CN206673517U - A kind of New type through-wall sleeve mounting structure - Google Patents

A kind of New type through-wall sleeve mounting structure Download PDF

Info

Publication number
CN206673517U
CN206673517U CN201720376445.9U CN201720376445U CN206673517U CN 206673517 U CN206673517 U CN 206673517U CN 201720376445 U CN201720376445 U CN 201720376445U CN 206673517 U CN206673517 U CN 206673517U
Authority
CN
China
Prior art keywords
steel
factory building
wall
sleeve pipe
mounting structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720376445.9U
Other languages
Chinese (zh)
Inventor
姜京辉
赵俊文
王伟
张悦中
任宝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inner Mongolia Songbiandian Co Ltd
Original Assignee
Inner Mongolia Songbiandian Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inner Mongolia Songbiandian Co Ltd filed Critical Inner Mongolia Songbiandian Co Ltd
Priority to CN201720376445.9U priority Critical patent/CN206673517U/en
Application granted granted Critical
Publication of CN206673517U publication Critical patent/CN206673517U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of New type through-wall sleeve mounting structure,The first factory building including penetrating side,Pass the second factory building of side,Interlayer wall is fixed between first factory building and the second factory building,The surface of interlayer wall offers the preformed hole for crossing sleeve pipe,One end of sleeve pipe is provided with mounting flange,The other end of sleeve pipe is provided with loose flange,The top and both sides of preformed hole are provided with built-in fitting,The side of preformed hole is provided with steel pipe support,The channel-section steel locked by bolt is offered on the top plate on steel pipe support top,The circular arc steel plate for supporting sleeve is welded with the top of channel-section steel,Electric device installing engineering should be met after sleeve pipe installation,Shorten the cycle of construction,Save cost,Relevant quality standard of constructing is implemented comprehensive,The follow-up inspection of overall process and control,Ensure the safety of construction,It is novel in design,It is a kind of good innovation scheme,There is very much market promotion prospect.

Description

A kind of New type through-wall sleeve mounting structure
Technical field
It the utility model is related to and use electric device installing engineering, more particularly to a kind of new 550kV overlength wall bushing Mounting structure.
Background technology
Needed conduit crossing wall during electric device, current domestic large-scale wall bushing mounting means uses mostly Indoor and outdoor is combined, and is so easy to construction and installation, and the mounting technique relative maturity of sleeve pipe.And for lifting wall bushing two end All indoors and the middle interlayer (wall) for also having 2.5 meters, due to narrow space, crane operation can not be carried out, and cause flexibility Decline, can not normal operating conventional mechanical, the installation to sleeve pipe carried out unusual inconvenience, causes the claim for eot of construction, increases The cost of construction, practical performance are bad, it is impossible to meet the needs of social high speed development.
In summary, for prior art the defects of, it is accordingly required in particular to a kind of New type through-wall sleeve mounting structure, it is existing to solve There is the deficiency of technology.
Utility model content
For problems of the prior art, the installation of wall bushing is influenceed, new is worn the utility model proposes a kind of Wall sleeve mounting structure, it is novel in design, complete to install by the way of scaffold and gallows frame are engaged, have to reach safety The construction purpose of effect, has solved the defects of prior art.
To achieve these goals, the technical solution of the utility model is as follows:
A kind of New type through-wall sleeve mounting structure, including penetrate the first factory building of side, pass the second factory building of side, the first factory Interlayer wall is fixed between room and the second factory building, the surface of interlayer wall offers the preformed hole for crossing sleeve pipe, sleeve pipe One end be provided with mounting flange, the other end of sleeve pipe is provided with loose flange, and the top and both sides of preformed hole are provided with pre- Embedded part, the side of preformed hole are provided with steel pipe support, offer what is locked by bolt on the top plate on steel pipe support top Channel-section steel, the circular arc steel plate for supporting sleeve is welded with the top of channel-section steel, the first factory building and the second factory building are close to preformed hole Scaffold bearing platform has been built at place, and the first factory building is provided with main crane in one end of scaffold bearing platform, and the first factory building exists The other end of scaffold bearing platform is provided with balance crane, and the second factory building is provided with straddle truck on scaffold bearing platform Frame, the walking guide chain of lifting is installed above gallows frame.
Further, the thickness of described interlayer wall is 680mm.
Oil filler point is offered on the surface of the utility model sleeve pipe, the width of oil filler point is 320mm.
The flitch for damage of being collided with when preventing that sleeve pipe from passing through is provided between sleeve pipe described in the utility model and built-in fitting Cushioning.
The length of scaffold bearing platform in the first factory building described in the utility model is 6m, width 8m, height For 4.9m, the length of the scaffold bearing platform in the second factory building is 6m, width 6m, is highly 4.9m, scaffold load-bearing is put down The load-bearing of platform is 6000kg.
Further, the length of described gallows frame is 6m, width 3m, is highly 8m, the lifting cross beam of gallows frame Using No. 24 I-steel, the load-bearing for guide chain of walking is 5000kg.
Further, described steel pipe support is 1180mm from the horizontal range of metope, and steel pipe support is apart from the vertical of ground Distance is 5280mm.
Further, described steel pipe support uses Φ 250 × 6mm steel pipes, and the dimensions length of top plate is 400mm, and width is 400mm, it is highly 10mm, is fixed between steel pipe support and top plate by the way of welding, channel-section steel is that two root long degree are the 10 of 1m Number channel-section steel is welded to form back-to-back, and the radius of circular arc steel plate is 250mm.
Further, using angle steel weld admittedly between the built-in fitting in the top and preformed hole of described steel pipe support Fixed, the pre-buried setscrew in the middle part and bottom and sandwich wall body of steel pipe support is locked with angle steel, and the hem width of angle steel is 50mm, the side thickness of angle steel is 5mm.
The beneficial effects of the utility model are:This product is simple in construction, and electric device peace should be met after sleeve pipe installation Fill engineering, shorten the cycle of construction, save cost, the relevant quality standard of constructing is implemented it is comprehensive, overall process with Track is examined and control, it is ensured that the safety of construction, it is novel in design, and it is a kind of good innovation scheme, there is very much market promotion prospect.
Brief description of the drawings
Describe the utility model in detail with reference to the accompanying drawings and detailed description:
Fig. 1 is floor map of the present utility model;
Fig. 2 is construction profile of the present utility model.
Fig. 3 is the structure chart of the utility model steel pipe support.
The factory buildings of 100- first in figure, the factory buildings of 110- second, the main cranes of 120-, 130- sleeve pipes, 140- scaffold bearing platforms, 150- preformed holes, 160- balance cranes, 170- gallows frames, 180- walking guide chains, 190- steel pipe supports, 200- interlayer walls, 210- mounting flanges, 220- loose flanges, 230- oil filler points, 191- top plates, 192- circular arc steel plates, 193- channel-section steels.
Embodiment
In order that technological means, creation characteristic, reached purpose and effect that the utility model is realized are easy to understand, under Face combines and is specifically illustrating, and the utility model is expanded on further.
