Prior art keywords
dam
overfall
reinforced gabion
earth
debris flow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621069249.9U
Other languages
Chinese (zh)
Inventor
汤雷
雷运华
付峥
曹驾云
蒲建平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
PowerChina Chengdu Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Chengdu Engineering Co Ltd filed Critical PowerChina Chengdu Engineering Co Ltd
Priority to CN201621069249.9U priority Critical patent/CN206052635U/en
Application granted granted Critical
Publication of CN206052635U publication Critical patent/CN206052635U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

This utility model is related to a kind of protection arrangement for debris flow gully, it is adaptable to the construction site platform arrangement in the construction of hydropower stations.This utility model includes that reinforced gabion is blocked overfall dam, earth and rockfill dam, water discharge tunnel, reinforced gabion blocks overfall dam, earth and rockfill dam along river course width arrangement, reinforced gabion blocks overfall dam positioned at the upstream side of earth and rockfill dam, the water inlet of water discharge tunnel is communicated in the river course that reinforced gabion is blocked between overfall dam and earth and rockfill dam, and the land side of earth and rockfill dam is arranged as construction site platform.This utility model is blocked overfall dam fixation riverbed by reinforced gabion and intercepts debris flow thing source, the debris flow thing source of potential outburst is intercepted by earth and rockfill dam, mud-rock flow is stagnated before earth and rockfill dam and form water stone separation, current pass through water discharge tunnel excessively stream, so as to take into account ditch water process and debris flow.

