CN2893055Y - Super high wall body three-section form - Google Patents

Super high wall body three-section form Download PDF

Info

Publication number
CN2893055Y
CN2893055Y CN 200620200520 CN200620200520U CN2893055Y CN 2893055 Y CN2893055 Y CN 2893055Y CN 200620200520 CN200620200520 CN 200620200520 CN 200620200520 U CN200620200520 U CN 200620200520U CN 2893055 Y CN2893055 Y CN 2893055Y
Authority
CN
China
Prior art keywords
wall
template
superelevation
utility
trinodel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200620200520
Other languages
Chinese (zh)
Inventor
曲春珑
蔡鹏程
朱海晨
宋红
赵欣
杨素珍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No1 Building Engineering Building Co Ltd Beijing Building Engineering Group
Original Assignee
No1 Building Engineering Building Co Ltd Beijing Building Engineering Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No1 Building Engineering Building Co Ltd Beijing Building Engineering Group filed Critical No1 Building Engineering Building Co Ltd Beijing Building Engineering Group
Priority to CN 200620200520 priority Critical patent/CN2893055Y/en
Application granted granted Critical
Publication of CN2893055Y publication Critical patent/CN2893055Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

A superelevation wall trinodal template which is spliced with a long trinodel wall template, two short trinodel wall templates by a bolt; wherein the long wall template is positioned between the two short wall templates, and the upper and lower rim of each trinodel wall template is fixed with a connection flange, wherein the connection flange is provided with a bolt hole. The utility model adopts the alternating connection and dismantlement way to regard the lower trinodel wall template and the wall as the support reinforcement system of the upper layer wall. Relying on the two binding force, the utility model is no need to add additional sloping support to fix after the first concrete pouring. Furthermore, the utility model has the advantages of that the splice is convenient so as to save template support materials, simplify the process, shorten the construction period and accelerate the construction speed, therefore evidently reducing the template support and remove times and evidently making the reduction gradually increase along with the reinforcing steel bar and concrete construction; besides, the wall surface is of good planeness and free of obvious stubbles and slab staggering and grouting leakage in particular, thus can effectively ensure the concrete quality to the superelevation wall and is easier to popularize.

Description

Superelevation body of wall three-section type template
(1) technical field
The utility model relates to the template that a kind of construction of buildings body of wall is used.
(2) background technology
Along with the development of society, in order to satisfy human aesthetic needs, the moulding of building is more and more unique, and surface quality requires more and more higher.The superelevation reinforced concrete wall occurs in construction work repeatedly, brings a lot of difficult problems to building operations.The superelevation reinforced concrete wall is in concreting process, and template construct, support be a big difficult point of construction often, does not see rational stencil design and support system for many years.The construction mould of existing ultra-high concrete body of wall is a single-unit ordinary concrete mould, need adopt successively formwork, cast, form removal, the to-and-fro method of formwork, cast, form removal successively again, all need establish diagonal brace for every layer and fix, complex process, diagonal brace formwork, form removal often, speed of application is slow, the cycle is long, easy spillage between each layer, body of wall has and obviously connects stubble, even faulting of slab ends occurs, has a strong impact on the concrete quality of superelevation body of wall.
(3) utility model content
The purpose of this utility model provides a kind of superelevation body of wall three-section type template, mainly solves the problem of simplifying the support of superelevation wall form, form removal technology, solves the technical problem that existing superelevation wall construction speed is slow, the cycle long, surface quality is difficult for assurance.
The purpose of this utility model is achieved in that this superelevation body of wall three-section type template, comprise panel, gusset, back cord and diagonal brace, it is characterized in that: be spliced with bolt combination by unexpected misfortune three joint wall forms, wherein the long wall form of a joint is between the short wall form of two joints, the last lower limb of every joint wall form is fixed with adpting flange, is distributed with bolt hole on the adpting flange.
Above-mentioned adpting flange is angle steel or channel-section steel.
Above-mentioned wall form is steel form or glass steel formwork.
Above-mentioned wall form middle part is provided with the through-wall bolt hole, penetrates body of wall by through-wall bolt the both sides wall form is fixed.
The utility model is compared the beneficial effect that has with existing conventional art: the utility model employing three joint assembling wall forms alternately are connected, the dismounting mode, lower punch segment wall form and body of wall are as the bracing reinforcement system of upper walls mould, by the two adhesion, just do not need to establish diagonal brace in addition in the first time behind the fluid concrete and fix.The splicing of the utility model formwork is convenient, saves a mold materials, simplifies technology, the reduction of erection time, accelerate speed of application, and significantly reduce superelevation wall form formwork, form removal number of times, and can progressively rise with reinforcing bar, Concrete Construction.The surface of wall planeness is good, does not obviously connect stubble, does not more have faulting of slab ends and spillage, can effectively guarantee the concrete quality of superelevation body of wall, is easy to promote.
(4) description of drawings
Fig. 1 is the structural representation of the utility model superelevation body of wall three-section type template.
Fig. 2 is a schematic diagram of using construction sequence of the present utility model (1);
Fig. 3 is a schematic diagram of using construction sequence of the present utility model (2);
Fig. 4 is a schematic diagram of using construction sequence of the present utility model (3);
Fig. 5 is a schematic diagram of using construction sequence of the present utility model (4);
Fig. 6 is a schematic diagram of using construction sequence of the present utility model (5);
Fig. 7 is a schematic diagram of using construction sequence of the present utility model (6).
(5) specific embodiment
Embodiment is referring to Fig. 1: this superelevation body of wall three-section type template, the material of wall form can select steel form or glass steel formwork all can, be spliced with bolt combination by unexpected misfortune three joint wall forms, wherein the long wall form 2 of a joint is at the short wall form 3 of last joint with down between the short wall form 1 of joint, every joint wall form comprises panel 5, gusset 6, back cord 7 and diagonal brace, the last lower limb of every joint wall form is fixed with adpting flange 9, is distributed with bolt hole 10 on the adpting flange.Above-mentioned adpting flange 9 can be selected angle steel or channel-section steel.
In case of necessity, for strengthening formwork rigidity, guarantee the wall leveling degree, above-mentioned wall form middle part can be provided with the through-wall bolt hole, penetrates body of wall by through-wall bolt 11 the both sides wall form is fixed, and controls thickness of wall body with through-wall bolt.
It is as follows to use construction sequence of the present utility model:
Step (1) is referring to Fig. 2, and the construction first time is connected long wall form 2 earlier with the short wall form 1 of following joint, and template is carried out the template support as a whole.
Step (2) behind the good diagonal brace 8, is carried out concreting 4 referring to Fig. 3.
Step (3), after concrete strength meets the demands is removed long wall form 2 referring to Fig. 4, retains the short wall form 1 of joint.
Step (4) is referring to Fig. 5, on the short wall form 1 of joint down by the long wall form 2 of bolt splicing with on joint weak point wall form 3.
Step (5) is carried out concreting again referring to Fig. 6.
Step (6) will descend short wall form 1 of joint and long wall form 2 to remove referring to Fig. 7 again, and the short wall form 3 of joint is waited until the splicing of next section template in the reservation.And the rest may be inferred, finishes the superelevation wall form and support.

Claims (4)

1. superelevation body of wall three-section type template, comprise panel, gusset, back cord and diagonal brace, it is characterized in that: be spliced with bolt combination by unexpected misfortune three joint wall forms, wherein the long wall form of a joint is between the short wall form of two joints, the last lower limb of every joint wall form is fixed with adpting flange, is distributed with bolt hole on the adpting flange.
2. superelevation body of wall three-section type template according to claim 1, it is characterized in that: described adpting flange is angle steel or channel-section steel.
3. superelevation body of wall three-section type template according to claim 1 and 2, it is characterized in that: described wall form is steel form or glass steel formwork.
4. superelevation body of wall three-section type template according to claim 1 is characterized in that: described wall form middle part is provided with the through-wall bolt hole, penetrates body of wall by through-wall bolt the both sides wall form is fixed.
CN 200620200520 2006-06-14 2006-06-14 Super high wall body three-section form Expired - Fee Related CN2893055Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620200520 CN2893055Y (en) 2006-06-14 2006-06-14 Super high wall body three-section form

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620200520 CN2893055Y (en) 2006-06-14 2006-06-14 Super high wall body three-section form

Publications (1)

Publication Number Publication Date
CN2893055Y true CN2893055Y (en) 2007-04-25

Family

ID=38061221

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620200520 Expired - Fee Related CN2893055Y (en) 2006-06-14 2006-06-14 Super high wall body three-section form

Country Status (1)

Country Link
CN (1) CN2893055Y (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102392534A (en) * 2011-07-29 2012-03-28 深圳市良创建筑铝模制品有限公司 Aluminum alloy building template assembly
CN102465595A (en) * 2010-11-06 2012-05-23 吴和生 Template for concrete pouring wall
CN102704673A (en) * 2012-05-30 2012-10-03 浙江大学 Multifunctional steel template and application thereof
CN104695703A (en) * 2015-02-11 2015-06-10 茂名市建筑集团有限公司 Non-drilled shear wall construction template system and shear wall construction method
CN104763142A (en) * 2015-04-01 2015-07-08 广东合迪科技股份有限公司 Aluminum template back arris system
CN105040980A (en) * 2015-06-17 2015-11-11 中国能源建设集团广西水电工程局有限公司 Method for continuous lifting construction of concrete complex structure
CN105178592A (en) * 2015-06-17 2015-12-23 中国能源建设集团广西水电工程局有限公司 Continuous ascending formwork for concrete complex structure
CN107514138A (en) * 2017-08-18 2017-12-26 杨磊 Fast assembling-disassembling building template system and its construction method
CN107964957A (en) * 2017-12-15 2018-04-27 成都农业科技职业学院 A kind of civil engineering support device
CN111926857A (en) * 2020-07-20 2020-11-13 鞍山三冶建筑工程有限公司 Template for construction joint of pipe gallery wall and construction method
CN112412025A (en) * 2020-11-11 2021-02-26 浙江中垚建设有限公司 Secondary structure concrete reversed ridge aluminum alloy template and forming method
CN114319718A (en) * 2020-09-30 2022-04-12 华中科技大学 Steel prestressed concrete composite beam and pouring mold thereof