Referring to Fig. 1, Fig. 2, Fig. 3, a kind of New type through-wall sleeve mounting structure, including penetrate the first factory building 100 of side, pass Second factory building 110 of side, is fixed with interlayer wall 200, the table of interlayer wall 200 between the first factory building 110 and the second factory building 120 Face offers the preformed hole 150 for crossing sleeve pipe 130, and one end of sleeve pipe 130 is provided with mounting flange 210, sleeve pipe 130 it is another One end is provided with loose flange 220, and the top and both sides of preformed hole 150 are provided with built-in fitting, and the side of preformed hole 150 is set There is steel pipe support 190, the channel-section steel 193 locked by bolt, channel-section steel 193 are offered on the top plate on the top of steel pipe support 190 Top be welded with circular arc steel plate 192 for supporting sleeve 130, the first factory building 100 and the second factory building 110 are close to reserved Scaffold bearing platform 140 is built at hole 150, the first factory building 100 is provided with main crane in one end of scaffold bearing platform 120, the first factory building 100 is provided with balance crane 160 in the other end of scaffold bearing platform, and the second factory building 110 is in scaffold Gallows frame 170 is provided with bearing platform, the walking guide chain 180 of lifting is installed above gallows frame 170.
In addition, the thickness of interlayer wall 200 is 680mm.The surface of sleeve pipe 130 offers oil filler point 230, oil filler point 230 Width be 320mm.The flitch cushioning for the damage that prevents from colliding with when sleeve pipe from passing through is provided between sleeve pipe 130 and built-in fitting.First The length of scaffold bearing platform 140 in factory building 100 is 6m, width 8m, is highly 4.9m, the scaffold in the second factory building The length of bearing platform 140 is 6m, width 6m, is highly 4.9m, and the load-bearing of scaffold bearing platform 140 is 6000kg.Dragon The length of door hanger 170 is 6m, width 3m, is highly 8m, and the lifting cross beam of gallows frame 170 uses No. 24 I-steel, OK The load-bearing for walking guide chain 180 is 5000kg.Steel pipe support 190 is 1180mm from the horizontal range of metope, and steel pipe support 190 is apart from ground The vertical range in face is 5280mm.Steel pipe support 190 uses Φ 250 × 6mm steel pipes, and the dimensions length of top plate 191 is 400mm, Width is 400mm, is highly 10mm, is fixed between steel pipe support 190 and top plate 191 by the way of welding, and channel-section steel 193 is two Root long degree is that 1m No. 10 channel-section steels are welded to form back-to-back, and the radius of circular arc steel plate 192 is 250mm.The top of steel pipe support 190 It is welded and fixed between the built-in fitting in preformed hole using angle steel, the middle part and bottom of steel pipe support 190 and interlayer wall Interior pre-buried setscrew is locked with angle steel, and the hem width of angle steel is 50mm, and the side thickness of angle steel is 5mm.
The condition that the utility model installation possesses:
1st, the side built-in fitting of preformed hole three is protected with flitch, prevents damage of being collided with when sleeve pipe passes through.
2nd, wall bushing, which penetrates the screen layer of side factory building inner sleeve installation place, need to open 5 × 10m (height 10m) hole.
The 3rd, construction power supply is provided.
4th, examine sleeve pipe qualified according to related request, can be installed.
5th, fixed sleeving steel plate is processed, first, the Ran Houyan good according to bore hole size and flange size overall processing of steel plate processing Center line is cut open with oxy-acetylene, first carry out examination installation it is errorless after, separately complete installation.
6th, hole site inspection through walls only has top and there is built-in fitting both sides, and bottom does not have built-in fitting, therefore before installation first By the concrete leveling of bottom.
The utility model installation prepares:
1st, sleeve pipe is penetrated in the factory building of side, sets up the load-bearing landing stage of scaffold of length × width × height=6 × 8 × 4.9 (rice);North side The load-bearing landing stage of scaffold of length × width × height=6 × 6 × 4.9 (rice) is set up in factory building, it is high to install sleeve pipe and workmen Idle job.The load capacity that the landing stage of scaffold is set up meets 6000kg and stably, firmly, and the technical requirements set up meet related rule Journey specification.
2nd, both sides factory building interlayer domestic demand does steel structure support and is used for permanent supporting sleeve.
3rd, sleeve pipe is transported to after scene, should be placed in and both be met installation requirement, and does not influence the position of other work.
4th, experiment hall passes side factory building because crane can not enter, so first setting up the dragon that self-control is used to lift by crane sleeve pipe Door hanger, the bearing platform of sleeve pipe is then set up again.The size of gallows frame is:Length × width × height=6 × 3 × 8 (rice), gantry Lifting cross beam on suspension bracket uses No. 24 I-steel, lifting slidably chain sling installed above, hoisting weight 5000kg.Set through walls Penetrating in the factory building of side for pipe, is lifted using crane.By to sleeve technology parameter and Hoisting Position, apart from situations such as Solution, plan are lifted using 30T truck cranes.
5th, sleeve pipe penetrates the parking spot and crane that side factory building planted agent chooses crane in advance, the rotation lifting of arm during work Space should meet to require.
The installation of the utility model sleeve pipe:
1st, load-bearing and stability test are carried out to the gallows frame assembled, meets lifting requirements.
2nd, load-bearing and stability test are carried out to the landing stage of scaffold set up, meets sleeve pipe installation requirement.
3rd, suspension centre determines, according to the structure of sleeve pipe, suspension centre selection irony part in the middle part of sleeve pipe of lifting for the first time is close The position of two side flanges, hung using 2 points, the distance between two suspension centres is 1.3m.
Examination, which is hung, to be carried out on the casing rack after unpacking, slow with crane in the good hanging sleeve of two hoisting point position colligations Sleeve pipe is lifted up, stops lifting when being promoted to apart from ground 100mm, each position of sleeve pipe, hanging sleeve is gone through, hangs Whether tool, crane have exception, and confirm sleeve pipe keep level state when not by external force.
The lifting of the utility model sleeve pipe:
After examination is hung successfully, fastened at sleeve pipe both ends and slip rope.After sleeve pipe level is lifted to sleeve pipe reserving hole position, factory building two Installation personnel on the platform of side coordinates crane that sleeve pipe slowly is penetrated into reserving hole while sleeve pipe is protected, while will be pre- Box out three side built-in fitting flitch cushionings, prevent damage of being collided with when sleeve pipe passes through, prevent sleeve pipe from rocking collision.In hoisting process, Close to wall, sleeve pipe stops suspension hook when penetrating about 3.7m.
Arrange that (porcelain patticoat of hoisting point position is filled up suspension centre with flexible material, outer layer rubber at 3.5 meters of wall bushing both ends Wrap up and be used for protection sleeve pipe porcelain patticoat), hanging sleeve is tied up, is lifted by crane using straddle truck and whipline, it is painstaking that suspender belt is slowly promoted to Untill, main suspension hook is unclamped, unties hanging sleeve.Then cooperated by the straddle truck and whipline of partition wall strong point both sides, will Sleeve pipe is slowly through installation site.
The fixation of the utility model sleeve pipe:
Mounting flange and loose flange are carried on wall bushing, mounting flange, rear installation activity flange are first installed.
1st, after sleeve pipe reaches installation site, wall-penetrating partition board is arranged on mounting flange, fastening bolt, utilizes horizon rule pair Sleeve pipe carries out horizontal alignment, and carefully adjustment level and installation dimension, is padded stationary barrier gap with parallels after reaching requirement, And parallels, dividing plate and the built-in fitting of relevant position are welded and fixed.
2nd, the stationary barrier of installation activity flange.Bolt is first put in the bolt hole of loose flange during installation and by dividing plate It is fixed, then the loose flange equipped with dividing plate is adjusted to installation site, stationary barrier gap is padded with parallels, and by parallels, Dividing plate and the built-in fitting of relevant position are welded and fixed.
Sleeve pipe must be protected when the 3rd, welding, covering must not tightly damage, burn sleeve pipe.
The installation of the utility model steel pipe support
In order to strengthen the stability of wall bushing, one stable support is done with steel pipe to wall bushing in interlayer.According to On-site actual situations determine the position of steel pipe support.
The determination of horizontal range:The centre distance of built-in fitting is 440mm in hole, and two wall faces of distance are respectively 120mm. Due to thering is heating and various pipelines to get out of the way 300mm close to metope in interlayer, then avoid the position of sleeve pipe oil filler point and sampling valve 320mm is got out of the way again, finally determines steel pipe support point distance sleeve mounting flange 1180mm according to above-mentioned data, i.e., apart from metope 620mm。
The determination of height:Installation hole base is 4900mm apart from ground level, the horizontal centre linear distance hole of hole Base 600mm, the radius of sleeve pipe steel cylinder part is 220mm (in-site measurement), and the height of steel pipe support is 4900+600- 220=5280mm.
Steel pipe support uses Φ 250 × 6mm steel pipes, top plate 400mm × 400mm × 10mm steel plates and steel-pipe welding;Top plate Welding is connected upper No. 10 channel-section steels with 2 1m length with steel pipe roof bolt back-to-back;1 block of circular arc steel plate (circle is welded on channel-section steel Arc radius 250mm) width x thickness=100 × 20mm supporting sleeves.
The fixation of steel pipe support:Because the ground in interlayer does not allow pre-embedded anchoring bolts, therefore the fixation of steel pipe support Using top is welded and fixed using the built-in fitting of hole with steel pipe support with 50 × 5 angle steel;Middle and bottom is using on wall Pre-buried expansion bolt is fixed with 50 × 5 angle steel with wall and steel pipe support.
Explanation:Steel pipe support does good material preparation by above-mentioned requirements, and live processing and fabricating is carried out according to actual conditions.Highly Error fine setting utilize top channel-section steel and top plate between cushioning iron method progress.
The advantages of the utility model is:
The engineering project deadline be one month, can save for only use three day time, be company directly save expense 101250 yuan (referring to table 1):
Table 1
By everyone per day people=3750 yuan of wage 150 yuan × 25;3750 yuan × 27 days=101250 yuan.
And put into operation in advance, certain contribution is also made that for power grid construction.
Electric device installing engineering should be met after sleeve pipe installation《High-Voltage Electrical Appliances are constructed and acceptance specification》(GB50147- 2010).After the completion of construction, relevant parameter is tested, it is ensured that sleeve pipe state is intact.Taken the initiative in construction control, to critical process Carry out stand-by supervision, the measure that emphasis is kept a close safeguard, carry out self-test, eventually reinspection, inspection in real earnest.Relevant quality standard of constructing is implemented complete Orientation, the follow-up inspection of overall process and control, accomplish that last process is qualified without examining, next procedure construction must not be transferred to.
The utility model is effective to be:It is simple in construction, electric device installing engineering should be met after sleeve pipe installation, is shortened In the cycle of construction, cost is saved, relevant quality standard implements comprehensive, overall process follow-up inspection and control to constructing System, it is ensured that the safety of construction, it is novel in design, it is a kind of good innovation scheme, there is very much market promotion prospect.
It should be understood by those skilled in the art that the utility model is not restricted to the described embodiments, above-described embodiment and Simply illustrate principle of the present utility model described in specification, on the premise of the spirit and scope of the utility model is not departed from originally Utility model also has various changes and modifications, and these changes and improvements are both fallen within claimed the scope of the utility model. The utility model requires protection scope is defined by appended claims and its equivalent.

Claims (9)

1. a kind of New type through-wall sleeve mounting structure, including penetrate the first factory building of side, pass the second factory building of side, its feature exists In:Interlayer wall is fixed between first factory building and the second factory building, the surface of interlayer wall is offered for crossing the pre- of sleeve pipe Box out, one end of sleeve pipe is provided with mounting flange, and the other end of sleeve pipe is provided with loose flange, and the top and both sides of preformed hole are equal Built-in fitting is provided with, the side of preformed hole is provided with steel pipe support, offers to enter by bolt on the top plate on steel pipe support top The channel-section steel of row locking, is welded with the circular arc steel plate for supporting sleeve at the top of channel-section steel, the first factory building and the second factory building by Scaffold bearing platform has been built at nearly preformed hole, the first factory building is provided with main crane in one end of scaffold bearing platform, the One factory building is provided with balance crane in the other end of scaffold bearing platform, and the second factory building is provided with scaffold bearing platform Gallows frame, the walking guide chain of lifting is installed above gallows frame.
A kind of 2. New type through-wall sleeve mounting structure according to claim 1, it is characterised in that:The thickness of described interlayer wall Spend for 680mm.
A kind of 3. New type through-wall sleeve mounting structure according to claim 1, it is characterised in that:Open on the surface of described sleeve pipe Provided with oil filler point, the width of oil filler point is 320mm.
A kind of 4. New type through-wall sleeve mounting structure according to claim 1, it is characterised in that:Described sleeve pipe and built-in fitting Between be provided with the flitch cushioning of the damage that prevents from colliding with when sleeve pipe from passing through.
A kind of 5. New type through-wall sleeve mounting structure according to claim 1, it is characterised in that:In the first described factory building The length of scaffold bearing platform is 6m, width 8m, is highly 4.9m, the length of the scaffold bearing platform in the second factory building It is highly 4.9m for 6m, width 6m, the load-bearing of scaffold bearing platform is 6000kg.
A kind of 6. New type through-wall sleeve mounting structure according to claim 1, it is characterised in that:The length of described gallows frame Spend for 6m, width 3m, be highly 8m, the lifting cross beam of gallows frame uses No. 24 I-steel, and the load-bearing for guide chain of walking is 5000kg。
A kind of 7. New type through-wall sleeve mounting structure according to claim 1, it is characterised in that:Described steel pipe support is from wall The horizontal range in face is 1180mm, and vertical range of the steel pipe support apart from ground is 5280mm.
A kind of 8. New type through-wall sleeve mounting structure according to claim 1, it is characterised in that:Described steel pipe support uses Φ 250 × 6mm steel pipes, the dimensions length of top plate is 400mm, width 400mm, is highly 10mm, steel pipe support and top plate it Between fixed by the way of welding, channel-section steel is that No. 10 channel-section steels that two root long degree are 1m are welded to form back-to-back, the half of circular arc steel plate Footpath is 250mm.
A kind of 9. New type through-wall sleeve mounting structure according to claim 1, it is characterised in that:The top of described steel pipe support It is welded and fixed between built-in fitting in portion and preformed hole using angle steel, in the middle part and bottom and sandwich wall body of steel pipe support Pre-buried setscrew be locked with angle steel, the hem width of angle steel is 50mm, and the side thickness of angle steel is 5mm.
CN201720376445.9U 2017-04-11 2017-04-11 A kind of New type through-wall sleeve mounting structure Active CN206673517U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720376445.9U CN206673517U (en) 2017-04-11 2017-04-11 A kind of New type through-wall sleeve mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720376445.9U CN206673517U (en) 2017-04-11 2017-04-11 A kind of New type through-wall sleeve mounting structure

Publications (1)

Publication Number Publication Date
CN206673517U true CN206673517U (en) 2017-11-24

Family

ID=60380825

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720376445.9U Active CN206673517U (en) 2017-04-11 2017-04-11 A kind of New type through-wall sleeve mounting structure

Country Status (1)

Country Link
CN (1) CN206673517U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108565769A (en) * 2018-03-27 2018-09-21 国家电网公司 One kind ± 1100kV direct-current wall bushing installation and repairing methods

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108565769A (en) * 2018-03-27 2018-09-21 国家电网公司 One kind ± 1100kV direct-current wall bushing installation and repairing methods

Similar Documents

Publication Publication Date Title
CN105443871B (en) A kind of new suspension and support and construction technology for the connection of horizontal multi-pipeline counterpart
CN106836498A (en) A kind of super-span Stadium roof system steel truss lifting construction engineering method
CN101858161B (en) Construction method of low-temperature double-wall storage tanks
CN113431340B (en) Construction method of rose-shaped special-shaped space grid steel structure
CN102235107B (en) Hydraulic lifting construction method for chimney steel inner cylinder
CN111576691B (en) Frame type glass curtain wall mounting method and glass curtain wall system
CN110528390A (en) It closes on both wired narrow spaces and sets up T beam construction method
CN110306782A (en) Reactor building shell dome template and its assembling and construction method
CN104674665A (en) Installation method for corridor bridge of large space steel structure
CN111561175B (en) Prestress underpinning static force cutting and column pulling construction process
CN106836836A (en) A kind of Flue Gas Desulphurization for Coal-burning Power Plant tower transforms secondary hydraulic lifting installation method
CN206673517U (en) A kind of New type through-wall sleeve mounting structure
CN203143872U (en) Mobile platform for elevator installation construction
CN111792540A (en) Full reverse construction method for hanging movable electric hoist on main structure beam slab
CN107140535A (en) A kind of short group's davit lifts the Lift-on/Lift-off System and lifting engineering method of tall and big anaerobism tank body
CN113896089B (en) Construction method of oversized blast furnace
CN110282557A (en) Assist mounting platform and the method with high vacant duct in bridge crane installation workshop
CN205555867U (en) Portable hoist and mount platform
CN206174438U (en) Prevent construction platform that inclines
CN106816194B (en) Installation method of passive advanced pressurized water reactor coolant pump
CN104264781A (en) Latticed cylindrical surface steel structure latticed shell and construction method thereof
CN207144533U (en) The horizontal protective of building hoist basis conversion
CN206053355U (en) A kind of tower concrete spreader
CN215071414U (en) Installation device for large-span bridge in net rack
CN112081404B (en) Improvement of existing Buddha tower structure for additionally arranging praying clock and construction method for hoisting praying clock

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant