CN107354917A - A kind of gravity rock and its construction method - Google Patents

A kind of gravity rock and its construction method Download PDF

Info

Publication number
CN107354917A
CN107354917A CN201710629529.3A CN201710629529A CN107354917A CN 107354917 A CN107354917 A CN 107354917A CN 201710629529 A CN201710629529 A CN 201710629529A CN 107354917 A CN107354917 A CN 107354917A
Authority
CN
China
Prior art keywords
dam
rock
area
concrete
slab
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710629529.3A
Other languages
Chinese (zh)
Other versions
CN107354917B (en
Inventor
魏海
陶开云
王新
陈丹蕾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunming University of Science and Technology
Original Assignee
Kunming University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunming University of Science and Technology filed Critical Kunming University of Science and Technology
Priority to CN201710629529.3A priority Critical patent/CN107354917B/en
Publication of CN107354917A publication Critical patent/CN107354917A/en
Application granted granted Critical
Publication of CN107354917B publication Critical patent/CN107354917B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/02Fixed barrages
    • E02B7/04Dams across valleys
    • E02B7/06Earth-fill dams; Rock-fill dams

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Revetment (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The present invention relates to a kind of gravity rock and its construction method, belong to hydraulic engineering technical field.Including parts such as concrete slab, bed course, L-shaped slab, rock-fill concrete areas, concrete slab is laid on dam body upstream side upstream face, side is bed course downstream, bed course downstream is rock-fill concrete area, one of L-shaped slab is set at a certain distance along height of dam, L-shaped slab can be horizontally disposed with, plate end is towards downstream, it is deep into rock-fill concrete area, the other end is stub end, towards upstream, supports concrete slab, rock-fill concrete area downstream is main rockfill area and time rockfill area, plays a part of constraining the deformation in rock-fill concrete area;Collector drain is located in rock-fill concrete area, plays discharge dam body, the infiltration of dam foundation upstream, reduces Uplift, improve dam stability.The present invention makes full use of the advantages of gravity dam and rock, reduces the deflection of panel, reduces the probability that panel destroys, it is ensured that the safety of high CFRD.