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102465595A (en) * 2010-11-06 2012-05-23 吴和生 Template for concrete pouring wall
CN102392534A (en) * 2011-07-29 2012-03-28 深圳市良创建筑铝模制品有限公司 Aluminum alloy building template assembly
CN102392534B (en) * 2011-07-29 2013-11-27 深圳市良创建筑铝模制品有限公司 Aluminum alloy building template assembly
CN102704673A (en) * 2012-05-30 2012-10-03 浙江大学 Multifunctional steel template and application thereof
CN102704673B (en) * 2012-05-30 2014-12-24 浙江大学 Multifunctional steel template and application thereof
CN104695703A (en) * 2015-02-11 2015-06-10 茂名市建筑集团有限公司 Non-drilled shear wall construction template system and shear wall construction method
CN104763142B (en) * 2015-04-01 2017-05-10 广东合迪科技股份有限公司 Aluminum template back arris system
CN104763142A (en) * 2015-04-01 2015-07-08 广东合迪科技股份有限公司 Aluminum template back arris system
CN105040980A (en) * 2015-06-17 2015-11-11 中国能源建设集团广西水电工程局有限公司 Method for continuous lifting construction of concrete complex structure
CN105178592A (en) * 2015-06-17 2015-12-23 中国能源建设集团广西水电工程局有限公司 Continuous ascending formwork for concrete complex structure
CN105178592B (en) * 2015-06-17 2017-04-05 中国能源建设集团广西水电工程局有限公司 The continuous ascending formwork of concrete labyrinth
CN105040980B (en) * 2015-06-17 2017-05-17 中国能源建设集团广西水电工程局有限公司 Method for continuous lifting construction of concrete complex structure
CN107514138A (en) * 2017-08-18 2017-12-26 杨磊 Fast assembling-disassembling building template system and its construction method
CN107964957A (en) * 2017-12-15 2018-04-27 成都农业科技职业学院 A kind of civil engineering support device
CN107964957B (en) * 2017-12-15 2019-08-09 成都农业科技职业学院 A kind of civil engineering support device
CN111926857A (en) * 2020-07-20 2020-11-13 鞍山三冶建筑工程有限公司 Template for construction joint of pipe gallery wall and construction method
CN111926857B (en) * 2020-07-20 2022-03-15 鞍山三冶建筑工程有限公司 Template for construction joint of pipe gallery wall and construction method
CN114319718A (en) * 2020-09-30 2022-04-12 华中科技大学 Steel prestressed concrete composite beam and pouring mold thereof
CN114319718B (en) * 2020-09-30 2023-03-14 华中科技大学 Steel prestressed concrete composite beam and pouring mold thereof
CN112412025A (en) * 2020-11-11 2021-02-26 浙江中垚建设有限公司 Secondary structure concrete reversed ridge aluminum alloy template and forming method

Similar Documents

Publication Publication Date Title
CN2893055Y (en) Super high wall body three-section form
CN1332102C (en) Dismantling-free internal and external wall heat insulation decoration formwork and its construction method
CN108914965A (en) The continuous construction method of aluminum alloy mould plate for pipe gallery
CN204898736U (en) Underground garage roof or bottom plate post -cast strip prestressing tendons structure
CN209040349U (en) A kind of ring muscle fastening shear wall structure being easily installed
CN114607140A (en) Concrete structure free of formwork construction and construction method
CN201232351Y (en) Cast-in-place floor construction joint baffle
CN111101715A (en) Concrete windowsill coping combined construction method and structure
CN202509764U (en) Template bracing structure for constructional column
CN204551172U (en) A kind of prefabricated road surface of assembled steel reinforced concrete hollow
CN215563552U (en) Vertical joint construction of prefabricated wallboard based on ultra high performance concrete form
CN217128632U (en) Assembled building wall form and assembled building wall
CN2893056Y (en) Taper pile shuttering
CN105369981A (en) Reinforcement-type permanent beam form with embedded buckle connection, concrete structural element and manufacture method thereof
CN109518857A (en) A kind of bidirectional laminated slab plate side piece connecting structure and overlapping board construction method
CN102926534B (en) Detachable building formwork for hollow floor slab and ribbed floor slab
CN210134641U (en) Construction structures is pour to concrete link plate secondary under roof beam
CN108589970A (en) The construction method of prefabricated window frame shear wall
CN205421710U (en) Permanent beam mold board, concrete structure component are connected to arrangement of reinforcement formula buckle
CN211774952U (en) Concrete superimposed sheet mosaic structure
CN211286164U (en) Self-compaction regeneration block concrete superimposed shear wall
CN202745377U (en) Strengthening bolt of shear wall linkage pattern plate
CN209723341U (en) A kind of bidirectional laminated slab bottom plate of close piece connection
CN102797356A (en) Shear wall jointing template reinforcing bolt
CN207436338U (en) A kind of new precast panel

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070425

Termination date: 20140614

EXPY Termination of patent right or utility model