CN106049848B - A kind of adjustable anti-shake mobile platform and its installation method - Google Patents

A kind of adjustable anti-shake mobile platform and its installation method Download PDF

Info

Publication number
CN106049848B
CN106049848B CN201610557317.4A CN201610557317A CN106049848B CN 106049848 B CN106049848 B CN 106049848B CN 201610557317 A CN201610557317 A CN 201610557317A CN 106049848 B CN106049848 B CN 106049848B
Authority
CN
China
Prior art keywords
steel wire
wire rope
shake
mobile platform
rope group
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610557317.4A
Other languages
Chinese (zh)
Other versions
CN106049848A (en
Inventor
汤毅
陈晓文
卢佳华
张宁波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Installation Engineering Group Co Ltd
Original Assignee
Shanghai Installation Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Installation Engineering Group Co Ltd filed Critical Shanghai Installation Engineering Group Co Ltd
Priority to CN201610557317.4A priority Critical patent/CN106049848B/en
Publication of CN106049848A publication Critical patent/CN106049848A/en
Application granted granted Critical
Publication of CN106049848B publication Critical patent/CN106049848B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/32Hoisting devices; Safety devices
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/32Hoisting devices; Safety devices
    • E04G3/325Safety devices for stabilising the mobile platform, e.g. to avoid it swinging in the wind
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286Mobile scaffolds; Scaffolds with mobile platforms mobile vertically

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Movable Scaffolding (AREA)

Abstract

A kind of adjustable anti-shake mobile platform and its installation method of the present invention, is related to construction equipment technical field.The problem of flexibility, security and economy can not be taken into account be present for the existing construction equipment at the top of volumed space building.It includes the top firmware being sheathed on architecture beam;Steel construction mobile platform and the support frame for being fixed on its bottom, support frame middle part are provided with hole for hoist and cover plate;Vertical steel wire rope group, it is respectively arranged at the anti-shake steel wire rope group one and anti-shake steel wire rope group two at steel construction mobile platform both ends and middle part;One end of vertical steel wire rope group is affixed on the support frame, and its other end is connected on architecture beam;Anti-shake steel wire rope group one includes two oblique and arranged in a crossed manner steel wire ropes positioned at steel construction mobile platform both sides, and the both ends of anti-shake steel wire rope group connect steel construction mobile platform and architecture beam respectively;The bottom of anti-shake steel wire rope group two is connected to the corner of hole for hoist, and its top is fixed on the top firmware above hole for hoist.