Description

For the protection arrangement of debris flow gully
Technical field
This utility model is related to a kind of protection arrangement for debris flow gully, it is adaptable to the construction in the construction of hydropower stations Place platform arrangement.
Background technology
With the continuous development of hydroelectric project, current major part power station progressively extends to the narrow valley region of High aititude, this A little area construction power station site conditions are relatively poor, and then take stream construction of certain gear row's measure near Project Areas to apply It is workshop the poor method of solution engineering construction site condition conventional at present.According to research in recent years, particularly 2008 After year Wenchuan earthquake, nearby mostly to be perennial flowing water, cutting relatively deep in most stream for southwest Project Areas, and receives earthquake shadow Ring and nearly all there is the condition for breaking out mud-rock flow, once break out mud-rock flow probably the lives and properties of the downstream people are pacified Entirely, engineering ground facility and engineering construction safety etc. cause very big threat and loss, therefore are carrying out the same of ditch water process When must take into mud-rock flow protection.Utilization in Hydropower Project for debris flow gully is few, at present only mudstone stream process Scale is also less, and conventional mode is that concrete blocking dam and drainage groove combine processing scheme, but this kind of processing mode to mud The row of rock glacier lead it is limited, and the place in blocking dam downstream can using degree it is also limited.Therefore, need to utilize for high-mountain gorge areas The debris flow gully in construction place, need to be from the basis of ditch water process, and the principle with reference to Controlling Debris Flow (is kept off, arranges, consolidating Etc. integrated control technique), giving treatment in accordance with the tendency of pathological change, on the spot opinion control, because evil is set up defences, and then design that a set of to take into account ditch water process and mud-rock flow anti- The debris flow gully protection arrangement system controlled has larger realistic meaning and using value.
Utility model content
Technical problem to be solved in the utility model is:Offer one kind can process stream flowing water and can resist mud-rock flow again Perfect, the economic protection arrangement for debris flow gully.
By solving the technical scheme that adopts of above-mentioned technical problem this utility model it is:Protection for debris flow gully is arranged Structure, including reinforced gabion blocks overfall dam, earth and rockfill dam, water discharge tunnel, reinforced gabion blocks overfall dam, earth and rockfill dam along river course Width arranges that reinforced gabion blocks overfall dam positioned at the upstream side of earth and rockfill dam, and the water inlet of water discharge tunnel is communicated in reinforcing bar The river course that gabion is blocked between overfall dam and earth and rockfill dam, the land side of earth and rockfill dam are arranged as construction site platform.
It is further:Reinforced gabion overfall dam quantity of blocking is at least two pieces.
It is further:Reinforced gabion blocks overfall dam quantity for two pieces, and the reinforced gabion positioned at upstream side is blocked overflow Permeable rockfill is provided with dam.
It is further:Reinforced gabion overfall dam of blocking includes multiple rectangular reinforced gabions, two neighboring reinforcing bar stone By steel wire rope colligation, the block top surface of overfall dam of reinforced gabion is ladder-like arranged cage in horizontally disposed, both sides, reinforcing bar stone The block land side of overfall dam of cage is provided with protection-apron, and the block top surface of overfall dam, reinforced gabion of reinforced gabion is blocked the overfall dam back of the body The step structure upper surface of water side, the top surface of protection-apron are equipped with Anti-scouring structure.
It is further:The dam foundation of earth and rockfill dam, the side that meets water are arranged with filter protection layer, in the filter protection layer of the dam foundation also Geotextiles are disposed with, the filter protection layer outer lower portion of the side that meets water is provided with gravelly soil sloping core, top and is provided with geomembrane, rubble The second filter protection layer is disposed with the outside of native sloping core, slope protection layer on the outside of geomembrane, is disposed with.
It is further:The water inlet of water discharge tunnel is disposed with intake tower, and intake tower has communicated drainage tunnel water inlet Intake antrum, the side that meets water of intake tower is provided with the inlet openings of multiple connection intake antrums.
It is further:Inlet opening rectangular array arrangement.
It is further:The overfall of connection intake antrum is provided with the top of intake tower, overfall is L-type structure, one Side is located at the side that meets water of intake tower, another side and is located at the top surface of intake tower.
It is further:Intake tower is reinforced concrete frame structure.
It is further:Water discharge tunnel be gateway opening type, tunneling boring reinforced concrete lining layer.
The beneficial effects of the utility model are:Overfall dam fixation riverbed is blocked by reinforced gabion and debris flow is intercepted Thing source, intercepts the debris flow thing source of potential outburst by earth and rockfill dam, mud-rock flow is stagnated before earth and rockfill dam and forms water stone point From current pass through water discharge tunnel excessively stream, so as to take into account ditch water process and debris flow.Wherein reinforced gabion is blocked overfall dam Dam body is permeable, dam facing energy overflow, formed dam body single reinforced gabion can gather materials on the spot, simple, cheap, whole dam of constructing The construction of body is almost destroyed to stream without the need for dam site foundation excavation, greatly reducing.In addition, reinforced gabion is blocked, overfall dam can Multiple Protective Structure is arranged as required to, to improve protective capacities;The water inlet of water discharge tunnel can also arrange intake tower, intake tower Shi Sha layering drainings of blocking will be played a part of, destruction of the mud-rock flow bed load to water discharge tunnel can be substantially reduced, draining is reduced Tunnel high maintenance cost and blocking risk, substantially reduce mud-rock flow and change its course and cause the risk of disaster;Earth and rockfill dam can be with construction waste Heap is built and is formed, the impervious form combined with gravelly soil sloping core using domatic geomembrane, and dam foundation gamut laying geotextiles are carried out instead Filter protection, more effectively can intercept to mud-rock flow.This utility model is arranged by the gear of above-mentioned several heavy buildings, is greatly improved Whole debris flow gully protection system function, and the system reproducible suitability is wide, and reinforced gabion is blocked overfall dam, native stone Dam, intake tower investment it is relatively low, to Yushan Hill Gao Gushen, construction site condition difference area build power station when, which is in mud Rock glacier ditch construction place has larger realistic meaning and using value.
Description of the drawings
Fig. 1 is horizontal layout schematic diagram of the present utility model.
Fig. 2 is that reinforced gabion is blocked overfall dam cross-sectional structure schematic diagram one.
Fig. 3 is that reinforced gabion is blocked overfall dam cross-sectional structure schematic diagram two.
Fig. 4 is intake tower vertical section structure schematic diagram.
Fig. 5 is intake tower upstream face structural representation.
Fig. 6 is water discharge tunnel generalized section.
Fig. 7 is earth and rockfill dam cross-sectional structure schematic diagram.
Labelling in figure:Block overfall dam, 2- earth and rockfill dams, 3- water discharge tunnels, 4- construction sites platform, 5- of 1- reinforced gabions enters The permeable rockfill of water tower, 11-, 12- reinforced gabions, 13- protection-aprons, 14- Anti-scouring structures, 21- filter protection layers, 22- geotextiles, 23- gravelly soil sloping cores, 24- geomembranes, 25- the second filter protection layers, 26- slope protection layers, 51- intake antrums, 52- inlet openings, 53- overfalls.
Specific embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings.
In figure, direction shown in arrow is water (flow) direction.
As shown in figure 1, this utility model includes that reinforced gabion is blocked overfall dam 1, earth and rockfill dam 2, water discharge tunnel 3, reinforcing bar stone Cage blocks overfall dam 1, earth and rockfill dam 2 along river course width arrangement, and reinforced gabion blocks overfall dam 1 positioned at the upper of earth and rockfill dam 2 Trip side, the water inlet of water discharge tunnel 3 are communicated in the river course that reinforced gabion is blocked between overfall dam 1 and earth and rockfill dam 2, earth and rockfill dam 2 Land side is arranged as construction site platform 4.As shown in fig. 6, water discharge tunnel 3 is preferably gateway opening type, tunneling boring armored concrete Lining cutting.Construction site platform 4 can be backfilled to be formed with waste.
This utility model is blocked the fixation riverbed of overfall dam 1 by reinforced gabion and intercepts debris flow thing source, by soil Masonry dam 2 intercepts the debris flow thing source of potential outburst, mud-rock flow is stagnated before earth and rockfill dam 2 and forms water stone separation, and current lead to 3 excessively stream of water discharge tunnel is crossed, so as to take into account ditch water process and debris flow.
Reinforced gabion overfall dam 1 of blocking can be arranged as required to Multiple Protective Structure, to improve protective capacities, i.e.,:Reinforcing bar Gabion 1 quantity of overfall dam of blocking is at least two pieces.Preferred implementation is:Reinforced gabion blocks 1 quantity of overfall dam for two pieces, position Reinforced gabion in upstream side is blocked, and overfall dam 1 is interior to be provided with permeable rockfill 11.It is general to block overfall dam 1 in the reinforced gabion Arrange must compare it is high in the case of, in order to Cai reduce reinforced gabion quantities in the permeable rockfill of its internal landfill 11.Conventional Reinforced gabion block overfall dam 1 structure as shown in Fig. 2 the reinforced gabion for being provided with permeable rockfill 11 is blocked overfall dam 1 Structure is as shown in Figure 3.
As shown in Figure 2 and Figure 3, the block preferred implementation of overfall dam 1 of reinforced gabion is:Reinforced gabion is blocked overfall dam 1 Including multiple rectangular reinforced gabions 12, two neighboring reinforced gabion 12 by steel wire rope colligation, block overflow by reinforced gabion The top surface on dam 1 is ladder-like arranged in horizontally disposed, both sides, and the block land side of overfall dam 1 of reinforced gabion is provided with protection-apron 13, the block top surface of overfall dam 1, reinforced gabion of reinforced gabion is blocked the step structure upper surface of 1 land side of overfall dam, protection-apron 13 top surface is equipped with Anti-scouring structure 14.The block land side of overfall dam 1 of reinforced gabion forms overflow groove structure, and overflow Rooved face has Anti-scouring structure 14, and more effectively mud-rock flow can be intercepted, while reinforced gabion is blocked, overfall dam 1 is overall Structure is also more stable.Reinforced gabion overfall dam 1 can block solid matter, solid bed, reduce ditch bed longitudinal gradient, slow down mud-rock flow stream Speed, the impulsive force for reducing mud-rock flow, dam body again can be permeable, while unnecessary current can also from the overflow launder excessively stream of overfall dam, and And cost is far below the conventional concrete dam of same scale.The height of reinforced gabion overfall dam 1 according to blocking throughout the year or can set The total value that meter standard reappears year is fixed.
As shown in fig. 7, the preferred implementation of earth and rockfill dam 2 is:The dam foundation of earth and rockfill dam 2, the side that meets water are arranged with anti-filter guarantor Sheath 21, there also is provided geotextiles 22 in the filter protection layer 21 of the dam foundation, and 21 outer lower portion of filter protection layer of the side that meets water is arranged There is gravelly soil sloping core 23, top to be provided with geomembrane 24, the outside of gravelly soil sloping core 23 is disposed with the second filter protection layer 25, soil The outside of work film 24 is disposed with slope protection layer 26.To ensure anti-seepage effect, gravelly soil should partly be stretched in the lower end of geomembrane 24 In the body of wall of sloping core 23.Once reinforced gabion is blocked, overfall dam 1 becomes silted up completely, lets out under mud-rock flow, and earth and rockfill dam 2 just can intercept mud-rock flow simultaneously Mud-rock flow is stagnated before earth and rockfill dam 2 and form water stone separation, it is to avoid downstream erosion damage is caused in mud-rock flow and flow direction downstream. Wherein, upper pond level and block when 2 height of earth and rockfill dam leads mud-rock flow water body peak flow under design standard off according to water discharge tunnel 3 Mud-rock flow aggregate storage capacity is fixed.Earth and rockfill dam 2 can be built with construction waste heap and be formed, and be combined with gravelly soil sloping core 23 using domatic geomembrane 24 Impervious form, the dam foundation gamut laying geotextiles 22 carry out filter protection, more effectively mud-rock flow can be intercepted.
Water discharge tunnel 3 is unique drainage gallery in whole debris flow gully protection system, therefore the safety fortune of water discharge tunnel 3 Row it is critical that.In order to avoid it is overproof or rapidly mud-rock flow passage metallic substance enter water discharge tunnel 3, make water discharge tunnel 3 suffer wear-out failure, and then need frequently to overhaul, and cause the maintenance cost of water discharge tunnel 3 very high, or even a large amount of materials of debris flow May also result in water discharge tunnel 3 to block, make mud-rock flow change its course, mud-rock flow changes its course and will cause what is can not estimated to downstream construction site Very big disaster, therefore intake tower 5 is disposed with 3 import of water discharge tunnel, as shown in Figure 4, Figure 5, the concrete structure of intake tower 5 is: Intake tower 5 has the intake antrum 51 of 3 water inlet of communicated drainage tunnel, and the side that meets water of intake tower 5 is provided with multiple connection intake antrums 51 inlet opening 52, wherein 52 preferred rectangular array of inlet opening are arranged.Intake tower 5 is layered the work of draining by the Shi Sha that blocks is played With can substantially reduce destruction of the mud-rock flow bed load to water discharge tunnel, reduce water discharge tunnel high maintenance cost and blocking risk, greatly Big reduction mud-rock flow changes its course and causes the risk of disaster.Intake tower 5 is preferably reinforced concrete frame structure.
Preferably, the top of intake tower 5 is provided with the overfall 53 of connection intake antrum 51, and overfall 53 is L-type structure, its One side is located at the side that meets water of intake tower 5, another side and is located at the top surface of intake tower 5, and the top surface of intake tower 5 is preferably open Structure.The top of intake tower 5 arranges open type overfall, can preferably play earial drainage effect.

Claims (10)

1. the protection arrangement of debris flow gully is used for, it is characterised in that:Block overfall dam (1), earth and rockfill dam including reinforced gabion (2) overfall dam (1), earth and rockfill dam (2) are blocked along river course width arrangement, reinforced gabion in, water discharge tunnel (3), reinforced gabion Overfall dam (1) block positioned at the upstream side of earth and rockfill dam (2), the water inlet of water discharge tunnel (3) is communicated in reinforced gabion and blocks overflow River course between dam (1) and earth and rockfill dam (2), the land side of earth and rockfill dam (2) are arranged as construction site platform (4).
2. the protection arrangement of debris flow gully is used for as claimed in claim 1, it is characterised in that:Reinforced gabion is blocked overflow Dam (1) quantity is at least two pieces.
3. the protection arrangement of debris flow gully is used for as claimed in claim 2, it is characterised in that:Reinforced gabion is blocked overflow Dam (1) quantity is two pieces, and the reinforced gabion positioned at upstream side is blocked, and overfall dam (1) is interior to be provided with permeable rockfill (11).
4. the protection arrangement of debris flow gully is used for as claimed in claim 1, it is characterised in that:Reinforced gabion is blocked overflow Dam (1) includes multiple rectangular reinforced gabions (12), and two neighboring reinforced gabion (12) is by steel wire rope colligation, reinforced gabion The top surface of overfall dam (1) of blocking is ladder-like arranged in horizontally disposed, both sides, and reinforced gabion is blocked the backwater of overfall dam (1) Side is provided with protection-apron (13), and the block top surface of overfall dam (1), reinforced gabion of reinforced gabion is blocked the rank of overfall dam (1) land side Ladder-shaper structure upper surface, the top surface of protection-apron (13) are equipped with Anti-scouring structure (14).
5. the protection arrangement for debris flow gully as described in any one in Claims 1 to 4, it is characterised in that:Soil The dam foundation of masonry dam (2), the side that meets water are arranged with filter protection layer (21), there also is provided geotechnique in the filter protection layer (21) of the dam foundation Cloth (22), filter protection layer (21) outer lower portion of the side that meets water are provided with gravelly soil sloping core (23), top and are provided with geomembrane (24) the second filter protection layer (25) is disposed with the outside of gravelly soil sloping core (23), is disposed with the outside of geomembrane (24) domatic Protective layer (26).
6. the protection arrangement for debris flow gully as described in any one in Claims 1 to 4, it is characterised in that:Row The water inlet of water tunnel (3) is disposed with intake tower (5), intake antrum of the intake tower (5) with communicated drainage tunnel (3) water inlet (51), the side that meets water of intake tower (5) is provided with the inlet opening (52) of multiple connections intake antrum (51).
7. the protection arrangement of debris flow gully is used for as claimed in claim 6, it is characterised in that:Inlet opening (52) is rectangular Array is arranged.
8. the protection arrangement of debris flow gully is used for as claimed in claim 6, it is characterised in that:The top of intake tower (5) The overfall (53) of connection intake antrum (51) is provided with, overfall (53) is L-type structure, and one side is located at intake tower (5) Meet water side, another side be located at intake tower (5) top surface.
9. the protection arrangement of debris flow gully is used for as claimed in claim 6, it is characterised in that:Intake tower (5) is reinforcing bar Concrete frame structure.
10. the protection arrangement for debris flow gully as described in any one in Claims 1 to 4, it is characterised in that:Row Water tunnel (3) is gateway opening type, tunneling boring reinforced concrete lining layer.
CN201621069249.9U 2016-09-21 2016-09-21 For the protection arrangement of debris flow gully Active CN206052635U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621069249.9U CN206052635U (en) 2016-09-21 2016-09-21 For the protection arrangement of debris flow gully

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621069249.9U CN206052635U (en) 2016-09-21 2016-09-21 For the protection arrangement of debris flow gully

Publications (1)

Publication Number Publication Date
CN206052635U true CN206052635U (en) 2017-03-29

Family

ID=58365866

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621069249.9U Active CN206052635U (en) 2016-09-21 2016-09-21 For the protection arrangement of debris flow gully

Country Status (1)

Country Link
CN (1) CN206052635U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106192871A (en) * 2016-09-21 2016-12-07 中国电建集团成都勘测设计研究院有限公司 Protection arrangement for debris flow gully
CN112813921A (en) * 2021-01-06 2021-05-18 西南科技大学 Mud-rock flow water-stone separation and storage system
TWI766820B (en) * 2021-11-12 2022-06-01 國立高雄科技大學 Earth-rock flow remediation structure of Yexi

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106192871A (en) * 2016-09-21 2016-12-07 中国电建集团成都勘测设计研究院有限公司 Protection arrangement for debris flow gully
CN112813921A (en) * 2021-01-06 2021-05-18 西南科技大学 Mud-rock flow water-stone separation and storage system
CN112813921B (en) * 2021-01-06 2022-06-07 西南科技大学 Mud-rock flow water-stone separation and storage system
TWI766820B (en) * 2021-11-12 2022-06-01 國立高雄科技大學 Earth-rock flow remediation structure of Yexi

Similar Documents

Publication Publication Date Title
CN106192871A (en) Protection arrangement for debris flow gully
CN103953008B (en) A kind of modified mixed dam being applicable to Tailings Dam
CN109371918B (en) Dam structure with permanent combination of multifunctional drainage box culvert and construction method thereof
CN106284205B (en) Method for building dam by hydraulic flushing of tailings of mold bag edge stems
CN206052635U (en) For the protection arrangement of debris flow gully
CN103061327B (en) Comprehensive water control technique for dump
CN210917200U (en) Permanent structure of renovating of dammed lake
CN111593742A (en) Construction method for rectifying and improving tailing pond based on rubble silt squeezing method
CN205954559U (en) A ditch water treatment structure that is used for large -scale sediment field of blocking
CN108316250A (en) Technology and construction method are cleared using the silt that stops for dynamically stopping silt storage capacity separation mud-rock flow
CN112854144A (en) Construction structure of earth-rock dam on deep sludge layer and construction method thereof
CN208395782U (en) Using the row's guide structure for dynamically stopping silt storage capacity separation mud-rock flow
CN113123301A (en) Partition structure of gravel soil core wall dam
CN207988083U (en) The orthogonal anti-structure of drainning off floodwaters of Gobi Region solar energy optical-thermal place
CN112282766A (en) Treatment method for surface collapse pit caused by sudden water burst of tunnel
CN110144861A (en) A kind of the sand discharge structure and method of heavily silt-carrying river natural flow station
CN204875703U (en) A cross adfluxion sediment weir for hydraulic and hydroelectric engineering
CN217104953U (en) Sand dam constructed by adopting natural sedimentation graded poor fine sand on site
Skrzypczak et al. Construction of dams using the hydraulic fill method, discussion of the methodology of the Tailings Storage Facility Żelazny Most
CN114508078B (en) Construction method for constructing homogeneous sand dam by adopting natural sedimentation graded poor fine sand on site
Tanchev et al. Dam engineering in Republic of Macedonia: Recent practice and plans
CN103277136A (en) Draining system
CN216892261U (en) Closed debris flow drainage structure
CN209907411U (en) Cofferdam
Federico et al. Design of draining cores to control seepage through embankment dams

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant