CN108035355A - A kind of building concrete, which pours, uses automatic positioning equipment - Google Patents

A kind of building concrete, which pours, uses automatic positioning equipment Download PDF

Info

Publication number
CN108035355A
CN108035355A CN201711389874.0A CN201711389874A CN108035355A CN 108035355 A CN108035355 A CN 108035355A CN 201711389874 A CN201711389874 A CN 201711389874A CN 108035355 A CN108035355 A CN 108035355A
Authority
CN
China
Prior art keywords
positioning
plate
threaded hole
groove
positioning base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711389874.0A
Other languages
Chinese (zh)
Other versions
CN108035355B (en
Inventor
陈键
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Xingqianli Intellectual Property Service Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711389874.0A priority Critical patent/CN108035355B/en
Publication of CN108035355A publication Critical patent/CN108035355A/en
Application granted granted Critical
Publication of CN108035355B publication Critical patent/CN108035355B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/08Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing
    • F16L3/12Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing comprising a member substantially surrounding the pipe, cable or protective tubing
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/06Placing concrete under water
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16FSPRINGS; SHOCK-ABSORBERS; MEANS FOR DAMPING VIBRATION
    • F16F15/00Suppression of vibrations in systems; Means or arrangements for avoiding or reducing out-of-balance forces, e.g. due to motion
    • F16F15/02Suppression of vibrations of non-rotating, e.g. reciprocating systems; Suppression of vibrations of rotating systems by use of members not moving with the rotating systems
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/40Miscellaneous comprising stabilising elements

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Acoustics & Sound (AREA)
  • Aviation & Aerospace Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The present invention relates to building to pour field,Specially a kind of building concrete, which pours, uses automatic positioning equipment,Including positioning base,Positioning pedestal and connecting shaft,Positioning pedestal is arranged on the upper end of positioning base,The both ends of the positioning base along its length are equipped with traction handle,It is convenient to be moved for positioning base,The lower end of positioning base is equipped with anti-skidding limit protrusion,The section of the positioning pedestal is trapezoidal shape,It can not only be slowed down by the present apparatus for the active force of ground pump,And by equipped with reinforcing liptinite be also possible that the present apparatus is more hard,Place more firm,So can to avoid when pouring using manually carrying out pullling positioning,It not only more can accurately be pinpointed and be poured,Improve the quality poured,But also artificial input can be reduced,Reduce the input of cost,And then the occurrence frequency of accident can be reduced,Improve the security poured.

Description

A kind of building concrete, which pours, uses automatic positioning equipment
Technical field
The present invention relates to building pouring technique field, and specially a kind of building concrete, which pours, uses automatic positioning equipment.
Background technology
Ground often relates to filling pile construction with foundation engineering in building trade and raft plate is constructed, and most pile foundations are mixed Solidifying soil is poured as underwater concrete construction, and the pouring quality of pile concreting quality and raft plate directly affects pile foundation bearing capacity And structure safety, therefore concreting and raft plate are poured often as the emphasis in process control.Generally poured in pile concrete Operating platform is poured during building and in raft plate casting process to set up more arbitrarily, operating personnel can not protect safely in casting process Card.And the conduit of concreting is fixed also without fixed form, often result in reinforce it is not in place cause conduit to come off, pile body matter Amount cannot be guaranteed, and pour area it is excessive when, mixed mud air pump pour area can not meet to pour use when Wait, when must just be poured using concrete ground pump, but be poured using ground pump, it is difficult to accomplish accurately to control Discharge pump line, can not accurately be poured, and since the power of ground pump is excessive, often when pouring, can also use Manpower is controlled for discharging pump line, but effect is undesirable, and sometimes can also threaten the life safety of worker.
The content of the invention
It is an object of the invention to provide a kind of building concrete to pour with automatic positioning equipment, and the present invention, which has, precisely to be poured The features such as building, pouring safely.
To achieve the above object, the present invention provides following technical solution:A kind of building concrete is poured with automatic positioning dress Put, including positioning base, positioning pedestal and connecting shaft, positioning pedestal are arranged on the upper end of positioning base, the positioning base edge The both ends of length direction are equipped with traction handle, convenient to be moved for positioning base, and the lower end of positioning base is equipped with anti-skidding Limit protrusion, the section of the positioning pedestal is trapezoidal shape, and the upper center of positioning pedestal is equipped with clamping groove, clamping groove For arc buckling groove;
The upper end of the positioning pedestal is equipped with hinged block, and hinged block is set close to one end of clamping groove, the upper end of hinged block One end of limiting plate is hinged with, the vertical section of limiting plate is arc shape, and the other end of limiting plate is equipped with connecting hole, described fixed Inside one end of position pedestal is equipped with connection cavity, and connects cavity and be internally provided with limited block, the upper end of limited block and connecting rod One end connection, the other end of connecting rod sequentially passes through connection cavity and positioning pedestal and positioned at the top of positioning pedestal, connection The other end of bar is close to the other end of clamping groove, and the other end of connecting rod passes through the other end through connecting hole and limiting plate Connection;
The inner transverse of the positioning pedestal is equipped with securing plate group, and securing plate group includes upper securing plate and lower securing plate, upper to add Grafting location hole is offered in solid plate and lower securing plate, the lower end of clamping groove is fixedly connected with one end of shock structure, damping The other end of column is connected through grafting location hole and with the inner bottom of positioning pedestal, and the lower end of the upper securing plate is equipped with upper delay Punching is raised, and the upper end of lower securing plate is equipped with lower buffering protrusion, and the raised and lower raised in the vertical direction of buffering of upper buffering is one by one It is vertical corresponding;
The inside middle-end of the positioning base is vertically equipped with inserting groove, and one end of inserting groove sequentially passes through positioning base and positioning base Seat simultaneously extends to the inner bottom of clamping groove, is connected in the middle part of the other end of inserting groove and the inner bottom of positioning base, grafting The middle part of groove is equipped with the first threaded hole, and the limiting plate and clamping groove have cooperatively formed buckling groove, and the inside of buckling groove The lantern ring is connected with, the lantern ring is socketed in the outside of pump line, and connecting plate is fixed with the downside of the lantern ring, and connecting plate is arc Shape, and installing plate is connected with the downside of connecting plate, the middle part of the installing plate are equipped with the second threaded hole, and installing plate be plugged on it is slotting The inside of access slot, connecting plate are embedded in the inside of clamping groove;
