CN208166361U - A kind of overlength light-weight metal roof boarding lifting attachment device - Google Patents

A kind of overlength light-weight metal roof boarding lifting attachment device Download PDF

Info

Publication number
CN208166361U
CN208166361U CN201820372587.2U CN201820372587U CN208166361U CN 208166361 U CN208166361 U CN 208166361U CN 201820372587 U CN201820372587 U CN 201820372587U CN 208166361 U CN208166361 U CN 208166361U
Authority
CN
China
Prior art keywords
attachment device
steel frame
screw rod
web member
cross bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820372587.2U
Other languages
Chinese (zh)
Inventor
王宇伟
袁国平
王杰
陈志伟
丁金利
孙孟海
包丽昀
蒋永扬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Zhongnan Lvjian Technology Group Co ltd
Original Assignee
Zhejiang Zhongnan Construction Group Steel Structure Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Zhongnan Construction Group Steel Structure Co Ltd filed Critical Zhejiang Zhongnan Construction Group Steel Structure Co Ltd
Priority to CN201820372587.2U priority Critical patent/CN208166361U/en
Application granted granted Critical
Publication of CN208166361U publication Critical patent/CN208166361U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of overlength light-weight metal roof boardings to lift by crane attachment device, including steel truss shoulder pole girder, adjustable packing steel frame and attachment device;Steel truss shoulder pole girder includes top boom, diagonal web member and lower boom, adjustable packing steel frame includes steel frame, moving casing and clamping screw, steel frame includes two cross bars disposed in parallel and upright bar, attachment device includes adjusting sleeve, adjusting screw rod, fixed square tube, installation casing, bottom plate, gaily decorated basket screw rod and wirerope, casing is installed to be set on horizontal web member, wirerope is connect with upper cross bar.The utility model meets to the lifting requirements of metal roofing board, so that metal roofing board keeps balancing lifting, operation is not succinct cumbersome, improves safety, while lifting by crane that quantity is more, and metal roofing board is unlikely to deform, and effectively improves construction efficiency and construction cost.

Description

A kind of overlength light-weight metal roof boarding lifting attachment device
Technical field
The utility model belongs to metal Roof system technical field, and in particular to a kind of overlength light-weight metal roof boarding lifting Attachment device.
Background technique
Metal Roof system is with self-insurance anti-corrosion ability, lightweight, high-strength, durable titanium zinc, copper, titanium, aluminum-zinc alloy The building roof system of the sheet metals such as colored steel and aluminium alloy, stainless sheet steel as plane materiel.
Metal Roof system be use light gauge cold-formed steel shape and swaging metal roofing board be equipped with insulation, sound-adsorbing sound-insulating hung with And the materials such as waterproof, the containment system being assembled into, and have following characteristics:1, metal Roof has from heavy and light, and durability is strong and passes through The high feature of performance of helping.2, metal Roof has excellent structural behaviour.3, has good waterproof performance.4, appearance adaptability By force, it is able to satisfy the appearance demand of variety classes building.5, install convenient and quickly, for different regions, environment and different function It is required that building have stronger adaptability.
Metal Roof system development at present is swift and violent, this is all widely used in the buildings such as many airports, station, workshop, gymnasium Class roof style, length is larger under normal conditions for the type roof boarding, lighter weight, can satisfy each large span public building pair The requirement of Roof system.Existing metal roofing board often has with hanging method:1. vertically being drawn from ground one by one using rope by manpower Rise to roofing;2. angled, golden by manpower application cable traction lightweight as slideway, slideway and ground using wirerope Belong to roof boarding along slideway from ground handling to roof.There are Railway Projects for the method for carrying:Light-weight metal roof boarding length compared with Greatly, carrying out step by step is carried out to over-long roof plate when vertical carrying, this results in roofing longitudinal lap joint heavy workload and there are rain The hidden danger of water leakage;It is low by the vertical handling efficiency of method progress of manpower, take slideway easily to damage the anti-of metal roofing board Rotten coating, there are hidden danger of quality, while labor intensity of workers is big;Since light-weight metal roof boarding in-plane stiffness is looked into, using manpower Carry the damage for easily causing individual light-weight metal roof boarding that bending and torsional deformation occurs.
Utility model content
The utility model aim is solution the above-mentioned technical problems in the prior art, provides a kind of overlength lightweight gold Belong to roof boarding and lift by crane attachment device, metal roofing board can be superimposed in the device, then adjustable packing steel framework used will be packaged Frame is connected on steel truss shoulder pole girder using attachment device, to realize light-weight metal roof boarding, adjustable packing steel frame, connection Device, steel truss shoulder pole girder are integral, and lifting considers that special operation condition factor is smaller, and operate simplicity;In vertical transport mistake Cheng Zhong, can be for the adjustable packing steel frame of the length setting respective numbers of overlength light-weight metal roof boarding, and docks respective counts The steel truss shoulder pole girder of amount meets the lifting requirements to overlength light-weight metal roof boarding, so that metal roofing board keeps balance peace It lifts by crane and is vertically carried entirely, operation is not succinct cumbersome, and safety is secure, while can disposably lift by crane tens of light-weight metals Roof boarding effectively improves construction efficiency, construction cost and labor intensity of workers is greatly lowered, while playing to lightweight Metal roofing board in vertical handling process quality protection, be unlikely to deform.
In order to solve the above-mentioned technical problem, the utility model adopts the following technical solution:
A kind of overlength light-weight metal roof boarding lifting attachment device, it is characterised in that:Including steel truss shoulder pole girder, adjustable beat Baogang's frame and attachment device;Steel truss shoulder pole girder includes top boom, diagonal web member and lower boom, top boom, diagonal web member and lower edge Bar forms an entirety by being welded to connect, and is fixedly connected with horizontal web member between lower boom;Adjustable packing steel frame includes steel Frame, moving casing and clamping screw, steel frame include two cross bars disposed in parallel and upright bar, and moving casing is right up and down respectively Claim the end for being welded in upright bar, moving casing is sheathed on cross bar, and clamping screw runs through the cross bar in top;Attachment device packet It includes and adjusts sleeve, adjusting screw rod, fixed square tube, installation casing, bottom plate, gaily decorated basket screw rod and wirerope, adjusting screw rod and adjusting set Cylinder is threadedly coupled, and adjusting screw rod is fixed with fixed square tubes soldering, and fixed square tube and installation casing are welded and fixed, fixed square tube and bottom Plate is welded and fixed, and gaily decorated basket screw rod is connect with bottom plate, and wirerope is connect with gaily decorated basket screw rod, and installation casing is set on horizontal web member, steel Cord is connect with upper cross bar.
Further, the both ends of top boom and the both ends of lower boom are equipped with flange connecting plate.Flange connecting plate passes through welding It is connected to the end of top boom and lower boom, and is provided with the bolt hole being connected, the connection to adjacent steel truss shoulder pole girder And disassembly.
Further, the medial surface of lower boom is equipped with the first connection otic placode, and the both ends of horizontal web member are equipped with the second engaging lug Plate is equipped with connection bolt between the first connection otic placode and the second connection otic placode.Realize that lower boom is fixedly connected with horizontal web member, side Just horizontal web member is mounted and dismounted.When being transported to steel truss shoulder pole girder, the horizontal web member of steel truss shoulder pole girder can be dismantled, And steel truss shoulder pole girder is nestable together, save transport space and transportation cost.
Further, adjustable puller bolt is installed, adjustable puller bolt is held out against in the side of cross bar on moving casing On.Moving casing is fixed with cross bar, moving casing is avoided to slide on cross bar.When that will adjust puller bolt and unscrew, Adjustable puller bolt not to cross bar generate active force, moving casing can be moved along cross bar axis, adjust upright bar between away from From, and then the entire adjustable width for being packaged steel frame is adjusted, convenient for metal roofing board is hung onto adjustable packing steel frame.
Further, the adjusting screw rod adjusted between sleeve in two is equipped with the first locating piece, and the first locating piece is close to In the side of horizontal web member, the side of horizontal web member is equipped with the second locating piece, and the first locating piece is set between the second locating piece.The A positioning block is cut through intersection, and when the installation casing of attachment device penetrates on horizontal web member, the first locating piece is tightly attached to water The side of flat web member, the first locating piece are set between the second locating piece, and the first locating piece plays the role of positioning support, the second positioning Block is to the first locating piece position-limiting action.
Further, it is welded with stiffener between fixed square tube and bottom plate, the connection improved between fixed square tube and bottom plate is strong Degree.
Further, the both ends of wirerope are equipped with hook, and the hook in top is connect with gaily decorated basket screw rod, in top Lifting lug is symmetrically arranged on cross bar, the hook being below is connect with lifting lug.It is connect by linking up with lifting lug, realizes wirerope and cross Bar connection.
A kind of vertical transporting method of overlength light-weight metal roof boarding lifting attachment device, it is characterised in that including walking as follows Suddenly:
A, it makes
(1) steel truss shoulder pole girder makes:Top boom, diagonal web member and lower boom are formed into an entirety by being welded to connect, Horizontal web member is bolted between lower boom again;
(2) adjustable packing steel frame manufacture:It is first welded in moving casing is symmetrical above and below respectively on the end of upright bar, then will Cross bar equipped with threaded hole penetrates the moving casing of top, another cross bar is penetrated to the moving casing of lower section, then in cross bar Clamping screw is screwed into threaded hole;
(3) attachment device makes:Sleeve first will be adjusted and adjusting screw rod is threadedly coupled, then will fixed square tube, installation casing It is welded and fixed, then fixed square tube is welded and fixed with adjusting screw rod, then connect gaily decorated basket screw rod in the lower section of bottom plate, so with bottom plate The lower section connecting steel wire ropes of gaily decorated basket screw rod afterwards;
B, metal roofing board is hung onto adjustable packing steel frame
(1) the fixedly adjustable lower section cross bar for being packaged steel frame is pinpointed:The length of the metal roofing board first hung as needed The fixation point of the adjustable lower section cross bar for being packaged steel frame, the fixation of the two neighboring adjustable lower section cross bar for being packaged steel frame are set The distance between point is identical, then is symmetrical arranged upright bar at the fixation point of the adjustable lower section cross bar for being packaged steel frame;
(2) the adjustable width for being packaged steel frame is adjusted;
(3) metal roofing board is hung one by one:Metal roofing board is hung onto adjustable packing steel frame using loop wheel machine, then The top surface of metal roofing board is put into cystosepiment, and the position of cystosepiment setting and the position of adjustable packing steel frame setting are mutually right It answers, then second metal roofing board is hung onto adjustable packing steel frame, second metal roofing board is placed on cystosepiment, It is put into cystosepiment in the top surface of second metal roofing board again, metal roofing board is hung onto adjustable packing by circulate operation one by one In steel frame, when metal roofing board whole dropping place is when in adjustable packing steel frame, it is inserted into cross bar, and by cross bar and moving casing It is fixedly connected, then turns clamping screw, clamping screw is compressed to the cystosepiment in the metal roofing board in the top;
C, installing and connecting apparatus
(1) attachment device is connect with steel truss shoulder pole girder:First according to the adjustable quantity for being packaged steel frame, respective counts are selected The steel truss shoulder pole girder of amount, and two neighboring steel truss shoulder pole girder is attached, then will be corresponding with adjustable packing steel frame Horizontal web member remove, then the installation casing of attachment device is penetrated on horizontal web member, then by horizontal web member and lower boom Between be fixedly connected;
(2) sling height is adjusted by gaily decorated basket screw rod, the connecting pin of two wirerope is in sustained height;
(3) adjusting sleeve is turned, the setting position of fixed square tube is adjusted, it will be on the connecting pin and cross bar of two wirerope Junction corresponds to each other;
D, vertical lifting metal roofing board
(1) steel truss shoulder pole girder is lifted by crane using loop wheel machine, and transfers steel truss shoulder pole girder, then by the connecting pin of wirerope and horizontal Junction on bar is connected with each other, then in two neighboring adjustable packing steel frame setting connection rope;
(2) vertical transport steel truss shoulder pole girder.
Further, the concrete operations of the adjustable width for being packaged steel frame are adjusted in step b as in the cross bar of lower section setting volume Ruler, then the adjustable puller bolt on the moving casing of lower section is unscrewed.Then wide by movable sleeve according to the plate of metal roofing board Pipe is movable on the cross bar of lower section, according to the length mark of tape measure, adjusts the distance between two upright bars.When adjustable packing steel framework The width of frame meets the hanging when requiring of metal roofing board, and the adjustable puller bolt on the moving casing on the cross bar of lower section is twisted Tightly.
The utility model is by adopting the above-described technical solution, have the advantages that:
1, metal roofing board can be superimposed in adjustable packing steel frame by the utility model, then will be packaged used adjustable beat Baogang's frame is connected on steel truss shoulder pole girder using attachment device, final to realize light-weight metal roof boarding, adjustable packing steel framework Frame, attachment device, steel truss shoulder pole girder are integral, and lifting considers that special operation condition factor is smaller, and operate simplicity.
2, the utility model can be directed to overlength light-weight metal before hanging onto metal roofing board in adjustable packing steel frame The adjustable packing steel frame of the length setting respective numbers of roof boarding, then overlength light-weight metal roof boarding is hung into adjustable packing When in steel frame, adjustable packing steel frame is not easy to tilt or turn on one's side, and realizes that metal roofing board lies in a horizontal plane in adjustable packing steel framework In frame.
In metal roofing board to be hung onto the detailed process in adjustable packing steel frame, metal roofing board is hung in one by one It regulates in the adjustable packing frame of width, often hangs one, a cystosepiment is arranged on metal roofing board, cystosepiment setting Position is corresponded to each other with the position of adjustable packing steel frame setting, metal roofing board can be prevented to be crushed out of shape in hoisting process; When metal roofing board whole dropping place is when in adjustable packing steel frame, it is inserted into cross bar, and cross bar is fixedly connected with moving casing, Then clamping screw is turned, clamping screw is compressed to the cystosepiment in the metal roofing board in the top, passes through clamping screw Adjustment effect on cross bar can hang greater number of metal roofing board in adjustable packing steel frame, solve existing skill The problem of metal roofing board limited amount is lifted by crane in art.The utility model can keep balancing safety lifting to metal roofing board in this way And vertically carried, operation is not succinct cumbersome, and safety is secure, while can disposably lift by crane tens of light-weight metal roofings Plate effectively improves construction efficiency, construction cost and labor intensity of workers is greatly lowered.
The adjustable width adjustment for being packaged frame is movable on cross bar specifically by moving casing, adjust between upright bar away from From, and then the entire adjustable width for being packaged steel frame is adjusted, convenient for metal roofing board is hung onto adjustable packing steel frame.
3, the utility model is able to satisfy the lifting requirements to overlength light-weight metal roof boarding in installing and connecting apparatus:Root According to the adjustable quantity for being packaged steel frame, the steel truss shoulder pole girder of respective numbers is docked;Sling height is adjusted by gaily decorated basket screw rod, it will The connecting pin of two wirerope is in sustained height;Adjusting sleeve is turned, the setting position of fixed square tube is adjusted, by two steel wires The connecting pin of rope is corresponded to each other with the junction on cross bar.
4, attachment device and steel truss shoulder pole girder are first connected into one in vertical lifting metal roofing board by the utility model Whole, metal roofing board is Liftable in adjustable packing steel frame afterwards in place, and whole process operation is succinct.
5, the horizontal web member of the utility model steel truss shoulder pole girder is detachable during transportation, and all steel truss can be nested Together, transport space is saved, transportation cost is saved.
6, the device in the utility model can be reused using green steel.
7, the utility model principle is clear, implementation operation is easy, and controls and require generally, easy to spread.
Detailed description of the invention
The utility model is described in further detail with reference to the accompanying drawing:
Fig. 1 is the structural schematic diagram of vertical transport in the utility model;
Fig. 2 is the structural schematic diagram of steel truss shoulder pole girder in the utility model;
Fig. 3 is the adjustable structural schematic diagram for being packaged steel frame in the utility model;
Fig. 4 is the structural schematic diagram of attachment device in the utility model;
Fig. 5 is the structural schematic diagram that lower boom is connect with horizontal web member in the utility model.
In figure, 1:Steel truss shoulder pole girder;2:Adjustable packing steel frame;3:Attachment device;1-1:Top boom;1-2:Oblique abdomen Bar;1-3:Lower boom;1-4:Horizontal web member;1-5:Flange connecting plate;1-6:First connection otic placode;1-7:Second connection otic placode; 1-8:Connect bolt;1-9:Second locating piece;2-1:Cross bar;2-2:Upright bar;2-3:Moving casing;2-4:Clamping screw;2-5: Adjustable puller bolt;2-6:Lifting lug;3-1:Adjust sleeve;3-2:Adjusting screw rod;3-3:Fixed square tube;3-4:Casing is installed; 3-5:Bottom plate;3-6:Gaily decorated basket screw rod;3-7:Wirerope;3-8:First locating piece;3-9:Stiffener;3-10:Hook.
Specific embodiment
As shown in Figures 1 to 5, attachment device 3, including steel are lifted by crane for a kind of overlength light-weight metal roof boarding of the utility model Truss shoulder pole girder 1, adjustable packing steel frame 2 and attachment device 3.
Steel truss shoulder pole girder 1 include top boom 1-1, diagonal web member 1-2 and lower boom 1-3, top boom 1-1, diagonal web member 1-2 and Lower boom 1-3 forms an entirety by being welded to connect, and is fixedly connected with horizontal web member 1-4 between lower boom 1-3.Lower boom 1- 3 medial surface is equipped with the first connection otic placode 1-6, and the both ends of horizontal web member 1-4 are equipped with the second connection otic placode 1-7, the first connection Connection bolt 1-8 is equipped between otic placode 1-6 and the second connection otic placode 1-7.It realizes that lower boom 1-3 and horizontal web member 1-4 is fixed to connect It connects, it is convenient that horizontal web member 1-4 is mounted and dismounted.It, can be by the water of steel truss shoulder pole girder 1 when being transported to steel truss shoulder pole girder 1 Flat web member 1-4 disassembly, and steel truss shoulder pole girder 1 is nestable together, save transport space and transportation cost.The two of top boom 1-1 End and the both ends of lower boom 1-3 are equipped with flange connecting plate 1-5.Flange connecting plate 1-5 by being welded to connect in top boom 1-1 and The end of lower boom 1-3, and it is provided with the bolt hole being connected, the connection and disassembly to adjacent steel truss shoulder pole girder 1.
Adjustable packing steel frame 2 includes steel frame, moving casing 2-3 and clamping screw 2-4.Steel frame includes two parallel The end symmetrical above and below for being welded in upright bar 2-2 respectively the cross bar 2-1 and upright bar 2-2 of setting, moving casing 2-3, moving casing 2-3 It is sheathed on cross bar 2-1, clamping screw 2-4 runs through the cross bar 2-1 in top.Adjustable top is installed on moving casing 2-3 Tight bolt 2-5, adjustable puller bolt 2-5 are held out against in being consolidated, moving casing 2-3 and cross bar 2-1 on the side of cross bar 2-1 It is fixed, avoid moving casing 2-3 from sliding on cross bar 2-1.When that will adjust puller bolt and unscrew, puller bolt 2-5 is adjusted not Active force is generated to cross bar 2-1, moving casing 2-3 can be moved along cross bar 2-1 axis, the distance between adjustment upright bar 2-2, into And the entire adjustable width for being packaged steel frame 2 is adjusted, convenient for metal roofing board is hung onto adjustable packing steel frame 2.
Attachment device 3 include adjust sleeve 3-1, adjusting screw rod 3-2, fixed square tube 3-3, installation casing 3-4, bottom plate 3-5, Gaily decorated basket screw rod 3-6 and wirerope 3-7.Adjusting screw rod 3-2 is threadedly coupled with sleeve 3-1 is adjusted, adjusting screw rod 3-2 and fixed square tube 3-3 is welded and fixed, and fixed square tube 3-3 and installation casing 3-4 are welded and fixed, and fixed square tube 3-3 and bottom plate 3-5 is welded and fixed.Gu Determine to be welded with stiffener 3-9 between square tube 3-3 and bottom plate 3-5, improves the bonding strength between fixed square tube 3-3 and bottom plate 3-5. Gaily decorated basket screw rod 3-6 is connect with bottom plate 3-5, and wirerope 3-7 is connect with gaily decorated basket screw rod 3-6, and installation casing 3-4 is set to horizontal web member 1- On 4, wirerope 3-7 is connect with upper cross bar 2-1.The both ends of wirerope 3-7 are equipped with hook 3-10, the hook 3- in top 10 connect with gaily decorated basket screw rod 3-6, are symmetrically arranged with lifting lug 2-6 on the cross bar 2-1 in top, the hook 3-10 being below with hang Ear 2-6 connection is connect with lifting lug 2-6 by hook 3-10, realizes that wirerope 3-7 is connect with cross bar 2-1.In two adjusting sets Adjusting screw rod 3-2 between cylinder 3-1 is equipped with the first locating piece 3-8, the first locating piece 3-8 and is tightly attached to the side of horizontal web member 1-4 Face, the side of horizontal web member 1-4 are equipped with the second locating piece 1-9, the first locating piece 3-8 between the second locating piece 1-9.First Locating piece 3-8 is cut through intersection, when the installation casing 3-4 of attachment device 3 is penetrated on horizontal web member 1-4, the first locating piece 3-8 is tightly attached to the side of horizontal web member 1-4, and the first locating piece 3-8 is set between the second locating piece 1-9, and the first locating piece 3-8 rises It is acted on to positioning support, the second locating piece 1-9 is to the first locating piece 3-8 position-limiting action.
A kind of vertical transporting method of overlength light-weight metal roof boarding lifting attachment device, includes the following steps:
A, it makes
(1) steel truss shoulder pole girder 1 makes:Top boom 1-1, diagonal web member 1-2 and lower boom 1-3 are formed by being welded to connect One entirety, then horizontal web member 1-4 is bolted between lower boom 1-3.
(2) adjustable packing steel frame 2 makes:First by the end symmetrical above and below for being welded in upright bar 2-2 respectively moving casing 2-3 On, then by be equipped with threaded hole cross bar 2-1 penetrate top moving casing 2-3, by another cross bar 2-1 penetrate lower section movable sleeve Then pipe 2-3 is screwed into clamping screw 2-4 in the threaded hole of cross bar 2-1.
(3) attachment device 3 makes:Sleeve 3-1 and adjusting screw rod 3-2 will first be adjusted to be threadedly coupled, then will fixed square tube 3- 3, installation casing 3-4 and bottom plate 3-5 is welded and fixed, and then fixed square tube 3-3 and adjusting screw rod 3-2 is welded and fixed, then the bottom of at The lower section of plate 3-5 connects gaily decorated basket screw rod 3-6, then the lower section connecting steel wire ropes 3-7 of gaily decorated basket screw rod 3-6.
B, metal roofing board is hung onto adjustable packing steel frame 2
(1) the fixedly adjustable lower section cross bar 2-1 for being packaged steel frame 2 is pinpointed:The metal roofing board first hung as needed The fixation point of the adjustable lower section cross bar 2-1 for being packaged steel frame 2, the two neighboring adjustable lower section for being packaged steel frame 2 is arranged in length The distance between the fixation point of cross bar 2-1 is identical, then at the fixation point of the adjustable lower section cross bar 2-1 for being packaged steel frame 2 It is symmetrical arranged upright bar 2-2, keeps upright bar 2-2 vertical state.
(2) the adjustable width for being packaged steel frame 2 is adjusted:Tape measure is arranged in cross bar 2-1 in lower section, then by the movable sleeve of lower section Adjustable puller bolt 2-5 on pipe 2-3 unscrews.Then according to the plate of metal roofing board it is wide by moving casing 2-3 in lower section It is movable on cross bar 2-1, according to the length mark of tape measure, adjust the distance between two upright bar 2-2.When adjustable packing steel frame 2 Width meet the hanging when requiring of metal roofing board, adjustable on the moving casing 2-3 on the cross bar 2-1 of lower section is held out against into spiral shell Bolt 2-5 is tightened.
(3) metal roofing board is hung one by one:Metal roofing board is hung onto adjustable packing steel frame 2 using loop wheel machine, then It is put into cystosepiment in the top surface of metal roofing board, the position of cystosepiment setting and the position that adjustable packing steel frame 2 is arranged are mutual It is corresponding, then second metal roofing board is hung onto adjustable packing steel frame 2, second metal roofing board is placed into cystosepiment On, then in the top surface of second metal roofing board it is put into cystosepiment.Metal roofing board is hung onto adjustable beat by circulate operation one by one In Baogang's frame 2, when metal roofing board whole dropping place is when in adjustable packing steel frame 2, insertion is adjustable to be packaged the upper of steel frame 2 Square cross bar 2-1, and top cross bar 2-1 is fixedly connected with moving casing 2-3, clamping screw 2-4 is then turned, by clamping screw 2-4 compresses the cystosepiment in the metal roofing board in the top.
C, installing and connecting apparatus 3
(1) attachment device 3 is connect with steel truss shoulder pole girder 1:First according to the adjustable quantity for being packaged steel frame 2, phase is selected The steel truss shoulder pole girder 1 of quantity is answered, and two neighboring steel truss shoulder pole girder 1 is attached, then will be with adjustable packing steel frame 2 Corresponding horizontal web member 1-4 is removed, and then penetrates the installation casing 3-4 of attachment device 3 on horizontal web member 1-4, then will It is fixedly connected between horizontal web member 1-4 and lower boom 1-3.
(2) sling height is adjusted by gaily decorated basket screw rod 3-6, the connecting pin of two wirerope 3-7 is in sustained height.
(3) it turns and adjusts sleeve 3-1, the setting position of fixed square tube 3-3 is adjusted, by the connecting pin of two wirerope 3-7 It is corresponded to each other with the junction on cross bar 2-1.
D, vertical lifting metal roofing board
(1) steel truss shoulder pole girder 1 is lifted by crane using loop wheel machine, and transfers steel truss shoulder pole girder 1, then by the connection of wirerope 3-7 End is connected with each other with the junction on cross bar 2-1, then in the two neighboring adjustable setting of packing steel frame 2 connection rope.
(2) vertical transport steel truss shoulder pole girder 1.
1, metal roofing board can be superimposed in adjustable packing steel frame 2 by the utility model, then will be packaged used adjustable Steel frame 2 is packaged to be connected on steel truss shoulder pole girder 1 using attachment device 3, it is final to realize light-weight metal roof boarding, adjustable packing Steel frame 2, attachment device 3, steel truss shoulder pole girder 1 are integral, and lifting considers that special operation condition factor is smaller, and operate letter Just.
2, the utility model, can be for overlength lightweight gold before hanging onto metal roofing board in adjustable packing steel frame 2 Belong to the adjustable packing steel frame 2 of the length setting respective numbers of roof boarding, then overlength light-weight metal roof boarding is hung onto adjustable When being packaged in steel frame 2, adjustable packing steel frame 2 is not easy to tilt or turn on one's side, and realizes that metal roofing board lies in a horizontal plane in adjustable beat In Baogang's frame 2.
In metal roofing board to be hung onto the detailed process in adjustable packing steel frame 2, metal roofing board is hung in one by one In the adjustable packing frame of adjusted good width, one is often hung, a cystosepiment, cystosepiment setting are arranged on metal roofing board Position with it is adjustable packing steel frame 2 be arranged position correspond to each other, can prevent metal roofing board in hoisting process by buckling Shape;When metal roofing board whole dropping place is when in adjustable packing steel frame 2, it is inserted into cross bar 2-1, and by cross bar 2-1 and movable sleeve Pipe 2-3 is fixedly connected, and then turns clamping screw 2-4, clamping screw 2-4 is compressed in the metal roofing board in the top Cystosepiment can hang a greater number in adjustable packing steel frame 2 by adjustment effect of the clamping screw 2-4 on cross bar 2-1 Metal roofing board, solve the problems, such as in the prior art lift by crane metal roofing board limited amount.The utility model can be right in this way Metal roofing board keeps balancing safety to lift by crane and vertically carried, and operation is not succinct cumbersome, and safety is secure, while can be primary Property lift by crane tens of light-weight metal roof boardings, effectively improve construction efficiency, construction cost is greatly lowered and worker labour Intensity.
The adjustable width adjustment for being packaged frame is movable on cross bar 2-1 specifically by moving casing 2-3, adjusts upright bar 2- The distance between 2, and then the entire adjustable width for being packaged steel frame 2 is adjusted, convenient for metal roofing board is hung onto adjustable packing In steel frame 2.
3, the utility model is able to satisfy the lifting requirements to overlength light-weight metal roof boarding in installing and connecting apparatus 3:Root According to the adjustable quantity for being packaged steel frame 2, the steel truss shoulder pole girder 1 of respective numbers is docked;It is high that lifting is adjusted by gaily decorated basket screw rod 3-6 Degree, is in sustained height for the connecting pin of two wirerope 3-7;It turns and adjusts sleeve 3-1, adjust the setting of fixed square tube 3-3 Position corresponds to each other the connecting pin of two wirerope 3-7 with the junction on cross bar 2-1.
4, the utility model first connects into attachment device 3 and steel truss shoulder pole girder 1 in vertical lifting metal roofing board One is whole, and metal roofing board i.e. Liftable, whole process operation after adjustable packing steel frame 2 is in place is succinct.
5, the horizontal web member 1-4 of the utility model steel truss shoulder pole girder 1 is detachable during transportation, and all steel truss can It is nestable to save transport space together, save transportation cost.
6, the device in the utility model can be reused using green steel.
7, the utility model principle is clear, implementation operation is easy, and controls and require generally, easy to spread.
The above are only specific embodiments of the present invention, but the technical characteristics of the utility model is not limited thereto.Appoint How based on the utility model, to solve essentially identical technical problem, essentially identical technical effect is realized, it is made Simple change, equivalent replacement or modification etc., are all covered by among the protection scope of the utility model.

Claims (7)

1. a kind of overlength light-weight metal roof boarding lifts by crane attachment device, it is characterised in that:Including steel truss shoulder pole girder, adjustable packing Steel frame and attachment device;The steel truss shoulder pole girder includes top boom, diagonal web member and lower boom, the top boom, it is described tiltedly Web member and the lower boom are fixedly connected with horizontal web member between the lower boom by being welded to connect one entirety of formation;Institute Stating adjustable packing steel frame includes steel frame, moving casing and clamping screw, and the steel frame includes two cross disposed in parallel Bar and upright bar, the end symmetrical above and below for being welded in the upright bar, the moving casing are sheathed on described the moving casing respectively On cross bar, the clamping screw runs through the cross bar in top;The attachment device include adjust sleeve, adjusting screw rod, Fixed square tube, installation casing, bottom plate, gaily decorated basket screw rod and wirerope, the adjusting screw rod are threadedly coupled with the adjusting sleeve, institute It states adjusting screw rod to fix with the fixed square tubes soldering, the fixed square tube and the installation casing are welded and fixed, the fixation Square tube is welded and fixed with the bottom plate, and the gaily decorated basket screw rod is connect with the bottom plate, and the wirerope and the gaily decorated basket screw rod connect It connects, the installation casing is set on the horizontal web member, and the wirerope is connect with cross bar described in top.
2. a kind of overlength light-weight metal roof boarding according to claim 1 lifts by crane attachment device, it is characterised in that:On described The both ends of chord member and the both ends of the lower boom are equipped with flange connecting plate.
3. a kind of overlength light-weight metal roof boarding according to claim 1 lifts by crane attachment device, it is characterised in that:Under described The medial surface of chord member is equipped with the first connection otic placode, and the both ends of the horizontal web member are equipped with the second connection otic placode, and described first connects Connection bolt is equipped between ear connecting plate and second connection otic placode.
4. a kind of overlength light-weight metal roof boarding according to claim 1 lifts by crane attachment device, it is characterised in that:The work Adjustable puller bolt is installed on dynamic casing, the adjustable puller bolt is held out against on the side of the cross bar.
5. a kind of overlength light-weight metal roof boarding according to claim 1 lifts by crane attachment device, it is characterised in that:In two A adjusting screw rod adjusted between sleeve is equipped with the first locating piece, and first locating piece is tightly attached to the level The side of web member, the side of the horizontal web member are equipped with the second locating piece, and first locating piece is set to second locating piece Between.
6. a kind of overlength light-weight metal roof boarding according to claim 1 lifts by crane attachment device, it is characterised in that:It is described solid Determine to be welded with stiffener between square tube and the bottom plate.
7. a kind of overlength light-weight metal roof boarding according to claim 1 lifts by crane attachment device, it is characterised in that:The steel The both ends of cord are equipped with hook, and the hook in top is connect with the gaily decorated basket screw rod, the cross bar in top On be symmetrically arranged with lifting lug, the hook being below is connect with the lifting lug.
CN201820372587.2U 2018-03-19 2018-03-19 A kind of overlength light-weight metal roof boarding lifting attachment device Expired - Fee Related CN208166361U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820372587.2U CN208166361U (en) 2018-03-19 2018-03-19 A kind of overlength light-weight metal roof boarding lifting attachment device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820372587.2U CN208166361U (en) 2018-03-19 2018-03-19 A kind of overlength light-weight metal roof boarding lifting attachment device

Publications (1)

Publication Number Publication Date
CN208166361U true CN208166361U (en) 2018-11-30

Family

ID=64373601

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820372587.2U Expired - Fee Related CN208166361U (en) 2018-03-19 2018-03-19 A kind of overlength light-weight metal roof boarding lifting attachment device

Country Status (1)

Country Link
CN (1) CN208166361U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108341331A (en) * 2018-03-19 2018-07-31 浙江中南建设集团钢结构有限公司 A kind of overlength light-weight metal roof boarding lifting attachment device and its vertical transporting method
CN109468966A (en) * 2019-01-08 2019-03-15 刘金顶 Steel box-girder suspension bridge dismounts soft rope device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108341331A (en) * 2018-03-19 2018-07-31 浙江中南建设集团钢结构有限公司 A kind of overlength light-weight metal roof boarding lifting attachment device and its vertical transporting method
CN109468966A (en) * 2019-01-08 2019-03-15 刘金顶 Steel box-girder suspension bridge dismounts soft rope device

Similar Documents

Publication Publication Date Title
CN108862045B (en) Special-shaped steel truss girder rod piece turning device and method for turning over rod piece
CN101200975A (en) High-altitude bridge type cantilever scaffold
CN208166361U (en) A kind of overlength light-weight metal roof boarding lifting attachment device
CN105888227B (en) Superelevation is tubaeform steel structure exterior finish operation platform and its building method
CN104153586A (en) Construction method for installing purline through suspension cable cranes
CN101649684B (en) Installing method of roof mast
CN212052333U (en) Suspension bridge catwalk surface course installing the system
CN203794505U (en) Internal climbing steel beam conveying device of internal climbing movable arm tower crane
CN216515140U (en) Overhead steel box girder welding platform device
CN214899827U (en) High-altitude outdoor cable terminal operation platform
CN110005250A (en) Friction plate girdle ring device
CN214652983U (en) A hoisting structure for assembled stair
CN108341331A (en) A kind of overlength light-weight metal roof boarding lifting attachment device and its vertical transporting method
CN209957212U (en) Lifting appliance and lifting system for mounting component under beam
CN209797236U (en) Box girder external mold hoisting device
CN201980890U (en) Herringbone hoisting mast for hoisting under special situation of high altitude
CN213143815U (en) Construction hanging flower basket is restoreed in eaves mouth high altitude that encorbelments of metal roofing
CN204643648U (en) Pylon and hanging basket thereof
CN106049848B (en) A kind of adjustable anti-shake mobile platform and its installation method
CN220319082U (en) Hanging basket installed on inclined web member of inverted triangle pipe truss
CN209835412U (en) Lifting appliance for lifting flange connection type steel framework
CN221070772U (en) Aerial disassembly device for crane boom of tower crane
CN210065020U (en) Portable double hoisting frame device
CN219710928U (en) Steel construction operation basket
CN218406387U (en) Steel platform suitable for suspended ceiling of hotel lobby installation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 311400 No.18, Changkou East Street, Changkou Town, Fuyang District, Hangzhou City, Zhejiang Province

Patentee after: Zhejiang Zhongnan Lvjian Technology Group Co.,Ltd.

Address before: No.245, BINKANG Road, Binjiang District, Hangzhou City, Zhejiang Province 310052

Patentee before: ZHEJIANG ZHONGNAN CONSTRUCTION GROUP STEEL STRUCTURE Co.,Ltd.

CP03 Change of name, title or address
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181130

CF01 Termination of patent right due to non-payment of annual fee