CN109555087A CN201910008195.7A CN201910008195A CN109555087A CN 109555087 A CN109555087 A CN 109555087A CN 201910008195 A CN201910008195 A CN 201910008195A CN 109555087 A CN109555087 A CN 109555087A
Authority
CN
China
Prior art keywords
dam
drainage
pump
water
pump drainage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910008195.7A
Other languages
Chinese (zh)
Other versions
CN109555087B (en
Inventor
翁永红
王英奎
曹去修
胡清义
郭艳阳
夏传星
黄元
周华
江义兰
王占军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changjiang Institute of Survey Planning Design and Research Co Ltd
Original Assignee
Changjiang Institute of Survey Planning Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changjiang Institute of Survey Planning Design and Research Co Ltd filed Critical Changjiang Institute of Survey Planning Design and Research Co Ltd
Priority to CN201910008195.7A priority Critical patent/CN109555087B/en
Publication of CN109555087A publication Critical patent/CN109555087A/en
Application granted granted Critical
Publication of CN109555087B publication Critical patent/CN109555087B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/02Fixed barrages
    • E02B7/04Dams across valleys
    • E02B7/08Wall dams
    • E02B7/10Gravity dams, i.e. those in which the weight of the structure prevents overturning
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B8/00Details of barrages or weirs ; Energy dissipating devices carried by lock or dry-dock gates
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B8/00Details of barrages or weirs ; Energy dissipating devices carried by lock or dry-dock gates
    • E02B8/06Spillways; Devices for dissipation of energy, e.g. for reducing eddies also for lock or dry-dock gates
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Barrages (AREA)
  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

本发明涉及水利水电工程泄洪消能设计领域,公开了一种运行期不抽排检修期临时抽排的二道坝结构,包括二道坝坝体,二道坝坝体的上游坝面和下游坝面均从上至下开设有若干个排水孔,二道坝坝体内底部设有水平的基础排水廊道,排水孔均与基础排水廊道连通,二道坝坝体内位于基础排水廊道下方设有集水井,集水井与基础排水廊道连通,集水井与二道坝坝体顶部之间设有竖直的抽水井,抽水井顶部出口位置设有安装水泵底座的预留坑。本发明还公开了一种运行期不抽排检修期临时抽排的二道坝结构的运用方法。本发明运行期不抽排检修期临时抽排的二道坝结构及其运用方法,仅检修期进行临时抽排,运行费用大大降低,维护管理方便。

The invention relates to the field of flood discharge and energy dissipation design of water conservancy and hydropower projects, and discloses a secondary dam structure that is not pumped during operation period and temporarily drained during maintenance period, comprising a secondary dam body, an upstream dam surface and a downstream of the secondary dam body. There are several drainage holes on the dam surface from top to bottom. There are horizontal foundation drainage corridors at the bottom of the dam body of Erdao dam. The drainage holes are all connected with the foundation drainage corridor. The body of Erdao dam is located below the foundation drainage corridor. There is a water collecting well, which is connected with the foundation drainage gallery. A vertical pumping well is set between the water collecting well and the top of the Erdao dam. The outlet of the top of the pumping well is provided with a reserved pit for installing the pump base. The invention also discloses an application method of the secondary dam structure that is not drained during the operation period and is temporarily drained during the maintenance period. According to the invention, the secondary dam structure and the application method for temporary extraction during the maintenance period without extraction during the operation period can be temporarily extracted only during the maintenance period, the operation cost is greatly reduced, and the maintenance and management are convenient.

Description

The two dam structures and its application method of runtime not pump drainage turn(a)round interim pump drainage
Technical field
The present invention relates to hydraulic and hydroelectric engineering Design of Discharge Dissipation fields, and in particular to a kind of not pump drainage turn(a)round runtime The two dam structures and its application method of interim pump drainage.
Background technique
With the construction of Southwestern China area large water conservancy hydroelectric engineering, the engineerings such as " high water head, big flow, narrow river valley " are special The more aobvious protrusion of point, flood-discharge energy-dissipating is the emphasis studied in engineering safely.In existing induced joint engineering Design of Discharge Dissipation, dam body Almost all uses the flood-discharge energy-dissipating mode of down stream of choosing, and this Energy Dissipation Modes have simple engineering structure, short time limit and to letting out Flow, Tailwater Depth change adaptable feature.Since induced joint engineering flood discharge power is huge, to avoid release floodwatering flow under Trip river causes seriously to wash away, and ensures flood discharge safety, needs to be arranged cushion pool behind dam and carries out energy dissipating, and is arranged in cushion pool end Two dams are with harmony high water level, to guarantee there is enough energy dissipating water bodys and water cushion depth in cushion pool.
In existing induced joint engineering, the two dam overwhelming majority use concrete gravity dam pattern, and are arranged in dam body Permanent closure evacuation system: being arranged the horizontal gallery of two row or multi-row in dam body, close to upstream and downstream dam facing position cloth between gallery Drainage in dam body hole is set, sets dam base drainage well in the gallery of bottom;Sump and pump house are arranged in bottom, and install the water pump that permanently draws water. It seeps water within the runtime, dam and is pooled in underdrain well by drainage in dam body hole and gallery, is discharged by water pump.Close pump drainage Two dam of formula can effectively be discharged in dam and seep water, and reduce osmotic pressure and Uplift in dam body, improve the stabilization on two dams Property.But closing two dam structure of pump-drainage type need to continue pump drainage in the normal operation phase, longtime running maintenance, construction investment and operation at This is larger.
It in general, include: 1. water level in the high cushion pool of harmony in the main function that two dams are arranged in cushion pool end;2. blocking Gear downstream river course sandstone back-silts to avoiding denuding in cushion pool;3. blocking downstream water in cushion pool turn(a)round as cushion pool Condition is overhauled in offer dryly, therefore the main of two dams with condition includes the following two kinds situation:
(1) phase is operated normally
During operating normally phase flood discharge, two dams are integrally submerged under water, and lower sluicing stream crosses two dam dam crest streams Downstream, the substantially anhydrous head difference of two above and below the dam or head difference very little.Even if at this point, leaning on it without pump drainage measure in two dams Self weight can meet stability requirement completely.Therefore, the evacuation system in two dam of normal operation phase is not necessarily to.
(2) cushion pool turn(a)round
Behind dam during cushion pool maintenance, two dams need to block downstream water, and condition of overhauling dryly is provided for cushion pool, general It is acted on by downstream water pressure and silt pressure, stress condition and general gravity dam are almost the same.To meet the steady of two dams Determine and answer force request, need that pump drainage measure is arranged in dam body and carry out pump drainage, to reduce the intracorporal osmotic pressure of foundation plane and dam Power.
It is found that two dams are only during cushion pool maintenance there are necessity of pump drainage, runtime pump drainage is complete for above-mentioned analysis It is not necessary to.Existing two dam structure of closing pump-drainage type need to continue pump drainage in the normal operation phase, longtime running maintenance, operation at This is higher, and operation maintenance management is complicated.
Summary of the invention
The purpose of the present invention is to the deficiency of above-mentioned technology, a kind of runtime not pump drainage turn(a)round interim pump drainage is provided Two dam structures and its application method, only turn(a)round, carries out interim pump drainage, and operating cost substantially reduces, and maintenance management is convenient.
To achieve the above object, two dam structures of the runtime not pump drainage turn(a)round interim pump drainage designed by the present invention, The two dam dam bodys including being located at cushion pool end, two dam dam body are concrete gravity dam, two dam dam body Upstream dam facing and downstream dam facing offer several drainage holes from top to bottom, and bottom is equipped with horizontal in two dam dam body Foundation drainage gallery, the drainage hole are connected to the foundation drainage gallery, and the basis is located in two dam dam body Sump is equipped with below collector drain, the sump is connected to the foundation drainage gallery, the infiltration of two dam dam body The sump can be converged into, is equipped with vertical pumped well, the pumping between the sump and two dam dam body top Well top exit position is equipped with the reserved hole of installation engineering for pump housing.
Preferably, several horizontal traffic collector drains, the friendship are additionally provided in two dam dam body from top to bottom Logical collector drain is connected to the foundation drainage gallery, the drainage hole above each traffic collector drain with the traffic Collector drain connection is catchmented described in the intracorporal infiltration in the dam two Dao Ba preferably remittance by the traffic collector drain Well.
Preferably, the pumped well top exit is closed by dismountable high-strength steel sheet, is utilized in the phase of normal operation The high-strength steel sheet closes the pumped well top exit, enters in the pumped well to avoid silt in water flow, described Cushion pool turn(a)round, removes the high-strength steel sheet, is easily installed the engineering for pump housing.
Preferably, the diameter of the pumped well is greater than 80cm, meets the requirement that the water pump that draws water sinks down into the sump.
Preferably, it is connected with the dam base drainage well for being located at the two dams dam body bottom below the foundation drainage gallery, made Infiltration below two dam dam body imports the foundation drainage gallery.
Preferably, the dam base drainage well downstream side is equipped with seepage proof curtain, reduces the infiltration below two dam dam body Amount.
A kind of application method of runtime not two dam structures of pump drainage turn(a)round interim pump drainage, in the phase of normal operation, institute Pumped well top exit is stated to close by dismountable high-strength steel sheet;Before cushion pool maintenance starts, the cushion pool Inside start to draw water, after the dam crest of two dam dam body exposes the surface, removes and close the high-strength of the pumped well top exit Steel plate is spent, engineering for pump housing is installed in the reserved hole, the water pump that will draw water is sunk down into the sump along the pumped well, is formed Evacuation system carries out pump drainage to the intracorporal infiltration in the dam two Dao Ba;During cushion pool maintenance, water in the cushion pool Body is drained, and the water pump that draws water carries out pump drainage to the infiltration in the two dams dam body dam;It, will after the completion of the cushion pool maintenance Water-filling in the cushion pool takes out the water that draws water in the sump before the dam crest of two dam dam body sinks to the water surface Pump removes the engineering for pump housing, and is closed the pumped well top exit by the high-strength steel sheet.
Compared with prior art, the present invention having the advantage that
1, without pump drainage within the phase of normal operation, two dam dam bodys, operational management is convenient, saves pump drainage operating cost;
2, two dam dam bodys are greatly facilitated without the electromechanical equipments such as water pump that draw water within the phase of normal operation, two dam dam bodys Operation maintenance management, and avoid the security risk of the generations such as electromechanical equipment aging, electric leakage;
3, in cushion pool turn(a)round, evacuation system is formed by installing the water pump that draws water, can meet in cushion pool and overhaul dryly Condition, two dam dam stabilizations are secure;
4, due in two dam dam bodys without permanent evacuation system, electrical equipment in two dam dam bodys, ventilation illumination, fire-fighting, The designs such as power supply can greatly simplify, and structure is relatively easy, and design difficulty and difficulty of construction are relatively low.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of runtime of the invention not two dam structures of pump drainage turn(a)round interim pump drainage.
Each part numbers are as follows in figure:
Two dam dam bodys 1, downstream dam facing 3, seepage proof curtain 4, drainage hole 5, foundation drainage gallery 6, catchment at upstream dam facing 2 Well 7, pumped well 8, reserved hole 9, traffic collector drain 10, dam base drainage well 11.
Specific embodiment
The following further describes the present invention in detail with reference to the accompanying drawings and specific embodiments.
As shown in Figure 1, by taking black East Germany's engineering as an example, two dam knots of runtime of the invention not pump drainage turn(a)round interim pump drainage Structure, including be located at cushion pool end two dam dam bodys 1, two dam dam bodys 1 be concrete gravity dam, two dam dam bodys 1 it is upper Trip dam facing 2 and downstream dam facing 3 offer several drainage holes 5 from top to bottom, and bottom is equipped with horizontal base in two dam dam bodys 1 Plinth collector drain 6 is additionally provided in two dam dam bodys 1 with the traffic collector drain 10 of a level, traffic collector drain 10 and basis Collector drain 6 is connected to, and the drainage hole 5 of 10 top of traffic collector drain is connected to the traffic collector drain 10, and traffic drains corridor The drainage hole 5 of 10 lower section of road is connected to foundation drainage gallery 6, is connected with below foundation drainage gallery 6 and is located at two dam dam bodys, 1 bottom Dam base drainage well 11,11 downstream side of dam base drainage well is equipped with seepage proof curtain 4, is located at foundation drainage gallery 6 in two dam dam bodys 1 Lower section is equipped with sump 7, and sump 7 is connected to foundation drainage gallery 6, is equipped between 1 top of sump 7 and two dam dam bodys perpendicular Straight pumped well 8, the diameter of pumped well 8 are 80cm, and 8 top exit position of pumped well is equipped with the reserved hole 9 of installation engineering for pump housing, 8 top exit of pumped well is closed by dismountable high-strength steel sheet.
A kind of application method of runtime not two dam structures of pump drainage turn(a)round interim pump drainage, in the phase of normal operation, two Dam 1 water levels of upstream and downstream of dam body in road is essentially identical, and without any electromechanical equipment in two dam dam bodys 1,8 top exit of pumped well passes through can The high-strength steel sheet of disassembly is closed, and is entered in pumped well 8 to avoid silt in water flow, without pump drainage in two dam dam bodys 1;In water cushion Before pool maintenance starts, start to draw water in cushion pool, two dam dam bodys, 1 water levels of upstream and downstream is essentially identical, when the dam of two dam dam bodys 1 After top is exposed the surface, the high-strength steel sheet of closing 8 top exit of pumped well is removed, in reserved 9 installation engineering for pump housing of hole, will be drawn water Water pump is sunk down into sump 7 along pumped well 8, forms evacuation system, carries out pump drainage to the infiltration in two dam dam bodys, 1 dam;? During cushion pool overhauls, water body is drained in cushion pool, and two dam dam bodys 1 need to block downstream water, is provided for cushion pool and is examined dryly Condition is repaired, two dam dam bodys 1 will be acted on by downstream water pressure and silt pressure, and the water pump that draws water is to the infiltration in two dam dam bodys 1 Water carries out pump drainage, it is ensured that two dam dam bodys 1 are stablized;After the completion of cushion pool maintenance, by water-filling in cushion pool, on two dam dam bodys 1 The level of tail water is essentially identical, before the dam crest of two dam dam bodys 1 sinks to the water surface, takes out the water pump that draws water in sump 7, removes Engineering for pump housing, and closed 1 top exit of pumped well by high-strength steel sheet.
Through calculating, Wu Dongde engineering, two dam structure of the present embodiment can save runtime pump drainage expense about 1,000,000 every year.
The two dam structures and its application method of runtime of the invention not pump drainage turn(a)round interim pump drainage, are operating normally Phase, two dam dam bodys 1 are interior without pump drainage, and operational management conveniently, saves pump drainage operating cost;And the interior nothing of two dam dam body 1 is drawn water The electromechanical equipments such as water pump, greatly facilitate the operation maintenance management of two dam dam bodys 1, and avoid electromechanical equipment aging, leakage The security risk of the generations such as electricity;In cushion pool turn(a)round, evacuation system is formed by installing the water pump that draws water, can be met in cushion pool Condition is overhauled dryly, and two dam dam bodys 1 are stablized secure;In addition, due in two dam dam bodys 1 without permanent evacuation system, two The designs such as electrical equipment in dam dam body 1, ventilation illumination, fire-fighting, power supply can greatly simplify, and structure is relatively easy, design difficulty and Difficulty of construction is relatively low.

Claims (7)

1. a kind of two dam structures of not pump drainage turn(a)round interim pump drainage of runtime, two dams Dao Ba including being located at cushion pool end Body (1), two dam dam body (1) are concrete gravity dam, it is characterised in that: the upstream dam facing of two dam dam body (1) (2) and downstream dam facing (3) offers several drainage holes (5) from top to bottom, and two dam dam body (1) interior bottom is equipped with water Flat foundation drainage gallery (6), the drainage hole (5) are connected to the foundation drainage gallery (6), two dam dam body (1) it is located at below the foundation drainage gallery (6) in and is equipped with sump (7), the sump (7) and the foundation drainage gallery (6) it is connected to, vertical pumped well (8) is equipped between the sump (7) and two dam dam body (1) top, it is described to draw water Well (8) top exit position is equipped with the reserved hole (9) of installation engineering for pump housing.
2. two dam structures of runtime not pump drainage turn(a)round interim pump drainage according to claim 1, it is characterised in that: described Several horizontal traffic collector drains (10), the traffic collector drain are additionally provided in two dam dam bodys (1) from top to bottom (10) be connected to the foundation drainage gallery (6), the drainage hole (5) above each traffic collector drain (10) with this Traffic collector drain (10) connection.
3. two dam structures of runtime according to claim 1 or claim 2 not pump drainage turn(a)round interim pump drainage, it is characterised in that: Pumped well (8) top exit is closed by dismountable high-strength steel sheet.
4. two dam structures of runtime not pump drainage turn(a)round interim pump drainage according to claim 3, it is characterised in that: described The diameter of pumped well (8) is greater than 80cm.
5. two dam structures of runtime not pump drainage turn(a)round interim pump drainage according to claim 4, it is characterised in that: described The dam base drainage well (11) for being located at two dam dam body (1) bottom is connected with below foundation drainage gallery (6).
6. two dam structures of runtime not pump drainage turn(a)round interim pump drainage according to claim 5, it is characterised in that: described Dam base drainage well (11) downstream side is equipped with seepage proof curtain (4).
7. the utilization side of a kind of claim 4 or 5 or 6 runtimes not two dam structures of pump drainage turn(a)round interim pump drainage Method, it is characterised in that: in the phase of normal operation, pumped well (8) top exit is closed by dismountable high-strength steel sheet;? Before the cushion pool maintenance starts, start to draw water in the cushion pool, when the dam crest of two dam dam body (1) exposes the surface Afterwards, the high-strength steel sheet for closing pumped well (8) top exit is removed, engineering for pump housing is installed in the reserved hole (9), will be taken out Water water pump is sunk down into the sump (7) along the pumped well (8), evacuation system is formed, to two dam dam body (1) dam Interior infiltration carries out pump drainage;During cushion pool maintenance, water body is drained in the cushion pool, and the water pump that draws water is to described Infiltration in two dam dam bodys (1) carries out pump drainage;After the completion of the cushion pool maintenance, by water-filling in the cushion pool, described The dam crest of two dam dam bodys (1) is sunk to before the water surface, takes out the water pump that draws water in the sump (7), removes the water pump bottom Seat, and closed the pumped well (1) top exit by the high-strength steel sheet.
CN201910008195.7A 2019-01-04 2019-01-04 Two-way dam structure with temporary pumping and draining function in non-pumping and draining maintenance period in operation period and application method of two-way dam structure Active CN109555087B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910008195.7A CN109555087B (en) 2019-01-04 2019-01-04 Two-way dam structure with temporary pumping and draining function in non-pumping and draining maintenance period in operation period and application method of two-way dam structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910008195.7A CN109555087B (en) 2019-01-04 2019-01-04 Two-way dam structure with temporary pumping and draining function in non-pumping and draining maintenance period in operation period and application method of two-way dam structure

Publications (2)

Publication Number Publication Date
CN109555087A true CN109555087A (en) 2019-04-02
CN109555087B CN109555087B (en) 2024-04-12

Family

ID=65872425

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910008195.7A Active CN109555087B (en) 2019-01-04 2019-01-04 Two-way dam structure with temporary pumping and draining function in non-pumping and draining maintenance period in operation period and application method of two-way dam structure

Country Status (1)

Country Link
CN (1) CN109555087B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111593706A (en) * 2020-05-25 2020-08-28 中国水利水电第七工程局有限公司 Two-dam-crossing traffic corridor structure and construction method thereof
CN115726309A (en) * 2022-11-01 2023-03-03 中国电建集团昆明勘测设计研究院有限公司 Water pumping and drainage system for maintenance of hydropower station plunge pool and construction method

Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB352523A (en) * 1930-03-13 1931-07-13 Albert Godenir Improvements relating to hydraulic dams, water-resisting walls and the like
SU1604904A1 (en) * 1988-12-14 1990-11-07 Ленинградское отделение Всесоюзного проектно-изыскательского и научно-исследовательского института "Гидропроект" им.С.Я.Жука Gravity dam
RU2200220C2 (en) * 2000-12-25 2003-03-10 Открытое акционерное общество Красноярский проектно-изыскательский институт "Гидропроект" Process of repair of multisectional concrete dam
FR2856710A1 (en) * 2003-06-30 2004-12-31 Michel Fonfrede CONTROLLED FLOW HYDRAULIC DAM
JP2005082980A (en) * 2003-09-04 2005-03-31 Ishikawajima Constr Materials Co Ltd Water storage and draining structure for check dam and well used therefor
KR20050092565A (en) * 2004-03-16 2005-09-22 농업기반공사 Basal water drainage structure of groundwater dam without power supply
CN101429759A (en) * 2008-12-12 2009-05-13 中国葛洲坝集团股份有限公司 Inverse drainage processing method in high concrete panel rock-fill dam construction period
CN201598619U (en) * 2010-01-22 2010-10-06 中国水电顾问集团华东勘测设计研究院 Dam body water draining structure
RU2418911C1 (en) * 2010-05-19 2011-05-20 Василий Петрович Ягин Method to increase reliability of concrete arc-gravity dam in operation
CN103774624A (en) * 2012-10-23 2014-05-07 中国葛洲坝集团股份有限公司 Concentration guiding drainage device of corridor drain hole
CN203741788U (en) * 2013-12-20 2014-07-30 中国水电顾问集团贵阳勘测设计研究院有限公司 Dam body drainage system for roller-compacted concrete
CN203768881U (en) * 2014-03-06 2014-08-13 中国水利水电第七工程局有限公司 Water seepage draining device for corridors of mountain and dam body
CN204185842U (en) * 2014-11-03 2015-03-04 中国电建集团成都勘测设计研究院有限公司 Evacuation system bottom induced joint cushion pool
CN204356745U (en) * 2014-12-10 2015-05-27 中国电建集团贵阳勘测设计研究院有限公司 Arrangement structure of pumping and drainage gallery system in concrete dam
CN106968227A (en) * 2017-05-16 2017-07-21 中国电建集团成都勘测设计研究院有限公司 The maintenance arrangement of the permanent plug of induced joint diversion tunnel
CN107354917A (en) * 2017-07-28 2017-11-17 昆明理工大学 A kind of gravity rock and its construction method
KR101825822B1 (en) * 2016-07-28 2018-02-06 (유)신진공업 Collector well for reservoir having inner steel
CN209603077U (en) * 2019-01-04 2019-11-08 长江勘测规划设计研究有限责任公司 The structure of the second dam with temporary drainage during the maintenance period without drainage during the operation period

Patent Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB352523A (en) * 1930-03-13 1931-07-13 Albert Godenir Improvements relating to hydraulic dams, water-resisting walls and the like
SU1604904A1 (en) * 1988-12-14 1990-11-07 Ленинградское отделение Всесоюзного проектно-изыскательского и научно-исследовательского института "Гидропроект" им.С.Я.Жука Gravity dam
RU2200220C2 (en) * 2000-12-25 2003-03-10 Открытое акционерное общество Красноярский проектно-изыскательский институт "Гидропроект" Process of repair of multisectional concrete dam
FR2856710A1 (en) * 2003-06-30 2004-12-31 Michel Fonfrede CONTROLLED FLOW HYDRAULIC DAM
JP2005082980A (en) * 2003-09-04 2005-03-31 Ishikawajima Constr Materials Co Ltd Water storage and draining structure for check dam and well used therefor
KR20050092565A (en) * 2004-03-16 2005-09-22 농업기반공사 Basal water drainage structure of groundwater dam without power supply
CN101429759A (en) * 2008-12-12 2009-05-13 中国葛洲坝集团股份有限公司 Inverse drainage processing method in high concrete panel rock-fill dam construction period
CN201598619U (en) * 2010-01-22 2010-10-06 中国水电顾问集团华东勘测设计研究院 Dam body water draining structure
RU2418911C1 (en) * 2010-05-19 2011-05-20 Василий Петрович Ягин Method to increase reliability of concrete arc-gravity dam in operation
CN103774624A (en) * 2012-10-23 2014-05-07 中国葛洲坝集团股份有限公司 Concentration guiding drainage device of corridor drain hole
CN203741788U (en) * 2013-12-20 2014-07-30 中国水电顾问集团贵阳勘测设计研究院有限公司 Dam body drainage system for roller-compacted concrete
CN203768881U (en) * 2014-03-06 2014-08-13 中国水利水电第七工程局有限公司 Water seepage draining device for corridors of mountain and dam body
CN204185842U (en) * 2014-11-03 2015-03-04 中国电建集团成都勘测设计研究院有限公司 Evacuation system bottom induced joint cushion pool
CN204356745U (en) * 2014-12-10 2015-05-27 中国电建集团贵阳勘测设计研究院有限公司 Arrangement structure of pumping and drainage gallery system in concrete dam
KR101825822B1 (en) * 2016-07-28 2018-02-06 (유)신진공업 Collector well for reservoir having inner steel
CN106968227A (en) * 2017-05-16 2017-07-21 中国电建集团成都勘测设计研究院有限公司 The maintenance arrangement of the permanent plug of induced joint diversion tunnel
CN107354917A (en) * 2017-07-28 2017-11-17 昆明理工大学 A kind of gravity rock and its construction method
CN209603077U (en) * 2019-01-04 2019-11-08 长江勘测规划设计研究有限责任公司 The structure of the second dam with temporary drainage during the maintenance period without drainage during the operation period

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111593706A (en) * 2020-05-25 2020-08-28 中国水利水电第七工程局有限公司 Two-dam-crossing traffic corridor structure and construction method thereof
CN115726309A (en) * 2022-11-01 2023-03-03 中国电建集团昆明勘测设计研究院有限公司 Water pumping and drainage system for maintenance of hydropower station plunge pool and construction method

Also Published As

Publication number Publication date
CN109555087B (en) 2024-04-12

Similar Documents

Publication Publication Date Title
CN109930548B (en) A facility and method for siphoning water in a reservoir using rainwater resources
CN204163745U (en) A kind of tunnel props up hole counter-slope drainage system
CN207582440U (en) A kind of preposition power station of forebay trash rack
CN103556611B (en) The cushion pool filling and drainage system that can generate electricity
CN106968227B (en) Maintenance arrangement structure and maintenance method of permanent plugs of diversion tunnel of high arch dam
CN109555087A (en) The two dam structures and its application method of runtime not pump drainage turn(a)round interim pump drainage
CN209603077U (en) The structure of the second dam with temporary drainage during the maintenance period without drainage during the operation period
CN210002360U (en) A damming and flood discharge structure in alpine canyons
CN207512707U (en) A kind of stiling basin for laying novel evacuation system
CN101949145A (en) Water supply and drainage system of plunge pool
CN205369181U (en) Ditch water treatment drainage hole structure
CN207159958U (en) Non-close is without pump drainage cushion pool structure
CN106013013B (en) Tubular power station separate combination type factory building system
CN209653088U (en) A kind of novel transformer substation flood control drainage arrangement
CN203768881U (en) Water seepage draining device for corridors of mountain and dam body
CN212714848U (en) Initial diversion tunnel plugging gate
CN206928255U (en) The maintenance arrangement of the permanent plug of induced joint diversion tunnel
CN104264642A (en) Drainage tunnel and drainage method for ditch water treatment
CN209277121U (en) Pump lock double-layer drainage structure
CN213538900U (en) Desilting and sand-discharging device for steel dam
CN201809752U (en) Water supply and drainage system for plunge pool
CN107326876B (en) Non-closed non-pumping drainage plunge pool structure
CN211472426U (en) A kind of maintenance system for deep scoop stilling basin
CN108194120B (en) Tunnel structure with power generation function
CN204385703U (en) Water collecting well in hydropower house

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant