CN207727558U - A kind of pile foundation quality control system - Google Patents

A kind of pile foundation quality control system Download PDF

Info

Publication number
CN207727558U
CN207727558U CN201820042549.0U CN201820042549U CN207727558U CN 207727558 U CN207727558 U CN 207727558U CN 201820042549 U CN201820042549 U CN 201820042549U CN 207727558 U CN207727558 U CN 207727558U
Authority
CN
China
Prior art keywords
fixedly connected
baffle
pile foundation
hollow pipe
fixed column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820042549.0U
Other languages
Chinese (zh)
Inventor
陆广
姚锋祥
张宏其
冯新林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Jin Pile Foundation Engineering Co Ltd
Original Assignee
Jiangsu Jin Pile Foundation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Jin Pile Foundation Engineering Co Ltd filed Critical Jiangsu Jin Pile Foundation Engineering Co Ltd
Priority to CN201820042549.0U priority Critical patent/CN207727558U/en
Application granted granted Critical
Publication of CN207727558U publication Critical patent/CN207727558U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of pile foundation quality control systems,Including cushion cap and hollow pipe,The cushion cap lower end is fixedly connected with hollow pipe,The cushion cap includes from top to bottom the second carrying lotus distribution layer successively,First carrying lotus distribution layer and drainage layer,The hollow pipe lower end is fixedly connected with fixed plate,The dead plate upper end is fixedly connected with baffle,The baffle side is fixedly connected with limited block by fixed link,The fixed plate lower end is fixedly connected with fixed column,The fixed column lower end is fixedly connected with inserted block,The fixed column both sides are both provided with convex block,The utility model is by being provided with baffle and limited block,When steel reinforcement cage is sleeved between hollow pipe and limited block,To which baffle and limited block are effectively limited and stopped to steel reinforcement cage,Avoid rubble that steel reinforcement cage is made to misplace,Steel reinforcement cage can be made to be stably placed in fixed plate,Ensure to pour the quality for completing drilled pile,Protect the life security of people.

Description

A kind of pile foundation quality control system
Technical field
The utility model is related to pile foundation, specially a kind of pile foundation quality control system.
Background technology
Pile foundation refers to the deep foundation being made of the pile framing of stake and connection stake top or the single-pile foundation being connect with pile foundation by column. Pile foundation is a kind of ancient foundation pattern.The quantity of stake and arrangement should be determined according to superstructure and load situation in pile foundation.Column Lower pile foundation also can side by side arrange into polygon with one with a clump of piles;Pile foundation is often arranged in rows under wall, when building load is big With floor space hour, then it to be arranged to full hall stake in flakes.Building pile foundation is usually embedded footing on piles, low capped pile foundation plinth.In skyscraper, stake Base application is extensive, and pile foundation is broadly divided into friction pile and bearing pile according to the Force principle on basis.1, friction pile system utilizes ground The frictional force of layer and foundation pile to carry structure and can be divided into pressure pile and tension pile, be typically used for stratum without hard bearing bed Or bearing bed is deeper.2, end-bearing pile system, which makes foundation pile be seated on bearing bed, makes that structure can be carried.It can divide according to form of construction work For prefabricated pile and bored concrete pile.3, prefabricated reinforced concrete pile is driven underground by piling machine for prefabricated pile.Advantage is that material saves, Intensity is high, is suitable for the building of high requirement, the disadvantage is that difficulty of construction is high, it is long to be limited the construction time by mechanical quantity.4, it is perfused Stake upper drilling on construction ground first, placing concrete is put into after reaching required depth by reinforcing bar.Advantage is that difficulty of construction is low, Especially artificial digging pile can not be limited by mechanical quantity, and all pile foundations are carried out at the same time construction, greatly save the time, be lacked Point is low bearing capacity, takes material.
But in drilled pile process of construction, we often into steel reinforcement cage casting concrete cast drilled pile, but During practice of construction, the bottom end of drilling there are rubble due to causing the when of placing steel reinforcement cage reinforcing bar occur to misplace, lead It causes steel reinforcement cage to tilt, influences the quality for pouring the drilled pile of completion, cause pile foundation quality unqualified, it is difficult to the appraisal to cause Consequence.For this purpose, it is proposed that a kind of pile foundation quality control system.
Utility model content
The purpose of this utility model is to provide a kind of pile foundation quality control systems, to solve to propose in above-mentioned background technology The problem of.
To achieve the above object, the utility model provides the following technical solutions:A kind of pile foundation quality control system, including hold Platform and hollow pipe, the cushion cap lower end are fixedly connected with hollow pipe, and the cushion cap includes from top to bottom the second carrying lotus successively Distribution layer, the first carrying lotus distribution layer and drainage layer, the hollow pipe lower end are fixedly connected with fixed plate, the dead plate upper end It is fixedly connected with baffle, the baffle side is fixedly connected with limited block by fixed link, and the fixed plate lower end is fixedly connected There are fixed column, the fixed column lower end to be fixedly connected with inserted block, the fixed column both sides are both provided with convex block.
Preferably, the hollow pipe surface is provided with through-hole.
Preferably, the fixed column particular number is provided with three groups, and three groups of fixed column triangular shape distributions.
Preferably, the inserted block is the inserted block of pyramidal structure.
Preferably, the baffle is the baffle of arc structure, and particular number is provided with four groups.
Compared with prior art, the utility model has the beneficial effects that:
1. the utility model by being provided with baffle and limited block, is sleeved on by steel reinforcement cage between hollow pipe and limited block When, to which baffle and limited block are effectively limited and stopped to steel reinforcement cage, avoid rubble that steel reinforcement cage is made to misplace, it can So that steel reinforcement cage is stably placed in fixed plate, ensures to pour the quality for completing drilled pile, protect the life security of people.
2. the utility model is risen by being provided with the first load distribution layer and the second load distribution layer, two groups of load distribution layers Arrived the effect to building uniform load, and the first load distribution layer and be added in the second load distribution layer lime and Pitch, lime and pitch have soaking effect, after pitch and lime water suction, the soil of surrounding can be hardened, to reinforce two The fixed function of group load distribution layer and soil, substantially increases the quality of pile foundation.
3. the utility model is by being provided with fixed column, and fixed column is provided with three groups, and distribution triangular in shape improves Stability of the fixed column on firm stratum, to improve the stability of drilled pile so that pile foundation is more firm.
Description of the drawings
Fig. 1 is the utility model overall structure diagram;
Fig. 2 is the utility model fixed plate overlooking structure diagram;
Fig. 3 is the utility model fixed column structural schematic diagram;
Fig. 4 is the utility model fixed column mounting structure schematic diagram.
In figure:1 cushion cap, 2 hollow pipes, 3 through-holes, 4 fixed plates, 5 fixed columns, 6 baffles, 7 drainage layers, the distribution of 8 first load Layer, 9 second load distribution layers, 10 limited blocks, 11 fixed links, 12 convex blocks, 13 inserted blocks.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
- 4 are please referred to Fig.1, the utility model provides a kind of technical solution:A kind of pile foundation quality control system, including cushion cap 1 With hollow pipe 2,1 lower end of the cushion cap is fixedly connected with hollow pipe 2, and the cushion cap 1 includes from top to bottom the second carrying successively Lotus distribution layer 9, first carries lotus distribution layer 8 and drainage layer 7, and 2 lower end of the hollow pipe is fixedly connected with fixed plate 4, described solid 4 upper end of fixed board is fixedly connected with baffle 6, and 6 side of the baffle is fixedly connected with limited block 10, the fixation by fixed link 11 4 lower end of plate is fixedly connected with fixed column 5, and 5 lower end of the fixed column is fixedly connected with inserted block 13, and 5 both sides of the fixed column are all provided with It is equipped with convex block 12.
Further, 2 surface of the hollow pipe is provided with through-hole 3, and through-hole 3 is convenient for the ponding in hollow pipe 2 being discharged, be carried The high service life of hollow pipe 2.
Further, 5 particular number of the fixed column is provided with three groups, and three groups of 5 triangular shape of fixed column distributions, carries High stability of the fixed column 5 on firm stratum, to improve the stability of drilled pile so that pile foundation is more firm.
Further, the inserted block 13 is the inserted block 13 of pyramidal structure, and taper inserted block 13 is solid convenient for squeezing into inserted block 13 Soil layer improves installation effectiveness.
Further, the baffle 6 is the baffle of arc structure, and particular number is provided with four groups, effectively to reinforcing bar Cage is limited and is stopped, avoids rubble that steel reinforcement cage is made to misplace, and steel reinforcement cage can be made to be stably placed in fixed plate 4, Ensure to pour the quality for completing drilled pile, protects the life security of people.
Specifically, in use, be fixed on fixed column 5 is triangular in shape in stake holes, and the convex block 12 of 5 both sides of fixed column can be with Weak soil is squeezed, improves the stability of fixed column 5, fixed plate 4 is then placed on fixation by effective impacting soil outward On column 5, steel reinforcement cage is being sleeved between hollow pipe 2 and limited block 10 so that steel reinforcement cage be against hollow pipe 2 and limited block 10 it Between, then the casting concrete in steel reinforcement cage, casts drilled pile, and baffle 6 and limited block 10 effectively limit steel reinforcement cage Position and blocking, avoid rubble that steel reinforcement cage is made to misplace, steel reinforcement cage can be made to be stably placed in fixed plate 4, ensure to pour Complete drilled pile quality, protect the life security of people, finally carry out cushion cap pour, and cushion cap 1 from top to bottom successively by Second carrying lotus distribution layer 9, first carries lotus distribution layer 8 and drainage layer 7 forms, and two groups of load distribution layers are played to building The effect of uniform load, and lime and pitch, lime is added in the first load distribution layer 8 and in the second load distribution layer 9 There is soaking effect with pitch, after pitch and lime water suction, the soil of surrounding can be hardened, to reinforce two groups of load distributions The fixed function of layer and soil, substantially increases the quality of pile foundation, and drainage layer 7 can be effectively by the moisture content in pile foundation by filtering Water layer 7 is discharged.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is appreciated that can these embodiments be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of pile foundation quality control system, including cushion cap(1)And hollow pipe(2), the cushion cap(1)Lower end is fixedly connected free Heart pipe(2), it is characterised in that:The cushion cap(1)Include from top to bottom the second carrying lotus distribution layer successively(9), first carrying Lotus distribution layer(8)And drainage layer(7), the hollow pipe(2)Lower end is fixedly connected with fixed plate(4), the fixed plate(4)Upper end It is fixedly connected with baffle(6), the baffle(6)Side passes through fixed link(11)It is fixedly connected with limited block(10), the fixation Plate(4)Lower end is fixedly connected with fixed column(5), the fixed column(5)Lower end is fixedly connected with inserted block(13), the fixed column (5)Both sides are both provided with convex block(12).
2. a kind of pile foundation quality control system according to claim 1, it is characterised in that:The hollow pipe(2)Surface is set It is equipped with through-hole(3).
3. a kind of pile foundation quality control system according to claim 1, it is characterised in that:The fixed column(5)Specific number Amount is provided with three groups, and three groups of fixed columns(5)Triangular shape is distributed.
4. a kind of pile foundation quality control system according to claim 1, it is characterised in that:The inserted block(13)For taper knot The inserted block of structure.
5. a kind of pile foundation quality control system according to claim 1, it is characterised in that:The baffle(6)For circular arc knot The baffle of structure, and particular number is provided with four groups.
CN201820042549.0U 2018-01-11 2018-01-11 A kind of pile foundation quality control system Expired - Fee Related CN207727558U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820042549.0U CN207727558U (en) 2018-01-11 2018-01-11 A kind of pile foundation quality control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820042549.0U CN207727558U (en) 2018-01-11 2018-01-11 A kind of pile foundation quality control system

Publications (1)

Publication Number Publication Date
CN207727558U true CN207727558U (en) 2018-08-14

Family

ID=63081958

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820042549.0U Expired - Fee Related CN207727558U (en) 2018-01-11 2018-01-11 A kind of pile foundation quality control system

Country Status (1)

Country Link
CN (1) CN207727558U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109655338A (en) * 2018-12-13 2019-04-19 深圳宏业基岩土科技股份有限公司 The method for controlling rock-socketed piles quality

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109655338A (en) * 2018-12-13 2019-04-19 深圳宏业基岩土科技股份有限公司 The method for controlling rock-socketed piles quality

Similar Documents

Publication Publication Date Title
CN102653945A (en) Foundation reinforcing and replacing structure and construction method thereof
CN102864781A (en) Foundation pit supporting method utilizing inclined piles
CN207244617U (en) A kind of new polygon pre-stress hollow stake
CN107724392A (en) Steel-pipe pile drawing out soil equipment and soil basketing method
CN207727558U (en) A kind of pile foundation quality control system
CN106013834A (en) Device and method for storey addition of basement
CN116290003B (en) Composite bearing type inclined support method and system
CN203768914U (en) Foundation pit bracing diagonal support pile structure
CN110206020B (en) Prefabricated snowflake type concrete steel sheet pile and construction method thereof
CN208167770U (en) Assembled drilledpier foundation
CN208219666U (en) A kind of foundation pit supporting construction of resistance to deformation
CN216515701U (en) Miniature stake raft board combination foundation structure
CN206800413U (en) A kind of soil-baffling structure
CN206337566U (en) Foundation ditch vertical prestressing anchor pole supporting construction
CN214938883U (en) Anti-slide pile board wall structure
CN213508431U (en) Building pile foundation structure
CN210737587U (en) Cantilever type retaining wall structure
CN114319418A (en) Open caisson type tower machine basis that can assemble fast
CN209384243U (en) A kind of prestressing force support pile and piling wall
CN207092110U (en) A kind of friction pile based on the beam of uniform strength
CN110656576A (en) Pier structure and construction method thereof
CN110318367A (en) A kind of novel revetment structure
CN109972673A (en) Retaining wall reinforcement structure and the inclined active restorative procedure of retaining wall
CN214245802U (en) Building pile foundation structure
CN210263227U (en) Soil retaining device for continuous wall construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180814