Description

A kind of adjustable anti-shake mobile platform and its installation method
Technical field
The present invention relates to construction equipment technical field, more particularly to a kind of adjustable anti-shake mobile platform and its installation Method.
Background technology
With domestic construction technology and the continuous improvement of national material and cultural needs, the country is to show room, cinema and report The construction demand for accusing the volumed space buildings such as conference hall is more and more stronger.Normal throw and occupation of land due to above-mentioned volumed space building Area is larger, and therefore, all kinds of electromechanical pipelines, the installation exercise difficulty of decorative panel, light fixture etc. are also corresponding at the top of volumed space building Increase.
At present, the construction operation at the top of volumed space building is generally carried out in ladder truck, cat ladder or scaffold, but these set The drawbacks of standby generally existing operating space is narrow and small.For example, when being constructed in ladder truck, construction platform is arranged on hydraulic machinery On arm, ladder truck has the characteristics that big transmission height, construction platform safety and stability and flexible adjustment, but there is also use dimension simultaneously Protect the defects of costly, delivered payload capability is poor and power consumption is big;Traditional cat ladder or scaffold are generally built on ground, once carried The collision of the fork truck of material, construction platform is often caused the serious consequence such as to cave in, and cat ladder or scaffold are special at some Occasion (such as stair, especially big choose sky) and being limited by place and can not realize that landing is built, application limitation is larger, moreover, The inner space of ultra-large type building, scaffold is built highly excessive, and platform is easily caused when workmen walks about and is rocked, famine Security, it is seen then that constructed using cat ladder or scaffold, though the drawbacks described above of ladder truck can be overcome, occupation of land face be present Product is greatly, consumable quantity is big, can not move, highly adjusts the shortcomings of inconvenience and influence ground construction.
In summary, for the flexibility of construction equipment generally existing, security and the economy at the top of volumed space building not The present situation that can be taken into account, how to design a kind of economical and practical and safety and stability mobile platform, and its operation of specification and installation method It is very urgent.
The content of the invention
For the existing flexibility of construction equipment generally existing, security and economy at the top of volumed space building not The problem of taking into account.It is an object of the invention to provide a kind of adjustable anti-shake mobile platform and its installation method, pass through vertical steel Cord group and anti-shake steel wire rope group hang on steel construction mobile platform in existing building structural beams, and by be arranged at both ends and The anti-shake steel wire rope group at middle part realizes that the mesh of anti-shake has, with floor space is small, flexible adjustment is convenient, Non-energy-consumption consumes, firm The advantages that reliably and not influenceing ground construction.
The present invention solves adjustable anti-shake mobile platform used by its technical problem, hangs under architecture beam Side, including some top firmwares being sheathed on the architecture beam;One horizontally disposed steel construction mobile platform;It is fixed on institute The support frame of steel construction mobile platform bottom is stated, the middle part of the support frame is provided with hole for hoist, is covered in the hole for hoist On two cover plates be hinged with the support frame;Several vertical steel wire rope groups, it is flat to be respectively arranged at the steel construction movement Two anti-shake steel wire rope groups one at platform both ends, and it is arranged at the anti-shake steel wire rope group two in the middle part of the steel construction mobile platform;Institute Stating vertical steel wire rope group includes being located at two pairs of steel wire ropes of the steel construction mobile platform both sides respectively, the vertical steel wire rope group One end be fixed in the support frame, the other end of the vertical steel wire rope group is connected to described build by the top firmware On building structure beam;The anti-shake steel wire rope group one includes two oblique and friendships respectively positioned at the steel construction mobile platform both sides The steel wire rope set is pitched, the bottom of the anti-shake steel wire rope group one is connected on the steel construction mobile platform, described anti- The top for shaking steel wire rope group one is then connected on the architecture beam;The bottom of four steel wire ropes of the anti-shake steel wire rope group two End is connected to the corner of the hole for hoist, and the top of the anti-shake steel wire rope group two is then held within above the hole for hoist Push up on firmware.
Preferably, the bottom of the steel construction mobile platform is also associated with least two elevator machine frames, hoist engine difference It is installed on the elevator machine frame.
Preferably, the bottom of the adjustable anti-shake mobile platform is additionally provided with some equally distributed hooks.
Preferably, the support frame is formed by some reinforcing frame bolt connections be arrangeding in parallel, on the hole for hoist Cover plate is connected with the edge of the adjacent reinforcing frame by metal rotating shaft, is fastened between the two neighboring cover plate by bolt lock It is fixed.
Preferably, every steel wire rope of the vertical steel wire rope group and the anti-shake steel wire rope group two is provided with least one Flower basket bolt.
Preferably, the top firmware includes the fastening of a pair of opposing and the U-shaped being sheathed on the architecture beam Main body, and some fixing bolts for being used to connect a pair of fastening main bodys;The top of the steel wire rope is connected by suspension ring one It is connected on the fixing bolt and is fixed on by clamp, the bottom of the steel wire rope on suspension ring two, under the suspension ring two Portion is then disposed through the reinforcing channel-section steel of the support frame bottom provided with externally threaded screw rod and fastened by bolt sleeve;It is described Channel-section steel is reinforced to be connect and formed by some transverse channel steels being staggered and longitudinal channel-section steel arc welding.
