CN205294665U - Jack -up tower crane based on engineering mechanics - Google Patents

Jack -up tower crane based on engineering mechanics Download PDF

Info

Publication number
CN205294665U
CN205294665U CN201620058626.2U CN201620058626U CN205294665U CN 205294665 U CN205294665 U CN 205294665U CN 201620058626 U CN201620058626 U CN 201620058626U CN 205294665 U CN205294665 U CN 205294665U
Authority
CN
China
Prior art keywords
tower crane
drawknot
platform
bar
case
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620058626.2U
Other languages
Chinese (zh)
Inventor
付超
敖东东
向有其
王泊卜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan University of Science and Engineering WUSE
Wuhan University of Science and Technology WHUST
Original Assignee
Wuhan University of Science and Engineering WUSE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan University of Science and Engineering WUSE filed Critical Wuhan University of Science and Engineering WUSE
Priority to CN201620058626.2U priority Critical patent/CN205294665U/en
Application granted granted Critical
Publication of CN205294665U publication Critical patent/CN205294665U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a jack -up tower crane based on engineering mechanics. The tired stack bolt fastening of column foot upper ledge pallet form the tower crane frame, tower crane frame top for steel hinge case, draw forth four cable wires under the steel hinge case, on the cable wire is fixed in the sedan -chair case, four in sedan -chair case side centre grippings in guiding rail bar, steel hinge case and equipment box between articulated mutually through the revolving stage, equipment box one side be equipped with the davit, the davit is equipped with the guardrail all around, the welding has subsidiary drawknot pole on each festival davit, assists the drawknot pole and link up the drawknot through a main drawknot pole, the equipment box opposite side be equipped with the platform that bears a burden, the heavy burden bench loads there is the piece of heavy burden, the utility model has the advantages of simple structure. Rise elevator formula structure in adopting, realized the purpose of structure double -purpose, the control of load subregion can be so that the firm degree increase of tower crane, the triangular plate cup joints fixedly, realizes the guarantee of whole control tower steadiness.

Description

A kind of lifting tower crane based on engineering mechanics
Technical field
The utility model relates to a kind of lifting tower crane based on engineering mechanics.
Background technology
A kind of weight handling equipment that tower crane is the most frequently used on construction site has another name called " tower hoist ", connect long (height) and it be used for hanging, with a section, the starting material that the reinforcing bar of construction, wood are stupefied, concrete, steel pipe etc. are constructed. Tower crane is a kind of essential equipment on building site. The function of tower crane point bears jib stay cord and upper load that balance arm stay cord transmits, and directly passes to tower body structure by turntable by the structure unit formula of revolution pylon, turntable, bearing etc. There is truncated cone pillar from rising tower top, lean forward or hypsokinesis truncated cone pillar, sheerleg formula and diagonal brace posture. Every upper rotary tower machine all needs to establish damper weight, and its function is supporting damper weight, in order to the counter-balance moment that effect aspect required on Construction designing is contrary with hoisting moment direction. Except damper weight, its afterbody installing lifting mechanism of being also everlasting. Why lifting mechanism is placed in balance arm tail end together with damper weight, can play part counterweight effect first, second increases the distance between rope reel and pinnacle of a pagoda guide wheel, in order to wireline row around and avoid disorderly to restrict phenomenon. Inversely, and between balance arm length and lifting beam length, there is certain proportion relation in the consumption of damper weight and the length of balance arm. Counterweight is considerable, and 3��4t generally at least wanted by light-duty tower machine, and heavy wants nearly 30t. Portable tower tower crane can be divided into again rail mounted, tire formula, truck mounted, track type four kinds according to the difference of running gear. The tower tower crane tower body of rail mounted is fixed on walking underframe, can run, good stability on ad hoc track, can walk by band load, and working efficiency height, is thus widely used in construction and installation engineering. The tower tower crane of tire formula, truck mounted and track type without rail set, conveniently moving, but can not the walking of band load, less stable. Fixed tower tower crane, according to the difference of installation position, is divided into again attachment self-rising type and inner climbing type two kinds, adheres to and can raise with buildings and raise from the tower tower crane of liter, it is applicable to Highrise buildings, the horizontal load transmitted by tower crane is only born in building structure, convenient attachment, but it is many to take structure steel;Inner climbing crane tower, at interior of building (elevator raise, staircase), climbs by a set of bracket and lifting system, and jacking is more loaded down with trivial details, but it is few to take structure steel, it is not necessary to installing basis, all deadweight and load are born by buildings.
Summary of the invention
The purpose of this utility model is to provide a kind of lifting tower crane based on engineering mechanics.
The utility model solves its above-mentioned technical problem and is adopted following technical scheme: a kind of lifting tower crane based on engineering mechanics, its major constituents has: tower base, framework platform, cab, cable wire, guardrail, steel hinge case, equipment case, arm, main drawknot bar, auxiliary drawknot bar, tiltedly rope bar, heavy burden platform, watch-keeping cubicle, balance platform, three gusset plates, flagpole, variable weights, guide rail bar, overhead traveling crane, turntable, driving rail, and the tired superposition bolt of described tower Ji Shangkuangjiatai is fixing forms tower crane framework; Described tower crane framework top is steel hinge case, draws four cable wires under steel hinge case, and cable wire is fixed in cab, and described cab four sides are held in guide rail bar;
It is hinged by turntable between described steel hinge case and equipment case;
Described equipment case side is provided with arm, and arm surrounding is provided with guardrail, and each joint arm is welded with auxiliary drawknot bar, and auxiliary drawknot bar is by a main through drawknot of drawknot bar;
Described another side of equipment case is provided with heavy burden platform, and heavy burden platform is mounted with variable weights;
Described arm, heavy burden platform are fixed on balance platform by oblique rope bar drawknot, and described balance platform is provided with three steel pipes being socketed by three gusset plates, and wherein on a steel pipe, cover has flagpole;
Described equipment case is provided with watch-keeping cubicle;
Being provided with two driving rails under described arm, sliding in driving rail is fixed with overhead traveling crane.
Above-mentioned steel hinge case has guardrail.
Above-mentioned overhead traveling crane is provided with steel cable.
Above-mentioned guardrail, main drawknot bar are provided with signal lamp.
The beneficial effects of the utility model: structure is simple; Jacking elevator formula structure in adopting, it is achieved that the object that structure is two; Load zonal control, it is possible to tower crane stable degree is increased; Three gusset plates are fixed by socket, it is achieved the guarantee of the firm property of whole control tower.
Accompanying drawing explanation
Fig. 1 is a kind of lifting tower crane one-piece construction figure based on engineering mechanics of the utility model.
Fig. 2 is a kind of lifting tower crane lifting piece structure iron based on engineering mechanics of the utility model.
Fig. 3 is a kind of lifting tower crane lifting component structure iron based on engineering mechanics of the utility model.
1-tower base in figure, 2-framework platform, 3-cab, 4-cable wire, 5-guardrail, 6-steel hinge case, 7-equipment case, 8-arm, the main drawknot bar of 9-, the auxiliary drawknot bar of 10-, the oblique rope bar of 11-, 12-heavy burden platform, 13-watch-keeping cubicle, 14-balances platform, 15-tri-gusset plate, 16-flagpole, 17-variable weights, 18-guide rail bar, 19-overhead traveling crane, 20-turntable, 21-drives a vehicle rail.
Embodiment
Below in conjunction with accompanying drawing 1-3, embodiment of the present utility model is made a detailed explanation.
Embodiment: a kind of lifting tower crane based on engineering mechanics, its major constituents has: tower base 1, framework platform 2, cab 3, cable wire 4, guardrail 5, steel cut with scissors case 6, equipment case 7, arm 8, main drawknot bar 9, auxiliary drawknot bar 10, tiltedly rope bar 11, heavy burden platform 12, watch-keeping cubicle 13, balance platform 14, three gusset plate 15, flagpole 16, variable weights 17, guide rail bar 18, overhead traveling crane 19, turntable 20, driving rail 21, and described tower base 1 upper frame platform 2 tires out superposition bolt fixing formation tower crane framework; Described tower crane framework top is steel hinge case 6, and steel hinge case draws four cable wires 46 times, and cable wire 4 is fixed in cab 3, and described cab 3 four sides are held in guide rail bar 18;
It is hinged by turntable 20 between described steel hinge case 6 and equipment case 7;
Described equipment case 7 side is provided with arm 8, and arm 8 surrounding is provided with guardrail 5, and each joint arm 8 is welded with auxiliary drawknot bar 10, and auxiliary drawknot bar 10 is by a main through drawknot of drawknot bar 9;
Described another side of equipment case 7 is provided with heavy burden platform 12, and heavy burden platform 12 is mounted with variable weights 17;
Described arm 8, heavy burden platform 12 are fixed on balance platform 14 by oblique rope bar 11 drawknot, and described balance platform 14 is provided with three steel pipes being socketed by three gusset plates 15, and wherein on a steel pipe, cover has flagpole 16;
Described equipment case 7 is provided with watch-keeping cubicle 13;
Being provided with two driving rails 21 under described arm 8, sliding in driving rail 21 is fixed with overhead traveling crane 19.
Described steel hinge case 6 has guardrail 5.
Described overhead traveling crane 19 is provided with steel cable.
Described guardrail 5, main drawknot bar 9 are provided with signal lamp.
The utility model have employed interior jacking elevator formula structure can add joint from rising by implementation framework platform 2, and the work of staff is upper and lower, such that it is able to realize the convenient of work, and improves overall safe operation.

Claims (4)

1. the lifting tower crane based on engineering mechanics, its major constituents has: tower base (1), framework platform (2), cab (3), cable wire (4), guardrail (5), steel hinge case (6), equipment case (7), arm (8), main drawknot bar (9), auxiliary drawknot bar (10), oblique rope bar (11), heavy burden platform (12), watch-keeping cubicle (13), balance platform (14), three gusset plates (15), flagpole (16), variable weights (17), guide rail bar (18), overhead traveling crane (19), turntable (20), driving rail (21), it is characterized in that: the tired superposition bolt of tower base (1) upper frame platform (2) is fixing forms tower crane framework, described tower crane framework top is steel hinge case (6), draws four cable wires (4) under steel hinge case (6), and cable wire (4) is fixed in cab (3), and described cab (3) four sides are held in guide rail bar (18),
It is hinged by turntable (20) between described steel hinge case (6) and equipment case (7);
Described equipment case (7) side is provided with arm (8), and arm (8) surrounding is provided with guardrail (5), and each joint arm (8) is welded with auxiliary drawknot bar (10), and auxiliary drawknot bar (10) is by a through drawknot of main drawknot bar (9);
Described equipment case (7) another side is provided with heavy burden platform (12), and heavy burden platform (12) is mounted with variable weights (17);
Described arm (8), heavy burden platform (12) are fixed in balance platform (14) by oblique rope bar (11) drawknot, and described balance platform (14) is provided with three steel pipes being socketed by three gusset plates (15), and wherein on a steel pipe, cover has flagpole (16);
Described equipment case (7) is provided with watch-keeping cubicle (13);
Being provided with two driving rails (21) under described arm (8), sliding in driving rail (21) is fixed with overhead traveling crane (19).
2. a kind of lifting tower crane based on engineering mechanics according to claim 1, it is characterised in that described steel hinge case (6) has guardrail (5).
3. a kind of lifting tower crane based on engineering mechanics according to claim 1, it is characterised in that described overhead traveling crane (19) is provided with steel cable.
4. a kind of lifting tower crane based on engineering mechanics according to claim 1, it is characterised in that described guardrail (5), main drawknot bar (9) are provided with signal lamp.
CN201620058626.2U 2016-01-21 2016-01-21 Jack -up tower crane based on engineering mechanics Expired - Fee Related CN205294665U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620058626.2U CN205294665U (en) 2016-01-21 2016-01-21 Jack -up tower crane based on engineering mechanics

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620058626.2U CN205294665U (en) 2016-01-21 2016-01-21 Jack -up tower crane based on engineering mechanics

Publications (1)

Publication Number Publication Date
CN205294665U true CN205294665U (en) 2016-06-08

Family

ID=56430110

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620058626.2U Expired - Fee Related CN205294665U (en) 2016-01-21 2016-01-21 Jack -up tower crane based on engineering mechanics

Country Status (1)

Country Link
CN (1) CN205294665U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107097350A (en) * 2017-06-16 2017-08-29 无锡石油化工起重机有限公司 Possesses the crane device of high-altitude cement mixing function
CN107128805A (en) * 2017-06-12 2017-09-05 无锡石油化工起重机有限公司 The derrick crane of Multifunction advertising displaying is installed
CN107235422A (en) * 2017-07-20 2017-10-10 无锡石油化工起重机有限公司 It is exclusively used in the crane device of lifting steel pipes and welding
CN107416701A (en) * 2017-05-22 2017-12-01 无锡石油化工起重机有限公司 The derrick crane of double lifts inside and outside installation
CN108750964A (en) * 2018-05-29 2018-11-06 嘉善昆腾机电设备有限公司 A kind of production crane

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107416701A (en) * 2017-05-22 2017-12-01 无锡石油化工起重机有限公司 The derrick crane of double lifts inside and outside installation
CN107128805A (en) * 2017-06-12 2017-09-05 无锡石油化工起重机有限公司 The derrick crane of Multifunction advertising displaying is installed
CN107097350A (en) * 2017-06-16 2017-08-29 无锡石油化工起重机有限公司 Possesses the crane device of high-altitude cement mixing function
CN107235422A (en) * 2017-07-20 2017-10-10 无锡石油化工起重机有限公司 It is exclusively used in the crane device of lifting steel pipes and welding
CN108750964A (en) * 2018-05-29 2018-11-06 嘉善昆腾机电设备有限公司 A kind of production crane

Similar Documents

Publication Publication Date Title
CN205294665U (en) Jack -up tower crane based on engineering mechanics
CN105000482B (en) Tower crane with walking mechanism
CN105236276A (en) Foldable gantry crane capable of ascending and descending
CN104805773A (en) Segmental assembled bridge girder erection machine for construction of small curved bridge
CN103086279A (en) Vertical transportation construction method for building construction
CN105692470A (en) Internal climbing tower crane and operating method thereof
JP4264470B2 (en) Bridge girder member erection method and erection device
CN201485194U (en) 60T walking type full-swing erecting crane
CN204980946U (en) Take running gear's tower crane
CN105060135B (en) Tower crane
CN1737267A (en) Walking type box beam bridge formation machine
CN210713752U (en) High-altitude operation construction hanging basket capable of moving in three-dimensional space
CN204823919U (en) Tower crane
RU2307783C1 (en) Tower crane
CN211444787U (en) Span-adjustable beam lifting machine
CN101664963B (en) Multifunctional operating platform for large-volume prestressed concrete box girder tensioning
CN205275061U (en) Semi -portal crane
CN212687392U (en) Cable crane hoisting device for bridge erection
CN204938801U (en) The tower crane that is connected can be realized with building
JPH085197Y2 (en) Shuttle boom type jib crane
CN111453630A (en) Bridge deck crane and using method thereof
CN212101684U (en) Movable hanging basket suitable for highway high-altitude construction operation
CN204823905U (en) Fix guide rail mechanism on building
CN217126736U (en) A gin pole hoist device for roofing
CN213294466U (en) Tower crane for building engineering

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160608

Termination date: 20180121

CF01 Termination of patent right due to non-payment of annual fee