Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821137689.2U
Other languages
Chinese (zh)
Inventor
马卓
韩军霞
王兴阔
王化劼
王殿学
邢希瑞
张文哲
林繁云
赵秋红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Luqiao Group Co Ltd
Original Assignee
Shandong Luqiao Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Luqiao Group Co Ltd filed Critical Shandong Luqiao Group Co Ltd
Priority to CN201821137689.2U priority Critical patent/CN208594487U/en
Application granted granted Critical
Publication of CN208594487U publication Critical patent/CN208594487U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model provides a kind of high-rise king-post construction adjustable angle creeping formwork guard system, and structure is simple, easy to operate, safe and reliable, tilt adjustable, is applicable to the high-rise king-post of various tilt angles.A kind of high level king-post construction adjustable angle creeping formwork guard system, including upper layer protection and lower layer's protection;Upper layer protection includes more than one upper platform, including two groups of upper pright stanchions and more than one ladder, upper pright stanchion are linked together by upper ear plate and upper connection pin shaft with each upper platform, and upper screw rod screw group is equipped between two groups of upper pright stanchions;Lower layer's protection includes more than one lower layer's platform, including sunpender and one or less ladder, lower sunpender link together by lower ear plate and lower connection pin shaft with each lower layer's platform under two groups, equipped with lower screw rod screw group between sunpender under two groups;Lateral distance is greater than under two groups lateral distance between sunpender between two groups of upper pright stanchions;Protective net is equipped on the outside of upper platform and lower layer's platform.

Description

High-rise king-post construction adjustable angle creeping formwork guard system
Technical field
The utility model relates to a kind of creeping formwork guard systems, and in particular to a kind of high level king-post construction adjustable angle creeping formwork Guard system, equipment for bridge construction field.
Background technique
Creeping formwork is the abbreviation of jumping formwork, it is by template, sliding equipment, climbing framework, climbing device, creeping formwork pendant, anti- Protecting system and seven part of hydra-electric composition, are the special equipments being often used in high-rise king-post work progress, reduce because having Hoisting machinery quantity, the first choice accelerating the advantages of speed of application and better economic benefit and constructing as high tower pile.The prior art Middle creeping formwork guard system is generally fixed on climbing frame, the installation of creeping formwork column constant tilt angle, when pouring different segment, protection System is unable to adjust tilt angle, is not suitable for the big king-post of angle change, and flexibility is low.
Utility model content
The utility model provides a kind of high-rise king-post construction adjustable angle creeping formwork guard system, and structure is simple, operates Easy, safe and reliable, tilt adjustable, is applicable to the high-rise king-post of various tilt angles, and versatility is good, and flexibility is high, For promoting king-post construction level important in inhibiting.
The utility model to achieve the above object, is achieved through the following technical solutions:
A kind of high level king-post construction adjustable angle creeping formwork guard system, including upper layer protection and lower layer's protection;Upper layer is anti- Shield and lower layer's protection include workbench, adjacent to interlink between each workbench inside and neighbouring workbench It is linked between workbench by ladder, a ladder channel is arranged in a workbench;Protective net is used on the outside of each workbench Carry out full protection;Between each workbench of upper layer protection by pin shaft and upper pright stanchion, upper screw rod screw group connect into one it is whole Body, upper pright stanchion are linked together by upper ear plate and upper connection pin shaft with each upper platform, and upper silk is equipped between two groups of upper pright stanchions Bar screw group;Lower layer's protection includes more than one lower layer's platform, each workbench of lower layer's protection by pin shaft and lower sunpender, Lower screw rod screw group connects into an entirety, and lower sunpender is connected to one by lower ear plate and lower connection pin shaft and each lower layer's platform It rises, is equipped with lower screw rod screw group under two groups between sunpender;Lateral distance is greater than horizontal between sunpender under two groups between two groups of upper pright stanchions To distance.
Above-mentioned high level king-post, which is constructed, uses adjustable angle creeping formwork guard system preferred embodiment, is welded on protective net and paralell Hook, protection sieve bottom are connected in the following platform of two neighboring platform by protective net otic placode and protective net pin shaft, are protected Online portion is connected in the upper stage of two neighboring platform by turnbuckle.
Above-mentioned high level king-post construction adjustable angle creeping formwork guard system preferred embodiment, upper pright stanchion and lower sunpender include one Group channel steel, every two, which is one group, channel steel back is opposite welds.
Utility model has the advantages that
1, applicability is high: by adjusting the tilt angle of lead screw length adjustment creeping formwork, applicable multiple slopes and curvature bridge The construction of tower, applicability are high;
2, it operates, is easy for installation: the adjustment of creeping formwork tilt angle can be completed by adjusting screw rod length, without tower crane etc. Lifting appliance, easy to operate, each component connection is mostly pin shaft connection, easy for installation;
3, good economy performance: adjustment creeping formwork angle adapts to bridge tower slope variation, minimizes the range of creeping formwork envelope bridge tower, saves Material saving, save the cost.
Detailed description of the invention
Attached drawing is used to provide a further understanding of the present invention, and constitutes part of specification, practical with this Novel embodiment is used to explain the utility model together, does not constitute limitations of the present invention.
Fig. 1 is guard system plan view applied by the utility model;
Fig. 2 is guard system side view applied by the utility model;
Fig. 3 is guard system side view applied by the utility model;
Fig. 4 provides 0# platform upper pright stanchion, lower sunpender connection schematic diagram for the utility model;
Fig. 5 is upper pright stanchion schematic front view provided by the utility model;
Fig. 6 is upper pright stanchion schematic side view provided by the utility model;
Fig. 7 is protecting screen structure schematic diagram provided by the utility model;
Fig. 8 is protective net schematic side view provided by the utility model;
Fig. 9 is 0# paralell structural schematic diagram provided by the utility model.
Wherein, the upper layer 1- is protected;The protection of 2- lower layer;3-0# platform;3-1- upper pright stanchion connection otic placode;Sunpender connects under 3-2- Ear connecting plate;3-3- screw rod connection otic placode;4-1# platform;5-2# platform;6-3# platform;7- screw rod;8- upper pright stanchion;8-1- screw rod connects Fishplate bar I;8-2- screw rod connecting plate II;The upper layer 9- protective net;9-1- protective net otic placode;9-2- hook;9-3- turnbuckle;10- Lower sunpender;11- -1# platform;12- -2# platform;13- ladder;14- ladder mouth fence.
Specific embodiment
It is illustrated below in conjunction with preferred embodiment of the attached drawing to the utility model, it should be understood that described herein excellent It selects embodiment to be only used for describing and explaining the present invention, is not used to limit the utility model.
As shown in Figures 1 and 2, the high-rise king-post construction adjustable angle creeping formwork guard system packet that the utility model is proposed It includes upper layer protection 1 and lower layer protects 2 two parts, upper layer protection 1 and lower layer's protection 2 include workbench, in each workbench To interlink between portion and neighbouring workbench, linked between operated adjacent platform by ladder, a workbench setting One ladder channel.Full protection is carried out using protective net on the outside of each workbench.
Referring to attached drawing 3, the upper layer protection includes 0# platform 3,1# platform 4,2# platform 5, the 3# platform 6 set gradually With, installation, adjustment, dismounting after assembly as template, the work that the installation of anchor cone and the tower limb reinforcing bar binding for not pouring concrete section are handled Make platform.An entirety is connected by pin shaft and upright bar 8, upper screw rod screw group 7 between each platform.
Referring to attached drawing 4, Fig. 5 and Fig. 6, the upright bar 8 is double flute steel construction, and upper pright stanchion 8 passes through upper ear plate 3-1 and upper connection Pin shaft links together with 0# platform 3, and the connection between upright bar 8 and each platform is all pin shaft connection, changes the inclination angle of upright bar 8 Degree can change the tilt angle of creeping formwork.Screw rod connecting plate 8-1 and screw rod connecting plate 8-2, upright bar are respectively equipped in two groups of upright bars 8 Between 8 and upright bar 8 by upper screw rod screw group 7 connect it is integral.Otic placode 3-3 is welded on 0# platform 3, upright bar 8 passes through otic placode 3-3 With lead screw in upper screw rod screw group 7 and 3 connection reinforcement of 0# platform.The adjustable in length for changing lead screw in upper screw rod screw group 7 is vertical The tilt angle of bar 8, and then change the tilt angle of creeping formwork.
Referring to attached drawing 2 and Fig. 3, lower layer's protection 2 includes -1# platform 11 and -2# platform 12, is used as the dress that climbs after assembled Set operation, the dismounting of anchor cone, tower limb concrete surface modification and the workbench that elevator entrance is set.- 1# platform 11 and -2# platform 1 An entirety is connected by pin shaft and lower sunpender 10, lower screw rod screw group, the length for changing lead screw in lower screw rod screw group can Adjust the tilt angle of creeping formwork.
Referring to attached drawing 3, the tilt angle for being applicable to various king-posts refers to the length by adjusting screw rod 7 to adjust The tilt angle of whole upright bar, and then the tilt angle of creeping formwork is adjusted, adjust lead screw and lower screw rod screw in upper screw rod screw group In group after the length of lead screw, stable structure is formed between upright bar 8, upper screw rod screw group, lower screw rod screw group and each platform, on Screw rod screw group and lower screw rod screw group have the function of locking in this mechanism.
Referring to attached drawing 1, attached drawing 3, attached drawing 4, attached drawing 7 and attached drawing 8, high-rise king-post construction adjustable angle creeping formwork guard system To carry out full protection by protective net 9,9 bottom of protective net is connected to by protective net otic placode 9-1 and protective net pin shaft adjacent In the following platform of two platforms, be welded on protective net 9 and paralell hook 9-2,9 top of protective net by hook 9-2 and Turnbuckle 9-3 is connected in the upper stage of two neighboring platform, and the adjustable in length by changing turnbuckle 9-3 is protected The tilt angle of net 9.When creeping formwork changes tilt angle, by adjusting the length of turnbuckle 9-3 and the connection position of hook 9-2 Set the full protection for guaranteeing protective net 9.
It referring to attached drawing 3, is interlinked between each platform by the guarantee of ladder 13, ladder mouth is provided with the progress of ladder mouth fence 14 Security protection.
Finally, it should be noted that the above descriptions are merely preferred embodiments of the present invention, it is not limited to this Utility model, although the utility model is described in detail with reference to the foregoing embodiments, for those skilled in the art For, it is still possible to modify the technical solutions described in the foregoing embodiments, or to part of technical characteristic It is equivalently replaced.Within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on, It should be included within the scope of protection of this utility model.

Claims (3)

1. a kind of high level king-post construction adjustable angle creeping formwork guard system, it is characterised in that: anti-including upper layer protection and lower layer Shield;Upper layer protection and lower layer's protection include workbench, are between each workbench inside and neighbouring workbench It interlinks, is linked between operated adjacent platform by ladder, a ladder channel is arranged in a workbench;On the outside of each workbench Full protection is carried out using protective net;Connected between each workbench of upper layer protection by pin shaft and upper pright stanchion, upper screw rod screw group Be connected into an entirety, upper pright stanchion is linked together by upper ear plate and upper connection pin shaft with each upper platform, two groups of upper pright stanchions it Between be equipped with upper screw rod screw group;Lower layer's protection includes more than one lower layer's platform, and each workbench of lower layer's protection passes through pin Axis and lower sunpender, lower screw rod screw group connect into an entirety, and lower sunpender is flat by lower ear plate and lower connection pin shaft and each lower layer Platform links together, and is equipped with lower screw rod screw group under two groups between sunpender;Lateral distance is greater than under two groups between two groups of upper pright stanchions Lateral distance between sunpender.
2. high-rise king-post construction adjustable angle creeping formwork guard system according to claim 1, it is characterised in that: protective net and Hook is welded on paralell, protection sieve bottom is connected under two neighboring platform by protective net otic placode and protective net pin shaft On Fang Pingtai, protective net top is connected in the upper stage of two neighboring platform by turnbuckle.
3. high level king-post construction adjustable angle creeping formwork guard system according to claim 1 or claim 2, it is characterised in that: upper vertical Bar and lower sunpender include one group of channel steel, and every two, which is one group, channel steel back is opposite welds.
CN201821137689.2U 2018-07-18 2018-07-18 High-rise king-post construction adjustable angle creeping formwork guard system Active CN208594487U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821137689.2U CN208594487U (en) 2018-07-18 2018-07-18 High-rise king-post construction adjustable angle creeping formwork guard system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821137689.2U CN208594487U (en) 2018-07-18 2018-07-18 High-rise king-post construction adjustable angle creeping formwork guard system

Publications (1)

Publication Number Publication Date
CN208594487U true CN208594487U (en) 2019-03-12

Family

ID=65603190

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821137689.2U Active CN208594487U (en) 2018-07-18 2018-07-18 High-rise king-post construction adjustable angle creeping formwork guard system

Country Status (1)

Country Link
CN (1) CN208594487U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110644376A (en) * 2019-10-14 2020-01-03 中交武汉港湾工程设计研究院有限公司 Automatic climbing device for inclined tower column internal mold support
CN112160245A (en) * 2020-09-04 2021-01-01 中交路桥华南工程有限公司 Method for mounting variable cross-section tower section

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110644376A (en) * 2019-10-14 2020-01-03 中交武汉港湾工程设计研究院有限公司 Automatic climbing device for inclined tower column internal mold support
CN110644376B (en) * 2019-10-14 2021-04-27 中交武汉港湾工程设计研究院有限公司 Automatic climbing device for inclined tower column internal mold support
CN112160245A (en) * 2020-09-04 2021-01-01 中交路桥华南工程有限公司 Method for mounting variable cross-section tower section
CN112160245B (en) * 2020-09-04 2022-06-07 中交路桥华南工程有限公司 Method for mounting variable cross-section tower section

Similar Documents

Publication Publication Date Title
CN207633222U (en) Bridge pier binder Coping Construction platform
CN110541556B (en) Attached lifting scaffold and climbing method
CN208594487U (en) High-rise king-post construction adjustable angle creeping formwork guard system
CN207499385U (en) Plug-in tower crane supporting beam, which has bad luck installation and climbs, uses operating platform
CN207392772U (en) Cable-free wind rope steel stand alignment system
CN209384109U (en) Elevated bridge construction anchor ear operating platform
CN109989348A (en) Cantilever formwork for concrete construction and construction method thereof
CN108643357A (en) Across the installation on ground method of arch grid structure starting and its dedicated infrastructure
CN209384110U (en) Pier stud bent cap protective platform
CN202990427U (en) Climbing discharging platform
CN208166361U (en) A kind of overlength light-weight metal roof boarding lifting attachment device
CN207267961U (en) A kind of bridge pier shaft pours operating platform
CN208748518U (en) A kind of formwork for placing support device
CN215671267U (en) Telescopic edge protection device
CN110040632A (en) A kind of segmental hoisting construction method of large span section steel beam
CN206646409U (en) Bridge construction scaffold in a kind of cast-in-place T beams
CN216515140U (en) Overhead steel box girder welding platform device
CN205348720U (en) Take hoisting device's removal scaffold
CN107476559A (en) A kind of spigot-and-socket builder's jack and installation method
CN108105477A (en) A kind of building concrete, which pours, uses automatic positioning equipment
CN207890940U (en) A kind of derrick tower based on engineering mechanics
CN112627045A (en) Hang basket template scissors cat ladder
CN209482687U (en) A kind of Super High exterior frame column construction operation platform
CN207812978U (en) A kind of heavy grade Sloping roof concreting job platform
CN207144963U (en) Anchor net laying sets emergency support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant