CN109555150A - Concrete gravity dam drain in dam foundation pore structure and its construction method - Google Patents

Concrete gravity dam drain in dam foundation pore structure and its construction method Download PDF

Info

Publication number
CN109555150A
CN109555150A CN201910045875.6A CN201910045875A CN109555150A CN 109555150 A CN109555150 A CN 109555150A CN 201910045875 A CN201910045875 A CN 201910045875A CN 109555150 A CN109555150 A CN 109555150A
Authority
CN
China
Prior art keywords
dam
gallery
drainage hole
section
horizontal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910045875.6A
Other languages
Chinese (zh)
Inventor
朱安龙
张弦
张胜利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN201910045875.6A priority Critical patent/CN109555150A/en
Publication of CN109555150A publication Critical patent/CN109555150A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/40Foundations for dams across valleys or for dam constructions
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/02Fixed barrages
    • E02B7/04Dams across valleys
    • E02B7/08Wall dams
    • E02B7/10Gravity dams, i.e. those in which the weight of the structure prevents overturning
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Mechanical Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Revetment (AREA)

Abstract

The invention discloses propose a kind of concrete gravity dam dam base drainage well and its construction method, influence of the gallery arrangement to drainage effect is reduced, drain in dam foundation ability is improved, reduces Uplift, and during uplift pressure monitoring instrument is damaged or is repaired, the interim observing function of uplift pressure is had concurrently.A kind of concrete gravity dam drain in dam foundation pore structure of the invention, including the dam foundation and gravity dam, gallery is arranged in the gravity dam, grout curtain is arranged in the gallery upstream in gravity dam, the gallery includes slope section and riverbed bottom level section, horizontal drainage channel is arranged in the slope section of gallery, and vertical drainage hole is arranged in the riverbed bottom level section of gallery, and oblique drainage hole is arranged in the bound fraction between gallery slope section and riverbed bottom level section.

Description

Concrete gravity dam drain in dam foundation pore structure and its construction method
Technical field
The present invention relates to a kind of concrete gravity dam dam base drainage wells and its construction party based on Dam Foundation Seepage characteristic arrangement Method.It is temporarily monitored suitable for concrete gravity dam drain in dam foundation and uplift pressure, is particularly suitable for the high steep concrete gravity of bank slope Dam engineering.
Background technique
One of an important factor for concrete gravity dam Uplift is influence dam stability, stress, particularly with bank slope Monolith, uplift pressure are affected to the lateral stability of dam.Therefore, the dam foundation is effectively reduced under the premise of guaranteeing anti-seepage effect to raise The stability of dam can be improved in pressure.Concrete gravity dam upstream carries out Anti-seeping technology using grout curtain at present, in order into one Step reduces uplift pressure, in curtain arranged downstream drainage hole, forms the antiseepage drainage system of " preceding stifled heel row ".According to specification, for The entity gravity dam of curtain and drainage hole is set, and river bed dam section dam foundation osmotic pressure strength factor is 0.25, and abutment sections are 0.35, this control standard is also the control standard obtained according to current built concrete gravity dam engineering measurement statistics.
The outlet of concrete gravity dam dam base drainage well is normally in dam corridor, and the arrangement of gallery is required control by current System, the gradient must not be suddenly in 1:1.0.The engineering steep for some side slopes, when the comprehensive slope ratio of bank slope section dam foundation side slope is suddenly in 1: When 1.0, the region of a triangle will be formed between gallery bottom and the dam foundation, in the area, drainage hole exit site and dam Base portion position height difference is larger.When drainage hole uses free-draining, biggish hydraulic pressure will form in drainage hole, drainage effect is poor, leads Cause the uplift pressure at the position larger, osmotic pressure strength factor even more than standardizes defined limit value, unfavorable to dam stability.For It solves the problems, such as that this needs to adjust the arrangement of gallery, such as increases horizontally disposed gallery, and pass through bypass gallery and Main Corridor Road linking, or layering are arranged gallery and are connected by vertical shaft, but are arranged so and obviously are unfavorable for constructing, especially for stone roller Concrete gravity dam is pressed, and some engineerings, because other structures arrangement requires, there is no too many space layout gallerys.Therefore, Based on leakage of dam foundation Field distribution characteristic, the arrangement of dam base drainage well is innovated, influences its drainage effect by gallery arrangement, for Simplify dam structure, facilitates construction that there is positive meaning.
Summary of the invention
The present invention be in order to solve it is in the prior art in view of the above problems, propose a kind of special based on Dam Foundation Seepage Property arrangement concrete gravity dam dam base drainage well and its construction method, reduce gallery and arrange influence to drainage effect, improve Drain in dam foundation ability reduces Uplift, and during uplift pressure monitoring instrument is damaged or is repaired, it is interim to have uplift pressure concurrently Observing function.
To achieve the above object, the invention adopts the following technical scheme:
A kind of concrete gravity dam drain in dam foundation pore structure of the invention, including the dam foundation and gravity dam, in the gravity dam Arrange that grout curtain is arranged in the gallery upstream in gallery, gravity dam, the gallery includes slope section and riverbed bottom level section, Horizontal drainage channel is arranged in the slope section of gallery, and vertical drainage hole, gallery slope section and river is arranged in the riverbed bottom level section of gallery Oblique drainage hole is arranged in bound fraction between bed bottom level section.
Preferably, the horizontal drainage channel height difference 10~15m of spacing, horizontal drainage channel enters petrosal foramen depth between 5m and this Between the half of position curtain horizontal depth.
Preferably, the vertical drainage hole 2~3m of pitch-row, the petrosal foramen depth that enters in vertical drainage hole is that corresponding site curtain is deep The half of degree.
Preferably, tiltedly one layer of oblique drainage hole is at least arranged in lower section in each cross section of the dam foundation of drainage hole arrangement range, Oblique drainage hole enters the half that petrosal foramen depth is corresponding site curtain depth.
Preferably, the gallery is provided with gutter, in the horizontal drainage channel, vertical drainage hole (5) and tiltedly draining The aperture installation steel pipe in hole is connected to the gutter of gallery.
Preferably, the horizontal drainage channel, vertical drainage hole and oblique drainage hole are provided with pressure gauge and valve.
Preferably, the drainage hole aperture of the horizontal drainage channel, vertical drainage hole and oblique drainage hole is 110mm or so, Aperture to be biased to 5-10 ° of downstream.
Present invention simultaneously provides a kind of construction method of concrete gravity dam drain in dam foundation pore structure, the method includes with Lower step:
Step 1, it is arranged according to gravity dam structure and requires to complete dam foundation excavation, gravity dam concreting and dam foundation curtain Grouting construction.
Step 2, it according to the water penetration of Dam Foundation Rock, anti-seepage scheme, design conditions etc., is determined by typical seepage flow field computation The elevation interval of horizontal drainage channel arrangement, and 2 layers are no less than according to each section horizontal drainage channel, depth is between 5m and correspondence portion The hole depth of position curtain depth half requires to carry out horizontal drainage channel layout design.
Step 3, according to horizontal drainage channel design parameter, horizontal drainage channel is drilled in the sloped sides section of gallery respectively.
Step 4, it is drilled in the riverbed horizontal segment of gallery according to the parameter of 2~3m spacing, corresponding site curtain depth half Vertical drainage hole.
Step 5, in the Delta Region between horizontal drainage channel and vertical drainage hole, according under the dam foundation in each cross section Side's at least one layer of drainage hole, hole depth are the requirement of the half of corresponding site curtain depth, determine the arrangement orientation of oblique drainage hole And hole depth, and it is drilled with oblique drainage hole.
Step 6, installation steel pipe in aperture guides in aperture to gallery gutter, needs selected section to drain according to later period operation Hole successively installs pressure gauge and valve additional.
A kind of concrete gravity dam dam base drainage well based on Dam Foundation Seepage characteristic arrangement, is divided into slope for gallery The gallery of two section, riverbed bottom level section regions, slope section solves abutment sections dam foundation row using horizontally disposed drainage hole Water, riverbed bottom level section gallery solve riverbed drain in dam foundation using the drainage hole arranged vertically, and on gallery slope and level Inclined hole appropriate is arranged at the position of section handover, solves the drain in dam foundation between lateral aperture and vertical holes.
The beneficial effects of the present invention are: feature and dam body inside gallery and the dam foundation based on Dam Foundation Seepage field distribution Relativeness, by the setting of horizontal drainage channel, oblique drainage hole, utmostly to reduce water column pressure in drainage hole hole, and with Shortest path excludes dam foundation infiltration.The drainaging scheme compare traditional vertical drainage hole scheme, have drainage effect it is significant, not by The advantage of drainage hole project amount is greatly decreased in gallery layout constraints, improves dam stability, while to advanced optimize dam body body Type, reduction dam body construction investment create conditions.Make it in spy by installing steel pipe, pressure gauge and valve mechanism in drainage hole aperture There is uplift pressure monitoring function under the conditions of different, further improve the reliability of dam operational management.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention.
Fig. 2 is dam base drainage well gallery slope section diagrammatic cross-section of the invention.
Fig. 3 is dam base drainage well gallery slope section and riverbed horizontal segment joining section diagrammatic cross-section of the invention.
Fig. 4 is dam base drainage well gallery riverbed horizontal segment diagrammatic cross-section of the invention.
Fig. 5 is the interim monitoring device figure of dam foundation poplar pressure of the invention.
In figure: 1, the dam foundation;2, gravity dam;3, gallery;4, horizontal drainage channel;5, vertical drainage hole;6, oblique drainage hole;7, curtain Curtain;8, pressure gauge;9, valve;10, steel pipe.
Specific embodiment
The present invention is described further with reference to the accompanying drawings and detailed description.
As shown in Figure 1, Figure 2, Figure 3, Figure 4,2 drain in dam foundation pore structure of a kind of concrete gravity dam of the invention, including dam Base 1 and gravity dam 2, the gravity dam 2 is interior to arrange gallery 3, and gravity dam 2 is in the milk in 3 upstream of gallery setting curtain 7, described Gallery 3 includes slope section and riverbed bottom level section, and horizontal drainage channel 4, the riverbed bottom of gallery 3 is arranged in the slope section of gallery 3 Vertical drainage hole 5 is arranged in horizontal segment, and oblique drainage hole 6 is arranged in the bound fraction between 3 slope section of gallery and riverbed bottom level section.
The 4 height difference 10~15m of spacing of horizontal drainage channel, horizontal drainage channel 4 enter petrosal foramen deeply between 5m and the position curtain Between the half of 7 horizontal depths of curtain.
5 2~the 3m of pitch-row of vertical drainage hole, vertical drainage hole 5 enter petrosal foramen depth for the one of 7 depth of corresponding site curtain Half.
One layer of oblique drainage hole 6 is at least arranged in lower section in each cross section of the dam foundation 1, and the petrosal foramen depth that enters of oblique drainage hole 6 is corresponding The half of 7 depth of position curtain.
As shown in figure 5, the gallery 3 is provided with gutter, in the horizontal drainage channel 4, vertical drainage hole 5 and tiltedly draining The aperture installation steel pipe 10 in hole 6 is connected to the gutter of gallery 3.The horizontal drainage channel 4, vertical drainage hole 5 and oblique drainage hole 6 It is provided with pressure gauge 8 and valve 9.
The horizontal drainage channel 4, vertical drainage hole 5 and tiltedly the drainage hole aperture of drainage hole 6 is 110mm or so, aperture to It is biased to 5-10 ° of downstream.
The embodiment of the present invention provides a kind of construction method of 2 dam foundation of concrete gravity dam, 1 drainage hole structure, the method packet Include following steps:
Step 1, it is arranged according to 2 structure of gravity dam and requires to complete the excavation of the dam foundation 1,2 concreting of gravity dam and the dam foundation 1 7 grouting construction of curtain.
Step 2, true by typical seepage flow field computation according to the water penetration of 1 rock mass of the dam foundation, anti-seepage scheme, design conditions etc. Determine the elevation interval of the arrangement of horizontal drainage channel 4, and be no less than 2 layers according to each section horizontal drainage channel 4, depth is between 5m and right The hole depth of 7 depth half of position curtain is answered to require to carry out 4 layout design of horizontal drainage channel.
Step 3, according to 4 design parameter of horizontal drainage channel, horizontal drainage channel 4 is drilled in the sloped sides section of gallery 3 respectively.
Step 4, it is bored in the riverbed horizontal segment of gallery 3 according to 2~3m spacing, the parameter of 7 depth half of corresponding site curtain If vertical drainage hole 5.
Step 5, in the Delta Region between horizontal drainage channel 4 and vertical drainage hole 5, according to the dam foundation in each cross section 1 lower section at least one layer of drainage hole, hole depth is the requirement of the half of 7 depth of corresponding site curtain, determines the arrangement of oblique drainage hole 6 Orientation and hole depth, and it is drilled with oblique drainage hole 6.
Step 6, installation steel pipe 10 in aperture guides in aperture to 3 gutter of gallery, needs selected section according to later period operation Drainage hole successively installs pressure gauge 8 and valve 9 additional.
A kind of described 2 dam foundation of concrete gravity dam, 1 drainage hole based on 1 seepage characteristic of dam foundation arrangement, gallery 3 is divided is The gallery 3 of two slope section, riverbed bottom level section regions, slope section solves abutment sections dam using horizontally disposed drainage hole Base 1 drains, and riverbed bottom level section gallery 3 solves the riverbed dam foundation 1 using the drainage hole arranged vertically and drains, and oblique in gallery 3 Inclined hole appropriate is arranged at slope and the position of horizontal segment handover, and the dam foundation 1 solved between lateral aperture and vertical holes drains.
The beneficial effects of the present invention are: gallery 3 and the dam foundation 1 inside feature and dam body based on 1 seepage field distribution of the dam foundation Relativeness, by the setting of horizontal drainage channel 4, oblique drainage hole 6, utmostly to reduce water column pressure in drainage hole hole, And the dam foundation 1 is excluded with shortest path and is seeped water.The drainaging scheme compares traditional 5 scheme of vertical drainage hole, aobvious with drainage effect It writes, not by 3 layout constraints of gallery, the advantage of drainage hole project amount is greatly decreased, improve dam stability, while being further excellent Change dam body figure, reduction dam body construction investment creates conditions.By installing steel pipe 10, pressure gauge 8 and valve 9 in drainage hole aperture Structure makes it have uplift pressure monitoring function under specific condition, further improves the reliability of dam operational management.

