CN206174438U - Prevent construction platform that inclines - Google Patents

Prevent construction platform that inclines Download PDF

Info

Publication number
CN206174438U
CN206174438U CN201620745790.0U CN201620745790U CN206174438U CN 206174438 U CN206174438 U CN 206174438U CN 201620745790 U CN201620745790 U CN 201620745790U CN 206174438 U CN206174438 U CN 206174438U
Authority
CN
China
Prior art keywords
wire rope
steel wire
steel
operation platform
mobile platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620745790.0U
Other languages
Chinese (zh)
Inventor
陈晓文
汤毅
卢佳华
张宁波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Installation Engineering Group Co Ltd
Original Assignee
Shanghai Installation Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Installation Engineering Group Co Ltd filed Critical Shanghai Installation Engineering Group Co Ltd
Priority to CN201620745790.0U priority Critical patent/CN206174438U/en
Application granted granted Critical
Publication of CN206174438U publication Critical patent/CN206174438U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a prevent construction platform that inclines relates to building construction equipment technical field. There is the problem that flexibility, security and economic nature can not be compromise in construction equipment to current building roof. It includes steel construction moving platform and braced frame, vertical wire rope group one end rigid coupling is on braced frame, and the other end is connected on building structure beam, the alarm device who is fixed in the braced frame bottom includes a horizontal calibrator who is packaged with conducting solution, a bubble floats at the conducting solution top, set up and be located the bubble in the top that the electrically conductive probe of horizontal calibrator central authorities exposes insulation support, warning circuit has the main circuit and electrically conductive probe connection of alarm, branch road and conducting solution intercommunication including the main circuit and the parallel branch that are connected, series connection.

Description

A kind of Anti-inclining operation platform
Technical field
The utility model is related to construction implement technical field, more particularly to a kind of Anti-inclining operation platform.
Background technology
With domestic construction technology and the continuous improvement of national material and cultural needs, the country is to show room, cinema and report The construction demand for accusing the volumed space buildings such as conference hall is more and more stronger.Normal throw and occupation of land due to above-mentioned volumed space building Area is larger, therefore, the installation exercise difficulty of all kinds of electromechanical pipelines, decorative panel, light fixture etc. is also corresponding at the top of volumed space building Increase.
At present, the construction operation at the top of volumed space building is generally carried out in ladder truck, cat ladder or scaffold, but these set The drawbacks of standby generally existing operating space is narrow and small.For example, when in-car of ascending a height is constructed, operation platform is arranged on hydraulic machinery On arm, ladder truck has the features such as transmitting big height, operation platform safety and stability and flexible adjustment, but while there is also using dimension Protect the defects such as costly, delivered payload capability is poor and power consumption is big;Traditional cat ladder or scaffold are generally built on ground, once carried The collision of the fork truck of material, the serious consequence such as often cause operation platform to cave in, and cat ladder or scaffold are special at some Occasion (such as stair, especially big choose sky) and limited by place and cannot be realized that landing is built, application limitation is larger;And, pass System operation platform lacks auto-alarm function, is difficult to find because what connection between part coming off and causing small inclines in work progress Tiltedly, cause to load goods and workmen occurs high fall accident, be unfavorable for construction safety.
In sum, for the construction equipment generally existing flexibility at the top of volumed space building, security and economy not How the present situation that can be taken into account, design a kind of economical and practical and safety and stability operation platform and its operation of specification be very urgent.
The content of the invention
Have what flexibility, security and economy can not be taken into account for the construction equipment at the top of existing volumed space building Problem.The purpose of this utility model is to provide a kind of Anti-inclining operation platform, and it is hung on existing architecture beam, will not The construction operation on ground is affected, the overall progress of construction is improve, and warning device is provided with operation platform bottom, occurred Alarm can automatically occur, so as to ensure construction safety during inclination.
The utility model solves a kind of Anti-inclining operation platform that its technical problem is adopted, and hangs on architecture beam Lower section, including a horizontally disposed steel construction mobile platform;It is fixed on the support frame of the steel construction mobile platform bottom;If Dry vertical steel wire rope group, the vertical steel wire rope group is included respectively positioned at two pairs of steel wires of the steel construction mobile platform both sides Rope one, one end of the vertical steel wire rope group is fixed in the support frame, and the other end of the vertical steel wire rope group passes through Top firmware is connected on the architecture beam;And at least one warning device for being fixed on the support frame bottom, institute Stating warning device includes:The one horizontal alignment instrument for being packaged with conducting solution;A bubble is floating with the top of the conducting solution;If At least four conductive probes in the horizontal alignment instrument central authorities are placed in, insulating sleeve is coated with outside the conductive probe, it is described Conductive probe exposes the top of the insulating sleeve and is located in the bubble;And warning circuit, the warning circuit include master Circuit and the branch road of at least two parallel connections being connected with the main circuit, the main circuit include series connection power supply, alarm and Normally closed switch, the other end of the main circuit is connected with the conductive probe, per branch road described in bar in be in series with a resistance, and institute The other end for stating branch road is connected with the conducting solution in the horizontal alignment instrument.
Preferably, the warning device also includes a heater circuit, and the heater circuit is molten including the conduction is arranged at Heating wire in liquid, and be arranged at the horizontal alignment instrument it is outer and connect with the heating wire resistance, power supply and normally opened open Close.
Preferably, also including two anti-shake steel for being respectively arranged at the steel construction mobile platform length bearing of trend two ends Cord group, the anti-shake steel wire rope group includes two oblique and arranged in a crossed manner steel wire ropes two, the bottom of the anti-shake steel wire rope group End is connected on the steel construction mobile platform, and the top of the anti-shake steel wire rope group is connected on the architecture beam.
Preferably, it is respectively equipped with least one flower basket bolt on the steel wire rope one and the steel wire rope two.
Preferably, the support frame is formed by some reinforcing frame bolt connections be arrangeding in parallel, the support frame Middle part arranges the hole for hoist with cover plate, and the cover plate on the hole for hoist passes through metal rotating shaft with the edge of the adjacent reinforcing frame Connection, is locked between the two neighboring cover plate by bolt.
Preferably, the bottom of the steel construction mobile platform is also associated with least two elevator machine frames, hoist engine difference It is installed on the elevator machine frame, and, the bottom of the steel construction mobile platform is additionally provided with some equally distributed hooks.
Preferably, the top firmware includes the fastening of a pair of opposing and the U-shaped being sheathed on the architecture beam Main body, and some fixing bolts for connecting fastening main body described in a pair, the steel wire rope one and the steel wire rope two Top is connected on the fixing bolt and by clamp, the steel wire rope one and the steel wire rope two by suspension ring one Bottom is fixed on suspension ring two, and the bottom of the suspension ring two is provided with externally threaded screw rod and is then disposed through the support frame bottom Reinforcing channel-section steel and fastened by bolt sleeve, the reinforcing channel-section steel is by some transverse channel steels being crisscross arranged and longitudinal channel-section steel arc welding Connect and form, and being smaller than between the two neighboring top firmware is equal to 1.5m.
Effect of the present utility model is:Anti-inclining operation platform of the present utility model, using support frame and several Vertical steel wire rope group hangs on steel construction mobile platform on existing architecture beam, due to the bottom of the steel construction mobile platform Portion is provided with support frame so that the steel construction mobile platform is more consolidated, and improves its bearing capacity;And, Anti-inclining is applied Work platform is hung on existing architecture beam, does not interfere with the construction operation on ground, improves the overall progress of construction;Especially For importantly, Anti-inclining operation platform of the present utility model is also provided with warning device, Anti-inclining in the bottom of support frame Operation platform in normal operation (non-regulated state or translation state), corresponds to four conductions in front, rear, left and right orientation In bubble, there is the protection of insulating sleeve conductive probe lower end on the exposed top of probe, therefore, Anti-inclining operation platform level During setting, electric wiring cannot realize path, and warning device does not work;When Anti-inclining operation platform is because of factors such as overload, shocks When causing the inclination horizontal by more than 10 °, the bubble in level standard instrument shifts, now the naked of conductive probe In conducting solution, circuit turn-on sends alarm to the top-submerged of sleeve pipe parcel so as to trigger alarm, points out workmen to stand Withdraw, after potential safety hazard is excluded construction operation is carried out again, the warning device simple structure is easy to operate, and can realize The monitoring of multi-faceted horizontal tilt state, so as to ensure construction safety.To sum up, Anti-inclining operation platform of the present utility model With floor space is little, flexible adjustment, it is applied widely, solid and reliable, do not affect ground construction, and be capable of achieving automatic alarm The advantages of, it is particularly well-suited in the construction operation at the top of volumed space building.
Description of the drawings
Fig. 1 is the structural representation of the Anti-inclining operation platform of the embodiment of the utility model one;
Fig. 2 is the side view of Fig. 1;
Fig. 3 is the structural representation of steel construction mobile platform in the embodiment Anti-inclining operation platform of the utility model one;
Fig. 4 is to push up the structural representation that firmware is installed on architecture beam;
Fig. 5 is the attachment structure schematic diagram of vertical steel wire rope group and support frame;
Fig. 6 is the structural representation of protective fence on steel construction mobile platform;
Fig. 7 is the circuit diagram of the warning device of the embodiment of the utility model one;
Fig. 8 is the circuit diagram under the warning device working condition of the embodiment of the utility model one.
Specific embodiment
Below in conjunction with the drawings and specific embodiments pair the utility model proposes a kind of Anti-inclining operation platform make further Describe in detail.According to following explanation and claims, advantages and features of the present utility model will become apparent from.It should be noted that, Accompanying drawing in the form of simplifying very much and uses non-accurately ratio, only conveniently, lucidly to aid in illustrating this practicality The purpose of new embodiment.For sake of convenience, it is described below " on ", the upper and lower direction of D score and accompanying drawing it is consistent, but this The restriction of technical solutions of the utility model can not be become.
A kind of Anti-inclining operation platform 100 of the present utility model, the Anti-inclining operation platform 100 are illustrated with reference to Fig. 1 to Fig. 8 The lower section of architecture beam 1 is hung on, it includes a horizontally disposed steel construction mobile platform 2;It is fixed on steel construction movement flat The support frame 3 of the bottom of platform 2;Several vertical steel wire rope groups 4, vertical steel wire rope group 4 includes that being located at steel construction movement respectively puts down Two pairs of steel wire ropes one of the both sides of platform 2, and vertically one end of steel wire rope group 4 is fixed in support frame 3, its other end is solid by top Part 7 is connected on architecture beam 1;And two warning devices 20, and warning device 20 is fixed on the two of the bottom of support frame 3 End;As shown in fig. 7, the warning device 20 includes a horizontal alignment instrument 21 for being packaged with conducting solution 22;The top of conducting solution 22 Portion is floating with a bubble 23;The central authorities of horizontal alignment instrument 21 and equidistantly four conductive probes 24 of arrangement are vertically arranged to, this is led Insulating sleeve is coated with outside electric probe 24, conductive probe 24 exposes the top of insulating sleeve and is located in above-mentioned bubble 23;And Warning circuit, warning circuit includes the branch road of main circuit and two parallel connections being connected with main circuit, i.e. branch road one and branch road two, its In, main circuit includes power supply DC, the alarm BL and normally closed switch K1, the other end of main circuit and four conductive probes 24 of series connection Connection, is in series with the R1 of resistance one in branch road one, be in series with the R2 of resistance two in branch road two, and the other end of branch road one and branch road two with Conducting solution 22 in horizontal alignment instrument 21 is connected.In the present embodiment, all electrical wirings or insulation sleeve for passing through warning device 20 Pipe, all should arrange seal approach of good performance to prevent conducting solution 22 from leaking, and so as to affect performance, above-mentioned conduction is molten Liquid 22 is the sodium chloride solution that the good concentration of nontoxic and electric conductivity is 23%, and the R1 of the resistance one and R2 of resistance two selects 1k Ω's Resistance, used as the protective resistance of branch road, power supply DC selects the dc source of 24V;As it was noted above, using two branch roads in parallel Only it is an example, a plurality of branch road may also be employed, corresponds to different orientation, so as to improve the sensitivity of warning device 20, herein Repeat no more.In addition, the above-mentioned size of steel construction mobile platform 2 is 7m (length) × 4m (width) × 1.2m (height), bearable load For 5000N/m2;The length and width that support frame 3 sets up is not less than the length and width of steel construction mobile platform 2, on the one hand The structural stability of steel construction mobile platform 2 is ensure that, is on the other hand easy to bind steel wire rope.Need to illustrate in addition, this Using front, whether unit in charge of construction should check the bearing capacity of architecture beam 1 and can the Anti-inclining operation platform 100 of utility model The use requirement of Anti-inclining operation platform 100 is met, after the license that original design unit is checked and approved with construction unit is obtained, to building Structural beams 1 carry out to be used after certain reinforcing.
Anti-inclining operation platform 100 of the present utility model, using support frame 3 and several vertical steel wire rope groups 4 by steel Structure mobile platform 2 is hung on existing architecture beam 1, because the bottom of the steel construction mobile platform 2 is provided with support Framework 3 so that the steel construction mobile platform 2 is more consolidated, and improve its bearing capacity;And, Anti-inclining operation platform 100 hangs It is hung on existing architecture beam 1, does not interfere with the construction operation on ground, improves the overall progress of construction;It is particularly important , Anti-inclining operation platform 100 of the present utility model is also provided with warning device 20, Anti-inclining in the bottom of support frame 3 In normal operation (non-regulated state or translation state), four of correspondence front, rear, left and right orientation lead operation platform 100 In bubble 23, there is the protection of insulating sleeve the lower end of conductive probe 24 on the exposed top of electric probe 24, therefore, Anti-inclining construction When platform 100 is horizontally disposed with, electric wiring cannot realize path, and warning device 20 does not work;When Anti-inclining operation platform 100 because When the factors such as overload, shock cause the inclination horizontal by more than 10 °, the bubble 23 in level standard instrument 21 shifts, Now in conducting solution 22, circuit turn-on is so as to triggering alarm for the top-submerged of the naked sleeve pipe parcel of conductive probe 24 BL sends alarm, points out workmen to withdraw immediately, and after potential safety hazard is excluded construction operation is carried out again, and the warning device 20 is tied Structure is simple, easy to operate, and can realize the monitoring of multi-faceted horizontal tilt state, so as to ensure construction safety.To sum up, Anti-inclining operation platform 100 of the present utility model has that floor space is little, flexible adjustment, applied widely, solid and reliable, not shadow Ground construction is rung, and the advantages of achievable automatic alarm, is particularly well-suited in the construction operation at the top of volumed space building.
In cold winter, the conducting solution 22 in warning device 20 it may happen that freeze and affect its normal work, To solve the above problems, the warning device 20 also includes a heater circuit, heater circuit include being arranged in conducting solution 22 and Be coated with the heating wire 25 of insulating sleeve, and be arranged at horizontal alignment instrument 21 it is outer and connect with heating wire 25 the R3 of resistance three, Power supply DC and normal open switch K2.The material of the insulating sleeve of the outer wrapping of above-mentioned heating wire 25 can be the good glass of heat conductivility, Ceramics, rubber or plastics etc., its effect is to prevent heating wire 25 from corroding, this reality in conducting solution 22 because of long period of soaking The heating wire 25 for applying example may be selected model 0Cr27A l 7Mo2, and power is the direct current heated filament of 36W, or is wanted according to concrete Ask customized;When the local environment temperature of warning device 20 is relatively low, normal open switch K2 is closed, heater circuit conducting, heating wire 25 adds Thermal conducting solution 22, it is ensured that conducting solution 22 does not freeze in the case of extreme cold in the winter time.Certainly, to prevent conducting solution 22 from letting out Leak and cause to measure misalignment, the insulating sleeve on heating wire 25 and conductive probe 24, and through the shell of horizontal alignment instrument 21 All kinds of wires should have good seal approach.
In the inner space of ultra-large type building, if operation platform is built highly excessive, easily cause when workmen walks about and apply Work platform is rocked, and there is potential safety hazard, is the safety for ensureing workmen, as depicted in figs. 1 and 2, anti-dumping of the present utility model Tiltedly operation platform 100 also includes being respectively arranged at two anti-shake steel wire ropes at the length bearing of trend two ends of steel construction mobile platform 2 Group 6;The anti-shake steel wire rope group 6 includes two oblique and arranged in a crossed manner steel wire ropes two, and the bottom of anti-shake steel wire rope group 6 is connected to On steel construction mobile platform 2, i.e., the bottom of two anti-shake steel wire rope groups 6 is bundled in respectively the four of the pedestal of steel construction mobile platform 2 Angle, and the top of anti-shake steel wire rope group 6 is then connected on architecture beam 1;By anti-shake steel wire rope group 6, further connection steel is tied Structure mobile platform 2 and architecture beam 1, when can avoid construction operation, steel construction mobile platform 2 draws because workmen walks about Rise it is different degrees of rock, so as to ensure construction safety.
Please continue to refer to Fig. 1 and Fig. 2, in order to adjust the height of steel construction mobile platform 2, above-mentioned steel wire rope one and steel wire rope At least one flower basket bolt 5 is equipped with two, flower basket bolt 5 is stretched by adjusting screw, can adjust the pine of steel wire rope Tightly.In the present embodiment, 1~3 flower basket bolt 5, the specified load of the flower basket bolt 5 are set on every steel wire rope one and steel wire rope two Lotus is not less than 3 × 104N, contract by distance is not less than 300mm, and so each steel construction mobile platform 2 can be according to site specific The fine setting in the range of 0.9m on vertical height direction is realized, thus, it is organic that said structure is more beneficial for volumed space building top institute The expansion of electric line, decorative engineering, lamp installation and building structure repairing work.Due to first passing through Mechanics Calculation in advance, employ The steel wire rope and flower basket bolt 5 of certain fixing model, while specification its installation operation code and service manual etc. so that the Anti-inclining Operation platform 100 has higher security performance than general plain type operation platform.
As shown in figures 1 and 3, above-mentioned support frame 3 is formed by some bolt connections of reinforcing frame 16 be arrangeding in parallel, is supported The middle part of framework 3 is provided with the hole for hoist 8 of being easy to that material is transported on steel construction mobile platform 2 and can cover lid thereon Plate 9, cover plate 9 is connected with the edge of adjacent reinforcing frame 16 by metal rotating shaft, is fastened by bolt lock between two neighboring cover plate 9 It is fixed.The size of the present embodiment cover plate 9 is 1.5m (width) × 4m (length).The bottom of steel construction mobile platform 2 is also associated with two The elevator machine frame 14 of individual U-shaped, two small winch 15 (is standby using) are respectively arranged on elevator machine frame 14, and Power supply is carried out using motor.When lifting construction material is needed, cover plate 9 can be opened, expose hole for hoist 8, by construction material Binding on a steel cord, starts hoist engine 15 and implements lifting, after construction material is hung on steel construction mobile platform 2, will need to cover Plate 9 is closed and locked, and the weight that hoist engine 15 is once lifted must not exceed 300kg, and during lifting operation, workmen will must pacify Full sling is tightly on the protective fence 2a of the surrounding of steel construction mobile platform 2.Above-mentioned Anti-inclining operation platform 100 is using front, every After secondary maintenance and maintenance, it is necessary to tested by the aerial loading carried no less than 20t, and stabilization time must not be less than 4h, be just The load of bearing test is installed additional in Anti-inclining operation platform 100, the bottom of the Anti-inclining operation platform 100 of the present embodiment also sets There are 20 equally distributed hooks 12.
As depicted in figs. 1 and 2, pushing up firmware 7 includes the tight of a pair of opposing and the U-shaped that is sheathed on architecture beam 1 Gu main body, and some fixing bolts for a pair of fastening main bodys of connection, and above-mentioned fixing bolt is distributed in architecture beam 1 Upper and lower both sides, as shown in figure 4, the top of steel wire rope one by the 4a of suspension ring one be connected to top firmware 7 fixing bolt on and lead to Cross clamp;As shown in figure 5, the bottom of steel wire rope one is fixed on the 4b of suspension ring two, the 4b bottoms of suspension ring two are provided with external screw thread Screw rod be then disposed through the bottom of support frame 3 reinforcing channel-section steel 11 and by bolt sleeve fasten.It can be seen that, the top of steel wire rope one It is fixed on architecture beam 1 by the 4a of suspension ring one, its bottom is by the 4b of suspension ring two and the reinforcing bolt connection of channel-section steel 11, above-mentioned company Binding structure is not only easy to the dismounting of steel construction mobile platform 2, and is easy to be needed that position is adjusted flexibly according to construction, improves and applies Work efficiency rate.Steel wire rope two and the annexation of architecture beam 1 and support frame 3 and the annexation class of above-mentioned steel wire rope one Seemingly, here is omitted.Above-mentioned reinforcing channel-section steel 11 is connect and is formed by some transverse channel steels being crisscross arranged and longitudinal channel-section steel arc welding, Type of Welding is arc welding, and weld seam must be welded real and can not adopt spot welding, to ensure both firm and reliable connections.The present embodiment Transverse channel steels and the preferred height 100mm of longitudinal channel-section steel, leg width 48mm, the channel-section steel of waist thickness 5.3mm.Preferably, two neighboring top is solid Being smaller than between part 7 is equal to 1.5m, to ensure the uniform force of architecture beam 1 so that the steel construction being suspended over is moved Moving platform 2 is more solid and reliable.
Above-mentioned steel wire rope is made using the zinc-coated wire or high-carbon steel wire of 301#, 304# or 316#, steel construction mobile platform 2 Antirust paint is scribbled with support frame 3.Wherein, the specification of steel wire rope one of vertical steel wire rope group 4 is 1 × 19 type or 7 × 19 types, directly Footpath is 6.0mm, and the rupture pull force of every steel wire rope is more than or equal to 3 × 104N;The steel wire rope two of anti-shake steel wire rope group 6 is identical rule Lattice, but it is more than or equal to 4 × 10 with diameter greater than the rupture pull force equal to 8.0mm, every steel wire rope4N, total Breaking load of steel wire rope More than 30t (3 × 105N)。
Refer to Fig. 1 and Fig. 6, steel construction mobile platform 2 by metal framework, the iron wire grid being fixed in metal framework and The protective fence 2a compositions being vertically arranged on metal framework, protective fence 2a and metal framework bolt connection, adjacent two sections are prevented Bolt connection between guard fence 2a, and metal framework and the bolt connection of support frame 3.In order to increase steel construction mobile platform 2 Antiseptic and rustproof function, above-mentioned metal framework and iron wire grid scribble antirust paint.
The using method of Anti-inclining operation platform is illustrated with reference to Fig. 1 to Fig. 8, step is as follows:
First, some top firmwares 7 are sheathed on architecture beam 1 by ladder truck (not shown), and by fixed spiral shell Bolt is fastened, and steel construction mobile platform 2 and support frame 3 are lifted on the lower section of architecture beam 1 by vertical steel wire rope group 4, specifically For, the top of vertical steel wire rope group 4 is connected on the firmware 7 of top by the 4a of suspension ring one, and its bottom is connected to by the 4b of suspension ring two On the reinforcing channel-section steel 11 of the bottom of support frame 3, and fixed by clamp, then, pacified respectively at the two ends of the bottom of support frame 3 Fill a warning device 20;
2nd, when steel construction mobile platform 2 is inclined to be triggered warning device 20 and send alarm, steel construction mobile platform is removed All weights and workmen is withdrawn on 2, adjust the flower basket bolt 5 on the steel wire rope one of vertical steel wire rope group 4, move steel construction Moving platform 2 recovers horizontal equilibrium.
To sum up, first, by some vertical steel wire rope groups 4 by the steel construction mobile platform 2 for connecting as one and carriage Frame 3 is suspended on architecture beam 1, and then at the two ends of the bottom of support frame 3 warning device 20 is respectively mounted, and Anti-inclining is applied In normal operation (non-regulated state or translation state), four conductive probes 24 are in bubble 23 work platform 100, by There is the protection of insulating sleeve in conductive probe 24, when Anti-inclining operation platform 100 is horizontally disposed with, electric wiring cannot be realized leading to Road, warning device 20 does not work;When Anti-inclining operation platform 100 because the factors such as overload, shock cause horizontal by more than 10 ° Inclination when, the bubble 23 in level standard instrument 21 shifts, now conductive probe 24 naked sleeve pipe parcel top In being immersed in conducting solution 22, circuit turn-on points out workmen to withdraw immediately, after potential safety hazard is excluded so as to realize reporting to the police Construction operation is carried out again;The installation operation of Anti-inclining operation platform 100 is convenient, and bearing capacity and construction space are bigger, and use There is any energy consumption in Shi Buhui, more meet the development trend of green construction, it is of particular importance that the operation platform is pacified by bottom The warning device 20 of dress realizes the monitoring of multi-faceted horizontal tilt state, simple to operate and ensured construction safety.
Above-mentioned steps one also include, at the two ends of the length bearing of trend of steel construction mobile platform 2 two anti-shakes are respectively provided with Steel wire rope group 6, the bottom of two anti-shake steel wire rope groups 6 is connected to the corner of the pedestal of steel construction mobile platform 2, anti-shake steel wire The top of rope group 6 is connected on architecture beam 1.After installing, check whether bolt all connects, whether steel wire rope has mill Damage, knot or distort, fixture block-regulations whether correct (i.e. whether steel wire rope keeps straight) etc..Enter one by anti-shake steel wire rope group 6 Step connection steel construction mobile platform 2 and architecture beam 1, so as to avoid during construction operation, steel construction mobile platform 2 is because of constructor Member walk about and cause it is different degrees of rock, ensured construction safety.
Also include after above-mentioned steps two, load test is carried out to Anti-inclining operation platform 100, in steel construction mobile platform 20 hooks 12 are installed in 2 bottoms, and hook 12 is uniformly distributed, and steel wire rope is passed through on each hook 12 and liftoff 1m and weight has been hung Weight no less than 1t, after 4h, the switching performance of such as Anti-inclining operation platform 100 is not affected by affecting, then it is believed that this is prevented Operation platform 100 is inclined by load test, can input for safety use.
When Anti-inclining operation platform 100 needs to move, operating procedure is as follows:
Step 1:Before mobile Anti-inclining operation platform 100, remove all weights thereon and withdraw workmen, tighten Flower basket bolt 5 in the middle of Anti-inclining operation platform 100 in vertical steel wire rope group 4, keep middle vertical steel wire rope group 44 hang Point stress, the vertical steel wire rope group 4 and anti-shake steel wire rope group 6 of loose ends, now, the vertical steel wire rope group 4 in two ends is in fluffy State, middle vertical steel wire rope group 4 is in then tensioned state, and first the vertical steel wire rope group 4 at two ends is fixed under architecture beam 1 On one moving step pitch point;
Step 2:Unscrew the flower basket bolt 5 in middle vertical steel wire rope group 4 simultaneously, steel construction mobile platform 2 is transferred, make The vertical steel wire rope group 4 in two ends is in gradually tensioned state, and middle vertical steel wire rope group 4 is in then loose condition (of surface), and now, steel construction is moved Moving platform 2 also can slowly be moved to next moving step pitch point, then, unclamp middle vertical steel wire rope group 4, and be fixed On the next moving step pitch point of architecture beam 1;
Step 3:Repeat the above steps 1 to 2, until Anti-inclining operation platform 100 is moved to into target area.
The each moving step pitch of above-mentioned Anti-inclining operation platform 100 is 1~2m, in principle with small step it is multiple based on, it is mobile During Anti-inclining operation platform 100, warning line is set in construction area, and the lower section of Anti-inclining operation platform 100 forbids personnel to walk about. In addition, when Anti-inclining operation platform 100 is lifted, such as there is side bar, side column, fence or curtain wall construction using region, and it is above-mentioned Structure can meet more than 30t additional loads, should try to be erected at the support frame 3 of the bottom of Anti-inclining operation platform 100 State in structure, while tensing vertical steel wire rope group 4 plays further firm effect.
When the highly desirable regulation of Anti-inclining operation platform 100, all weights on steel construction mobile platform 2 are unloaded, Both sides anti-shake steel wire ropes group 6 is first adjusted, then adjusts the flower basket bolt 5 in middle vertical steel wire rope group 4, finally, adjusted two ends and erect To the flower basket bolt 5 in steel wire rope group 6 so that steel construction mobile platform 2 remains that balance is steady during height is adjusted It is fixed, be conducive to construction safety.
Foregoing description is only the description to the utility model preferred embodiment, not to any limit of the utility model scope Calmly, the those of ordinary skill in the utility model field does according to the disclosure above content any change, modification, belonging to right will Seek scope.

Claims (7)

1. a kind of Anti-inclining operation platform, hangs on the lower section of architecture beam, it is characterised in that include:
One horizontally disposed steel construction mobile platform;
It is fixed on the support frame of the steel construction mobile platform bottom;
Several vertical steel wire rope groups, the vertical steel wire rope group is included respectively positioned at the two of the steel construction mobile platform both sides To steel wire rope one, one end of the vertical steel wire rope group is fixed in the support frame, the vertical steel wire rope group it is another End is connected on the architecture beam by pushing up firmware;
And at least one warning device for being fixed on the support frame bottom, the warning device includes:
The one horizontal alignment instrument for being packaged with conducting solution;
A bubble is floating with the top of the conducting solution;
At least four conductive probes in the horizontal alignment instrument central authorities are arranged at, outside the conductive probe insulation sleeve is coated with Pipe, the conductive probe exposes the top of the insulating sleeve and is located in the bubble;
And warning circuit, the warning circuit includes propping up for main circuit and at least two parallel connections be connected with the main circuit Road, the main circuit includes power supply, alarm and normally closed switch, the other end of the main circuit and the conductive probe of series connection Connection, per branch road described in bar in be in series with a resistance, it is and conductive molten in the other end of the branch road and the horizontal alignment instrument Liquid is connected.
2. Anti-inclining operation platform according to claim 1, it is characterised in that:The warning device also includes one plus thermoelectricity Road, the heater circuit includes being arranged at heating wire in the conducting solution, and be arranged at the horizontal alignment instrument it is outer and Resistance, power supply and the normal open switch connected with the heating wire.
3. Anti-inclining operation platform according to claim 1 and 2, it is characterised in that:Also include being respectively arranged at the steel Two anti-shake steel wire rope groups at structure mobile platform length bearing of trend two ends, the anti-shake steel wire rope group include two it is oblique and Steel wire rope two arranged in a crossed manner, the bottom of the anti-shake steel wire rope group is connected on the steel construction mobile platform, the anti-shake The top of steel wire rope group is connected on the architecture beam.
4. Anti-inclining operation platform according to claim 3, it is characterised in that:The steel wire rope one and the steel wire rope two On be respectively equipped with least one flower basket bolt.
5. Anti-inclining operation platform according to claim 1 and 2, it is characterised in that:The support frame is by some parallel The reinforcing frame bolt connection of setting is formed, and the middle part of the support frame arranges the hole for hoist with cover plate, on the hole for hoist The edge of cover plate and the adjacent reinforcing frame connected by metal rotating shaft, locked by bolt between the two neighboring cover plate It is fixed.
6. Anti-inclining operation platform according to claim 1 and 2, it is characterised in that:The bottom of the steel construction mobile platform Portion is also associated with least two elevator machine frames, and hoist engine is respectively arranged on the elevator machine frame, and, the steel construction The bottom of mobile platform is additionally provided with some equally distributed hooks.
7. Anti-inclining operation platform according to claim 1 and 2, it is characterised in that:The top firmware is relative including a pair The fastening main body of U-shaped for arranging and being sheathed on the architecture beam, and it is some for fastening main body described in a pair of connection Fixing bolt, the top of the steel wire rope one and the steel wire rope two is connected on the fixing bolt and is led to by suspension ring one The bottom for crossing clamp, the steel wire rope one and the steel wire rope two is fixed on suspension ring two, and the bottom of the suspension ring two is provided with Externally threaded screw rod is then disposed through the reinforcing channel-section steel of the support frame bottom and is fastened by bolt sleeve, the reinforcing channel-section steel Connect and formed by some transverse channel steels being crisscross arranged and longitudinal channel-section steel arc welding, and the spacing between the two neighboring top firmware Less than or equal to 1.5m.
CN201620745790.0U 2016-07-15 2016-07-15 Prevent construction platform that inclines Withdrawn - After Issue CN206174438U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620745790.0U CN206174438U (en) 2016-07-15 2016-07-15 Prevent construction platform that inclines

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620745790.0U CN206174438U (en) 2016-07-15 2016-07-15 Prevent construction platform that inclines

Publications (1)

Publication Number Publication Date
CN206174438U true CN206174438U (en) 2017-05-17

Family

ID=58673818

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620745790.0U Withdrawn - After Issue CN206174438U (en) 2016-07-15 2016-07-15 Prevent construction platform that inclines

Country Status (1)

Country Link
CN (1) CN206174438U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106049846A (en) * 2016-07-15 2016-10-26 上海市安装工程集团有限公司 Anti-tilt construction platform and using method thereof
CN108609551A (en) * 2018-04-02 2018-10-02 国核电力规划设计研究院有限公司 A kind of hoistable platform

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106049846A (en) * 2016-07-15 2016-10-26 上海市安装工程集团有限公司 Anti-tilt construction platform and using method thereof
CN108609551A (en) * 2018-04-02 2018-10-02 国核电力规划设计研究院有限公司 A kind of hoistable platform

Similar Documents

Publication Publication Date Title
CN103410670B (en) Truss type wind-driven generator tower frame and there is the wind power generating set of this pylon
CN106049846B (en) A kind of Anti-inclining construction platform and its application method
CN107215808A (en) A kind of hydraulic elevating platform safety stabilizing devices
CN105003090B (en) Temporary support frame for mounting assembly type steel structure
CN206174438U (en) Prevent construction platform that inclines
CN105275251A (en) Railway existing line overhead line system hard crossbeam erection method
KR20110014341A (en) Tower ctane wall bracing with a safety fence
CN103967263A (en) Novel hydraulic automatic climbing discharging platform
CN105071298A (en) Foldable operation platform for manned operation on high-voltage lines
CN204661180U (en) A kind of tower crane
CN204001751U (en) Super high steel structure construction overhanging unloading platform
CN107217912B (en) A kind of superelevation physical isolation construction method for neighbouring high-speed rail Business Line construction
CN206494694U (en) A kind of Multi-layer electric hanging basket
CN205555867U (en) Portable hoist and mount platform
CN108396981A (en) A kind of safety protection device for building construction and method
CN201304644Y (en) Gantry type tool assembly dolly
CN106049848B (en) A kind of adjustable anti-shake mobile platform and its installation method
CN204038917U (en) Dismountable external hanging service platform
CN206673517U (en) A kind of New type through-wall sleeve mounting structure
CN203787851U (en) Maintenance device used for power supply and power transmission lines
CN106861882A (en) The method that ball mill has bad luck lifting in building
CN205918083U (en) Suspension type prevents shaking construction platform
CN205918087U (en) Prevent shaking moving platform with adjustable
CN207513137U (en) Building engineering construction builder's jack
CN206203820U (en) A kind of thermal power plant boiler burner hearth lift maintaining platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20170517

Effective date of abandoning: 20180406