CN208166361U - A kind of overlength light-weight metal roof boarding lifting attachment device - Google Patents
A kind of overlength light-weight metal roof boarding lifting attachment device Download PDFInfo
- Publication number
- CN208166361U CN208166361U CN201820372587.2U CN201820372587U CN208166361U CN 208166361 U CN208166361 U CN 208166361U CN 201820372587 U CN201820372587 U CN 201820372587U CN 208166361 U CN208166361 U CN 208166361U
- Authority
- CN
- China
- Prior art keywords
- attachment device
- steel frame
- screw rod
- web member
- cross bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910052751 metal Inorganic materials 0.000 title claims abstract description 107
- 239000002184 metal Substances 0.000 title claims abstract description 107
- 239000010959 steel Substances 0.000 claims abstract description 144
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 143
- 238000012856 packing Methods 0.000 claims abstract description 58
- 238000009434 installation Methods 0.000 claims abstract description 16
- 239000003351 stiffener Substances 0.000 claims description 4
- 238000005476 soldering Methods 0.000 claims description 2
- 230000015572 biosynthetic process Effects 0.000 claims 1
- 239000007787 solid Substances 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 8
- 238000000034 method Methods 0.000 description 11
- 238000010586 diagram Methods 0.000 description 5
- 230000008569 process Effects 0.000 description 5
- 230000002459 sustained effect Effects 0.000 description 4
- 230000000694 effects Effects 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 230000009471 action Effects 0.000 description 2
- PCHJSUWPFVWCPO-UHFFFAOYSA-N gold Chemical compound [Au] PCHJSUWPFVWCPO-UHFFFAOYSA-N 0.000 description 2
- 239000010931 gold Substances 0.000 description 2
- 229910052737 gold Inorganic materials 0.000 description 2
- 150000002739 metals Chemical class 0.000 description 2
- 238000011112 process operation Methods 0.000 description 2
- 229910000838 Al alloy Inorganic materials 0.000 description 1
- 229910000851 Alloy steel Inorganic materials 0.000 description 1
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 description 1
- RTAQQCXQSZGOHL-UHFFFAOYSA-N Titanium Chemical compound [Ti] RTAQQCXQSZGOHL-UHFFFAOYSA-N 0.000 description 1
- 229910001297 Zn alloy Inorganic materials 0.000 description 1
- 210000001015 abdomen Anatomy 0.000 description 1
- FJMNNXLGOUYVHO-UHFFFAOYSA-N aluminum zinc Chemical compound [Al].[Zn] FJMNNXLGOUYVHO-UHFFFAOYSA-N 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 239000011248 coating agent Substances 0.000 description 1
- 238000000576 coating method Methods 0.000 description 1
- 229910052802 copper Inorganic materials 0.000 description 1
- 239000010949 copper Substances 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000033772 system development Effects 0.000 description 1
- 239000010936 titanium Substances 0.000 description 1
- 229910052719 titanium Inorganic materials 0.000 description 1
- YJVLWFXZVBOFRZ-UHFFFAOYSA-N titanium zinc Chemical compound [Ti].[Zn] YJVLWFXZVBOFRZ-UHFFFAOYSA-N 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a kind of overlength light-weight metal roof boardings to lift by crane attachment device, including steel truss shoulder pole girder, adjustable packing steel frame and attachment device;Steel truss shoulder pole girder includes top boom, diagonal web member and lower boom, adjustable packing steel frame includes steel frame, moving casing and clamping screw, steel frame includes two cross bars disposed in parallel and upright bar, attachment device includes adjusting sleeve, adjusting screw rod, fixed square tube, installation casing, bottom plate, gaily decorated basket screw rod and wirerope, casing is installed to be set on horizontal web member, wirerope is connect with upper cross bar.The utility model meets to the lifting requirements of metal roofing board, so that metal roofing board keeps balancing lifting, operation is not succinct cumbersome, improves safety, while lifting by crane that quantity is more, and metal roofing board is unlikely to deform, and effectively improves construction efficiency and construction cost.
Description
Technical field
The utility model belongs to metal Roof system technical field, and in particular to a kind of overlength light-weight metal roof boarding lifting
Attachment device.
Background technique
Metal Roof system is with self-insurance anti-corrosion ability, lightweight, high-strength, durable titanium zinc, copper, titanium, aluminum-zinc alloy
The building roof system of the sheet metals such as colored steel and aluminium alloy, stainless sheet steel as plane materiel.
Metal Roof system be use light gauge cold-formed steel shape and swaging metal roofing board be equipped with insulation, sound-adsorbing sound-insulating hung with
And the materials such as waterproof, the containment system being assembled into, and have following characteristics:1, metal Roof has from heavy and light, and durability is strong and passes through
The high feature of performance of helping.2, metal Roof has excellent structural behaviour.3, has good waterproof performance.4, appearance adaptability
By force, it is able to satisfy the appearance demand of variety classes building.5, install convenient and quickly, for different regions, environment and different function
It is required that building have stronger adaptability.
Metal Roof system development at present is swift and violent, this is all widely used in the buildings such as many airports, station, workshop, gymnasium
Class roof style, length is larger under normal conditions for the type roof boarding, lighter weight, can satisfy each large span public building pair
The requirement of Roof system.Existing metal roofing board often has with hanging method:1. vertically being drawn from ground one by one using rope by manpower
Rise to roofing;2. angled, golden by manpower application cable traction lightweight as slideway, slideway and ground using wirerope
Belong to roof boarding along slideway from ground handling to roof.There are Railway Projects for the method for carrying:Light-weight metal roof boarding length compared with
Greatly, carrying out step by step is carried out to over-long roof plate when vertical carrying, this results in roofing longitudinal lap joint heavy workload and there are rain
The hidden danger of water leakage;It is low by the vertical handling efficiency of method progress of manpower, take slideway easily to damage the anti-of metal roofing board
Rotten coating, there are hidden danger of quality, while labor intensity of workers is big;Since light-weight metal roof boarding in-plane stiffness is looked into, using manpower
Carry the damage for easily causing individual light-weight metal roof boarding that bending and torsional deformation occurs.
Utility model content
The utility model aim is solution the above-mentioned technical problems in the prior art, provides a kind of overlength lightweight gold
Belong to roof boarding and lift by crane attachment device, metal roofing board can be superimposed in the device, then adjustable packing steel framework used will be packaged
Frame is connected on steel truss shoulder pole girder using attachment device, to realize light-weight metal roof boarding, adjustable packing steel frame, connection
Device, steel truss shoulder pole girder are integral, and lifting considers that special operation condition factor is smaller, and operate simplicity;In vertical transport mistake
Cheng Zhong, can be for the adjustable packing steel frame of the length setting respective numbers of overlength light-weight metal roof boarding, and docks respective counts
The steel truss shoulder pole girder of amount meets the lifting requirements to overlength light-weight metal roof boarding, so that metal roofing board keeps balance peace
It lifts by crane and is vertically carried entirely, operation is not succinct cumbersome, and safety is secure, while can disposably lift by crane tens of light-weight metals
Roof boarding effectively improves construction efficiency, construction cost and labor intensity of workers is greatly lowered, while playing to lightweight
Metal roofing board in vertical handling process quality protection, be unlikely to deform.
In order to solve the above-mentioned technical problem, the utility model adopts the following technical solution:
A kind of overlength light-weight metal roof boarding lifting attachment device, it is characterised in that:Including steel truss shoulder pole girder, adjustable beat
Baogang's frame and attachment device;Steel truss shoulder pole girder includes top boom, diagonal web member and lower boom, top boom, diagonal web member and lower edge
Bar forms an entirety by being welded to connect, and is fixedly connected with horizontal web member between lower boom;Adjustable packing steel frame includes steel
Frame, moving casing and clamping screw, steel frame include two cross bars disposed in parallel and upright bar, and moving casing is right up and down respectively
Claim the end for being welded in upright bar, moving casing is sheathed on cross bar, and clamping screw runs through the cross bar in top;Attachment device packet
It includes and adjusts sleeve, adjusting screw rod, fixed square tube, installation casing, bottom plate, gaily decorated basket screw rod and wirerope, adjusting screw rod and adjusting set
Cylinder is threadedly coupled, and adjusting screw rod is fixed with fixed square tubes soldering, and fixed square tube and installation casing are welded and fixed, fixed square tube and bottom
Plate is welded and fixed, and gaily decorated basket screw rod is connect with bottom plate, and wirerope is connect with gaily decorated basket screw rod, and installation casing is set on horizontal web member, steel
Cord is connect with upper cross bar.
Further, the both ends of top boom and the both ends of lower boom are equipped with flange connecting plate.Flange connecting plate passes through welding
It is connected to the end of top boom and lower boom, and is provided with the bolt hole being connected, the connection to adjacent steel truss shoulder pole girder
And disassembly.
Further, the medial surface of lower boom is equipped with the first connection otic placode, and the both ends of horizontal web member are equipped with the second engaging lug
Plate is equipped with connection bolt between the first connection otic placode and the second connection otic placode.Realize that lower boom is fixedly connected with horizontal web member, side
Just horizontal web member is mounted and dismounted.When being transported to steel truss shoulder pole girder, the horizontal web member of steel truss shoulder pole girder can be dismantled,
And steel truss shoulder pole girder is nestable together, save transport space and transportation cost.
Further, adjustable puller bolt is installed, adjustable puller bolt is held out against in the side of cross bar on moving casing
On.Moving casing is fixed with cross bar, moving casing is avoided to slide on cross bar.When that will adjust puller bolt and unscrew,
Adjustable puller bolt not to cross bar generate active force, moving casing can be moved along cross bar axis, adjust upright bar between away from
From, and then the entire adjustable width for being packaged steel frame is adjusted, convenient for metal roofing board is hung onto adjustable packing steel frame.
Further, the adjusting screw rod adjusted between sleeve in two is equipped with the first locating piece, and the first locating piece is close to
In the side of horizontal web member, the side of horizontal web member is equipped with the second locating piece, and the first locating piece is set between the second locating piece.The
A positioning block is cut through intersection, and when the installation casing of attachment device penetrates on horizontal web member, the first locating piece is tightly attached to water
The side of flat web member, the first locating piece are set between the second locating piece, and the first locating piece plays the role of positioning support, the second positioning
Block is to the first locating piece position-limiting action.
Further, it is welded with stiffener between fixed square tube and bottom plate, the connection improved between fixed square tube and bottom plate is strong
Degree.
Further, the both ends of wirerope are equipped with hook, and the hook in top is connect with gaily decorated basket screw rod, in top
Lifting lug is symmetrically arranged on cross bar, the hook being below is connect with lifting lug.It is connect by linking up with lifting lug, realizes wirerope and cross
Bar connection.
A kind of vertical transporting method of overlength light-weight metal roof boarding lifting attachment device, it is characterised in that including walking as follows
Suddenly:
A, it makes
(1) steel truss shoulder pole girder makes:Top boom, diagonal web member and lower boom are formed into an entirety by being welded to connect,
Horizontal web member is bolted between lower boom again;
(2) adjustable packing steel frame manufacture:It is first welded in moving casing is symmetrical above and below respectively on the end of upright bar, then will
Cross bar equipped with threaded hole penetrates the moving casing of top, another cross bar is penetrated to the moving casing of lower section, then in cross bar
Clamping screw is screwed into threaded hole;
(3) attachment device makes:Sleeve first will be adjusted and adjusting screw rod is threadedly coupled, then will fixed square tube, installation casing
It is welded and fixed, then fixed square tube is welded and fixed with adjusting screw rod, then connect gaily decorated basket screw rod in the lower section of bottom plate, so with bottom plate
The lower section connecting steel wire ropes of gaily decorated basket screw rod afterwards;
B, metal roofing board is hung onto adjustable packing steel frame
(1) the fixedly adjustable lower section cross bar for being packaged steel frame is pinpointed:The length of the metal roofing board first hung as needed
The fixation point of the adjustable lower section cross bar for being packaged steel frame, the fixation of the two neighboring adjustable lower section cross bar for being packaged steel frame are set
The distance between point is identical, then is symmetrical arranged upright bar at the fixation point of the adjustable lower section cross bar for being packaged steel frame;
(2) the adjustable width for being packaged steel frame is adjusted;
(3) metal roofing board is hung one by one:Metal roofing board is hung onto adjustable packing steel frame using loop wheel machine, then
The top surface of metal roofing board is put into cystosepiment, and the position of cystosepiment setting and the position of adjustable packing steel frame setting are mutually right
It answers, then second metal roofing board is hung onto adjustable packing steel frame, second metal roofing board is placed on cystosepiment,
It is put into cystosepiment in the top surface of second metal roofing board again, metal roofing board is hung onto adjustable packing by circulate operation one by one
In steel frame, when metal roofing board whole dropping place is when in adjustable packing steel frame, it is inserted into cross bar, and by cross bar and moving casing
It is fixedly connected, then turns clamping screw, clamping screw is compressed to the cystosepiment in the metal roofing board in the top;
C, installing and connecting apparatus
(1) attachment device is connect with steel truss shoulder pole girder:First according to the adjustable quantity for being packaged steel frame, respective counts are selected
The steel truss shoulder pole girder of amount, and two neighboring steel truss shoulder pole girder is attached, then will be corresponding with adjustable packing steel frame
Horizontal web member remove, then the installation casing of attachment device is penetrated on horizontal web member, then by horizontal web member and lower boom
Between be fixedly connected;
(2) sling height is adjusted by gaily decorated basket screw rod, the connecting pin of two wirerope is in sustained height;
(3) adjusting sleeve is turned, the setting position of fixed square tube is adjusted, it will be on the connecting pin and cross bar of two wirerope
Junction corresponds to each other;
D, vertical lifting metal roofing board
(1) steel truss shoulder pole girder is lifted by crane using loop wheel machine, and transfers steel truss shoulder pole girder, then by the connecting pin of wirerope and horizontal
Junction on bar is connected with each other, then in two neighboring adjustable packing steel frame setting connection rope;
(2) vertical transport steel truss shoulder pole girder.
Further, the concrete operations of the adjustable width for being packaged steel frame are adjusted in step b as in the cross bar of lower section setting volume
Ruler, then the adjustable puller bolt on the moving casing of lower section is unscrewed.Then wide by movable sleeve according to the plate of metal roofing board
Pipe is movable on the cross bar of lower section, according to the length mark of tape measure, adjusts the distance between two upright bars.When adjustable packing steel framework
The width of frame meets the hanging when requiring of metal roofing board, and the adjustable puller bolt on the moving casing on the cross bar of lower section is twisted
Tightly.
The utility model is by adopting the above-described technical solution, have the advantages that:
1, metal roofing board can be superimposed in adjustable packing steel frame by the utility model, then will be packaged used adjustable beat
Baogang's frame is connected on steel truss shoulder pole girder using attachment device, final to realize light-weight metal roof boarding, adjustable packing steel framework
Frame, attachment device, steel truss shoulder pole girder are integral, and lifting considers that special operation condition factor is smaller, and operate simplicity.
2, the utility model can be directed to overlength light-weight metal before hanging onto metal roofing board in adjustable packing steel frame
The adjustable packing steel frame of the length setting respective numbers of roof boarding, then overlength light-weight metal roof boarding is hung into adjustable packing
When in steel frame, adjustable packing steel frame is not easy to tilt or turn on one's side, and realizes that metal roofing board lies in a horizontal plane in adjustable packing steel framework
In frame.
In metal roofing board to be hung onto the detailed process in adjustable packing steel frame, metal roofing board is hung in one by one
It regulates in the adjustable packing frame of width, often hangs one, a cystosepiment is arranged on metal roofing board, cystosepiment setting
Position is corresponded to each other with the position of adjustable packing steel frame setting, metal roofing board can be prevented to be crushed out of shape in hoisting process;
When metal roofing board whole dropping place is when in adjustable packing steel frame, it is inserted into cross bar, and cross bar is fixedly connected with moving casing,
Then clamping screw is turned, clamping screw is compressed to the cystosepiment in the metal roofing board in the top, passes through clamping screw
Adjustment effect on cross bar can hang greater number of metal roofing board in adjustable packing steel frame, solve existing skill
The problem of metal roofing board limited amount is lifted by crane in art.The utility model can keep balancing safety lifting to metal roofing board in this way
And vertically carried, operation is not succinct cumbersome, and safety is secure, while can disposably lift by crane tens of light-weight metal roofings
Plate effectively improves construction efficiency, construction cost and labor intensity of workers is greatly lowered.
The adjustable width adjustment for being packaged frame is movable on cross bar specifically by moving casing, adjust between upright bar away from
From, and then the entire adjustable width for being packaged steel frame is adjusted, convenient for metal roofing board is hung onto adjustable packing steel frame.
3, the utility model is able to satisfy the lifting requirements to overlength light-weight metal roof boarding in installing and connecting apparatus:Root
According to the adjustable quantity for being packaged steel frame, the steel truss shoulder pole girder of respective numbers is docked;Sling height is adjusted by gaily decorated basket screw rod, it will
The connecting pin of two wirerope is in sustained height;Adjusting sleeve is turned, the setting position of fixed square tube is adjusted, by two steel wires
The connecting pin of rope is corresponded to each other with the junction on cross bar.
4, attachment device and steel truss shoulder pole girder are first connected into one in vertical lifting metal roofing board by the utility model
Whole, metal roofing board is Liftable in adjustable packing steel frame afterwards in place, and whole process operation is succinct.
5, the horizontal web member of the utility model steel truss shoulder pole girder is detachable during transportation, and all steel truss can be nested
Together, transport space is saved, transportation cost is saved.
6, the device in the utility model can be reused using green steel.
7, the utility model principle is clear, implementation operation is easy, and controls and require generally, easy to spread.
Detailed description of the invention
The utility model is described in further detail with reference to the accompanying drawing:
Fig. 1 is the structural schematic diagram of vertical transport in the utility model;
Fig. 2 is the structural schematic diagram of steel truss shoulder pole girder in the utility model;
Fig. 3 is the adjustable structural schematic diagram for being packaged steel frame in the utility model;
Fig. 4 is the structural schematic diagram of attachment device in the utility model;
Fig. 5 is the structural schematic diagram that lower boom is connect with horizontal web member in the utility model.
In figure, 1:Steel truss shoulder pole girder;2:Adjustable packing steel frame;3:Attachment device;1-1:Top boom;1-2:Oblique abdomen
Bar;1-3:Lower boom;1-4:Horizontal web member;1-5:Flange connecting plate;1-6:First connection otic placode;1-7:Second connection otic placode;
1-8:Connect bolt;1-9:Second locating piece;2-1:Cross bar;2-2:Upright bar;2-3:Moving casing;2-4:Clamping screw;2-5:
Adjustable puller bolt;2-6:Lifting lug;3-1:Adjust sleeve;3-2:Adjusting screw rod;3-3:Fixed square tube;3-4:Casing is installed;
3-5:Bottom plate;3-6:Gaily decorated basket screw rod;3-7:Wirerope;3-8:First locating piece;3-9:Stiffener;3-10:Hook.
Specific embodiment
As shown in Figures 1 to 5, attachment device 3, including steel are lifted by crane for a kind of overlength light-weight metal roof boarding of the utility model
Truss shoulder pole girder 1, adjustable packing steel frame 2 and attachment device 3.
Steel truss shoulder pole girder 1 include top boom 1-1, diagonal web member 1-2 and lower boom 1-3, top boom 1-1, diagonal web member 1-2 and
Lower boom 1-3 forms an entirety by being welded to connect, and is fixedly connected with horizontal web member 1-4 between lower boom 1-3.Lower boom 1-
3 medial surface is equipped with the first connection otic placode 1-6, and the both ends of horizontal web member 1-4 are equipped with the second connection otic placode 1-7, the first connection
Connection bolt 1-8 is equipped between otic placode 1-6 and the second connection otic placode 1-7.It realizes that lower boom 1-3 and horizontal web member 1-4 is fixed to connect
It connects, it is convenient that horizontal web member 1-4 is mounted and dismounted.It, can be by the water of steel truss shoulder pole girder 1 when being transported to steel truss shoulder pole girder 1
Flat web member 1-4 disassembly, and steel truss shoulder pole girder 1 is nestable together, save transport space and transportation cost.The two of top boom 1-1
End and the both ends of lower boom 1-3 are equipped with flange connecting plate 1-5.Flange connecting plate 1-5 by being welded to connect in top boom 1-1 and
The end of lower boom 1-3, and it is provided with the bolt hole being connected, the connection and disassembly to adjacent steel truss shoulder pole girder 1.
Adjustable packing steel frame 2 includes steel frame, moving casing 2-3 and clamping screw 2-4.Steel frame includes two parallel
The end symmetrical above and below for being welded in upright bar 2-2 respectively the cross bar 2-1 and upright bar 2-2 of setting, moving casing 2-3, moving casing 2-3
It is sheathed on cross bar 2-1, clamping screw 2-4 runs through the cross bar 2-1 in top.Adjustable top is installed on moving casing 2-3
Tight bolt 2-5, adjustable puller bolt 2-5 are held out against in being consolidated, moving casing 2-3 and cross bar 2-1 on the side of cross bar 2-1
It is fixed, avoid moving casing 2-3 from sliding on cross bar 2-1.When that will adjust puller bolt and unscrew, puller bolt 2-5 is adjusted not
Active force is generated to cross bar 2-1, moving casing 2-3 can be moved along cross bar 2-1 axis, the distance between adjustment upright bar 2-2, into
And the entire adjustable width for being packaged steel frame 2 is adjusted, convenient for metal roofing board is hung onto adjustable packing steel frame 2.
Attachment device 3 include adjust sleeve 3-1, adjusting screw rod 3-2, fixed square tube 3-3, installation casing 3-4, bottom plate 3-5,
Gaily decorated basket screw rod 3-6 and wirerope 3-7.Adjusting screw rod 3-2 is threadedly coupled with sleeve 3-1 is adjusted, adjusting screw rod 3-2 and fixed square tube
3-3 is welded and fixed, and fixed square tube 3-3 and installation casing 3-4 are welded and fixed, and fixed square tube 3-3 and bottom plate 3-5 is welded and fixed.Gu
Determine to be welded with stiffener 3-9 between square tube 3-3 and bottom plate 3-5, improves the bonding strength between fixed square tube 3-3 and bottom plate 3-5.
Gaily decorated basket screw rod 3-6 is connect with bottom plate 3-5, and wirerope 3-7 is connect with gaily decorated basket screw rod 3-6, and installation casing 3-4 is set to horizontal web member 1-
On 4, wirerope 3-7 is connect with upper cross bar 2-1.The both ends of wirerope 3-7 are equipped with hook 3-10, the hook 3- in top
10 connect with gaily decorated basket screw rod 3-6, are symmetrically arranged with lifting lug 2-6 on the cross bar 2-1 in top, the hook 3-10 being below with hang
Ear 2-6 connection is connect with lifting lug 2-6 by hook 3-10, realizes that wirerope 3-7 is connect with cross bar 2-1.In two adjusting sets
Adjusting screw rod 3-2 between cylinder 3-1 is equipped with the first locating piece 3-8, the first locating piece 3-8 and is tightly attached to the side of horizontal web member 1-4
Face, the side of horizontal web member 1-4 are equipped with the second locating piece 1-9, the first locating piece 3-8 between the second locating piece 1-9.First
Locating piece 3-8 is cut through intersection, when the installation casing 3-4 of attachment device 3 is penetrated on horizontal web member 1-4, the first locating piece
3-8 is tightly attached to the side of horizontal web member 1-4, and the first locating piece 3-8 is set between the second locating piece 1-9, and the first locating piece 3-8 rises
It is acted on to positioning support, the second locating piece 1-9 is to the first locating piece 3-8 position-limiting action.
A kind of vertical transporting method of overlength light-weight metal roof boarding lifting attachment device, includes the following steps:
A, it makes
(1) steel truss shoulder pole girder 1 makes:Top boom 1-1, diagonal web member 1-2 and lower boom 1-3 are formed by being welded to connect
One entirety, then horizontal web member 1-4 is bolted between lower boom 1-3.
(2) adjustable packing steel frame 2 makes:First by the end symmetrical above and below for being welded in upright bar 2-2 respectively moving casing 2-3
On, then by be equipped with threaded hole cross bar 2-1 penetrate top moving casing 2-3, by another cross bar 2-1 penetrate lower section movable sleeve
Then pipe 2-3 is screwed into clamping screw 2-4 in the threaded hole of cross bar 2-1.
(3) attachment device 3 makes:Sleeve 3-1 and adjusting screw rod 3-2 will first be adjusted to be threadedly coupled, then will fixed square tube 3-
3, installation casing 3-4 and bottom plate 3-5 is welded and fixed, and then fixed square tube 3-3 and adjusting screw rod 3-2 is welded and fixed, then the bottom of at
The lower section of plate 3-5 connects gaily decorated basket screw rod 3-6, then the lower section connecting steel wire ropes 3-7 of gaily decorated basket screw rod 3-6.
B, metal roofing board is hung onto adjustable packing steel frame 2
(1) the fixedly adjustable lower section cross bar 2-1 for being packaged steel frame 2 is pinpointed:The metal roofing board first hung as needed
The fixation point of the adjustable lower section cross bar 2-1 for being packaged steel frame 2, the two neighboring adjustable lower section for being packaged steel frame 2 is arranged in length
The distance between the fixation point of cross bar 2-1 is identical, then at the fixation point of the adjustable lower section cross bar 2-1 for being packaged steel frame 2
It is symmetrical arranged upright bar 2-2, keeps upright bar 2-2 vertical state.
(2) the adjustable width for being packaged steel frame 2 is adjusted:Tape measure is arranged in cross bar 2-1 in lower section, then by the movable sleeve of lower section
Adjustable puller bolt 2-5 on pipe 2-3 unscrews.Then according to the plate of metal roofing board it is wide by moving casing 2-3 in lower section
It is movable on cross bar 2-1, according to the length mark of tape measure, adjust the distance between two upright bar 2-2.When adjustable packing steel frame 2
Width meet the hanging when requiring of metal roofing board, adjustable on the moving casing 2-3 on the cross bar 2-1 of lower section is held out against into spiral shell
Bolt 2-5 is tightened.
(3) metal roofing board is hung one by one:Metal roofing board is hung onto adjustable packing steel frame 2 using loop wheel machine, then
It is put into cystosepiment in the top surface of metal roofing board, the position of cystosepiment setting and the position that adjustable packing steel frame 2 is arranged are mutual
It is corresponding, then second metal roofing board is hung onto adjustable packing steel frame 2, second metal roofing board is placed into cystosepiment
On, then in the top surface of second metal roofing board it is put into cystosepiment.Metal roofing board is hung onto adjustable beat by circulate operation one by one
In Baogang's frame 2, when metal roofing board whole dropping place is when in adjustable packing steel frame 2, insertion is adjustable to be packaged the upper of steel frame 2
Square cross bar 2-1, and top cross bar 2-1 is fixedly connected with moving casing 2-3, clamping screw 2-4 is then turned, by clamping screw
2-4 compresses the cystosepiment in the metal roofing board in the top.
C, installing and connecting apparatus 3
(1) attachment device 3 is connect with steel truss shoulder pole girder 1:First according to the adjustable quantity for being packaged steel frame 2, phase is selected
The steel truss shoulder pole girder 1 of quantity is answered, and two neighboring steel truss shoulder pole girder 1 is attached, then will be with adjustable packing steel frame 2
Corresponding horizontal web member 1-4 is removed, and then penetrates the installation casing 3-4 of attachment device 3 on horizontal web member 1-4, then will
It is fixedly connected between horizontal web member 1-4 and lower boom 1-3.
(2) sling height is adjusted by gaily decorated basket screw rod 3-6, the connecting pin of two wirerope 3-7 is in sustained height.
(3) it turns and adjusts sleeve 3-1, the setting position of fixed square tube 3-3 is adjusted, by the connecting pin of two wirerope 3-7
It is corresponded to each other with the junction on cross bar 2-1.
D, vertical lifting metal roofing board
(1) steel truss shoulder pole girder 1 is lifted by crane using loop wheel machine, and transfers steel truss shoulder pole girder 1, then by the connection of wirerope 3-7
End is connected with each other with the junction on cross bar 2-1, then in the two neighboring adjustable setting of packing steel frame 2 connection rope.
(2) vertical transport steel truss shoulder pole girder 1.
1, metal roofing board can be superimposed in adjustable packing steel frame 2 by the utility model, then will be packaged used adjustable
Steel frame 2 is packaged to be connected on steel truss shoulder pole girder 1 using attachment device 3, it is final to realize light-weight metal roof boarding, adjustable packing
Steel frame 2, attachment device 3, steel truss shoulder pole girder 1 are integral, and lifting considers that special operation condition factor is smaller, and operate letter
Just.
2, the utility model, can be for overlength lightweight gold before hanging onto metal roofing board in adjustable packing steel frame 2
Belong to the adjustable packing steel frame 2 of the length setting respective numbers of roof boarding, then overlength light-weight metal roof boarding is hung onto adjustable
When being packaged in steel frame 2, adjustable packing steel frame 2 is not easy to tilt or turn on one's side, and realizes that metal roofing board lies in a horizontal plane in adjustable beat
In Baogang's frame 2.
In metal roofing board to be hung onto the detailed process in adjustable packing steel frame 2, metal roofing board is hung in one by one
In the adjustable packing frame of adjusted good width, one is often hung, a cystosepiment, cystosepiment setting are arranged on metal roofing board
Position with it is adjustable packing steel frame 2 be arranged position correspond to each other, can prevent metal roofing board in hoisting process by buckling
Shape;When metal roofing board whole dropping place is when in adjustable packing steel frame 2, it is inserted into cross bar 2-1, and by cross bar 2-1 and movable sleeve
Pipe 2-3 is fixedly connected, and then turns clamping screw 2-4, clamping screw 2-4 is compressed in the metal roofing board in the top
Cystosepiment can hang a greater number in adjustable packing steel frame 2 by adjustment effect of the clamping screw 2-4 on cross bar 2-1
Metal roofing board, solve the problems, such as in the prior art lift by crane metal roofing board limited amount.The utility model can be right in this way
Metal roofing board keeps balancing safety to lift by crane and vertically carried, and operation is not succinct cumbersome, and safety is secure, while can be primary
Property lift by crane tens of light-weight metal roof boardings, effectively improve construction efficiency, construction cost is greatly lowered and worker labour
Intensity.
The adjustable width adjustment for being packaged frame is movable on cross bar 2-1 specifically by moving casing 2-3, adjusts upright bar 2-
The distance between 2, and then the entire adjustable width for being packaged steel frame 2 is adjusted, convenient for metal roofing board is hung onto adjustable packing
In steel frame 2.
3, the utility model is able to satisfy the lifting requirements to overlength light-weight metal roof boarding in installing and connecting apparatus 3:Root
According to the adjustable quantity for being packaged steel frame 2, the steel truss shoulder pole girder 1 of respective numbers is docked;It is high that lifting is adjusted by gaily decorated basket screw rod 3-6
Degree, is in sustained height for the connecting pin of two wirerope 3-7;It turns and adjusts sleeve 3-1, adjust the setting of fixed square tube 3-3
Position corresponds to each other the connecting pin of two wirerope 3-7 with the junction on cross bar 2-1.
4, the utility model first connects into attachment device 3 and steel truss shoulder pole girder 1 in vertical lifting metal roofing board
One is whole, and metal roofing board i.e. Liftable, whole process operation after adjustable packing steel frame 2 is in place is succinct.
5, the horizontal web member 1-4 of the utility model steel truss shoulder pole girder 1 is detachable during transportation, and all steel truss can
It is nestable to save transport space together, save transportation cost.
6, the device in the utility model can be reused using green steel.
7, the utility model principle is clear, implementation operation is easy, and controls and require generally, easy to spread.
The above are only specific embodiments of the present invention, but the technical characteristics of the utility model is not limited thereto.Appoint
How based on the utility model, to solve essentially identical technical problem, essentially identical technical effect is realized, it is made
Simple change, equivalent replacement or modification etc., are all covered by among the protection scope of the utility model.
Claims (7)
1. a kind of overlength light-weight metal roof boarding lifts by crane attachment device, it is characterised in that:Including steel truss shoulder pole girder, adjustable packing
Steel frame and attachment device;The steel truss shoulder pole girder includes top boom, diagonal web member and lower boom, the top boom, it is described tiltedly
Web member and the lower boom are fixedly connected with horizontal web member between the lower boom by being welded to connect one entirety of formation;Institute
Stating adjustable packing steel frame includes steel frame, moving casing and clamping screw, and the steel frame includes two cross disposed in parallel
Bar and upright bar, the end symmetrical above and below for being welded in the upright bar, the moving casing are sheathed on described the moving casing respectively
On cross bar, the clamping screw runs through the cross bar in top;The attachment device include adjust sleeve, adjusting screw rod,
Fixed square tube, installation casing, bottom plate, gaily decorated basket screw rod and wirerope, the adjusting screw rod are threadedly coupled with the adjusting sleeve, institute
It states adjusting screw rod to fix with the fixed square tubes soldering, the fixed square tube and the installation casing are welded and fixed, the fixation
Square tube is welded and fixed with the bottom plate, and the gaily decorated basket screw rod is connect with the bottom plate, and the wirerope and the gaily decorated basket screw rod connect
It connects, the installation casing is set on the horizontal web member, and the wirerope is connect with cross bar described in top.
2. a kind of overlength light-weight metal roof boarding according to claim 1 lifts by crane attachment device, it is characterised in that:On described
The both ends of chord member and the both ends of the lower boom are equipped with flange connecting plate.
3. a kind of overlength light-weight metal roof boarding according to claim 1 lifts by crane attachment device, it is characterised in that:Under described
The medial surface of chord member is equipped with the first connection otic placode, and the both ends of the horizontal web member are equipped with the second connection otic placode, and described first connects
Connection bolt is equipped between ear connecting plate and second connection otic placode.
4. a kind of overlength light-weight metal roof boarding according to claim 1 lifts by crane attachment device, it is characterised in that:The work
Adjustable puller bolt is installed on dynamic casing, the adjustable puller bolt is held out against on the side of the cross bar.
5. a kind of overlength light-weight metal roof boarding according to claim 1 lifts by crane attachment device, it is characterised in that:In two
A adjusting screw rod adjusted between sleeve is equipped with the first locating piece, and first locating piece is tightly attached to the level
The side of web member, the side of the horizontal web member are equipped with the second locating piece, and first locating piece is set to second locating piece
Between.
6. a kind of overlength light-weight metal roof boarding according to claim 1 lifts by crane attachment device, it is characterised in that:It is described solid
Determine to be welded with stiffener between square tube and the bottom plate.
7. a kind of overlength light-weight metal roof boarding according to claim 1 lifts by crane attachment device, it is characterised in that:The steel
The both ends of cord are equipped with hook, and the hook in top is connect with the gaily decorated basket screw rod, the cross bar in top
On be symmetrically arranged with lifting lug, the hook being below is connect with the lifting lug.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820372587.2U CN208166361U (en) | 2018-03-19 | 2018-03-19 | A kind of overlength light-weight metal roof boarding lifting attachment device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820372587.2U CN208166361U (en) | 2018-03-19 | 2018-03-19 | A kind of overlength light-weight metal roof boarding lifting attachment device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208166361U true CN208166361U (en) | 2018-11-30 |
Family
ID=64373601
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820372587.2U Expired - Fee Related CN208166361U (en) | 2018-03-19 | 2018-03-19 | A kind of overlength light-weight metal roof boarding lifting attachment device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208166361U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108341331A (en) * | 2018-03-19 | 2018-07-31 | 浙江中南建设集团钢结构有限公司 | A kind of overlength light-weight metal roof boarding lifting attachment device and its vertical transporting method |
CN109468966A (en) * | 2019-01-08 | 2019-03-15 | 刘金顶 | Steel box-girder suspension bridge dismounts soft rope device |
-
2018
- 2018-03-19 CN CN201820372587.2U patent/CN208166361U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108341331A (en) * | 2018-03-19 | 2018-07-31 | 浙江中南建设集团钢结构有限公司 | A kind of overlength light-weight metal roof boarding lifting attachment device and its vertical transporting method |
CN109468966A (en) * | 2019-01-08 | 2019-03-15 | 刘金顶 | Steel box-girder suspension bridge dismounts soft rope device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108862045B (en) | Special-shaped steel truss girder rod piece turning device and method for turning over rod piece | |
CN101200975A (en) | High-altitude bridge type cantilever scaffold | |
CN208166361U (en) | A kind of overlength light-weight metal roof boarding lifting attachment device | |
CN105888227B (en) | Superelevation is tubaeform steel structure exterior finish operation platform and its building method | |
CN104153586A (en) | Construction method for installing purline through suspension cable cranes | |
CN101649684B (en) | Installing method of roof mast | |
CN212052333U (en) | Suspension bridge catwalk surface course installing the system | |
CN203794505U (en) | Internal climbing steel beam conveying device of internal climbing movable arm tower crane | |
CN216515140U (en) | Overhead steel box girder welding platform device | |
CN214899827U (en) | High-altitude outdoor cable terminal operation platform | |
CN110005250A (en) | Friction plate girdle ring device | |
CN214652983U (en) | A hoisting structure for assembled stair | |
CN108341331A (en) | A kind of overlength light-weight metal roof boarding lifting attachment device and its vertical transporting method | |
CN209957212U (en) | Lifting appliance and lifting system for mounting component under beam | |
CN209797236U (en) | Box girder external mold hoisting device | |
CN201980890U (en) | Herringbone hoisting mast for hoisting under special situation of high altitude | |
CN213143815U (en) | Construction hanging flower basket is restoreed in eaves mouth high altitude that encorbelments of metal roofing | |
CN204643648U (en) | Pylon and hanging basket thereof | |
CN106049848B (en) | A kind of adjustable anti-shake mobile platform and its installation method | |
CN220319082U (en) | Hanging basket installed on inclined web member of inverted triangle pipe truss | |
CN209835412U (en) | Lifting appliance for lifting flange connection type steel framework | |
CN221070772U (en) | Aerial disassembly device for crane boom of tower crane | |
CN210065020U (en) | Portable double hoisting frame device | |
CN219710928U (en) | Steel construction operation basket | |
CN218406387U (en) | Steel platform suitable for suspended ceiling of hotel lobby installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 311400 No.18, Changkou East Street, Changkou Town, Fuyang District, Hangzhou City, Zhejiang Province Patentee after: Zhejiang Zhongnan Lvjian Technology Group Co.,Ltd. Address before: No.245, BINKANG Road, Binjiang District, Hangzhou City, Zhejiang Province 310052 Patentee before: ZHEJIANG ZHONGNAN CONSTRUCTION GROUP STEEL STRUCTURE Co.,Ltd. |
|
CP03 | Change of name, title or address | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181130 |
|
CF01 | Termination of patent right due to non-payment of annual fee |