Preferably, it is two neighboring it is described top firmware between be smaller than be equal to 1.5m.
In addition, present invention also offers a kind of installation method of adjustable anti-shake mobile platform, step are as follows:
First, some top firmwares are sheathed on architecture beam, and fastened by fixing bolt, steel construction mobile platform and branch Support frame frame is lifted on below the architecture beam by vertical steel wire rope group;
2nd, two anti-shake steel wire rope groups one are set respectively at the both ends of the steel construction mobile platform length bearing of trend, So that the bottom of two anti-shake steel wire rope groups one is connected on steel construction mobile platform, the anti-shake steel wire rope group one Top be connected on the architecture beam, in the corner of mounting hole installation anti-shake steel wire rope group two, the anti-shake steel wire rope The other end of group two is then held within the top firmware above the mounting hole.
Preferably, when the adjustable anti-shake mobile platform needs to move, step is as follows:
Step 1:Before the movement adjustable anti-shake mobile platform, remove all weights thereon and withdraw constructor Member, the flower basket bolt in vertical steel wire rope group among the adjustable anti-shake mobile platform is tightened, keeps middle vertical steel wire rope The suspension centre stress of group, the vertical steel wire rope group of loose ends and anti-shake steel wire rope group one, first fix the vertical steel wire rope group at both ends On next moving step pitch point of the architecture beam;
Step 2:Unscrew the flower basket bolt in middle vertical steel wire rope group and anti-shake steel wire rope group two simultaneously, by the steel knot Structure mobile platform is transferred, and the steel construction mobile platform is moved to next moving step pitch point, then, unclamps the vertical of centre Steel wire rope group, and be fixed on next moving step pitch point of the architecture beam;
Step 3:1 to 2 is repeated the above steps, until the adjustable anti-shake mobile platform is moved into target area.
Preferably, when the highly desirable regulation of the adjustable anti-shake mobile platform, step is as follows:First adjust the steel Anti-shake steel wire rope group one described in structure mobile platform both sides, then adjust the middle vertical steel wire rope group and the anti-shake steel wire rope Flower basket bolt in group two, finally, adjust the flower basket bolt in vertical steel wire rope group described in both ends.
Effect of the invention is that:
First, adjustable anti-shake mobile platform of the invention, using support frame and several vertical steel wire rope groups by steel knot Structure mobile platform is hung on existing architecture beam, because the bottom of the steel construction mobile platform is provided with support frame, So that the steel construction mobile platform is more firm, and improve its bearing capacity;Moreover, adjustable anti-shake mobile platform is hung on now On some architecture beams, the construction operation on ground is not interfered with, improves the overall progress of construction;The middle part of support frame is also It is particularly important there is provided being easy to the hole for hoist that material is transported on steel construction mobile platform and cover plate thereon can be covered It is that it is also respectively provided with least two anti-shake steel wire rope groups one at the both ends of steel construction mobile platform length bearing of trend, should Anti-shake steel wire rope group one is made up of two oblique and arranged in a crossed manner steel wire ropes, and steel is further connected by anti-shake steel wire rope group one Structure mobile platform and architecture beam, when can avoid construction operation, steel construction mobile platform draws because workmen walks about Rise it is different degrees of rock, so as to ensure construction safety;Meanwhile be connected to the anti-shake steel wire rope group two of hole for hoist corner The other end is then fixedly secured on the architecture beam above hole for hoist, and therefore, the setting of anti-shake steel wire rope group two can ensure Hole for hoist will not occur acutely to rock and influence construction safety when conveying material;To sum up, adjustable anti-shake of the invention movement Platform has that floor space is small, both horizontally and vertically flexible adjustment, applied widely, solid and reliable and do not influence ground construction The advantages that, especially suitable in the construction operation at the top of volumed space building.
2nd, the installation method of adjustable anti-shake mobile platform of the invention, first, will even by some vertical steel wire rope groups It is connected in integral steel construction mobile platform and support frame is suspended on architecture beam, prolongs then at steel construction mobile platform length The both ends for stretching direction set two anti-shake steel wire rope groups one respectively so that the bottom of two anti-shake steel wire rope groups one is connected to The corner of steel construction mobile platform pedestal, the top of anti-shake steel wire rope group one are connected on architecture beam, so as to avoid constructing During operation, steel construction mobile platform is different degrees of because caused by walking about workmen to be rocked, and has ensured construction safety;And And the corner connection anti-shake steel wire rope group two of mounting hole, and the top of anti-shake steel wire rope group two is held within above mounting hole Top firmware on, the setting of anti-shake steel wire rope group two can ensure hole for hoist when conveying material, will not occur acutely to rock and Influence construction safety;Compared to the application method of construction platform in ladder truck hydraulic manipulator, adjustable anti-shake of the invention movement The installation method of platform, steel construction mobile platform can be made to reach identical construction height, and bearing capacity and construction space are more Greatly, and during use any energy consumption will not occur, more meets the development trend of green construction.Therefore, adjustable anti-shake of the invention The installation method of mobile platform has the advantages that installation operation is convenient, and Non-energy-consumption consumes.
Brief description of the drawings
Fig. 1 is a kind of structural representation of adjustable anti-shake mobile platform of one embodiment of the invention;
Fig. 2 is the upward view of support frame in steel construction mobile platform;
Fig. 3 is Fig. 1 side view;
Fig. 4 is vertical steel wire rope group and the connection diagram of architecture beam;
Fig. 5 is connection diagram of the vertical steel wire rope group with reinforcing channel-section steel;
Fig. 6 is the partial structural diagram of protective fence on steel construction mobile platform.
Embodiment
Below in conjunction with the drawings and specific embodiments to a kind of adjustable anti-shake mobile platform proposed by the present invention and its installation Method is described in further detail.According to following explanation and claims, advantages and features of the invention will become apparent from.Need Bright, accompanying drawing uses using very simplified form and non-accurately ratio, only to convenience, lucidly aids in illustrating The purpose of the embodiment of the present invention.For sake of convenience, the upper and lower direction of " on ", " under " with accompanying drawing described below is consistent, but This can not turn into the limitation of technical solution of the present invention.
Embodiment one:Illustrate a kind of adjustable anti-shake mobile platform 10 of the present invention with reference to Fig. 1 to Fig. 6, it, which hangs on, builds The lower section of building structure beam 1, it includes some top firmwares 3 being sheathed on architecture beam 1;One horizontally disposed steel construction movement Platform 2;It is fixed on the support frame 14 of the bottom of steel construction mobile platform 2;The middle part of support frame 14 is provided with hole for hoist 8, covering It is be hinged in two cover plates 9 on hole for hoist 8 and support frame 14;Several vertical steel wire rope groups 4, it is respectively arranged at steel construction shifting Two anti-shake steel wire rope groups 1 at the both ends of moving platform 2, and it is arranged at the anti-shake steel wire rope group two at the middle part of steel construction mobile platform 2 7;Above-mentioned vertical steel wire rope group 4 includes being located at two pairs of steel wire ropes of the both sides of steel construction mobile platform 2, vertical steel wire rope group 4 respectively One end be fixed in support frame 14, the other end of vertical steel wire rope group 4 is connected on architecture beam 1 by pushing up firmware 3; As shown in figures 1 and 3, above-mentioned anti-shake steel wire rope group 1 include respectively positioned at two of the both sides of steel construction mobile platform 2 it is oblique and Steel wire rope arranged in a crossed manner, the bottom of anti-shake steel wire rope group 1 are connected on steel construction mobile platform 2, i.e. two anti-shakes The bottom of steel wire rope group 1 is bundled in the corner of the pedestal of steel construction mobile platform 2 respectively, and the top of anti-shake steel wire rope group 1 Then it is connected on architecture beam 1;The bottom of four steel wire ropes of above-mentioned anti-shake steel wire rope group 27 is connected to the four of hole for hoist 8 Angle, the top of anti-shake steel wire rope group 27 are then held within the top firmware 3 of the top of hole for hoist 8.In the present embodiment, steel construction The size of mobile platform 2 is 7m (length) × 4m (width) × 1.2m (height), bearable load 5000N/m2;Moreover, above-mentioned support The length and width that framework 14 is set up is not less than the length and width of steel construction mobile platform 2, on the one hand can ensure steel construction The structural stability of mobile platform 2, on the other hand it is easy to bind steel wire rope.It need to illustrate in addition, of the invention is adjustable anti- Mobile platform 10 is shaken before use, whether the bearing capacity that unit in charge of construction should check architecture beam 1 can meet adjustable anti-shake The requirement of mobile platform 10, after obtaining original design unit and checking and approving the license with construction unit, architecture beam 1 is carried out Certain reinforcing rear can be used.
The adjustable anti-shake mobile platform 10 of the present invention, using support frame 14 and several vertical steel wire rope groups 4 by steel Structure mobile platform 2 is hung on existing architecture beam 1, because the bottom of the steel construction mobile platform 2 is provided with support Framework 14 so that the steel construction mobile platform 2 is more firm, and improves its bearing capacity;Moreover, adjustable anti-shake mobile platform 10 hang on existing architecture beam 1, do not interfere with the construction operation on ground, improve the overall progress of construction;Support The middle part of framework 14 is also provided with being easy to transport the hole for hoist 8 of material on steel construction mobile platform 2 and can covering thereon Cover plate 9, particular, it is important that it is also respectively provided with least two at the both ends of the length bearing of trend of steel construction mobile platform 2 Individual anti-shake steel wire rope group 1, the anti-shake steel wire rope group 1 are made up of two oblique and arranged in a crossed manner steel wire ropes, pass through anti-shake Steel wire rope group 1 further connects steel construction mobile platform 2 and architecture beam 1, and when can avoid construction operation, steel construction moves Moving platform 2 is different degrees of because caused by walking about workmen to be rocked, so as to ensure construction safety;Meanwhile it is connected to and hangs The other end for filling the anti-shake steel wire rope group 27 in 8 four jiaos of hole is then fixedly secured on the architecture beam 1 above hole for hoist 8, because This, the setting of anti-shake steel wire rope group 27 can ensure that hole for hoist 8 when conveying material, will not occur acutely to rock and influence to apply Work safety;To sum up, adjustable anti-shake mobile platform 10 of the invention is with floor space is small, both horizontally and vertically regulation is clever It is living, applied widely, solid and reliable and the advantages that do not influence ground construction, make especially suitable for the construction at the top of volumed space building In industry.
As shown in figures 1 and 3, the bottom of steel construction mobile platform 2 is also associated with the elevator machine frame 12 of two U-shapeds, and two Platform small winch (one is standby using one) is respectively arranged on elevator machine frame 12, and carries out power supply using motor.When When needing lifting construction material, cover plate 9 can be opened, exposes hole for hoist 8, by construction material binding on a steel cord, starts elevator Machine implements lifting, after construction material is hung on steel construction mobile platform 2, need to close cover plate 9 and locked, hoist engine is once hung The weight of dress must not exceed 300kg, and during lifting operation, workmen must fasten safety rope in Construction of Steel Structure platform 2 four On the protective fence 2a in week.
Above-mentioned adjustable anti-shake mobile platform 10 is before use, each maintenance and maintenance after, it is necessary to by carrying be no less than 20t aerial loading is tested, and stabilization time must not be less than 4h, and bearing test is installed additional for ease of adjustable anti-shake mobile platform 10 Load, the bottom of the adjustable anti-shake mobile platform 10 of the present embodiment are additionally provided with 20 equally distributed hooks 11.
As shown in Fig. 2 support frame 14 is formed by some reinforcing frame bolt connections be arrangeding in parallel, the lid on hole for hoist 8 Plate 9 is connected with the edge of adjacent reinforcing frame by metal rotating shaft, is locked between two cover plates 9 by bolt.The present embodiment The size of cover plate 9 is 1.5m (width) × 4m (length).
Please continue to refer to Fig. 1 and Fig. 3, in order to adjust the height of steel construction mobile platform 2, the above-mentioned vertical He of steel wire rope group 4 Every steel wire rope of anti-shake steel wire rope group 27 is provided with least one flower basket bolt 5, and flower basket bolt 5 is carried out by adjusting screw It is flexible, the elastic of steel wire rope can be adjusted.In the present embodiment, 1~3 flower basket bolt 5, the gaily decorated basket spiral shell are set on every steel wire rope The rated load of bolt 5 is not less than 3 × 104N, contract by distance are not less than 300mm, and so each steel construction mobile platform 2 can basis Site specific realizes the fine setting in the range of 0.9m on vertical height direction, thus, said structure is more beneficial for large space and built Build the expansion of all electromechanical pipelines in top, decorative engineering, lamp installation and building structure repairing work.The present embodiment it is adjustable Anti-shake mobile platform 10, due to first passing through Mechanics Calculation in advance, the steel wire rope and flower basket bolt 5 of certain fixing model are employed, is advised simultaneously Model its installation operation code and service manual etc. so that the adjustable anti-shake mobile platform 10 has than general plain type platform Higher security performance.
As shown in figure 4, top firmware 3 includes the fastening master of a pair of opposing and the U-shaped being sheathed on architecture beam 1 Body, and some fixing bolts for being used to connect a pair of fastening main bodys, and above-mentioned fixing bolt is distributed in architecture beam 1 Upper and lower both sides, the top of steel wire rope are connected on fixing bolt by the 4a of suspension ring one and pass through clamp;As shown in figure 5, steel The bottom of cord is fixed on the 4b of suspension ring two, and the 4b bottoms of suspension ring two are then disposed through support frame provided with externally threaded screw rod The reinforcing channel-section steel 15 of 14 bottoms is simultaneously fastened by bolt sleeve.The top of steel wire rope is fixed on architecture beam 1 by the 4a of suspension ring one, By the 4b of suspension ring two with reinforcing the bolt connection of channel-section steel 15, above-mentioned attachment structure, which not only dismounts, is easy to steel construction to move for the bottom of steel wire rope The dismounting of moving platform 2, and be easy to be needed that position is adjusted flexibly according to construction, improve efficiency of construction.Above-mentioned reinforcing channel-section steel 15 Connect and formed by some transverse channel steels being staggered and longitudinal channel-section steel arc welding, Type of Welding is arc welding, and weld seam must weld reality And spot welding can not be used, to ensure both firm and reliable connections.The transverse channel steels of the present embodiment and the preferred height of longitudinal channel-section steel 100mm, the wide 48mm of leg, waist thickness 5.3mm channel-section steel.
Preferably, it is two neighboring top firmware 3 between be smaller than be equal to 1.5m, to ensure that the stress of architecture beam 1 is equal Even, the steel construction mobile platform 2 being suspended over is more solid and reliable.
Above-mentioned steel wire rope is made of 301#, 304# or 316# zinc-coated wire or high-carbon steel wire, steel construction mobile platform 2 Antirust paint is scribbled with support frame 14.Wherein, the steel wire rope specification of vertical steel wire rope group 4 is 1 × 19 type or 7 × 19 types, directly Footpath is 6.0mm, and the rupture pull force of every steel wire rope is more than or equal to 3 × 104N;Anti-shake steel wire rope group 1 and anti-shake steel wire rope group two 7 steel wire rope is same size, but diameter is more than or equal to 8.0mm, and the rupture pull force of every steel wire rope is more than or equal to 4 × 104N, Total Breaking load of steel wire rope is more than 30t (3 × 105N)。
Refer to Fig. 1 and Fig. 6, steel construction mobile platform 2 by metal framework, the iron wire grid being fixed in metal framework and The protective fence 2a compositions being vertically arranged on metal framework, protective fence 2a and metal framework bolt connection, adjacent two sections anti- Bolt connection between guard fence 2a, and metal framework and the bolt connection of support frame 14.In order to increase steel construction mobile platform 2 Antiseptic and rustproof function, above-mentioned metal framework and iron wire grid scribble antirust paint.
Embodiment two:Illustrate the installation method of the adjustable anti-shake mobile platform using the present invention, tool with reference to Fig. 1 to Fig. 6 Body step is as follows:
First, some top firmwares 3 are sheathed on architecture beam 1 by ladder truck (not shown), and by fixed spiral shell Bolt fastens, and steel construction mobile platform 2 and support frame 14 are lifted on the lower section of architecture beam 1 by vertical steel wire rope group 4, specifically For, the top of vertical steel wire rope group 4 is connected on the firmware 3 of top by the 4a of suspension ring one, and the bottom of vertical steel wire rope group 4 is by hanging The 4b of ring two is connected on the reinforcing channel-section steel 15 of the bottom of support frame 14, and is fixed by clamp;
2nd, two anti-shake steel wire rope groups 1 are set respectively at the both ends of the length bearing of trend of steel construction mobile platform 2, made The bottom for obtaining two anti-shake steel wire rope groups 1 is connected to the corner of the pedestal of steel construction mobile platform 2, anti-shake steel wire rope group one 6 top is connected on architecture beam 1, moreover, in the corner of mounting hole 8 installation anti-shake steel wire rope group 27, anti-shake steel wire rope The other end of group 27 is then held within the top firmware 3 of the top of mounting hole 8;After installing, check whether bolt all connects Connect, whether steel wire rope has abrasion, knotting or distortion, fixture block-regulations whether correct (i.e. whether steel wire rope keeps straight) etc..
The installation method of the adjustable anti-shake mobile platform of the present invention, first, will connection by some vertical steel wire rope groups 4 The steel construction mobile platform 2 and support frame 14 being integrated are suspended on architecture beam 1, are grown then at steel construction mobile platform 2 The both ends of degree bearing of trend set two anti-shake steel wire rope groups 1 respectively so that the bottom difference of two anti-shake steel wire rope groups 1 The corner of the pedestal of steel construction mobile platform 2 is connected to, the top of anti-shake steel wire rope group 1 is connected on architecture beam 1, so as to When avoiding construction operation, steel construction mobile platform 2 is different degrees of because caused by walking about workmen to be rocked, and has ensured construction Safety;Moreover, the corner connection anti-shake steel wire rope group 27 of mounting hole 8, and the top of anti-shake steel wire rope group 27 is held within On the top firmware 3 of the top of mounting hole 8, the setting of anti-shake steel wire rope group 27 can ensure that hole for hoist 8, will not when conveying material Generation is acutely rocked and influences construction safety;It is of the invention compared to the application method of construction platform in ladder truck hydraulic manipulator The installation method of adjustable anti-shake mobile platform, steel construction mobile platform 2 can be made to reach identical construction height, and carry energy Power and construction space are bigger, and any energy consumption will not occur during use, more meet the development trend of green construction.Therefore, this hair The installation method of bright adjustable anti-shake mobile platform has the advantages that installation operation is convenient, and Non-energy-consumption consumes.
Also include after above-mentioned steps two, load test is carried out to adjustable anti-shake mobile platform 10, moved in steel construction 20 hooks 11 are installed in the bottom of platform 2, and link up with and 11 be uniformly distributed, on each hook 11 through steel wire rope and hung liftoff 1m and Weight is no less than 1t weight, and after 4h, the switching performance of such as adjustable anti-shake mobile platform 10 is not affected by influence, then can recognize Be the adjustable anti-shake mobile platform 10 by load test, can input for safety use.
When adjustable anti-shake mobile platform 10 needs to move, operating procedure is as follows:
Step 1:Before mobile adjustable anti-shake mobile platform 10, remove all weights thereon and withdraw workmen, The flower basket bolt 5 in vertical steel wire rope group 4 among adjustable anti-shake mobile platform 10 is tightened, keeps middle vertical steel wire rope group 4 4 suspension centre stress, the vertical steel wire rope group 4 and anti-shake steel wire rope group 1 of loose ends, now, the vertical steel wire rope group 4 in both ends In loose condition (of surface), middle vertical steel wire rope group 4 and anti-shake steel wire rope group 27 are in tensioned state, first by the vertical steel wire at both ends Rope group 4 is fixed on next moving step pitch point of architecture beam 1;
Step 2:Unscrew the flower basket bolt 5 in middle vertical steel wire rope group 4 and anti-shake steel wire rope group 27 simultaneously, by steel knot Structure mobile platform 2 is transferred, and it is in gradually tensioned state, middle vertical steel wire rope group 4 and anti-shake steel to make the vertical steel wire rope group 4 in both ends Cord group 27 is in loose condition (of surface), and now, steel construction mobile platform 2 also can slowly be moved to next moving step pitch point, so Afterwards, the vertical steel wire rope group 4 of centre is unclamped, and is fixed on next moving step pitch point of architecture beam 1;
Step 3:1 to 2 is repeated the above steps, until adjustable anti-shake mobile platform 10 is moved into target area.
The each moving step pitch of above-mentioned adjustable anti-shake mobile platform 10 is 1~2m, in principle with small step it is multiple based on, move When moving adjustable anti-shake mobile platform 10, warning line is set in construction area, and the lower section of adjustable anti-shake mobile platform 10 is forbidden Personnel walk about.In addition, when lifting adjustable anti-shake mobile platform 10, as using area has side bar, side column, fence or curtain wall Structure, and said structure can meet more than 30t additional loads, should try the support of the adjustable bottom of anti-shake mobile platform 10 Framework 14 is erected on said structure, while is tensed vertical steel wire rope group 4 and played further firm effect.
When the highly desirable regulation of adjustable anti-shake mobile platform 10, unload all heavy on steel construction mobile platform 2 Thing, both sides anti-shake steel wire rope group 1 is first adjusted, then adjust the gaily decorated basket in middle vertical steel wire rope group 4 and anti-shake steel wire rope group 27 Bolt 5, finally, adjust the flower basket bolt 5 in the vertical steel wire rope group 1 in both ends so that steel construction mobile platform 2 is in regulation height During, balance and stability is remained, is advantageous to construction safety.
Foregoing description is only the description to present pre-ferred embodiments, not to any restriction of the scope of the invention, this hair Any change, the modification that the those of ordinary skill in bright field does according to the disclosure above content, belong to right.