Description

A kind of gravity rock and its construction method
Technical field
The present invention relates to a kind of gravity rock and its construction method, belong to hydraulic engineering technical field.
Background technology
Existing rock is mainly made up of armored concrete panel and rockfill, and armored concrete panel mainly rises anti- The effect of oozing, rockfill mainly play a part of to undertake dam body upstream side water ballast(ing) maintenance dam stabilization.Can armored concrete panel Normal work directly determines the security performance of dam body, therefore the rational design of armored concrete panel is to determine rock One of key factor of safety.Although armored concrete panel has many good qualities, also have disadvantages that, such as:Tensile strength Low, category fragile material, poor plasticity, adaptive deformation ability is low etc..In order to overcome these shortcomings, at present when panel designs, Many vertical lap seam and periphery fissure are provided with panel, to adapt to deformation of the dam body under water ballast(ing) effect.Although vertical lap seam and The setting of periphery fissure enhances the deformability of panel, but middle panel in Practical Project still be present and showing for extruding destruction occurs As causing panel damage to have influence on the safety of dam body.Found according to a large amount of engineering experiences, cause panel to destroy, it is main former Because precisely due to rockfill area deformation is larger, the panel being placed on rockfill area does not adapt to this large deformation, finally destroys.Though So ground at present using large-scale vibrating, the deformation modulus of rockfill area can be improved, but dam body is in the amount of creeping of runtime rockfill area Still larger, the probability that panel destroys is still higher, and very big risk is brought to building for high CFRD.
The content of the invention
The technical problem to be solved in the present invention is to provide a kind of gravity rock and its construction method, it is therefore an objective to overcomes Easily there is the problem of crack in traditional high CFRD panel, and the dam type can make full use of gravity dam to deform small, security The advantages of high and rock have the advantages of adaptive deformation ability is strong, cement consumption is low, low cost, fundamentally solve high Easily there is the problem of crack in rock panel, improves the safety and reliability of high CFRD.
The technical solution adopted by the present invention is:A kind of gravity rock, including concrete slab 1, bed course 2, L-shaped are thick Plate 3, rock-fill concrete area 4, main rockfill area 5, secondary rockfill area 6, toe board 7, seepage proof curtain 8, bulwark 9, collector drain 10, dam body Drainpipe 11, dam base drainage well 12, sump 13, drain in dam foundation pipe 14, dam abutment drainpipe 15, transverse joint 16;
Concrete slab 1 is laid on dam body upstream side upstream face, and the rock-fill concrete area 4, on ground, section is in ladder Shape, dam bottom width, dam crest are narrow, downstream slope ratio about 1:0.2~1:0.5, transverse joint 16, coagulation are set at a certain distance along the axis of dam Native panel 1 is placed on toe board 7, and toe board 7 is placed on basement rock and lower section and seepage proof curtain 8 are closely coupled, the edge of concrete slab 1 Height of dam sets one of L-shaped slab 3 at a certain distance, and L-shaped slab 3 is horizontally disposed, and plate end is deep into enrockment coagulation towards downstream Inside native area 4, the other end is stub end, towards upstream, supports concrete slab 1, is set between L-shaped slab and concrete slab 1 It is equipped with measures of preventing water, the top of concrete slab 1 is closely coupled with bulwark 9, and the downstream of concrete slab 1 is bed course 2, bed course 2 Downstream is rock-fill concrete area 4, and the downstream of rock-fill concrete area 4 is main rockfill area 5, and the main downstream of rockfill area 5 is time enrockment Area 6, the collector drain 10 are arranged on river bed dam section and need to set the rock-fill concrete area 4 of the dam abutment monolith of collector drain 10 Bottom, the top spacing arrangement drainage in dam body pipe 11 of collector drain 10, the bottom spacing arrangement dam base drainage well 12 of collector drain 10, The dam body bottom for being not provided with the dam abutment monolith of collector drain 10 sets dam abutment drainpipe 15, the outlet of drainpipe 15 and collector drain 10 connections, sump 13 is set in the slope point that rises of river-bed section collector drain 10, for collecting the infiltration of gallery, the bottom of sump 13 Provided with the drainpipe 14 for leading to downstream, for draining the water in sump 13 automatically.
Described concrete slab 1 sets one of L-shaped slab 3 along height of dam every 100 meters, and described L-shaped slab 3 uses More than C30 armored concrete pours, and thickness is 500 ~ 1000mm.
The plate end of described L-shaped slab 3 is deep into rock-fill concrete area 5m ~ 10m.
The stockpile in described rock-fill concrete area 4 is different from the main rock filling in main rockfill area 5, rock-fill concrete area 4 The particle diameter of stockpile be 0.2m ~ 0.8m.
Described rock-fill concrete area 4, formed by filling self-compacting concrete in enrockment.
A kind of construction method of gravity rock, comprises the following steps:
1)Clear base, riverbed alluvium is removed to design altitude, removes axis of dam two sides diluvial layer;
2)Construction toe board 7 and seepage proof curtain 8;
3)Construct rock-fill concrete area 4, sets transverse joint 16 at a certain distance along the axis of dam;
4)Construct successively main rockfill area 5 and bed course 2;
5)When dam embankment is to 10 floor elevation of collector drain, construction drainage gallery 10, door opening tee section, in collector drain 10 Dam base drainage well 12 is arranged into ground at interval of certain distance, and sump is set in the slope point that rises of river-bed section collector drain 10 13, totally 2 mouthfuls, the bottom of sump 13, which is provided with, leads to the drain in dam foundation pipe 14 in downstream, to ensure not blocking drain in dam foundation pipe during construction 14;
6)When more than dam embankment to the cope level of collector drain 10, dam body is set at a certain distance along collector drain 10 Drainpipe 11;
7)After dam construction is to design altitude, then concrete slab 1 of constructing;
8)After concrete slab 1 is constructed to design altitude, then L-shaped slab 3 of constructing, after the completion of the construction of L-shaped slab 3, then apply The next elevation dam body of work;
9), need to be at dam body bottom when pouring rock-fill concrete area 4 when dam construction is to the dam abutment monolith for not setting collector drain 10 The pre-buried dam abutment drainpipe 15 in portion, to ensure not blocking dam abutment drainpipe 15 during construction;
10)When dam construction is to crest elevation, then bulwark 9 of constructing.
Dam base drainage well 12, the hole of dam base drainage well 12 are arranged into ground at interval of 2 ~ 3m in described collector drain 10 Footpath is 100 ~ 150mm.
The size of described sump 13 is 2.0*2.0*2.0m3, the caliber of drain in dam foundation pipe 14 is 300 ~ 400mm,
Drainage in dam body pipe 11 is set every 3 ~ 5m on described collector drain 10, the caliber of drainage in dam body pipe 11 is 200 ~ 250mm.
The caliber of described dam abutment drainpipe 15 is 200 ~ 250mm.
The beneficial effects of the invention are as follows:
(1)Gravity dam can be made full use of with deforming small, safe and rock-fill dams with adaptive deformation ability is strong, cement consumption The advantages of low, low cost, the advantages of playing two kinds of dam types.
(2)By setting rock-fill concrete significantly to reduce the Three-direction deformation of panel under panel;Pass through portion in the panel One or multi-channel L-shaped slab is set, can significantly reduce the probability of the generation bending cracks at the top of panel, reduces squeezing for central panel Compression and the probability that extruding destruction occurs.
(3)By setting bed course between rock-fill concrete area and concrete slab, panel and enrockment coagulation can be coordinated Tu Qu deformation, further reduce the probability that concrete slab produces crack.
(4)As a result of rock-fill concrete, speed of application is fast, influences small to influenceing speed of application, cost increase is not yet Greatly.
Brief description of the drawings
Fig. 1 is the representative section schematic diagram of the present invention;
Fig. 2, which is that the upstream of the present invention is vertical, regards schematic diagram;
Fig. 3 is the floor map of the present invention.
In figure respectively marked as:Concrete slab -1, bed course -2, L-shaped slab -3, rock-fill concrete area -4, main rockfill area -5, Secondary rockfill area -6, toe board -7, seepage proof curtain -8, bulwark -9, collector drain -10, drainage in dam body pipe -11, dam base drainage well - 12nd, sump -13, drain in dam foundation pipe -14, dam abutment drainpipe -15, transverse joint -16.
Embodiment
With reference to the accompanying drawings and detailed description, the present invention is further illustrated.
Embodiment 1:As Figure 1-3, a kind of gravity rock, including concrete slab 1, bed course 2, L-shaped slab 3rd, rock-fill concrete area 4, main rockfill area 5, secondary rockfill area 6, toe board 7, seepage proof curtain 8, bulwark 9, collector drain 10, dam body row Water pipe 11, dam base drainage well 12, sump 13, drain in dam foundation pipe 14, dam abutment drainpipe 15, transverse joint 16;
Concrete slab 1 is laid on dam body upstream side upstream face, and the rock-fill concrete area 4, on ground, section is in ladder Shape, dam bottom width, dam crest are narrow, downstream slope ratio about 1:0.2~1:0.5, transverse joint 16, coagulation are set at a certain distance along the axis of dam Native panel 1 is placed on toe board 7, and toe board 7 is placed on basement rock and lower section and seepage proof curtain 8 are closely coupled, the edge of concrete slab 1 Height of dam sets one of L-shaped slab 3 at a certain distance, and L-shaped slab 3 is horizontally disposed, and plate end is deep into enrockment coagulation towards downstream Inside native area 4, the other end is stub end, towards upstream, supports concrete slab 1, is set between L-shaped slab and concrete slab 1 It is equipped with measures of preventing water, the top of concrete slab 1 is closely coupled with bulwark 9, and the downstream of concrete slab 1 is bed course 2, bed course 2 Downstream is rock-fill concrete area 4, and the downstream of rock-fill concrete area 4 is main rockfill area 5, and the main downstream of rockfill area 5 is time enrockment Area 6, the collector drain 10 are arranged on river bed dam section and need to set the rock-fill concrete area 4 of the dam abutment monolith of collector drain 10 Bottom, the top spacing arrangement drainage in dam body pipe 11 of collector drain 10, the bottom spacing arrangement dam base drainage well 12 of collector drain 10, The dam body bottom for being not provided with the dam abutment monolith of collector drain 10 sets dam abutment drainpipe 15, the outlet of drainpipe 15 and collector drain 10 connections, sump 13 is set in the slope point that rises of river-bed section collector drain 10, for collecting the infiltration of gallery, the bottom of sump 13 Provided with the drainpipe 14 for leading to downstream, for draining the water in sump 13 automatically.
Concrete slab 1 primarily serves antiseepage effect;Bed course 2, which primarily serves, coordinates concrete slab 1 and rock-fill concrete Deformation between area 4.
The rock-fill concrete area 4, positioned at the downstream of bed course 2, primarily serve and undertake water ballast(ing) and maintain dam stabilization Effect.The physico mechanical characteristic of rock-fill concrete has higher elasticity modulus, higher between normal concrete and main enrockment Compression strength, relatively low porosity and compressibility, all more main rockfill area of deflection and the amount of creeping under load action is much smaller, Therefore vertical deformation, suitable river are all smaller to deformation, river valley to deforming.Due to rock-fill concrete area 4 deform it is smaller, then be laid on The Three-direction deformation of concrete slab 1 thereon is relatively low, can reduce the probability of the generation bending cracks at the top of concrete slab 1, The extrusion stress of central panel can be reduced simultaneously and the probability that extruding destroys occurs.
In the L-shaped slab 3 that the middle part of concrete slab 1 is set, L-shaped slab 3 can set one or multi-channel, reduction according to height of dam The deformation of panel, sustainable concrete slab 1 undertake its load, further reduce the deformation of concrete slab 1, and it is broken to reduce generation Bad probability.
The main rockfill area 5, positioned at the downstream of rock-fill concrete area 4, main rockfill area 5 has plasticity big, adapts to big become Shape ability is strong, is not likely to produce crack, while can play a part of constraining rock-fill concrete deformation, further maintains the steady of dam body It is fixed.
The bed course 2 is arranged between concrete slab 1 and rock-fill concrete area 4, is played and is coordinated concrete slab 1 and heap Deformation between stone concrete area 4, further reduce the probability that concrete slab 1 produces crack.
The collector drain 10 is arranged on river bed dam section and needs to set the enrockment coagulation of the dam abutment monolith of collector drain 10 The native bottom of area 4, collector drain 10 primarily serve the infiltration for excluding dam body, reduce the effect of Uplift.All monoliths are equal Rock-fill concrete area 4 need to be set, but collector drain 10 need not all be set in all monoliths, typically dam abutment monolith head ratio compared with Low position can is not provided with collector drain 10, so can be with convenient construction.
The top spacing arrangement drainage in dam body pipe 11 of collector drain 10, passes through the water that dam body is penetrated under panel for discharging.Row The bottom spacing arrangement dam base drainage well 12 of water gallery 10, for draining the current oozed in the dam foundation under upstream, reduces Uplift, Strengthen dam stability.Slope point is played in collector drain 10 sump 13 is set, for collecting catchmenting in gallery, by being laid in Water is excreted to downstream river course by the drain in dam foundation pipe 14 that downstream is led in the bottom of sump 13.
Further, described concrete slab 1 sets one of L-shaped slab 3, described L-shaped thickness every 100 meters along height of dam Plate 3 is poured using more than C30 armored concrete, and thickness is 500 ~ 1000mm.
Further, the plate end of described L-shaped slab 3 is deep into rock-fill concrete area 5m ~ 10m.
Further, the stockpile in described rock-fill concrete area 4 is different from the main rock filling in main rockfill area 5, enrockment The particle diameter of the stockpile of concrete region 4 is 0.2m ~ 0.8m.
Further, described rock-fill concrete area 4, formed by filling self-compacting concrete in enrockment.
A kind of construction method of gravity rock, comprises the following steps:
1)Clear base, riverbed alluvium is removed to design altitude, removes axis of dam two sides diluvial layer;
2)Construction toe board 7 and seepage proof curtain 8;
3)Construct rock-fill concrete area 4, sets transverse joint 16 at a certain distance along the axis of dam;
4)Construct successively main rockfill area 5 and bed course 2;
5)When dam embankment is to 10 floor elevation of collector drain, construction drainage gallery 10, door opening tee section, in collector drain 10 Dam base drainage well 12 is arranged into ground at interval of certain distance, and sump is set in the slope point that rises of river-bed section collector drain 10 13, totally 2 mouthfuls, the bottom of sump 13, which is provided with, leads to the drain in dam foundation pipe 14 in downstream, to ensure not blocking drain in dam foundation pipe during construction 14;
6)When more than dam embankment to the cope level of collector drain 10, dam body is set at a certain distance along collector drain 10 Drainpipe 11;
7)After dam construction is to design altitude, then concrete slab 1 of constructing;
8)After concrete slab 1 is constructed to design altitude, then L-shaped slab 3 of constructing, after the completion of the construction of L-shaped slab 3, then apply The next elevation dam body of work;
9), need to be at dam body bottom when pouring rock-fill concrete area 4 when dam construction is to the dam abutment monolith for not setting collector drain 10 The pre-buried dam abutment drainpipe 15 in portion, to ensure not blocking dam abutment drainpipe 15 during construction;
10)When dam construction is to crest elevation, then bulwark 9 of constructing.
Specifically, dam base drainage well 12, drain in dam foundation are arranged into ground at interval of 2 ~ 3m in described collector drain 10 The aperture in hole 12 is 100 ~ 150mm.
Specifically, the size of described sump 13 is 2.0*2.0*2.0m3, the caliber of drain in dam foundation pipe 14 for 300 ~ 400mm,
Specifically, drainage in dam body pipe 11 is set every 3 ~ 5m on described collector drain 10, the caliber of drainage in dam body pipe 11 is 200 ~250mm。
Specifically, the caliber of described dam abutment drainpipe 15 is 200 ~ 250mm.
The present invention can make full use of the advantages of gravity dam and rock, reduce the deflection of panel, reduce panel hair The raw probability destroyed, it is ensured that the safety of high CFRD.
Above in association with accompanying drawing to the present invention embodiment be explained in detail, but the present invention be not limited to it is above-mentioned Embodiment, can also be before present inventive concept not be departed from those of ordinary skill in the art's possessed knowledge Put that various changes can be made.

Claims (10)

  1. A kind of 1. gravity rock, it is characterised in that:Including concrete slab(1), bed course(2), L-shaped slab(3), enrockment Concrete region(4), main rockfill area(5), secondary rockfill area(6), toe board(7), seepage proof curtain(8), bulwark(9), collector drain (10), drainage in dam body pipe(11), dam base drainage well(12), sump(13), drain in dam foundation pipe(14), dam abutment drainpipe(15)、 Transverse joint(16);
    Concrete slab(1)It is laid on dam body upstream side upstream face, the rock-fill concrete area(4), on ground, section Trapezoidal, dam bottom width, dam crest are narrow, downstream slope ratio about 1:0.2~1:0.5, along the axis of dam, transverse joint is set at a certain distance (16), concrete slab(1)It is placed on toe board(7)On, toe board(7)It is placed on basement rock and lower section and seepage proof curtain(8)Closely It is connected, concrete slab(1)One of L-shaped slab is set at a certain distance along height of dam(3), L-shaped slab(3)It is horizontally disposed, plate End is deep into rock-fill concrete area towards downstream(4)Inside, the other end are stub end, towards upstream, support concrete slab (1), L-shaped slab(3)With concrete slab(1)Between be provided with measures of preventing water, concrete slab(1)Top and bulwark(9) It is closely coupled, concrete slab(1)Downstream is bed course(2), bed course(2)Downstream is rock-fill concrete area(4), enrockment coagulation Tu Qu(4)Downstream is main rockfill area(5), main rockfill area(5)Downstream is time rockfill area(6), the collector drain(10)If Put in river bed dam section and need to set collector drain(10)Dam abutment monolith rock-fill concrete area(4)Bottom, collector drain (10)Top spacing arrangement drainage in dam body pipe(11), collector drain(10)Bottom spacing arrangement dam base drainage well(12), do not setting Put collector drain(10)Dam abutment monolith dam body bottom set dam abutment drainpipe(15), drainpipe(15)Outlet and draining corridor Road(10)Connection, in river-bed section collector drain(10)Rise slope point set sump(13), for collecting the infiltration of gallery, catchment Well(13)Bottom is provided with the drainpipe for leading to downstream(14), for draining sump automatically(13)In water.
  2. A kind of 2. gravity rock according to claim 1, it is characterised in that:Described concrete slab(1)Edge Height of dam sets one of L-shaped slab every 100 meters(3), described L-shaped slab(3)Poured using more than C30 armored concrete, Thickness is 500 ~ 1000mm.
  3. A kind of 3. gravity rock according to claim 1 or 2, it is characterised in that:Described L-shaped slab(3)'s Plate end is deep into rock-fill concrete area(4)5m~10m.
  4. A kind of 4. gravity rock according to claim 1, it is characterised in that:Described rock-fill concrete area(4) Stockpile be different from main rockfill area(5)In main rock filling, rock-fill concrete area(4)Stockpile particle diameter for 0.2m ~ 0.8m。
  5. A kind of 5. gravity rock according to claim 1, it is characterised in that:Described rock-fill concrete area(4), Formed by filling self-compacting concrete in enrockment.
  6. A kind of 6. construction method of gravity rock, it is characterised in that:Comprise the following steps:
    1)Clear base, riverbed alluvium is removed to design altitude, removes axis of dam two sides diluvial layer;
    2)Construction toe board(7)And seepage proof curtain(8);
    3)Construct rock-fill concrete area(4), along the axis of dam, transverse joint is set at a certain distance(16);
    4)Construct successively main rockfill area(5)And bed course(2);
    5)When dam embankment to collector drain(10)During floor elevation, construction drainage gallery(10), door opening tee section, collector drain (10)It is interior that dam base drainage well is arranged into ground at interval of certain distance(12), and in river-bed section collector drain(10)Rise slope point Sump is set(13), totally 2 mouthfuls, sump(13)Bottom is provided with the drain in dam foundation pipe for leading to downstream(14), to ensure during construction Drain in dam foundation pipe is not blocked(14);
    6)When dam embankment to collector drain(10)When more than cope level, dam is set at a certain distance along collector drain 10 Body drainpipe(11);
    7)After dam construction is to design altitude, then concrete slab of constructing(1);
    8)Work as concrete slab(1)Construct to after design altitude, then L-shaped slab of constructing(3), in L-shaped slab(3)Construction is completed Afterwards, then next elevation dam body of constructing;
    9)When dam construction is not to setting collector drain(10)Dam abutment monolith when, pouring rock-fill concrete area(4)When, need to be on dam The pre-buried dam abutment drainpipe in body bottom(15), to ensure not blocking dam abutment drainpipe during construction(15);
    10)When dam construction is to crest elevation, then bulwark of constructing(9).
  7. A kind of 7. construction method of gravity rock according to claim 6, it is characterised in that:Described draining corridor Road(10)It is interior that dam base drainage well is arranged into ground at interval of 2 ~ 3m(12), dam base drainage well(12)Aperture be 100 ~ 150mm.
  8. A kind of 8. construction method of gravity rock according to claim 6, it is characterised in that:Described sump (13)Size be 2.0*2.0*2.0m3, drain in dam foundation pipe(14)Caliber be 300 ~ 400mm.
  9. A kind of 9. construction method of gravity rock according to claim 6, it is characterised in that:Described draining corridor Road(10)On every 3 ~ 5m set drainage in dam body pipe(11), drainage in dam body pipe(11)Caliber be 200 ~ 250mm.
  10. A kind of 10. construction method of gravity rock according to claim 6, it is characterised in that:Described dam abutment Drainpipe(15)Caliber be 200 ~ 250mm.
CN201710629529.3A 2017-07-28 2017-07-28 A kind of gravity rock and its construction method Active CN107354917B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710629529.3A CN107354917B (en) 2017-07-28 2017-07-28 A kind of gravity rock and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710629529.3A CN107354917B (en) 2017-07-28 2017-07-28 A kind of gravity rock and its construction method

Publications (2)

Publication Number Publication Date
CN107354917A true CN107354917A (en) 2017-11-17
CN107354917B CN107354917B (en) 2019-06-11

Family

ID=60284651

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710629529.3A Active CN107354917B (en) 2017-07-28 2017-07-28 A kind of gravity rock and its construction method

Country Status (1)

Country Link
CN (1) CN107354917B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109555087A (en) * 2019-01-04 2019-04-02 长江勘测规划设计研究有限责任公司 The two dam structures and its application method of runtime not pump drainage turn(a)round interim pump drainage
CN109555150A (en) * 2019-01-17 2019-04-02 中国电建集团华东勘测设计研究院有限公司 Concrete gravity dam drain in dam foundation pore structure and its construction method
CN109577287A (en) * 2018-11-15 2019-04-05 重庆交通大学 A kind of two sided sheetpile stone regulating barrage and its construction method with non-return valve
CN110106836A (en) * 2019-04-19 2019-08-09 中国电建集团贵阳勘测设计研究院有限公司 A kind of Face Rockfill Dam reversed construction method
CN110468795A (en) * 2019-08-02 2019-11-19 昆明理工大学 A kind of assembly concrete gravity dam and its construction method based on iterative structure
CN110616681A (en) * 2019-08-27 2019-12-27 国家电网有限公司 Construction method of face rockfill dam in karst development area
CN113494066A (en) * 2021-07-22 2021-10-12 中国电建集团中南勘测设计研究院有限公司 Concrete faced rockfill dam and construction method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2307891C1 (en) * 2006-01-19 2007-10-10 Общество с ограниченной ответственностью "Русская инжиниринговая компания" Ground dam built on permafrost base
CN202969345U (en) * 2012-12-17 2013-06-05 北京华实水木科技有限公司 Dam body integrally poured with concrete faceplates and rock filled concrete
CN105297686A (en) * 2015-11-25 2016-02-03 河海大学 Grid type concrete faced rockfill dam

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2307891C1 (en) * 2006-01-19 2007-10-10 Общество с ограниченной ответственностью "Русская инжиниринговая компания" Ground dam built on permafrost base
CN202969345U (en) * 2012-12-17 2013-06-05 北京华实水木科技有限公司 Dam body integrally poured with concrete faceplates and rock filled concrete
CN105297686A (en) * 2015-11-25 2016-02-03 河海大学 Grid type concrete faced rockfill dam

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109577287A (en) * 2018-11-15 2019-04-05 重庆交通大学 A kind of two sided sheetpile stone regulating barrage and its construction method with non-return valve
CN109555087A (en) * 2019-01-04 2019-04-02 长江勘测规划设计研究有限责任公司 The two dam structures and its application method of runtime not pump drainage turn(a)round interim pump drainage
CN109555087B (en) * 2019-01-04 2024-04-12 长江勘测规划设计研究有限责任公司 Two-way dam structure with temporary pumping and draining function in non-pumping and draining maintenance period in operation period and application method of two-way dam structure
CN109555150A (en) * 2019-01-17 2019-04-02 中国电建集团华东勘测设计研究院有限公司 Concrete gravity dam drain in dam foundation pore structure and its construction method
CN110106836A (en) * 2019-04-19 2019-08-09 中国电建集团贵阳勘测设计研究院有限公司 A kind of Face Rockfill Dam reversed construction method
CN110468795A (en) * 2019-08-02 2019-11-19 昆明理工大学 A kind of assembly concrete gravity dam and its construction method based on iterative structure
CN110616681A (en) * 2019-08-27 2019-12-27 国家电网有限公司 Construction method of face rockfill dam in karst development area
CN113494066A (en) * 2021-07-22 2021-10-12 中国电建集团中南勘测设计研究院有限公司 Concrete faced rockfill dam and construction method thereof

Also Published As

Publication number Publication date
CN107354917B (en) 2019-06-11

Similar Documents

Publication Publication Date Title
CN107354917B (en) A kind of gravity rock and its construction method
CN207597428U (en) Prefabricated piping lane is connected waterproof construction with cast-in-place piping lane
CN107859064A (en) A kind of prefabricated piping lane is connected waterproof construction and construction method with cast-in-place piping lane
CN104652371B (en) The glue of crossing set up based on old dam coagulates rock-fill dams and construction method thereof
CN206016853U (en) Base plate anchors restricted type tunnel lining structure
CN105862662B (en) A kind of curl arched mole
CN205530580U (en) System for collection is prevented osmosis membrane anchor, is cut flood and current as an organic whole
CN105672443A (en) Structure integrating anti-seepage film anchoring, flood interception and passage
CN103061351B (en) Prevent the device that basement bottom board swells, seeps water
CN205382480U (en) Anti liquefaction drainage precast concrete side's stake
CN217870559U (en) Inclined wall geomembrane earth-rock cofferdam structure suitable for higher manger plate flood peak of geomembrane
CN108867225B (en) Method for processing water falling hole in karst landform road subgrade range
CN206015619U (en) A kind of rock for reducing panel stress strain level
CN206570767U (en) The case base analysis on aqueduct structure being arranged in parallel suitable for double flute
CN206512733U (en) A kind of two-layer equation drainage arrangement
CN105780938B (en) A kind of Super High core tube end plate vertical construction joint construction method
CN211849527U (en) High water pressure drop well combination plugging device
CN207194952U (en) A kind of flood mine working bottom plate is harnessed the river structure
CN110424762B (en) Cave dwelling reinforcing system
CN106759134A (en) A kind of method of the maintenanceability of arch duplex face dam and raising panel
CN207211173U (en) CFRD reverse drainage system
CN207525575U (en) A kind of novel water permeable brick structure
CN112813931A (en) Heightening mixed dam structure combined with built earth-rock dam and construction method thereof
CN104695392A (en) Plunge pool structure used for high arch dam, narrow canyon and large-flow flood discharge hole
CN205387721U (en) Highway retaining wall reinforced structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant