assignee
DALIAN SANCHUAN CONSTRUCTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DALIAN SANCHUAN CONSTRUCTION GROUP Co Ltd filed Critical DALIAN SANCHUAN CONSTRUCTION GROUP Co Ltd
Priority to CN201920482399.XU priority Critical patent/CN210134641U/en
Application granted granted Critical
Publication of CN210134641U publication Critical patent/CN210134641U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A secondary pouring construction structure for a concrete hanging plate under a beam relates to the technical field of constructional engineering. The reinforcing structure comprises a rectangular hole reserved on a floor slab at the position of a beam lower hanging plate and a reinforcing mechanism used for reinforcing the beam lower hanging plate; the reinforcing mechanism is including setting up the template of connecting between the link plate under rectangle hole and the roof beam, connecting in the outside reinforcement steel pipe of template, the template is including setting up the link plate exterior sheathing of connecting in the link plate periphery under the roof beam and connecting in the diagonal formwork between link plate exterior sheathing and rectangle hole, consolidate the steel pipe and set up and connect in link plate exterior sheathing periphery, the cross section of horizontal vertical steel pipe passes through the fastener and consolidates the connection, is located and consolidates through the split bolt between two vertical steel pipes of link plate exterior sheathing. The utility model discloses link plate construction quality under can promoting saves the secondary and pours the time, practices thrift the cost, avoids the later stage because of pouring the quality hidden danger that the untight picks chisel repair of vibration brought, also improves engineering economic benefits simultaneously, convenient construction.

Description

Construction structures is pour to concrete link plate secondary under roof beam
Technical Field
The utility model relates to a building engineering technical field, concretely relates to construction structures is pour to concrete link plate secondary under roof beam.
Background
In the building engineering, the first floor position of public building usually sets up concrete link plate under the roof beam, and the link plate effect is to replace the lintel, generally lies in public building first floor, two layers position, exists the interval between exterior window and the concrete structure roof beam, and general door and window size overlength is unsuitable to install the lintel, and the link plate is built with floor beam slab inconvenient pouring simultaneously in the earlier stage construction under the scene, reserves reinforcing bar or later stage bar planting, and the concrete link plate under the secondary pouring roof beam, and the process is generally for setting up the scaffold frame, prop up one side template, tie up the reinforcing bar, prop up another side template, concreting. From the whole construction condition, its comprehensive quality is not ideal, through the entity quality inspection after the form removal, finds that leaks thick liquid, not closely knit, exposes the muscle, presss from both sides the sediment etc. in the pouring time, the board takes artifical little transmission to pour into the concrete under the roof beam, and it is longer to consume time, and it is inconvenient to stand on the scaffold frame to construct under the beam slab.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem, the utility model provides a construction structures is pour to concrete link plate secondary under roof beam can promote down link plate construction quality, saves the secondary and pours the time, practices thrift the cost, avoids later stage pick chisel to repair the quality hidden danger that brings, also improves engineering economic benefits simultaneously, convenient construction.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides a construction structures is pour to concrete link plate secondary under roof beam which characterized in that: the reinforcing structure comprises a rectangular hole reserved on a floor slab at the position of a beam lower hanging plate and a reinforcing mechanism used for reinforcing the beam lower hanging plate; the reinforcing mechanism is including setting up the template of connecting between the link plate under rectangle hole and the roof beam, connecting in the outside reinforcement steel pipe of template, the template is including setting up the link plate exterior sheathing of connecting in the link plate periphery under the roof beam and connecting in the diagonal formwork between link plate exterior sheathing and rectangle hole, consolidate the steel pipe and set up and connect in link plate exterior sheathing periphery, the cross section of horizontal vertical steel pipe passes through the fastener and consolidates the connection, is located and consolidates through the split bolt between two vertical steel pipes of link plate exterior sheathing.
The number of the rectangular holes is 2-3, the hole spacing is 3m, and the size is 300 x 300 mm.
The hanging plate outer formwork is connected with the reinforced steel pipe through the reinforcing blocks.
The utility model discloses take the upper portion floor position of concrete link plate under the roof beam to reserve the secondary and pour the hole, directly pour concrete placement's a structure from upper portion, can promote down link plate construction quality, save the secondary and pour the time, practice thrift the cost, avoid the later stage because of pour the quality hidden danger that the untight picks chisel repair of vibration brought, also improve engineering economic benefits simultaneously, convenient construction.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a schematic structural view of the template of the present invention;
in the figure: 1-rectangular hole, 2-hanging plate under beam, 3-template, 3-1-hanging plate external template, 3-2-inclined template, 4-reinforced steel pipe, 5-fastener, 6-split bolt, 7-reinforcing block and 8-vibrating rod.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and specific embodiments, but the present invention is not limited to the specific embodiments.
Examples
The secondary pouring construction structure for the concrete hanging plate under the beam shown in fig. 1 comprises a rectangular hole 1 reserved on a floor slab at the position of the concrete hanging plate under the beam 2 and a reinforcing mechanism used for reinforcing the concrete hanging plate under the beam 2; the reinforcing mechanism comprises a template 3 connected between a rectangular hole and a beam lower hanging plate 2 and a reinforcing steel pipe 4 connected to the outside of the template 3, as shown in figure 2, the template 3 comprises a hanging plate outer template 3-1 connected to the periphery of the beam lower hanging plate 2 and an inclined template 3-2 connected between the hanging plate outer template 3-1 and the rectangular hole 1, the reinforcing steel pipe 4 is connected to the periphery of the hanging plate outer template 3-1 in an erected mode, the cross part of the transverse and vertical steel pipes is connected in a reinforced mode through a fastener 5, and the two vertical steel pipes located between the hanging plate outer templates 3-1 are reinforced through a split bolt 6. The hanging plate outer template 3-1 is connected with the reinforced steel pipe 4 through a reinforcing block 7.
The number of the rectangular holes 1 is determined to be 2-3 according to the length of the lower hanging plate, the hole spacing is 3m, and the size is 300 x 300 mm.
The utility model discloses the use: a constructor stands on an upper construction operation layer of the hanging plate 2 under the beam, concrete is poured from top to bottom, a rectangular hole 1 is formed in a concrete inlet, a vibrating rod 8 extends into a hanging plate reinforcing steel bar in a hanging plate outer formwork 3-1 along an inclined formwork 3-2 from the rectangular hole 1 to vibrate, secondary pouring construction of the hanging plate under the beam is completed, and then hanging formwork plugging is conducted on the rectangular hole 1.

Claims (3)

1. The utility model provides a construction structures is pour to concrete link plate secondary under roof beam which characterized in that: the reinforcing structure comprises a rectangular hole (1) reserved on a floor slab at the position of a beam lower hanging plate (2) and a reinforcing mechanism used for reinforcing the beam lower hanging plate (2); the reinforcing mechanism comprises a template (3) connected between a rectangular hole (1) and a beam lower hanging plate (2) and a reinforcing steel pipe (4) connected to the outside of the template (3), wherein the template (3) comprises a hanging plate outer template (3-1) connected to the periphery of the beam lower hanging plate (2) and an inclined template (3-2) connected between the hanging plate outer template (3-1) and the rectangular hole (1), the reinforcing steel pipe (4) is connected to the periphery of the hanging plate outer template (3-1), the cross position of the transverse and vertical steel pipe is connected in a reinforcing mode through a fastener (5), and the two vertical steel pipes located between the hanging plate outer template (3-1) are reinforced through split bolts (6).
2. The secondary pouring construction structure for the concrete hanging plate under the beam according to claim 1, is characterized in that: the number of the rectangular holes (1) is 2-3, the hole spacing is 3m, and the size is 300 x 300 mm.
3. The secondary pouring construction structure for the concrete hanging plate under the beam according to claim 1, is characterized in that: the hanging plate outer template (3-1) is connected with the reinforced steel pipe (4) through a reinforcing block (7).
CN201920482399.XU 2019-04-11 2019-04-11 Construction structures is pour to concrete link plate secondary under roof beam Expired - Fee Related CN210134641U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920482399.XU CN210134641U (en) 2019-04-11 2019-04-11 Construction structures is pour to concrete link plate secondary under roof beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920482399.XU CN210134641U (en) 2019-04-11 2019-04-11 Construction structures is pour to concrete link plate secondary under roof beam

Publications (1)

Publication Number Publication Date
CN210134641U true CN210134641U (en) 2020-03-10

Family

ID=69703030

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920482399.XU Expired - Fee Related CN210134641U (en) 2019-04-11 2019-04-11 Construction structures is pour to concrete link plate secondary under roof beam

Country Status (1)

Country Link
CN (1) CN210134641U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116657898A (en) * 2023-07-24 2023-08-29 山西三建集团建设工程有限公司 Integral cast-in-situ construction method for beam plate and beam bottom L-shaped hanging plate
CN116892289A (en) * 2023-07-24 2023-10-17 山西三建集团建设工程有限公司 Formwork support system for integral casting of beam plate and L-shaped hanging plate at the bottom of the beam
CN118346050A (en) * 2024-04-08 2024-07-16 中国五冶集团有限公司 A secondary construction method for hanging slabs under concrete beams

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116657898A (en) * 2023-07-24 2023-08-29 山西三建集团建设工程有限公司 Integral cast-in-situ construction method for beam plate and beam bottom L-shaped hanging plate
CN116892289A (en) * 2023-07-24 2023-10-17 山西三建集团建设工程有限公司 Formwork support system for integral casting of beam plate and L-shaped hanging plate at the bottom of the beam
CN118346050A (en) * 2024-04-08 2024-07-16 中国五冶集团有限公司 A secondary construction method for hanging slabs under concrete beams

Similar Documents

Publication Publication Date Title
CN210439720U (en) A concrete beam side enlarged section reinforcement structure
CN110306774B (en) Method and device for installing socket type cantilever scaffold
CN108149819B (en) Integrated superposed outer wall of building bottom reinforcing area and production and construction method thereof
CN106401207A (en) Superimposed connection structure for additionally arranging column foundation on existing building and construction method of superimposed connection structure
CN107013033A (en) A kind of concrete side wall formwork for placing and its construction method
CN115748961A (en) Improved Steel Tube Constrained Precast Concrete Column Connection Structure and Construction Method
CN111101715A (en) Concrete windowsill coping combined construction method and structure
CN2893055Y (en) Super high wall body three-section form
CN109252879A (en) A kind of vcehicular tunnel gutter liner tool-typed formwork and construction method
CN206071096U (en) The underpinning device of load bearing wall in brick mix structure
CN105019645B (en) Fetch earth in contrary sequence method and the template system and construction method of xoncrete structure are built at mouth
CN208534081U (en) A kind of reconstruction structure of old building constructional column
CN108625531A (en) A kind of construction method pouring constructional column concrete non-dismantling formwork
CN207647033U (en) A kind of precast reinforced basket structure
CN211850804U (en) Shear force wall settlement joint steel wood combines template to prop up establishes device
CN220598069U (en) Integrated support system for cast-in-place formwork for concrete drainage ditches
CN220451424U (en) Template supporting system for integrally pouring beam plate and beam bottom L-shaped hanging plate
CN206319404U (en) A kind of building precast exterior sheathing
CN215594892U (en) High-rise transformation elevator shaft sealing plate formwork
CN215052265U (en) Reinforced concrete thin wall body reinforced structure
CN112575812B (en) Inner support conversion system applied to demolition and transformation project and construction method thereof
CN116623986A (en) Large-span space non-coplanar frame column pulling construction method
CN212224611U (en) Shear force wall pouring template reinforcing apparatus
CN108930406A (en) Construction method for large-formwork narrow-space wall based on integral assembly
CN211369523U (en) Template system of expansion joint shear force wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200310