CN107964957A - A kind of civil engineering support device - Google Patents

A kind of civil engineering support device Download PDF

Info

Publication number
CN107964957A
CN107964957A CN201711414834.7A CN201711414834A CN107964957A CN 107964957 A CN107964957 A CN 107964957A CN 201711414834 A CN201711414834 A CN 201711414834A CN 107964957 A CN107964957 A CN 107964957A
Authority
CN
China
Prior art keywords
guard plate
side guard
block
fixed
support device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711414834.7A
Other languages
Chinese (zh)
Other versions
CN107964957B (en
Inventor
何琼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Vocational College of Agricultural Science and Technology
Original Assignee
Chengdu Vocational College of Agricultural Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Vocational College of Agricultural Science and Technology filed Critical Chengdu Vocational College of Agricultural Science and Technology
Priority to CN201711414834.7A priority Critical patent/CN107964957B/en
Publication of CN107964957A publication Critical patent/CN107964957A/en
Application granted granted Critical
Publication of CN107964957B publication Critical patent/CN107964957B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes

Abstract

The invention discloses a kind of civil engineering support device, including the first side guard plate and the second side guard plate, the 3rd side guard plate and the 4th side guard plate are provided between first side guard plate and the second side guard plate, both ends of the surface on the outside of 3rd side guard plate are respectively fixed with the first limited block, the both ends of the surface of 4th side guard plate are respectively fixed with the second limited block, three fixed blocks are respectively fixed with the lateral wall of first side guard plate and on the lateral wall of the second side guard plate, with being respectively fixed with a fixed block on the lateral wall of the 4th side guard plate on 3rd side guard plate, each fixed block has been respectively fixedly connected with supporting rod, the other end of supporting rod is fixed with micromatic setting, micromatic setting includes adjusting bolt, supporting block and cushion block, tapped through hole is offered in supporting block, installation and adjustment bolt on tapped through hole, the lower end of adjusting bolt is fixedly connected with cushion block.Install convenient is combined in the invention, and overall stability preferably easily combines whole support device with the house foundation length that can be poured as needed.

Description

A kind of civil engineering support device
Technical field
Invention is related to support device technical field, is specially a kind of civil engineering support device.
Background technology
Civil engineering had both referred to the technologies such as applied material, equipment and the exploration carried out, design, construction, maintenance, maintenance Activity, also refers to the object of engineering construction.Build on the ground or in underground, land or water, be directly or indirectly human lives, life Production, military, the various job facilities of Scientific Research Service, such as house, road, railway, pipeline, tunnel, bridge, canal, dykes and dams, port Mouth, power station, airport, ocean platform, water supply and drainage and protection works etc..Wherein house rise build during, it is necessary into The concreting of row house foundation, it is therefore desirable to using to civil engineering formwork for placing is supported with support device, but mesh It is preceding to be exclusively used in the support device that house foundation pours and have that combination installation is inconvenient, and overall stability is undesirable and basis The problem of house foundation length for needing to pour easily combines whole support device.
The content of the invention
The purpose of invention is to provide a kind of civil engineering support device, to solve proposed in the above background technology ask Topic.
To achieve the above object, invention provides following technical solution:A kind of civil engineering support device, including the first side Backplate and the second side guard plate, it is first spacing that the medial surface of first side guard plate equidistantly offers several successively along its length Groove, the medial surface of second side guard plate equidistantly offer several second limiting slots, first side successively along its length The 3rd side guard plate and the 4th side guard plate, one end installation of the 3rd side guard plate are provided between backplate and second side guard plate In corresponding first limiting slot, the other end of the 3rd side guard plate is installed in corresponding second limiting slot, described One end of 4th side guard plate is installed in corresponding first limiting slot, and the other end of the 4th side guard plate is installed in corresponding The second limiting slot in, the both ends of the surface on the outside of the 3rd side guard plate are respectively fixed with the first limited block, one of them described One limited block is fixedly connected by two the first fastening bolts with adjacent first side guard plate, first described in other in which Limited block is fixedly connected by two the first fastening bolts with second side guard plate, the both ends of the surface difference of the 4th side guard plate The second limited block is fixed with, one of them described second limited block passes through two the second fastening bolts and adjacent first side Backplate is fixedly connected, and the second limited block described in other in which is fixed by two the second fastening bolts and second side guard plate Connect, three fixations are respectively fixed with the lateral wall of first side guard plate and on the lateral wall of second side guard plate Block, the middle position of the lateral wall of the 3rd side guard plate and the middle position of the lateral wall of the 4th side guard plate are distinguished A fixed block is fixed with, each fixed block has been respectively fixedly connected with supporting rod, and the other end of the supporting rod is fixed with Micromatic setting, the micromatic setting include adjusting bolt, supporting block and cushion block, the side of the supporting block and the supporting rod End is fixedly connected, and the tapped through hole vertically set is offered in the supporting block, installs and adjusts on the tapped through hole Bolt is saved, the lower end of the adjusting bolt is fixedly connected with cushion block.
Preferably, second limiting slot is opened up along the width extension of second side guard plate.
Preferably, the 3rd threaded hole adapted to the described first fastening spiral shell phase-detecting, institute are offered on first limited block State the 4th threaded hole for offering on the second limited block and being adapted with second fastening bolt.
Preferably, some groups of the first threaded holes, the second side shield are provided with first side guard plate along its length Some groups of the second threaded holes are provided with plate along its length.
Preferably, the first spiral pin is installed in first threaded hole being not used by, second spiral shell being not used by Second spiral pin is installed in pit.
Preferably, the first fixture block is installed, the upper end of first fixture block is set in first limiting slot being not used by It is equipped with the first edge being mounted on first side guard plate.
Preferably, the second fixture block is installed, the upper end of second fixture block is set in second limiting slot being not used by It is equipped with the second edge being mounted on second side guard plate.
Compared with prior art, advantageous effect of the invention is:The civil engineering support device, in use, taking first One side guard plate and the second side guard plate across pitch, which are placed into, to be needed to pour in the foundation pit of house foundation, then in the first side guard plate and 3rd side guard plate and the 4th side guard plate are installed between two side guard plates, by set on the first side guard plate the first limiting slot and Second limiting slot is set on the second side guard plate, and the first limiting slot therein can be installed in it with the second limiting slot to corresponding The end of 3rd side guard plate and the end progress of the 4th side guard plate are spacing, improve the stability of combining structure, and the 3rd Two the first limited blocks are set to pass through the first fastening bolt and corresponding first side guard plate and the second side guard plate respectively on side guard plate It is fixedly connected, and sets two the second limited blocks to pass through the second fastening bolt and corresponding first respectively on the 4th side guard plate Side guard plate is fixedly connected with the second side guard plate, these combinations can further increase integrally-built stability;Due to digging Foundation pit inner bottom surface be not smooth, the branch of device surrounding occurs in the device so entirely combined when being arranged in foundation pit The end of strut cannot all play the effect of support, have some vacantly, the effect of support is not had, by supporting rod End set micromatic setting, and micromatic setting includes adjusting bolt, supporting block and cushion block, can pass through and adjust spiral shell Bolt, realizes that each cushion block can play the effect of support, stability of the increase device during support;By in the first side The medial surface of backplate equidistantly opens up several first limiting slots successively along its length, the second side guard plate medial surface along length Direction equidistantly opens up several second limiting slots successively, sets some groups of the first threaded holes along its length on the first side guard plate And second be provided with some groups of the second threaded holes on side guard plate along its length, the length selection phase that can be poured as needed The first limiting slot answered and the second limiting slot install the 3rd side guard plate, the 4th side guard plate, select corresponding first threaded hole and the Two threaded holes strengthen firm so that and the house foundation length that can be poured as needed easily combines whole support device, The first limiting slot for not being selected of residue with the second limiting slot by installing corresponding first fixture block, the second fixture block, not by The first threaded hole chosen the first spiral pin corresponding with installation in the second threaded hole, the second spiral pin, can effectively ensure to pour Ground the smooth of the edge and protect these limiting slots and threaded hole.
Brief description of the drawings
Fig. 1 is a kind of civil engineering support device structure diagram;
Fig. 2 is a kind of the first side guard board structure schematic diagram of civil engineering support device;
Fig. 3 is a kind of the second side guard board structure schematic diagram of civil engineering support device;
Fig. 4 is a kind of micromatic setting structure diagram of civil engineering support device.
In figure:The first side guard plates of 1-;The second side guard plates of 2-;The 3rd side guard plates of 3-;The 4th side guard plates of 4-;5- first is spacing Block;The second limited blocks of 6-;The second fastening bolts of 7-;The first fastening bolts of 8-;The first limiting slots of 9-;The second limiting slots of 10-;11- Fixed block;12- supporting rods;13- micromatic settings;131- adjusting bolts;132- supporting blocks;133- cushion blocks;The first threaded holes of 14-; The first fixture blocks of 15-;16- first edges;The second threaded holes of 17-;The second fixture blocks of 18-;19- second edges;The first spiral pins of 20-;21- Second spiral pin.
Embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other without making creative work Embodiment, belongs to the scope of protection of the invention.
- 4 are please referred to Fig.1, invention provides a kind of technical solution:A kind of civil engineering support device, including the first side shield 1 and second side guard plate 2 of plate, the medial surface of first side guard plate 1 equidistantly offer several the first limits successively along its length Position groove 9, the medial surface of second side guard plate 2 equidistantly offers several second limiting slots 10 successively along its length, described The 3rd side guard plate 3 and the 4th side guard plate 4, the 3rd side guard plate are provided between first side guard plate 1 and second side guard plate 2 3 one end is installed in corresponding first limiting slot 9, and the other end of the 3rd side guard plate 3 is installed on corresponding second In limiting slot 10, one end of the 4th side guard plate 4 is installed in corresponding first limiting slot 9, the 4th side guard plate 4 The other end is installed in corresponding second limiting slot 10, and the both ends of the surface in the outside of the 3rd side guard plate 3 are respectively fixed with first Limited block 5, one of them described first limited block 5 are solid by two the first fastening bolts 8 and adjacent first side guard plate 1 Fixed connection, the first limited block 5 described in other in which is fixed by two the first fastening bolts 8 with second side guard plate 2 to be connected Connect, the both ends of the surface of the 4th side guard plate 4 are respectively fixed with the second limited block 6, one of them described second limited block 6 passes through two A second fastening bolt 7 is fixedly connected with adjacent first side guard plate 1, and the second limited block 6 passes through described in other in which Two the second fastening bolts 7 are fixedly connected with second side guard plate 2, on the lateral wall of first side guard plate 1 and described Three fixed blocks 11, the interposition of the lateral wall of the 3rd side guard plate 3 are respectively fixed with the lateral wall of second side guard plate 2 The place of putting and the middle position of the lateral wall of the 4th side guard plate 4 are respectively fixed with a fixed block 11, each fixation Block 11 has been respectively fixedly connected with supporting rod 12, and the other end of the supporting rod 12 is fixed with micromatic setting 13, the micromatic setting 13 include adjusting bolt 131, supporting block 132 and cushion block 133, the side of the supporting block 132 and the end of the supporting rod 12 It is fixedly connected, offers the tapped through hole vertically set in the supporting block 132, installation and adjustment on the tapped through hole Bolt 131, the lower end of the adjusting bolt 131 are fixedly connected with cushion block 133.
Second limiting slot 10 is opened up along the width extension of second side guard plate 2.
Offered on first limited block 5 with first fastening bolt 8 be adapted the 3rd threaded hole, described second The 4th threaded hole being adapted with second fastening bolt 7 is offered on limited block 6.
Some groups of the first threaded holes 14 are provided with first side guard plate 1 along its length, on second side guard plate 2 Some groups of the second threaded holes 17 are provided with along its length.
The first spiral pin 20 is installed in first threaded hole 14 being not used by, second threaded hole being not used by Second spiral pin 21 is installed in 17.
First fixture block 15 is installed, the upper end of first fixture block 15 is set in first limiting slot 9 being not used by There is the first edge 16 being mounted on first side guard plate 1.
Second fixture block 18 is installed, the upper end of second fixture block 18 is set in second limiting slot 10 being not used by There is the second edge 19 being mounted on second side guard plate 2.
Operation principle:The civil engineering support device, in use, taking 2 edge of the first side guard plate 1 and the second side guard plate first Trend, which is placed into, to be needed to pour in the foundation pit of house foundation, and the 3rd is then installed between the first side guard plate 1 and the second side guard plate 2 3 and the 4th side guard plate 4 of side guard plate, by setting the first limiting slot 9 on the first side guard plate 1 and being set on the second side guard plate 2 The second limiting slot 10 is put, the first limiting slot 9 therein can protect corresponding the 3rd side installed in it with the second limiting slot 10 The end of plate 3 and the progress of the end of the 4th side guard plate 4 are spacing, improve the stability of combining structure, and in the 3rd side guard plate 3 Two the first limited blocks 5 of upper setting are solid with corresponding first side guard plate, 1 and second side guard plate 2 by the first fastening bolt 8 respectively Fixed connection, and set on the 4th side guard plate 4 two the second limited blocks 6 respectively by the second fastening bolt 7 and corresponding the One side guard plate 1 is fixedly connected with the second side guard plate 2, these combinations can further increase integrally-built stability;Due to The foundation pit inner bottom surface dug is not smooth, and device surrounding occurs in the device so entirely combined when being arranged in foundation pit The end of supporting rod 12 cannot all play the effect of support, have that some are hanging, do not have the effect of support, by The end set micromatic setting 13 of supporting rod 12, and micromatic setting 13 includes adjusting bolt 131, supporting block 132 and cushion block 133, it can realize that each cushion block 133 can play the effect of support, increase device is supporting by adjusting adjusting bolt 131 During stability;By equidistantly opening up several the first limits successively along its length in the medial surface of the first side guard plate 1 Position groove 9, equidistantly opens up several second limiting slots 10, in the first side successively along its length in the medial surface of the second side guard plate 2 Set along its length on backplate 1 be provided with along its length on some groups of the first threaded holes 14 and the second side guard plate 2 it is some The second threaded hole 17 of group, the length that can be poured as needed select corresponding first limiting slot 9 to be installed with the second limiting slot 10 3rd side guard plate 3, the 4th side guard plate 4, select corresponding first threaded hole, 14 and second threaded hole 17 to carry out strengthening consolidating so that The house foundation length that can be poured as needed easily combines whole support device, the first limiting slot that residue is not selected 9 with the second limiting slot 10 by installing corresponding first fixture block 15, the second fixture block 18, the first threaded hole 14 for not being selected with Corresponding first spiral pin 20 of installation, the second spiral pin 21, can effectively ensure the ground edge-light poured in second threaded hole 17 Slide and protect these limiting slots and threaded hole.
Obviously, various changes and modifications can be made to the invention without departing from essence of the invention by those skilled in the art God and scope.In this way, if these modifications and changes of the present invention belongs to the scope of the claims in the present invention and its equivalent technologies Within, then the present invention is also intended to comprising including these modification and variations.

Claims (7)

  1. A kind of 1. civil engineering support device, it is characterised in that:It is described including the first side guard plate (1) and the second side guard plate (2) The medial surface of first side guard plate (1) equidistantly offers several first limiting slots (9), the second side shield successively along its length The medial surface of plate (2) equidistantly offers several second limiting slots (10) successively along its length, first side guard plate (1) with It is provided with the 3rd side guard plate (3) and the 4th side guard plate (4) between second side guard plate (2), the one of the 3rd side guard plate (3) End is installed in corresponding first limiting slot (9), and the other end of the 3rd side guard plate (3) is installed on the corresponding second limit In position groove (10), one end of the 4th side guard plate (4) is installed in corresponding first limiting slot (9), the 4th side shield The other end of plate (4) is installed in corresponding second limiting slot (10), the both ends of the surface difference on the outside of the 3rd side guard plate (3) Be fixed with the first limited block (5), one of them described first limited block (5) by two the first fastening bolts (8) with it is adjacent First side guard plate (1) is fixedly connected, and the first limited block (5) described in other in which passes through two the first fastening bolts (8) It is fixedly connected with second side guard plate (2), the both ends of the surface of the 4th side guard plate (4) are respectively fixed with the second limited block (6), One of them described second limited block (6) is fixed with adjacent first side guard plate (1) by two the second fastening bolts (7) Connection, the second limited block (6) described in other in which are solid by two the second fastening bolts (7) and second side guard plate (2) It is fixed to connect, respectively it is fixed with the lateral wall of first side guard plate (1) and on the lateral wall of second side guard plate (2) Three fixed blocks (11), the middle position of the lateral wall of the 3rd side guard plate (3) and the outside of the 4th side guard plate (4) The middle position of wall is respectively fixed with a fixed block (11), and each fixed block (11) has been respectively fixedly connected with supporting rod (12), the other end of the supporting rod (12) is fixed with micromatic setting (13), and the micromatic setting (13) includes adjusting bolt (131), supporting block (132) and cushion block (133), the side and the end of the supporting rod (12) of the supporting block (132) are fixed Connection, offers the tapped through hole vertically set on the supporting block (132), installation and adjustment spiral shell on the tapped through hole Bolt (131), the lower end of the adjusting bolt (131) are fixedly connected with cushion block (133).
  2. A kind of 2. civil engineering support device as claimed in claim 1, it is characterised in that:First limiting slot (9) edge The width extension of first side guard plate (1) opens up, width of second limiting slot (10) along second side guard plate (2) The extension of degree direction opens up.
  3. A kind of 3. civil engineering support device as claimed in claim 1, it is characterised in that:On first limited block (5) Offer the 3rd threaded hole being adapted with first fastening bolt (8), offer on second limited block (6) with it is described The 4th adaptable threaded hole of second fastening bolt (7).
  4. A kind of 4. civil engineering support device as claimed in claim 1, it is characterised in that:On first side guard plate (1) Some groups of the first threaded holes (14) are provided with along its length, are provided with along its length on second side guard plate (2) some The second threaded hole of group (17).
  5. A kind of 5. civil engineering support device as claimed in claim 4, it is characterised in that:First spiral shell being not used by The first spiral pin (20) is installed in pit (14), the second spiral pin is installed in second threaded hole (17) being not used by (21)。
  6. A kind of 6. civil engineering support device as claimed in claim 1, it is characterised in that:First limit being not used by The first fixture block (15) is installed in position groove (9), the upper end of first fixture block (15), which is provided with, is mounted in first side guard plate (1) first edge (16) on.
  7. A kind of 7. civil engineering support device as claimed in claim 1, it is characterised in that:Second limit being not used by The second fixture block (18) is installed in position groove (10), the upper end of second fixture block (18), which is provided with, is mounted in second side guard plate (2) second edge (19) on.
CN201711414834.7A 2017-12-15 2017-12-15 A kind of civil engineering support device Expired - Fee Related CN107964957B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711414834.7A CN107964957B (en) 2017-12-15 2017-12-15 A kind of civil engineering support device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711414834.7A CN107964957B (en) 2017-12-15 2017-12-15 A kind of civil engineering support device

Publications (2)

Publication Number Publication Date
CN107964957A true CN107964957A (en) 2018-04-27
CN107964957B CN107964957B (en) 2019-08-09

Family

ID=61994747

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711414834.7A Expired - Fee Related CN107964957B (en) 2017-12-15 2017-12-15 A kind of civil engineering support device

Country Status (1)

Country Link
CN (1) CN107964957B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114592496A (en) * 2022-04-27 2022-06-07 王琳 Anti-sinking bracket type building foundation reinforcing mechanism

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002250042A (en) * 2001-02-26 2002-09-06 Eco World:Kk Form structure
CN2893055Y (en) * 2006-06-14 2007-04-25 北京建工一建工程建设有限公司 Super high wall body three-section form

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002250042A (en) * 2001-02-26 2002-09-06 Eco World:Kk Form structure
CN2893055Y (en) * 2006-06-14 2007-04-25 北京建工一建工程建设有限公司 Super high wall body three-section form

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114592496A (en) * 2022-04-27 2022-06-07 王琳 Anti-sinking bracket type building foundation reinforcing mechanism

Also Published As

Publication number Publication date
CN107964957B (en) 2019-08-09

Similar Documents

Publication Publication Date Title
CN104358421B (en) A kind of replacing method of shock insulation rubber bearing
CN107268450B (en) The drag reduction guiding discharge mechanism and pushing method of combined bridge are built for pushing tow
CN109898465A (en) A kind of construction of hydro project baffle device for water
CN107964957B (en) A kind of civil engineering support device
KR20130005412A (en) Elasticity connection apparatus of tunnel support girder
CN103225307B (en) Construction method for dynamic steel supporting system of deep foundation pit
CN205534591U (en) Hang protection architecture of trusteeship line
CN102720890A (en) Crossing protector for submarine pipeline
CN104032767A (en) Tower crane foundation in deep foundation pit and construction method of tower crane foundation
CN106638326A (en) Construction system for hoisting cable tower-free bridge cable and construction method
CN203177845U (en) Underwater frame cage protective type settlement observation device
CN109208615A (en) A kind of groove notch supporting construction, construction method and groove pouring procedure
CN101864705B (en) Mounting method of track fundamental equipment bracket of tamping coke oven SCP (Stamping, Charging and Pushing) machine
CN105604129A (en) Water pump mounting construction method
CN109281301B (en) Construction method for hanging irrigation channel
CN206887995U (en) Detachable cement tank tower foundation device
CN209688253U (en) A kind of water conservancy construction pipe laying wire fixing device
CN208586468U (en) The secondary scalable general railway roadbed of pouring type
CN207714149U (en) Across the cast-in-place section construction holder in high-altitude obliquely-intersected beams abrupt slope side
CN217402101U (en) Supporting platform for hydraulic engineering construction
CN210031682U (en) Slope protection support frame for hydraulic engineering
CN104594207A (en) Supporting device used for bridge horizontal rotation construction, rotation supporting system and construction method
CN217479985U (en) Girder installation device adopting bracket and temporary inhaul cable
CN209307970U (en) Gas shield dam anchoring system
CN112575735B (en) Ecological river bank construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190809

Termination date: 20201215