CN207513137U - Building engineering construction builder's jack - Google Patents

Building engineering construction builder's jack Download PDF

Info

Publication number
CN207513137U
CN207513137U CN201721325703.7U CN201721325703U CN207513137U CN 207513137 U CN207513137 U CN 207513137U CN 201721325703 U CN201721325703 U CN 201721325703U CN 207513137 U CN207513137 U CN 207513137U
Authority
CN
China
Prior art keywords
support mechanism
steel
building
engineering construction
installed part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721325703.7U
Other languages
Chinese (zh)
Inventor
沈渊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jingdong Building Development Co Ltd
Original Assignee
Shanghai Jingdong Building Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jingdong Building Development Co Ltd filed Critical Shanghai Jingdong Building Development Co Ltd
Priority to CN201721325703.7U priority Critical patent/CN207513137U/en
Application granted granted Critical
Publication of CN207513137U publication Critical patent/CN207513137U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a kind of building engineering construction builder's jack, it is related to building engineering construction instrument field, including anchoring mechanism, support mechanism and main frame body, anchoring mechanism includes anchoring piece and installed part, the side of installed part is connect with support mechanism, the opposite side of installed part is connect with anchoring piece, and anchoring piece is connect with building, and main frame body is installed on the top of support mechanism.This scaffold by way of rolling and connecting be attached between support mechanism and building, so that installation is very convenient quick, and support mechanism is provided with supporting plate, one stabilization can be provided for main frame body and more spacious mounting surface, and the setting of supporting plate can make worker carry out scaffold to set up process more safe, the present apparatus is simple in structure, easy for installation, and with certain antidetonation and wind loading rating.

Description

Building engineering construction builder's jack
Technical field
The utility model relates generally to building engineering construction instrument field, in particular to a kind of building engineering construction Use builder's jack.
Background technology
In building engineering field, particularly Bases in High Building Construction field, scaffold is a kind of construction instrument of indispensability, both It can again can be as the exterior protection structure of skyscraper as interim vertical supporting structure.Under normal conditions, work as building When object construction height reaches 6 layers or 20 meters or more, erection must be just segmented, in order to meet job specfication requirement, is generally required Builder's jack is installed, in order to which the construction of superstructure can be carried out.Builder's jack of the prior art is all using pre- Based on burying I-steel or channel steel, then carry out setting up for scaffold successively upwards again, taken in this manner If speed it is slower, also, since scaffold is also unformed as safeguard structure, easily generate safe thing during setting up Therefore.Moreover, because either to be capable of providing bond area to scaffold small when earthquake or high wind disaster occurs for channel steel for I-steel When, scaffold slides from I-steel or channel steel.
Builder's jack of the prior art is all to adopt in manner just described mostly, for example, Chinese patent, a kind of overhanging foot Hand cradle (205804911 U of CN), including overhanging support, scaffold and closing protection, scaffold building is in the overhanging of overhanging support On section steel beam, the overhanging end of overhanging type steel beam is fixed using steel wire rope drawknot, shape steel plate and boarding wire mesh sheet composition foot hand Frame closing protection, the overhanging type steel beam, which is shelved, to be fixed on agent structure layer, and scaffold is solid using overhanging type steel beam as support Fixed point, drawknot steel wire rope is equipped at the overhanging end of overhanging type steel beam, and the bottom gap of scaffold carries out closing with sizing steel plate and prevents Shield, every layer operation frame of scaffold carry out closing protection using boarding wire mesh sheet.The builder's jack of the utility model is one Kind increase sizing steel plate and steel fabric sheet on overhanging type steel tube clamps formula scaffold, formation, which has, repeats utilization, fire prevention work( The scaffold of the profile steel overhanging of energy, live protection safety is reliable, realizes the regularization processing and fabricating installation at scene.It but should For builder's jack still using the I-steel of bottom or channel steel as carrying basis, loaded area is smaller, easily generates foot hand The danger of toppling of frame.
Utility model content
The purpose of this utility model is to provide a kind of building engineering construction builder's jacks, obtain the problem of above-mentioned It is effectively improved.
The utility model is realized in this way:
Based on above-mentioned purpose, the embodiment of the utility model provides a kind of building engineering construction builder's jack, packet Anchoring mechanism, support mechanism and main frame body are included, the anchoring mechanism includes anchoring piece and installed part, the side of the installed part It being connect with the support mechanism, the opposite side of the installed part is connect with the anchoring piece, and the anchoring piece is connect with building, The main frame body is installed on the top of the support mechanism.
In the alternative embodiment of the utility model, the installed part is I-steel, and the building is embedded with more simultaneously The screw rod of setting is arranged, the I-steel offers multiple through-holes to match with the screw rod, and the screw rod passes through the through-hole And pass through nut and fix, the support mechanism close to one end of the installed part for connecting pin, the connecting pin be provided with to Few two connectors, and at least two connectors are located at the both ends of the connecting pin respectively, the connector includes snap ring With at least two clamping wheels, the snap ring offers opening close to one end of the anchoring piece, and the clamping wheel rolls setting In the snap ring, and the clamping portion to match with the I-steel is configured between two clamping wheels, the connector leads to It crosses the clamping portion and rolls connection with the I-steel.
In the alternative embodiment of the utility model, the anchoring piece includes at least two anchor rods, wherein described in one One end of anchor rod is rotatablely connected with one of them described connector, one end of another anchor rod and another described company Fitting is rotatablely connected, and two anchor rods are detachably secured to the building.
In the alternative embodiment of the utility model, the support mechanism includes at least two girders and is fixed on two Supporting plate between the girder, the main frame body include more hollow steel pipes, and the supporting plate is provided with more along vertical side To the fixed link of distribution, the steel pipe and the fixed link grafting.
In the alternative embodiment of the utility model, one end far from the connecting pin of the girder is additionally provided with anchoring Head, the anchorage head are connect with superstructure by anchoringwire.
Compared with prior art, the beneficial effects of the utility model are:
The building engineering construction builder's jack that the embodiment of the utility model provides, by way of rolling and connecting into It is attached between row support mechanism and building so that installation is very convenient quick, and support mechanism is provided with support Plate, a stabilization can be provided for main frame body and more spacious mounting surface, and the setting of supporting plate can carry out worker Scaffold sets up that process is more safe, and the present apparatus is simple in structure, easy for installation, and with certain antidetonation and wind resistance energy Power.
Description of the drawings
It, below will be to required in embodiment in order to illustrate more clearly of the technical solution of the utility model embodiment The attached drawing used is briefly described, it should be understood that the following drawings illustrates only some embodiments of the utility model, therefore not The restriction to range is should be considered as, for those of ordinary skill in the art, without creative efforts, It can also be obtained according to these attached drawings other relevant attached drawings.
Fig. 1 is the knot at the one of visual angle for the building engineering construction builder's jack that the utility model embodiment provides Structure schematic diagram;
Fig. 2 is the structure diagram at another visual angle of the building engineering construction builder's jack of Fig. 1;
Fig. 3 is the enlarged diagram at the A of Fig. 2.
Icon:10- anchoring mechanisms;11- anchoring pieces;110- anchor rods;12- installed parts;120- wing plates;121- connecting plates; 122- through-holes;123- screw rods;124- nuts;20- supports mechanism;21- connecting pins;22- connectors;220- snap rings;221- is clamped Wheel;222- is open;223- clamping portions;23- girders;24- supporting plates;25- anchorage heads;26- anchoringwires;30- main frame bodies;31- steel Pipe.
Specific embodiment
Purpose, technical scheme and advantage to make the utility model embodiment are clearer, new below in conjunction with this practicality Attached drawing in type embodiment, the technical scheme in the utility model embodiment is clearly and completely described, it is clear that is retouched The embodiment stated is the utility model part of the embodiment, instead of all the embodiments.Usually here described in attached drawing and The component of the utility model embodiment shown can be configured to arrange and design with a variety of different.Therefore, below to attached The detailed description of the embodiment of the utility model provided in figure is not intended to limit claimed the scope of the utility model, But it is merely representative of the selected embodiment of the utility model.
Embodiment
It please refers to shown in Fig. 1, the embodiment of the utility model provides a kind of building engineering construction builder's jack, packet Anchoring mechanism 10, support mechanism 20 and main frame body 30 are included, main frame body 30 is used to carry in construction personnel and work progress The load that Work tool generates.Mechanism of the support mechanism 20 as main frame body 30, for carrying the dead weight of main frame body 30 and others Load.Anchoring mechanism 10 is used to mutually fix support mechanism 20 and the agent structure of building.
It please refers to shown in Fig. 2 and Fig. 3, specifically, anchoring mechanism 10 includes anchoring piece 11 and installed part 12, installed part 12 Side is connect with support mechanism 20, and the opposite side of installed part 12 is connect with anchoring piece 11, and anchoring piece 11 is connect with building, body frame Body 30 is installed on the top of support mechanism 20.
In the present embodiment, installed part 12 is I-steel, and I-steel includes the wing plate 120 of both sides and is connected to wing plates on two sides Connecting plate 121 between 120, building are embedded with more screw rods 123 arranged side by side, which can be embedded in building in advance In object, make its connection more firm.I-steel offers multiple through-holes 122 to match with screw rod 123, specifically, through-hole 122 open up on the wing plate 120 of side wherein, and installed part 12 is horizontally disposed.Screw rod 123 passes through through-hole 122 simultaneously Fixed by nut 124, due to being connected by screw bolts between installed part 12 and building, so, can very easily into Row installation and removal.
One end of the close installed part 12 of support mechanism 20 is connecting pin 21, and connecting pin 21 is provided at least two connectors 22, and at least two connectors 22 are located at the both ends of connecting pin 21 respectively, and connecting pin 21 can be made to keep balance.Connector 22 wraps The clamping of snap ring 220 and at least two wheel 221 is included, one end of the close anchoring piece 11 of snap ring 220 offers opening 222, makes snap ring 220 can be along the length direction activity of I-steel.Clamping wheel 221, which rolls, is set to snap ring 220, and two clamping wheels 221 are along vertical Direction is arranged side by side, and is configured to the clamping portion to match with connecting plate 121 223 between two clamping wheels 221, and connector 22 is logical It crosses clamping portion 223 and rolls connection with I-steel;Here the rolling between clamping portion 223 and I-steel connects, and also then corresponds to Rolling connection between support mechanism 20 and I-steel using such connection mode, can so that support mechanism 20 is very convenient One end of slave I-steel slide to the other end and fixation, installation is very convenient.
In the present embodiment, anchoring piece 11 include at least two anchor rods 110, wherein one end of an anchor rod 110 with One of connector 22 is rotatablely connected, and one end of another anchor rod 110 is rotatablely connected with another connector 22, anchor rod Rotation connection between 110 and connector 22 when the installation for carrying out the scaffold, needs to turn to anchor rod 110 Close to support mechanism 20 side, avoid when being installed to the scaffold, anchor rod 110 can be against on building and Make scaffold that can not be moved along the length direction of I-steel.And when support mechanism 20 is moved to suitable position, it needs Anchor rod 110 into building is rotated, and is fixed with building.Two anchor rods 110 are detachably secured to building, this In be detachably connected, can be connected by pre-embedded bolt.The effect of anchoring piece 11 is that support mechanism 20 is fixed more It is firm, while can also make to be relatively fixed between connector 22 and I-steel, support mechanism 20 is avoided to generate in the construction process Along the displacement of I-steel length direction.
In the present embodiment, support mechanism 20 includes at least two girders 23 and is fixed on holding between two girders 23 Supporting plate 24.Supporting plate 24 can also be used as vertical safeguard structure, when support mechanism as the bearing structure of main frame body 30 After 20 are mounted on I-steel, supporting plate 24 can be as the platform of construction, and worker can be based on supporting plate 24 upper While construct, it is very safe.
Main frame body 30 includes more hollow steel pipes 31, and supporting plate 24 is provided with the more fixed links being vertically distributed (not shown), steel pipe 31 and fixed link grafting can make the connection between steel pipe 31 and supporting plate 24 more firm, keep away Exempt from steel pipe 31 and skid off supporting plate 24.
In the present embodiment, one end of the separate connecting pin 21 of girder 23 is additionally provided with anchorage head 25, anchorage head 25 with it is upper Layer building is connected by anchoringwire 26, and anchoringwire 26 here may be used reinforcing bar, steel wire or steel strand wires and be made, Ke Yizeng The bearing capacity of big support mechanism 20.
It should be noted that since the support mechanism 20 of the present apparatus and the connection of I-steel clamping wheel 221 realize, So support mechanism 20 can roll in the range of certain amplitude along the length direction of I-steel, when there is earthquake or high wind During disaster, above-mentioned rolling connection can clear up a part of shearing, so as to reduce the whole possibility toppled.
The above descriptions are merely preferred embodiments of the present invention, is not intended to limit the utility model, for this For the technical staff in field, various modifications and changes may be made to the present invention.It is all in the spirit and principles of the utility model Within, any modification, equivalent replacement, improvement and so on should be included within the scope of protection of this utility model.

Claims (5)

1. a kind of building engineering construction builder's jack, which is characterized in that including anchoring mechanism (10), support mechanism (20) with And main frame body (30), the anchoring mechanism (10) include anchoring piece (11) and installed part (12), the side of the installed part (12) It is connect with the support mechanism (20), the opposite side of the installed part (12) is connect with the anchoring piece (11), the anchoring piece (11) it is connect with building, the main frame body (30) is installed on the top of the support mechanism (20).
2. building engineering construction builder's jack according to claim 1, which is characterized in that the installed part (12) is I-steel, the building are embedded with more screw rods arranged side by side (123), and the I-steel offers the multiple and screw rod (123) through-hole (122) to match, the screw rod (123) is across the through-hole (122) and passes through nut (124) fixation, described Support mechanism (20) is connecting pin (21) close to one end of the installed part (12), and the connecting pin (21) is provided at least two A connector (22), and at least two connectors (22) are located at the both ends of the connecting pin (21), the connector respectively (22) (221) are taken turns including snap ring (220) and at least two clampings, the one of the close anchoring piece (11) of the snap ring (220) End offers opening (222), and the clamping wheel (221), which rolls, is set to the snap ring (220), and two clamping wheels (221) clamping portion to match with the I-steel (223) is configured between, the connector (22) passes through the clamping portion (223) it rolls and connects with the I-steel.
3. building engineering construction builder's jack according to claim 2, which is characterized in that anchoring piece (11) packet At least two anchor rods (110) are included, wherein one end of an anchor rod (110) turns with one of them described connector (22) Dynamic connection, one end of another anchor rod (110) are rotatablely connected with another described connector (22), two anchorings Bar (110) is detachably secured to the building.
4. building engineering construction builder's jack according to claim 2, which is characterized in that the support mechanism (20) Including at least two girders (23) and the supporting plate (24) being fixed between two girders (23), the main frame body (30) Including more hollow steel pipes (31), the supporting plate (24) is provided with the more fixed links being vertically distributed, the steel Manage (31) and the fixed link grafting.
5. building engineering construction builder's jack according to claim 4, which is characterized in that the girder (23) it is remote One end from the connecting pin (21) is additionally provided with anchorage head (25), and the anchorage head (25) passes through anchoringwire with superstructure (26) it connects.
CN201721325703.7U 2017-10-16 2017-10-16 Building engineering construction builder's jack Expired - Fee Related CN207513137U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721325703.7U CN207513137U (en) 2017-10-16 2017-10-16 Building engineering construction builder's jack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721325703.7U CN207513137U (en) 2017-10-16 2017-10-16 Building engineering construction builder's jack

Publications (1)

Publication Number Publication Date
CN207513137U true CN207513137U (en) 2018-06-19

Family

ID=62534509

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721325703.7U Expired - Fee Related CN207513137U (en) 2017-10-16 2017-10-16 Building engineering construction builder's jack

Country Status (1)

Country Link
CN (1) CN207513137U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114215331A (en) * 2021-12-24 2022-03-22 重庆中航建设(集团)有限公司 Cantilever beam anchoring structure in cantilever type scaffold and cantilever beam anchoring construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114215331A (en) * 2021-12-24 2022-03-22 重庆中航建设(集团)有限公司 Cantilever beam anchoring structure in cantilever type scaffold and cantilever beam anchoring construction method

Similar Documents

Publication Publication Date Title
CN103866986B (en) Long span variable cross-section bolted spherical node net shell mounting method
CN205133081U (en) Novel hanging flower basket system
CN201297036Y (en) Discharging platform
CN103993728B (en) A kind of assembling shaped steel is encorbelmented protection canopy
CN101210418A (en) Non-floor-bracket construction method for suspension bridge tower frame cross beam
CN101503908B (en) Construction method for spacing suspension cable structural template support platform
CN107100187A (en) Tower crane steel girder erection structure and installation method
CN105298107B (en) A kind of high carriage of High Large Cantilever structure
CN105003090A (en) Temporary support frame for mounting assembly type steel structure
CN215055170U (en) Hanging basket system
CN207513137U (en) Building engineering construction builder's jack
CN103288002A (en) Simple combination portal upper-air heavy-article hoisting device
CN106049843A (en) Hanging type anti-shaking construction platform and mounting method thereof
CN212270712U (en) Construction device for mounting and dismounting steel box girder by suspension of bridge girder erection machine
CN103643791B (en) For the traveling stage device of belt porch
CN211689948U (en) Suspension operation platform device for construction of suspension cable at tower part of cable-stayed bridge
CN203284126U (en) Simple composite gantry high-altitude weight hoisting device
CN209308433U (en) A kind of multi-functional trolley of Cast-in-situ Beam steel reinforcement cage binding installation
CN204876631U (en) Assembled steel structure installation uses interim support frame
CN108729644B (en) Suspension beam bracket and installation and use method thereof
CN203065046U (en) Self-stabilizing double-rocker-arm lifting device for installation of high-rise tower
CN101457516B (en) Multilayer horizontal stay fixing method
CN207245143U (en) A kind of fixation elevating mechanism painted for external wall of house
CN112049017A (en) Bailey frame integral frame falling device for cast-in-place box girder and construction process
CN211621249U (en) Hoisting device for box-type beam wave web

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180619

Termination date: 20181016