The two sides of the positioning base offer the 3rd threaded hole, and the inner transverse of positioning base is provided with link slot, and The inner wall of link slot offers thread groove, and one end of link slot and the side of inserting groove connect, and link slot, the first screw thread Hole, the second threaded hole and the 3rd threaded hole are respectively positioned on same level height, and the outside of the connecting shaft is equipped with thread protrusion, connects One end of axis by interting the 3rd threaded hole, the first threaded hole and the second threaded hole and positioned at the inside of link slot, connection successively The other end of axis is equipped with swing handle, and swing handle is located at the outside of positioning base;
The inside both ends of the positioning base and positioning pedestal are reinforcing liptinite, and the inside for reinforcing liptinite is equipped with two Block partition plate, the first reinforcing rib group and the second reinforcing rib group, reinforce liptinite by partition plate be arranged with the first cavity, the second cavity and 3rd cavity, one end of the first reinforcing rib group is fixedly connected with reinforcing the side of liptinite inner upper end, and first strengthens The other end of muscle group is connected through partition plate with reinforcing in the middle part of liptinite inner bottom, one end of the second reinforcing rib group and partition plate Outer middle side part be fixedly connected, and the other end of the second reinforcing rib group is connected with reinforcing one end of bottom side inside liptinite, described The inside of first cavity, the second cavity and the 3rd cavity is filled with concrete.
Preferably, another end surfaces of the connecting rod are equipped with screw thread, and the other end thread fitting of connecting rod is socketed with Nut, connecting rod are two, and two connecting rods are arranged in positioning pedestal along its length.
Preferably, the shock structure is at least five, and is equally spaced between shock structure.
Preferably, the installing plate and inserting groove are five, and installing plate and inserting groove be equally distributed on clamping it is recessed The lower end of groove.
Preferably, the inner side of the limiting plate and the inside of clamping groove are equipped with buffering protective cushion, and buffering protective cushion For the opposite arc buffering neonychium of two pieces of openings.
Preferably, the quantity of the first reinforcing rib group and the second reinforcing rib group is at least two groups, and every group of reinforcement Muscle number is at least three.
Preferably, the installing plate, connecting plate and the lantern ring are an integral molding structure.
Preferably, the first threaded hole on each inserting groove, the second threaded hole on each installing plate and positioning bottom The 3rd threaded hole on seat is three, and is between the 3rd threaded hole between the first threaded hole, between the second threaded hole Angular distribution.
Compared with prior art, the beneficial effects of the invention are as follows:Pass through the positioning base of addition, positioning pedestal and limiting plate Mutual cooperation effect, not only can using ground pump when, for discharging pump line reinforce, prevent discharging pump line occur Displacement, pours so as to accurately be positioned, and when being poured, since the power of ground pump is bigger, thus Meeting will be very big for pouring the active force of positioner, it is easy to causes to pour the damage of positioner or sideslip, passes through The present apparatus can not only slow down for the active force of ground pump, and by equipped with reinforcing liptinite be also possible that this dress Put it is more hard, place it is more firm, so can to avoid when pouring using manually carrying out pullling positioning, not only can be with Carry out more accurate fixed point to pour, improve the quality poured, but also artificial input can be reduced, reduce the throwing of cost Enter, and then the occurrence frequency of accident can be reduced, improve the security poured.
Brief description of the drawings
Fig. 1 is the side view of the present invention;
Fig. 2 is the front view of the present invention;
Fig. 3 is the structure diagram of the reinforcing liptinite of the present invention;
Fig. 4 is the installing plate of the present invention and the connection diagram of inserting groove;
Fig. 5 is the installing plate of the present invention and the connection diagram of connecting plate;
Fig. 6 is the connecting rod schematic diagram of the present invention;
Fig. 7 is the shock structure of the present invention and the connection diagram of securing plate group.
In figure:Positioning base 1, positioning pedestal 2, limiting plate 3, traction handle 4, connecting shaft 5, partition plate 6, the first reinforcing rib group 7th, the second reinforcing rib group 8, buffering protective cushion 9, installing plate 10, link slot 11, inserting groove 12, connecting rod 13, limited block 131, company Fishplate bar 14, pump line 15, the lantern ring 16, shock structure 17, securing plate group 18.
Embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other without making creative work Embodiment, belongs to the scope of protection of the invention.
- 7 are please referred to Fig.1, the present invention provides a kind of technical solution:A kind of building concrete is poured with automatic positioning equipment, Including positioning base 1, positioning pedestal 2 and connecting shaft 5, positioning pedestal 2 is arranged on the upper end of positioning base 1, and positioning base 1 is along length The both ends in degree direction are equipped with traction handle 4, convenient to be moved for positioning base 1, and the lower end of positioning base 1 is equipped with anti-skidding Limit protrusion, the section of positioning pedestal 2 is trapezoidal shape, and the upper center of positioning pedestal 2 is equipped with clamping groove, and clamping groove is Arc buckling groove.
The upper end of positioning pedestal 2 is equipped with hinged block, and hinged block is set close to one end of clamping groove, the upper end of hinged block One end of limiting plate 3 is hinged with, the vertical section of limiting plate 3 is arc shape, and the other end of limiting plate 3 is equipped with connecting hole, fixed Inside one end of position pedestal 2 is equipped with connection cavity, and connect cavity is internally provided with limited block 131, the upper end of limited block 131 with One end connection of connecting rod 13, the other end of connecting rod 13 sequentially pass through connection cavity and positioning pedestal 2 and are located at positioning pedestal 2 Top, the other end of connecting rod 13 is close to the other end of clamping groove, and the other end of connecting rod 13 passes through through connecting hole It is connected with the other end of limiting plate 3, another end surfaces of connecting rod 13 are equipped with screw thread, and the other end thread fitting of connecting rod 13 Be socketed with nut, connecting rod 13 is two, and two connecting rods 13 are arranged in positioning pedestal 2 along its length, limiting plate 3 it is interior Side and the inside of clamping groove are equipped with buffering protective cushion 9, and buffering protective cushion 9 is the opposite arc buffering protection of two pieces of openings Pad.
The inner transverse of positioning pedestal 2 is equipped with securing plate group 18, and securing plate group 18 includes upper securing plate and lower securing plate, Grafting location hole is offered in upper securing plate and lower securing plate, the lower end of clamping groove is fixed with one end of shock structure 17 to be connected Connect, the other end of shock structure 17 is connected through grafting location hole and with the inner bottom of positioning pedestal 2, and the lower end of upper securing plate is set There is upper buffering protrusion, the upper end of lower securing plate is equipped with lower buffering protrusion, and the raised and lower protrusion that buffers of upper buffering is in vertical direction On it is vertical corresponding one by one, shock structure 17 is at least five, and is equally spaced between shock structure 17.
The inside middle-end of positioning base 1 is vertically equipped with inserting groove 12, and one end of inserting groove 12 sequentially passes through 1 He of positioning base Positioning pedestal 2 and the inner bottom for extending to clamping groove, the other end of inserting groove 12 and the inner bottom middle part of positioning base 1 Connection, the middle part of inserting groove 12 are equipped with the first threaded hole, and limiting plate 3 and clamping groove have cooperatively formed buckling groove, and are clamped The inside of groove is connected with the lantern ring 16, and the lantern ring 16 is socketed in the outside of pump line 15, and the downside of the lantern ring 16 is fixed with connecting plate 14, Connecting plate 14 is arc shape, and the downside of connecting plate 14 is connected with installing plate 10, and installing plate 10, connecting plate 14 and the lantern ring 16 are one Forming structure, the middle part of installing plate 10 is equipped with the second threaded hole, and installing plate 10 is plugged on the inside of inserting groove 12, connecting plate 14 are embedded in the inside of clamping groove, and installing plate 10 and inserting groove 12 are five, and installing plate 10 and inserting groove 12 are equidistant It is distributed in the lower end of clamping groove.
The two sides of positioning base 1 offer the 3rd threaded hole, and the inner transverse of positioning base 1 is provided with link slot 11, and the inner wall of link slot 11 offers thread groove, one end of link slot 11 is connected with the side of inserting groove 12, and link slot 11st, the first threaded hole, the second threaded hole and the 3rd threaded hole are respectively positioned on same level height, and the outside of connecting shaft 5 is equipped with screw thread Protrusion, one end of connecting shaft 5 by interting the 3rd threaded hole, the first threaded hole and the second threaded hole and being located at link slot 11 successively Inside, the other end of connecting shaft 5 is equipped with swing handle, and swing handle is located at the outside of positioning base 1, each inserting groove 12 On the first threaded hole, the 3rd threaded hole on the second threaded hole and positioning base on each installing plate 10 be three, and Between first threaded hole, between the second threaded hole between the 3rd threaded hole be in angular distribution.
The inside both ends of positioning base 1 and positioning pedestal 2 are reinforcing liptinite, and the inside for reinforcing liptinite is equipped with Two pieces of partition plates 6, the first reinforcing rib group 7 and the second reinforcing rib group 8, reinforce liptinite and are arranged with the first cavity, second by partition plate 6 Cavity and the 3rd cavity, one end of the first reinforcing rib group 7 is fixedly connected with reinforcing the side of liptinite inner upper end, and first adds The other end of strengthening tendons group 7 through partition plate 6 with reinforce liptinite inner bottom in the middle part of be connected, one end of the second reinforcing rib group 8 and every The outer middle side part of plate 6 is fixedly connected, and the other end of the second reinforcing rib group 8 is connected with reinforcing one end of bottom side inside liptinite, The inside of first cavity, the second cavity and the 3rd cavity is filled with concrete.First reinforcing rib group 7 and the second reinforcing rib group 8 Quantity be at least two groups, and every group reinforcing rib number be at least three.
Operation principle:When being poured using ground pump, the lantern ring 16 is socketed in first the outside of pump line 15, then Installing plate 10 is plugged on the inside of inserting groove 12, connecting plate 14 is connected to the inside of clamping groove, at this time by nut and The cooperation of connecting rod 13, limiting plate 3 is firmly secured in positioning pedestal 2, and the lantern ring 16 can be confined in limit well at this time Position plate 3 and clamping groove have been cooperatively formed inside buckling groove.
Positioning base 1, installing plate 10 and inserting groove 12 are connected by connecting shaft 5, so then can be further for pump Pipe 15 is positioned, and prevents pump line 15 from occurring deviation during pouring, so as to accurately be poured work.
When proceed by pour when due to ground pump in work when, power caused by ground pump is that interruption is continuous Property, thus it is easy to cause to damage for positioner or so that positioner is subjected to displacement, passes through shock structure first 17 slow down for the impact force of ground pump, since the inside of positioning pedestal 2 is fixed with securing plate group 18, can thus make Shock structure 17 when being slowed down, can be fixed, situation about will not shift, and by upper buffering it is raised and The raised cooperation of lower buffering, can further carry out slowing down processing for impact force.
It can then ensure the stability of whole positioner by reinforcing liptinite, prevent positioner from damaging, by Excessive in the weight of whole positioner, constant movement, so as to be provided with traction handle 4, tower crane can by drawing handle 4 Moved well for positioner, and during general pouring construction, positioner is typically all to be placed on Above the reinforcing bar bound, so by being equipped with anti-skidding limit protrusion in the lower end of positioning base 1, by anti-skidding limit protrusion and The contact of reinforcing bar, can increase the skid resistance of positioning base 1, so that further stabilizing locating device, placement positioning device When pouring, it is subjected to displacement.
Acted on by the mutual cooperation of the positioning base 1 of addition, positioning pedestal 2 and limiting plate 3, can not only use ground When pump, reinforced for discharging pump line, prevent discharging pump line from displacement occur, poured so as to accurately be positioned, and And when being poured, thus can will for pouring the active force of positioner since the power of ground pump is bigger It is very big, it is easy to cause to pour the damage of positioner or sideslip, not only can be for the active force of ground pump by the present apparatus Slowed down, and by equipped with reinforcing liptinite be also possible that the present apparatus is more hard, place it is more firm, so may be used Using manually carrying out pullling positioning, it not only more can accurately be pinpointed and be poured, raising is poured to avoid when pouring The quality built, but also artificial input can be reduced, the input of cost is reduced, and then the occurrence frequency of accident can be reduced, Improve the security poured.
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with Understanding without departing from the principles and spirit of the present invention can carry out these embodiments a variety of changes, modification, replace And modification, the scope of the present invention is defined by the appended.

Claims (10)

1. a kind of building concrete is poured with automatic positioning equipment, including positioning base(1), positioning pedestal(2)And connecting shaft (5), positioning pedestal(2)It is arranged on positioning base(1)Upper end, it is characterised in that:The positioning base(1)Along its length Both ends are equipped with traction handle(4), it is convenient for positioning base(1)Moved, positioning base(1)Lower end be equipped with anti-skidding limit Position is raised, the positioning pedestal(2)Section be trapezoidal shape, and positioning pedestal(2)Upper center be equipped with clamping groove, be clamped Groove is arc buckling groove;
The positioning pedestal(2)Upper end be equipped with hinged block, and hinged block is set close to one end of clamping groove, hinged block it is upper End is hinged with limiting plate(3)One end, limiting plate(3)Vertical section be arc shape, and limiting plate(3)The other end be equipped with connect Connect hole, the positioning pedestal(2)Inside one end be equipped with connection cavity, and connect cavity and be internally provided with limited block(131), limit Position block(131)Upper end and connecting rod(13)One end connection, connecting rod(13)The other end sequentially pass through connection cavity and fixed Position pedestal(2)And it is located at positioning pedestal(2)Top, connecting rod(13)The other end close to clamping groove the other end, and even Extension bar(13)The other end pass through through connecting hole and limiting plate(3)The other end connection;
The positioning base(1)And positioning pedestal(2)Inside both ends be reinforcing liptinite, and reinforce liptinite inside it is equal Equipped with two pieces of partition plates(6), the first reinforcing rib group(7)With the second reinforcing rib group(8), reinforce liptinite and pass through partition plate(6)It is arranged with First cavity, the second cavity and the 3rd cavity, the first reinforcing rib group(7)One end with reinforce liptinite inner upper end one Side is fixedly connected, and the first reinforcing rib group(7)The other end run through partition plate(6)It is connected with reinforcing in the middle part of liptinite inner bottom, The second reinforcing rib group(8)One end and partition plate(6)Outer middle side part be fixedly connected, and the second reinforcing rib group(8)It is another Hold and be connected with reinforcing one end of bottom side inside liptinite, the inside of first cavity, the second cavity and the 3rd cavity is filled There is concrete.
2. a kind of building concrete according to claim 1 is poured with automatic positioning equipment, it is characterised in that:The positioning Base(1)Inside middle-end be vertically equipped with inserting groove(12), inserting groove(12)One end sequentially pass through positioning base(1)And positioning Pedestal(2)And extend to the inner bottom of clamping groove, inserting groove(12)The other end and positioning base(1)Inner bottom in Portion connects, inserting groove(12)Middle part be equipped with the first threaded hole, the limiting plate(3)Clamping has been cooperatively formed with clamping groove Groove, and the inside of buckling groove is connected with the lantern ring(16), the lantern ring(16)It is socketed in pump line(15)Outside, and the lantern ring(16)'s Downside is fixed with connecting plate(14), connecting plate(14)For arc shape, and connecting plate(14)Downside be connected with installing plate(10), The installing plate(10)Middle part be equipped with the second threaded hole, and installing plate(10)It is plugged on inserting groove(12)Inside, connecting plate (14)It is embedded in the inside of clamping groove.
3. a kind of building concrete according to claim 2 is poured with automatic positioning equipment, it is characterised in that:The positioning Base(1)Two sides offer the 3rd threaded hole, and positioning base(1)Inner transverse be provided with link slot(11), and even Access slot(11)Inner wall offer thread groove, link slot(11)One end and inserting groove(12)Side connection, and link slot (11), the first threaded hole, the second threaded hole and the 3rd threaded hole be respectively positioned on same level height, the connecting shaft(5)Outside Equipped with thread protrusion, connecting shaft(5)One end pass through and intert the 3rd threaded hole, the first threaded hole and the second threaded hole and position successively In link slot(11)Inside, connecting shaft(5)The other end be equipped with swing handle, and swing handle is located at positioning base(1)'s Outside.
4. a kind of building concrete according to claim 1 is poured with automatic positioning equipment, it is characterised in that:The positioning Pedestal(2)Inner transverse be equipped with securing plate group(18), and securing plate group(18)Including upper securing plate and lower securing plate, upper reinforcing Grafting location hole, the lower end of clamping groove and shock structure are offered in plate and lower securing plate(17)One end be fixedly connected, subtract Shake column(17)The other end through grafting location hole and and positioning pedestal(2)Inner bottom connection, under the upper securing plate End is raised equipped with upper buffering, and the upper end of lower securing plate is equipped with lower buffering protrusion, and the raised and lower buffering protrusion of upper buffering is vertical It is vertical corresponding one by one on direction;
The positioning base(1)Inside middle-end be vertically equipped with inserting groove(12), inserting groove(12)One end sequentially pass through positioning Base(1)And positioning pedestal(2)And extend to the inner bottom of clamping groove, inserting groove(12)The other end and positioning base (1)Inner bottom in the middle part of connection, inserting groove(12)Middle part be equipped with the first threaded hole, the limiting plate(3)It is recessed with being clamped Groove has cooperatively formed buckling groove, and the inside of buckling groove is connected with the lantern ring(16), the lantern ring(16)It is socketed in pump line(15)'s Outside, and the lantern ring(16)Downside be fixed with connecting plate(14), connecting plate(14)For arc shape, and connecting plate(14)Downside It is connected with installing plate(10), the installing plate(10)Middle part be equipped with the second threaded hole, and installing plate(10)It is plugged on inserting groove (12)Inside, connecting plate(14)It is embedded in the inside of clamping groove.
5. a kind of building concrete according to claim 1 is poured with automatic positioning equipment, it is characterised in that:The connection Bar(13)Another end surfaces be equipped with screw thread, and connecting rod(13)Other end thread fitting be socketed with nut, connecting rod(13) For two, two connecting rods(13)Positioning pedestal is arranged on along its length(2)On.
6. a kind of building concrete according to claim 4 is poured with automatic positioning equipment, it is characterised in that:The damping Column(17)At least five, and shock structure(17)Between be equally spaced.
7. a kind of building concrete according to claim 2 is poured with automatic positioning equipment, it is characterised in that:The installation Plate(10)And inserting groove(12)It is five, and installing plate(10)And inserting groove(12)It is equally distributed under clamping groove End.
8. a kind of building concrete according to claim 1 is poured with automatic positioning equipment, it is characterised in that:It is described spacing Plate(3)Inner side and the inside of clamping groove be equipped with buffering protective cushion(9), and buffering protective cushion(9)It is opposite for two pieces of openings Arc buffering neonychium.
9. a kind of building concrete according to claim 1 is poured with automatic positioning equipment, it is characterised in that:Described first Reinforcing rib group(7)With the second reinforcing rib group(8)Quantity be at least two groups, and every group reinforcing rib number be at least three Root.
10. a kind of building concrete according to claim 2 is poured with automatic positioning equipment, it is characterised in that:Each institute State inserting groove(12)On the first threaded hole, each installing plate(10)On the second threaded hole and positioning base on the 3rd screw thread Hole is three, and between the first threaded hole, between the second threaded hole between the 3rd threaded hole be in angular distribution.
CN201711389874.0A 2016-10-31 2016-10-31 Automatic positioning device for building concrete pouring Expired - Fee Related CN108035355B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711389874.0A CN108035355B (en) 2016-10-31 2016-10-31 Automatic positioning device for building concrete pouring

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201610927901.4A CN106320343B (en) 2016-10-31 2016-10-31 A kind of building concrete, which pours, uses automatic positioning equipment
CN201711389874.0A CN108035355B (en) 2016-10-31 2016-10-31 Automatic positioning device for building concrete pouring

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201610927901.4A Division CN106320343B (en) 2016-10-31 2016-10-31 A kind of building concrete, which pours, uses automatic positioning equipment

Publications (2)

Publication Number Publication Date
CN108035355A true CN108035355A (en) 2018-05-15
CN108035355B CN108035355B (en) 2020-10-30

Family

ID=57818097

Family Applications (4)

Application Number Title Priority Date Filing Date
CN201711389875.5A Expired - Fee Related CN108035356B (en) 2016-10-31 2016-10-31 Automatic positioning device for building concrete pouring
CN201711389838.4A Expired - Fee Related CN108105477B (en) 2016-10-31 2016-10-31 Automatic positioning device for building concrete pouring
CN201610927901.4A Active CN106320343B (en) 2016-10-31 2016-10-31 A kind of building concrete, which pours, uses automatic positioning equipment
CN201711389874.0A Expired - Fee Related CN108035355B (en) 2016-10-31 2016-10-31 Automatic positioning device for building concrete pouring

Family Applications Before (3)

Application Number Title Priority Date Filing Date
CN201711389875.5A Expired - Fee Related CN108035356B (en) 2016-10-31 2016-10-31 Automatic positioning device for building concrete pouring
CN201711389838.4A Expired - Fee Related CN108105477B (en) 2016-10-31 2016-10-31 Automatic positioning device for building concrete pouring
CN201610927901.4A Active CN106320343B (en) 2016-10-31 2016-10-31 A kind of building concrete, which pours, uses automatic positioning equipment

Country Status (1)

Country Link
CN (4) CN108035356B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112922343A (en) * 2021-01-18 2021-06-08 李逸 High-efficiency concrete pouring equipment

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108035356B (en) * 2016-10-31 2020-10-30 安徽省行千里知识产权服务有限公司 Automatic positioning device for building concrete pouring

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004068531A (en) * 2002-08-09 2004-03-04 Kitagawa Iron Works Co Ltd Underwater concreting device
CN203626256U (en) * 2013-12-24 2014-06-04 王维孝 Shock absorption bracket of concrete delivery pipeline
CN204042204U (en) * 2014-03-30 2014-12-24 青岛一建集团有限公司 A kind of pump line shock bracket
CN204201297U (en) * 2014-10-08 2015-03-11 广西建工集团第三建筑工程有限责任公司 A kind of disappear rolling bearing device built on stilts for the horizontal pump line of ground pump
CN204531451U (en) * 2015-03-23 2015-08-05 中机环建集团有限公司 Pumping of concrete horizontal conveying pipe roller bearing shock bracket
CN204590632U (en) * 2015-04-30 2015-08-26 张洁 Pump concrete carrier pipe shock bracket is dragged in a kind of building site
CN204828953U (en) * 2015-06-17 2015-12-02 江苏弘盛建设工程集团有限公司 Special buffering split heads of concrete conveying pipe
CN205400075U (en) * 2016-02-26 2016-07-27 江苏南通二建集团有限公司无锡分公司 Concrete conveying pipe shock attenuation bracket

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61266727A (en) * 1985-05-21 1986-11-26 Taisei Corp Method and apparatus for placement of underwater concrete
JP2004068521A (en) * 2002-08-09 2004-03-04 Tomoe Corp Brace frame with damper
CN202323956U (en) * 2011-10-26 2012-07-11 中冶集团武汉勘察研究院有限公司 Underwater concrete pouring elevation control device
CN103015427B (en) * 2012-12-28 2015-07-01 中铁二十四局集团有限公司 Hole pile underwater concrete pouring positioning device and positioning device thereof
CN203420473U (en) * 2013-05-21 2014-02-05 湖南鑫隆模塑科技开发有限公司 Fast-clamping concrete pouring device
CN108035356B (en) * 2016-10-31 2020-10-30 安徽省行千里知识产权服务有限公司 Automatic positioning device for building concrete pouring

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004068531A (en) * 2002-08-09 2004-03-04 Kitagawa Iron Works Co Ltd Underwater concreting device
CN203626256U (en) * 2013-12-24 2014-06-04 王维孝 Shock absorption bracket of concrete delivery pipeline
CN204042204U (en) * 2014-03-30 2014-12-24 青岛一建集团有限公司 A kind of pump line shock bracket
CN204201297U (en) * 2014-10-08 2015-03-11 广西建工集团第三建筑工程有限责任公司 A kind of disappear rolling bearing device built on stilts for the horizontal pump line of ground pump
CN204531451U (en) * 2015-03-23 2015-08-05 中机环建集团有限公司 Pumping of concrete horizontal conveying pipe roller bearing shock bracket
CN204590632U (en) * 2015-04-30 2015-08-26 张洁 Pump concrete carrier pipe shock bracket is dragged in a kind of building site
CN204828953U (en) * 2015-06-17 2015-12-02 江苏弘盛建设工程集团有限公司 Special buffering split heads of concrete conveying pipe
CN205400075U (en) * 2016-02-26 2016-07-27 江苏南通二建集团有限公司无锡分公司 Concrete conveying pipe shock attenuation bracket

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112922343A (en) * 2021-01-18 2021-06-08 李逸 High-efficiency concrete pouring equipment

Also Published As

Publication number Publication date
CN108035355B (en) 2020-10-30
CN108035356A (en) 2018-05-15
CN106320343B (en) 2018-05-22
CN108105477A (en) 2018-06-01
CN108105477B (en) 2020-06-05
CN106320343A (en) 2017-01-11
CN108035356B (en) 2020-10-30

Similar Documents

Publication Publication Date Title
CN108999226B (en) Inclination correcting method for building with rotary displacement frame structure
CN104975719A (en) Novel material distribution device and construction method for pouring floor concrete by using same
CN111021256A (en) Construction method for hoisting heavy-tonnage high-precision steel box girder
CN105113539B (en) Combined multi-functional diaphram wall Core Walls Structure and its construction method in a kind of contrary sequence method
CN106320343B (en) A kind of building concrete, which pours, uses automatic positioning equipment
CN110106881A (en) A kind of steel-pipe pile construction guidance locating rack and construction method
CN211665759U (en) Guide positioning device for permanent steel casing of large onshore pile foundation
CN113756320B (en) Method for hoisting low-clearance and ultra-long reinforcement cage section by section into holes under high-voltage line
US4441685A (en) Column form
CN102296600A (en) Method for positioning middle pile of spread built subway station
CN207268080U (en) A kind of Multifunction scaffold template for subway side wall
CN208594487U (en) High-rise king-post construction adjustable angle creeping formwork guard system
CN217537008U (en) Entity bank protection construction equipment
CN110206020A (en) Prefabricated snowflake type concrete steel sheet pile and its construction method
CN206655065U (en) Combined type support post and overhead rail system for overhead rail system
CN206529881U (en) The constructing device of cushion cap and ground girder construction
CN207727558U (en) A kind of pile foundation quality control system
CN208280154U (en) Outdoor construction elevator foundation reinforcing apparatus
CN207314332U (en) A kind of cement mixing pile building enclosure
CN207498828U (en) A kind of monoblock type welds steel anchor box entirely
CN207538506U (en) The independent supporting rack of efficient construction of precast floorslab
CN110656581A (en) Temporary bridge construction process
CN202228859U (en) Mudflat construction equipment and barrel-shaped foundation thereof
CN111593702A (en) Wharf upgrading and reconstruction method and wharf upgrading and reconstruction structure
CN206220491U (en) A kind of cast-in-place boom support adjustment and the rack device that falls

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20200929

Address after: 236000 118 households in houtianzi village, Baimiao village, Yingquan District, Fuyang City, Anhui Province

Applicant after: Anhui xingqianli Intellectual Property Service Co.,Ltd.

Address before: 264000 Zhifu City, Shandong Province, the extension of the road through the District of Yantai, No. 121

Applicant before: Chen Jian

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201030

Termination date: 20211031