Claims (10)

1. a kind of adjustable anti-shake mobile platform, hang on the lower section of architecture beam, it is characterised in that including:
Some top firmwares being sheathed on the architecture beam;
One horizontally disposed steel construction mobile platform;
The support frame of the steel construction mobile platform bottom is fixed on, the middle part of the support frame is provided with hole for hoist, covering It is hinged in two cover plates on the hole for hoist with the support frame;
Several vertical steel wire rope groups, two anti-shake steel wire rope groups one at the steel construction mobile platform both ends are respectively arranged at, And it is arranged at the anti-shake steel wire rope group two in the middle part of the steel construction mobile platform;
The vertical steel wire rope group includes being located at two pairs of steel wire ropes of the steel construction mobile platform both sides, the vertical steel respectively One end of cord group is fixed in the support frame, and the other end of the vertical steel wire rope group is connected to by the top firmware On the architecture beam;The anti-shake steel wire rope group one includes oblique positioned at two of the steel construction mobile platform both sides respectively To and steel wire rope arranged in a crossed manner, the bottom of the anti-shake steel wire rope group one be connected on the steel construction mobile platform, The top of the anti-shake steel wire rope group one is then connected on the architecture beam;Four steel wires of the anti-shake steel wire rope group two The bottom of rope is connected to the corner of the hole for hoist, and the top of the anti-shake steel wire rope group two is then held within the hole for hoist On the top firmware of top.
2. adjustable anti-shake mobile platform according to claim 1, it is characterised in that:The bottom of the steel construction mobile platform Portion is also associated with least two elevator machine frames, and hoist engine is respectively arranged on the elevator machine frame.
3. adjustable anti-shake mobile platform according to claim 1 or 2, it is characterised in that:The adjustable anti-shake movement The bottom of platform is additionally provided with some equally distributed hooks.
4. adjustable anti-shake mobile platform according to claim 1 or 2, it is characterised in that:The support frame is by some The reinforcing frame bolt connection be arrangeding in parallel forms, and the edge of the cover plate on the hole for hoist and the adjacent reinforcing frame passes through metal Rotating shaft connects, and is locked between the two neighboring cover plate by bolt.
5. adjustable anti-shake mobile platform according to claim 1 or 2, it is characterised in that:The vertical steel wire rope group and Every steel wire rope of the anti-shake steel wire rope group two is provided with least one flower basket bolt.
6. adjustable anti-shake mobile platform according to claim 1 or 2, it is characterised in that:The top firmware includes a pair The fastening main body for the U-shaped for being oppositely arranged and being sheathed on the architecture beam, and it is some for connecting a pair of fastenings The fixing bolt of main body;The top of the steel wire rope is connected on the fixing bolt by suspension ring one and by clamp, The bottom of the steel wire rope is fixed on suspension ring two, and the bottom of suspension ring two is then disposed through institute provided with externally threaded screw rod State the reinforcing channel-section steel of support frame bottom and fastened by bolt sleeve;The reinforcing channel-section steel by some transverse channel steels being staggered and Longitudinal channel-section steel arc welding, which connects, to be formed.
7. adjustable anti-shake mobile platform according to claim 1 or 2, it is characterised in that:The two neighboring top firmware Between be smaller than be equal to 1.5m.
8. the installation method of the adjustable anti-shake mobile platform as described in any one of claim 1 to 7, step are as follows:
First, some top firmwares are sheathed on architecture beam, and fastened by fixing bolt, steel construction mobile platform and carriage Frame is lifted on below the architecture beam by vertical steel wire rope group;
2nd, two anti-shake steel wire rope groups one are set respectively at the both ends of the steel construction mobile platform length bearing of trend so that The bottom of two anti-shake steel wire rope groups one is connected on steel construction mobile platform, the top of the anti-shake steel wire rope group one End is connected on the architecture beam, installation anti-shake steel wire rope group two, the anti-shake steel wire rope group two in the corner of mounting hole The other end be then held within the top firmware above the mounting hole.
9. installation method according to claim 8, it is characterised in that when the adjustable anti-shake mobile platform needs to move When, step is as follows:
Step 1:Before the movement adjustable anti-shake mobile platform, remove all weights thereon and withdraw workmen, twist Flower basket bolt among the tight adjustable anti-shake mobile platform in vertical steel wire rope group, keeps hanging for middle vertical steel wire rope group Point stress, the vertical steel wire rope group of loose ends and anti-shake steel wire rope group one, first the vertical steel wire rope group at both ends is fixed on described On next moving step pitch point of architecture beam;
Step 2:Unscrew the flower basket bolt in middle vertical steel wire rope group and anti-shake steel wire rope group two simultaneously, the steel construction is moved Moving platform is transferred, and the steel construction mobile platform is moved to next moving step pitch point, then, unclamps the vertical steel wire of centre Rope group, and be fixed on next moving step pitch point of the architecture beam;
Step 3:1 to 2 is repeated the above steps, until the adjustable anti-shake mobile platform is moved into target area.
10. installation method according to claim 8 or claim 9, it is characterised in that when the height of the adjustable anti-shake mobile platform When degree needs regulation, step is as follows:First adjust anti-shake steel wire rope group one described in the steel construction mobile platform both sides, then adjust Between flower basket bolt in the vertical steel wire rope group and the anti-shake steel wire rope group two, finally, adjust vertical steel wire described in both ends Flower basket bolt in rope group.
CN201610557317.4A 2016-07-15 2016-07-15 A kind of adjustable anti-shake mobile platform and its installation method Active CN106049848B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610557317.4A CN106049848B (en) 2016-07-15 2016-07-15 A kind of adjustable anti-shake mobile platform and its installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610557317.4A CN106049848B (en) 2016-07-15 2016-07-15 A kind of adjustable anti-shake mobile platform and its installation method

Publications (2)

Publication Number Publication Date
CN106049848A CN106049848A (en) 2016-10-26
CN106049848B true CN106049848B (en) 2018-04-06

Family

ID=57186925

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610557317.4A Active CN106049848B (en) 2016-07-15 2016-07-15 A kind of adjustable anti-shake mobile platform and its installation method

Country Status (1)

Country Link
CN (1) CN106049848B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108590154A (en) * 2018-04-25 2018-09-28 合肥上城信息技术有限公司 A kind of building top hanging apparatus and its method

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2043128A (en) * 1934-06-04 1936-06-02 Charles A Miller Scaffold for structural workers
CN101672102B (en) * 2009-10-19 2015-03-04 中铁建设集团有限公司 Steel structural overhead ceiling construction platform
CN203783105U (en) * 2014-01-28 2014-08-20 中国建筑第八工程局有限公司 Fast construction operating platform used for section steel column interior pouring concrete
CN104878867B (en) * 2015-05-21 2017-06-16 中国建筑第二工程局有限公司 Integral structure of ceiling joist and double-deck operation platform and preparation method thereof
CN105298099A (en) * 2015-11-17 2016-02-03 中国建筑第八工程局有限公司 Modular suspension type steel tube fastener scaffold operating platform and erecting method thereof
CN205918087U (en) * 2016-07-15 2017-02-01 上海市安装工程集团有限公司 Prevent shaking moving platform with adjustable

Also Published As

Publication number Publication date
CN106049848A (en) 2016-10-26

Similar Documents

Publication Publication Date Title
CN106049843B (en) A kind of suspension type anti-shake construction platform and its installation method
CN101892736B (en) High altitude moving hanging basket construction method
US6000562A (en) Powered lifting apparatus using multiple booms
CN105692470A (en) Internal climbing tower crane and operating method thereof
CN205294665U (en) Jack -up tower crane based on engineering mechanics
US8627619B2 (en) Rigging deck module
CN106049848B (en) A kind of adjustable anti-shake mobile platform and its installation method
US7066343B1 (en) Powered lifting apparatus using multiple booms
CN106087990A (en) Movable reinforcement cage installs equipment
CN107816209B (en) The large-scale Roof Truss construction technology of installation is lifted across outer two sides
CN106315426A (en) Block form tower crane mounting and jacking method for assembled building
CN205918087U (en) Prevent shaking moving platform with adjustable
CN106049846B (en) A kind of Anti-inclining construction platform and its application method
CN104627849B (en) Hoisting equipment and hoisting method for hoisting inner courtyard pipeline
CN208166361U (en) A kind of overlength light-weight metal roof boarding lifting attachment device
CN103743581B (en) Internal-climbing tower crane test platform device and test method
CN205918083U (en) Suspension type prevents shaking construction platform
CN107055317A (en) The steel structure hoisting device of conventional lifting machine restricted clearance
CN203794505U (en) Internal climbing steel beam conveying device of internal climbing movable arm tower crane
CN206346500U (en) Compact simplified arm extending type straddle truck
CN206174438U (en) Prevent construction platform that inclines
CN209163407U (en) A kind of detachable simple construction lifting platform
CN212392581U (en) Bypass operation crossing structure
CN106861882A (en) The method that ball mill has bad luck lifting in building
CN201980890U (en) Herringbone hoisting mast for hoisting under special situation of high altitude

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant