CN206887995U CN201720851489.2U CN201720851489U CN206887995U CN 206887995 U CN206887995 U CN 206887995U CN 201720851489 U CN201720851489 U CN 201720851489U CN 206887995 U CN206887995 U CN 206887995U
Authority
CN
China
Prior art keywords
tank tower
fixed substrate
basic module
basic
foundation device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720851489.2U
Other languages
Chinese (zh)
Inventor
张晓明
孙维根
钱军
陈晓明
姜谦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Original Assignee
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tiesiju Civil Engineering Group Co Ltd CTCE Group filed Critical China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority to CN201720851489.2U priority Critical patent/CN206887995U/en
Application granted granted Critical
Publication of CN206887995U publication Critical patent/CN206887995U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Physical Or Chemical Processes And Apparatus (AREA)

Abstract

It the utility model is related to a kind of detachable cement tank tower foundation device, including fixed substrate, the upper face of the fixed substrate sets dismountable basic module, the basic module be located in fixed substrate set it is multiple, multiple basic module splits are the basis for supporting cementing tank tower, multiple mutual mosaics of basic module are provided with the installing plate for installing cementing tank tower support feet, it is above-mentioned to be used to support the basis of fixed cementing tank tower to split into multiple basic modules, so as to utilize the integral lifting carrying for playing equipment realization to basic module, and basic module is arranged in fixed substrate, fixed substrate entirety stress, the cracking tilt phenomenon that basic stress can be avoided uneven and occurred, so as to improve the stability to the support of cementing tank tower.

Description

Detachable cement tank tower foundation device
Technical field
It the utility model is related to Construction Technology field, and in particular to a kind of detachable cement tank tower foundation device.
Background technology
In engineering construction, the construction installation on basis typically can be all built well in advance, the wherein construction of cementing tank tower is particularly heavy Will, cementing tank tower is generally fixed on ground, because the weight of cementing tank tower is larger, it is necessary to enter to the basis of fixed cementing tank tower Row construction, during the foundation construction of cementing tank tower of the prior art, it is necessary first to foundation ditch is dug on the ground, and into foundation ditch Plain concrete is filled, after concrete setting, forms a substrate, in substrate upper face mounting plate, so as to realize pair The fixation of cementing tank tower support feet, in the prior art, after above-mentioned cementing tank tower fixes, to save material and avoiding cement from stirring Mix pile driving construction and terminate rear cementing tank tower foundation and just abandon substantially, because original basis is all to be cast-in-place current, abandons, make after the completion of use Abandoned outside need to being crushed into the pipe of cement basis after the completion of material loss and waste and use, workload is larger, and original basis scene is digged pit Formwork erection pours, if being soil matrix in field, easily causes bottom out-of-flatness, washes away that to be easily caused part basis hanging after particularly raining, So as to topple over because discontinuity produces basis cracking inclination even cementing tank.
Utility model content
The purpose of this utility model be just to provide one kind can detachable cementing tank tower foundation device, can reuse, The waste of material is reduced, can also improve the strong degree to the support of cementing tank tower.
To achieve the above object, the technical solution adopted in the utility model is:
Detachable cement tank tower foundation device, including fixed substrate, the upper face of the fixed substrate are set detachably Basic module, the basic module be located in fixed substrate set it is multiple, multiple basic module splits be for supporting cement The basis of tank tower, multiple mutual mosaics of basic module are provided with the installing plate for installing cementing tank tower support feet.
Following characteristics also be present in the utility model:
The upper face that the basic module is located at fixed substrate is provided with 4, and 4 basic modules are mutually spliced to form rectangle Tabular, suspension ring are provided with the basic module.
Two dividing plates are provided with the fixed substrate, two divider upright is intersected and fixed substrate is divided into 4 Region for installation foundation module.
Positioning L-square is additionally provided with the fixed substrate, the positioning L-square is located at four turnings of fixed substrate Place is set.
The lower face of the fixed substrate sets multiple fixed cones.
Compared with prior art, the technique effect that the utility model possesses is:It is above-mentioned to be used to support fixed cementing tank tower Basis splits into multiple basic modules, and the integral lifting of basic module is carried so as to be realized using lifting appliance, and base Plinth module is arranged in fixed substrate, fixed substrate entirety stress, you can the cracking for avoiding basic stress uneven and occurring tilts Phenomenon, so as to improve the stability to the support of cementing tank tower.
Brief description of the drawings
Fig. 1 is the top view of basic module;
Fig. 2 is the top view of fixed substrate;
Fig. 3 is the structural representation that base apparatus is used to support cementing tank tower.
Embodiment
With reference to Fig. 1 to Fig. 3, the utility model is further described:
Detachable cement tank tower foundation device, including fixed substrate 10, the upper face of the fixed substrate 10 is set can The basic module 20 of dismounting, the basic module 20, which is located in fixed substrate 10, to be set multiple, and multiple splits of basic module 20 are For supporting the basis of cementing tank tower 30, multiple 20 mutual mosaics of basic module are provided with to be supported for installing cementing tank tower 30 The installing plate 21 of pin;
It is above-mentioned to be used to support the basis of fixed cementing tank tower 30 to split into multiple basic modules 20 with reference to shown in Fig. 3, so as to The integral lifting of basic module 20 is carried using equipment realization is played, and basic module 20 is arranged on fixed substrate 10 On, 20 overall stress of fixed substrate, you can the cracking tilt phenomenon for avoiding basic stress uneven and occurring, so as to improve to cement The stability that tank tower 30 supports.
Further, with reference to shown in Fig. 1, the upper face that the basic module 20 is located at fixed substrate 10 is provided with 4, and 4 Individual basic module 20 is mutually spliced to form rectangular plate-like, and suspension ring 22 are provided with the basic module 20;
Above-mentioned suspension ring 22 can be banded on steel reinforcement cage when basic module 20 is preset, and to steel reinforcement cage casting concrete, After concrete setting, basic module 20 is molded, you can realizes the installation and dismounting to basic module 20 using hanging device.
To implement the positioning to basic module 20, with reference to shown in Fig. 2, two dividing plates 11 are provided with the fixed substrate 10, The square crossing of two dividing plate 11 and by fixed substrate 10 be divided into 4 be used for installation foundation module 20 regions;
The above-mentioned thickness of two dividing plate 11 is unsuitable blocked up, causes the gap between basic module 20 to be maintained at 5cm or so as far as possible.
Further, positioning L-square 12 is additionally provided with the fixed substrate 10, the positioning L-square 12 is positioned at solid Four corners for determining substrate 10 are set.
To implement the advance fixation to strap 10, the lower face of the fixed substrate 10 sets multiple fixed cones 13.
It is obvious to a person skilled in the art that the utility model is not limited to the details of above-mentioned one exemplary embodiment, and And without departing from the spirit or essential characteristics of the present invention, the utility model can be realized in other specific forms. Therefore, no matter from the point of view of which point, embodiment all should be regarded as exemplary, and is nonrestrictive, the utility model Scope limited by appended patent requirements rather than described above, it is intended that implication in the equivalency of patent requirements will be fallen Included with all changes in scope in the present invention.Any reference in patent requirements should not be considered as involved by limitation Patent requirements.
Moreover, it will be appreciated that although the present specification is described in terms of embodiments, not each embodiment is only wrapped Containing an independent technical scheme, this narrating mode of specification is only that those skilled in the art should for clarity Using specification as an entirety, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art It is appreciated that other embodiment.

Claims (5)

1. detachable cement tank tower foundation device, it is characterised in that:Including fixed substrate (10), the fixed substrate (10) Upper face sets dismountable basic module (20), the basic module (20) be located in fixed substrate (10) set it is multiple, it is more Individual basic module (20) split is the basis for supporting cementing tank tower (30), and multiple basic modules (20) mutually mosaic is set There is the installing plate (21) for installing cementing tank tower (30) support feet.
2. detachable cement tank tower foundation device according to claim 1, it is characterised in that:The basic module (20) The upper face of fixed substrate (10) is provided with 4,4 basic modules (20) are mutually spliced to form rectangular plate-like, the base Suspension ring (22) are provided with plinth module (20).
3. detachable cement tank tower foundation device according to claim 2, it is characterised in that:The fixed substrate (10) On be provided with two dividing plates (11), two dividing plates (11) square crossing and be divided into 4 to be used to install fixed substrate (10) The region of basic module (20).
4. detachable cement tank tower foundation device according to claim 3, it is characterised in that:The fixed substrate (10) On be additionally provided with positioning L-square (12), it is described positioning L-square (12) be located at fixed substrate (10) four corners setting.
5. detachable cement tank tower foundation device according to claim 4, it is characterised in that:The fixed substrate (10) Lower face multiple fixed cones (13) are set.
CN201720851489.2U 2017-07-13 2017-07-13 Detachable cement tank tower foundation device Active CN206887995U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720851489.2U CN206887995U (en) 2017-07-13 2017-07-13 Detachable cement tank tower foundation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720851489.2U CN206887995U (en) 2017-07-13 2017-07-13 Detachable cement tank tower foundation device

Publications (1)

Publication Number Publication Date
CN206887995U true CN206887995U (en) 2018-01-16

Family

ID=61296363

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720851489.2U Active CN206887995U (en) 2017-07-13 2017-07-13 Detachable cement tank tower foundation device

Country Status (1)

Country Link
CN (1) CN206887995U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113323003A (en) * 2021-06-15 2021-08-31 中国建筑第八工程局有限公司 Cement tank foundation capable of being circulated and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113323003A (en) * 2021-06-15 2021-08-31 中国建筑第八工程局有限公司 Cement tank foundation capable of being circulated and construction method thereof

Similar Documents

Publication Publication Date Title
US7740417B2 (en) Construction method for installing underground pipes for high-tension cables by using trough
CN110130355B (en) Foundation bottom plate post-cast strip force transmission structure and construction method thereof
CN102444130B (en) Support replacing construction method in deep foundation pit project
CN105201011A (en) Complex anchored-plate retaining wall and construction method thereof
KR101048023B1 (en) System pile unit of type suction
CN109386050A (en) A kind of multi-layer combined type house structure
CN206887995U (en) Detachable cement tank tower foundation device
KR20200032316A (en) Method for Forming Top-down-typed Underground Strucutre using Trus-typed Support
CN110158602A (en) A kind of Soft Clay deep foundation pit support excavation construction structure and construction method
CN207775938U (en) A kind of monoblock type walling crib construction formwork removing device of inspection shaft
CN103122642A (en) Construction method of vertical post support change
JP2014051848A (en) Solar panel installation base
CN211113217U (en) Curved surface support
CN110439162A (en) The construction technology of cast-in-situ hollow building roof
CN204038860U (en) Tee girder formwork hoisting instrument
CN105839786A (en) Air-supported membrane building concrete anchor bolt pre-buried structure and construction method thereof
KR101282333B1 (en) Cross-type supporting structure and method for super-structure of bridge
KR101213404B1 (en) Concrete structure for bridge and its manufacturing method
CN210684474U (en) Follow-up supporting device for bridge jacking construction
CN204326613U (en) A kind of 110kV transformer station installation component
CN211772879U (en) Spacing top of steel case roof beam hoist and mount pushes away construction structures
CN108342984B (en) Soft foundation trestle for mudflat and installation and sedimentation method thereof
CN108035355A (en) A kind of building concrete, which pours, uses automatic positioning equipment
CN210621482U (en) Steel box supporting cushion block for bridge jacking construction
CN108824452A (en) A kind of foundation pit enclosure support system