Claims (8)

1. a kind of concrete gravity dam drain in dam foundation pore structure, including the dam foundation (1) and gravity dam (2), the interior cloth of the gravity dam (2) It sets gallery (3), grout curtain (7) are arranged in the gallery (3) upstream in gravity dam (2), characterized in that the gallery (3) includes Horizontal drainage channel (4) are arranged in the slope section of slope section and riverbed bottom level section, gallery (3), the riverbed bottom level of gallery (3) Oblique drainage hole is arranged in section setting vertical drainage hole (5), the bound fraction between gallery (3) slope section and riverbed bottom level section (6)。
2. a kind of concrete gravity dam drain in dam foundation pore structure according to claim 1, characterized in that the horizontal drainage Hole (4) height difference 10~15m of spacing, horizontal drainage channel (4) enter deep one between 5m with position curtain (7) horizontal depth of petrosal foramen Between half.
3. a kind of concrete gravity dam drain in dam foundation pore structure according to claim 1, characterized in that the vertical drainage Hole (5) 2~3m of pitch-row, vertical drainage hole (5) enter the half that petrosal foramen depth is corresponding site curtain (7) depth.
4. a kind of concrete gravity dam drain in dam foundation pore structure according to claim 1, characterized in that the dam foundation (1) is each One layer of oblique drainage hole (6) is at least arranged in lower section in cross section, and the petrosal foramen depth that enters of oblique drainage hole (6) is that corresponding site curtain (7) are deep The half of degree.
5. a kind of concrete gravity dam drain in dam foundation pore structure according to claim 1, characterized in that the gallery (3) It is provided with gutter, steel pipe (10) are installed in the aperture of the horizontal drainage channel (4), vertical drainage hole (5) and oblique drainage hole (6) It is connected to the gutter of gallery (3).
6. a kind of concrete gravity dam drain in dam foundation pore structure according to claim 1, characterized in that the horizontal drainage Hole (4), vertical drainage hole (5) and oblique drainage hole (6) are provided with pressure gauge (8) and valve (9).
7. a kind of concrete gravity dam drain in dam foundation pore structure according to claim 1, characterized in that the horizontal drainage The drainage hole aperture in hole (4), vertical drainage hole (5) and oblique drainage hole (6) is 110mm or so, and aperture is to being biased to 5-10 ° of downstream.
8. the construction method of concrete gravity dam drain in dam foundation pore structure described in a kind of claim 1~7 any one, special Sign is to the described method comprises the following steps:
Step 1, it is arranged according to gravity dam (2) structure and requires to complete the dam foundation (1) excavation, gravity dam (2) concreting and dam Base grout curtain (7) construction.
Step 2, it according to the water penetration of Dam Foundation Rock, anti-seepage scheme, design conditions etc., is determined by typical seepage flow field computation horizontal The elevation interval of drainage hole (4) arrangement, and 2 layers are no less than according to each section horizontal drainage channel (4), depth is between 5m and correspondence The hole depth of position curtain (7) depth half requires to carry out horizontal drainage channel layout design.
Step 3, according to horizontal drainage channel (4) design parameter, horizontal drainage channel is drilled in the sloped sides section of gallery (3) respectively (4)。
Step 4, it is bored in the riverbed horizontal segment of gallery (3) according to 2~3m spacing, the parameter of corresponding site curtain (7) depth half Vertical drainage hole if (5).
Step 5, in the Delta Region between horizontal drainage channel (4) and vertical drainage hole (5), according to the dam foundation in each cross section Lower section at least one layer of drainage hole, hole depth are the requirement of the half of corresponding site curtain depth, determine the arrangement of oblique drainage hole (6) Orientation and hole depth, and it is drilled with oblique drainage hole (6).
Step 6, aperture installation steel pipe (10) guides in aperture to gallery (3) gutter, needs selected section according to later period operation Drainage hole successively installs pressure gauge (8), valve (9) additional.
CN201910045875.6A 2019-01-17 2019-01-17 Concrete gravity dam drain in dam foundation pore structure and its construction method Pending CN109555150A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910045875.6A CN109555150A (en) 2019-01-17 2019-01-17 Concrete gravity dam drain in dam foundation pore structure and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910045875.6A CN109555150A (en) 2019-01-17 2019-01-17 Concrete gravity dam drain in dam foundation pore structure and its construction method

Publications (1)

Publication Number Publication Date
CN109555150A true CN109555150A (en) 2019-04-02

Family

ID=65873344

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910045875.6A Pending CN109555150A (en) 2019-01-17 2019-01-17 Concrete gravity dam drain in dam foundation pore structure and its construction method

Country Status (1)

Country Link
CN (1) CN109555150A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111997080A (en) * 2020-09-09 2020-11-27 郭云美 Gravity dam foundation drainage structure and implementation method thereof
CN115369818A (en) * 2022-07-19 2022-11-22 中国电建集团华东勘测设计研究院有限公司 Warehouse bank mask anti-seepage structure with foundation uplift pressure monitoring and emergency pressure relief device and construction method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107354917A (en) * 2017-07-28 2017-11-17 昆明理工大学 A kind of gravity rock and its construction method
JP2018141301A (en) * 2017-02-28 2018-09-13 大成建設株式会社 Method for constructing drain drainage channel
CN209636839U (en) * 2019-01-17 2019-11-15 中国电建集团华东勘测设计研究院有限公司 Concrete gravity dam drain in dam foundation pore structure

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018141301A (en) * 2017-02-28 2018-09-13 大成建設株式会社 Method for constructing drain drainage channel
CN107354917A (en) * 2017-07-28 2017-11-17 昆明理工大学 A kind of gravity rock and its construction method
CN209636839U (en) * 2019-01-17 2019-11-15 中国电建集团华东勘测设计研究院有限公司 Concrete gravity dam drain in dam foundation pore structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
秦俊德: ""陈村大坝坝基渗压问题的探讨"", 《大坝与安全》, no. 4, pages 28 - 33 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111997080A (en) * 2020-09-09 2020-11-27 郭云美 Gravity dam foundation drainage structure and implementation method thereof
CN115369818A (en) * 2022-07-19 2022-11-22 中国电建集团华东勘测设计研究院有限公司 Warehouse bank mask anti-seepage structure with foundation uplift pressure monitoring and emergency pressure relief device and construction method
CN115369818B (en) * 2022-07-19 2024-04-26 中国电建集团华东勘测设计研究院有限公司 Reservoir bank mask seepage-proofing structure with foundation lifting pressure monitoring and emergency pressure relief device and construction method

Similar Documents

Publication Publication Date Title
CN107151956B (en) Grouting method for reinforcement and coverage type karst embankment with pressurized return grouting
CN113294205B (en) Underground water flow guide structure of subway station and construction method
CN102877420A (en) Construction method of large tube well fixed point precipitation, sealing bottom free concrete and steel sheet pile cofferdam deepwater bearing platform
CN109555150A (en) Concrete gravity dam drain in dam foundation pore structure and its construction method
CN110004935A (en) A kind of locally deep pit drain measure trench system and construction method
CN105926682A (en) Basement baseplate post-cast strip construction method with pressure bearing water and higher water pressure
LU501840B1 (en) Method of controlling water pressure on floor in foundation pit floor construction of deep foundation pit and structure thereof
CN209636839U (en) Concrete gravity dam drain in dam foundation pore structure
CN111424627A (en) Ship lock extension supporting structure and ship lock extension method
CN109339079B (en) Foundation pit water stopping system adjacent to river permeable stratum and construction process thereof
CN108999635A (en) A kind of pilot drainage arrangement and construction method for the weak cementing roadway surrounding rock of rich water
CN206052635U (en) For the protection arrangement of debris flow gully
CN108561180A (en) A kind of longitudinal drainage system and method for disposition tunnel floor pore gas flow
CN208996061U (en) A kind of structure for deep basal pit underdrain hole position precipitation
CN114575359B (en) Weak-permeability soil layer side slope underground flood control method
CN113323722B (en) Special tunnel water burst treatment method
CN203475453U (en) Deeply-buried type bearing platform curtain structure of bridge
CN114086659A (en) Anti-floating and anti-water-leakage pressure-reducing structural system for double outer walls of basement
CN208870637U (en) A kind of high water head rich water tunnel tunnel bottom construction
CN206052749U (en) For the deep collection water-stop in water-rich sand layer foundation pit construction
CN112982319A (en) Structure and method for conducting diversion, emptying and water taking through dam foundation culvert
CN112780299A (en) Waterproof subway station access and exit passage structure and construction method thereof
CN217300653U (en) High-pressure water draining structure of long-distance tunnel
CN107218057B (en) Drainage portal structure suitable for water-rich stratum
CN109779637B (en) Dewatering reinforcement construction method for water-rich fine sand stratum in closed space

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination