CN207525575U - A kind of novel water permeable brick structure - Google Patents

A kind of novel water permeable brick structure Download PDF

Info

Publication number
CN207525575U
CN207525575U CN201721608145.5U CN201721608145U CN207525575U CN 207525575 U CN207525575 U CN 207525575U CN 201721608145 U CN201721608145 U CN 201721608145U CN 207525575 U CN207525575 U CN 207525575U
Authority
CN
China
Prior art keywords
water
permeable brick
horizontal stripe
brick
permeable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721608145.5U
Other languages
Chinese (zh)
Inventor
张宇
魏浪
纵霄
孙荣
张习传
赵俊
唐达
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201721608145.5U priority Critical patent/CN207525575U/en
Application granted granted Critical
Publication of CN207525575U publication Critical patent/CN207525575U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model provides a kind of novel water permeable brick structure, including water-permeable brick group;The water-permeable brick group is made of several water-permeable bricks, water-permeable brick includes horizontal stripe water-permeable brick I, horizontal stripe water-permeable brick II and horizontal stripe water-permeable brick III, the side of horizontal stripe water-permeable brick I is connect with one end of horizontal stripe water-permeable brick II, the other end of horizontal stripe water-permeable brick II is connect with the side of horizontal stripe water-permeable brick III, gapless between horizontal stripe water-permeable brick I, horizontal stripe water-permeable brick II and horizontal stripe water-permeable brick III;One end of the horizontal stripe water-permeable brick III is equipped with the pillar to raise up, and the other end is equipped with the connector of downward indent;The pillar, connector form osculum between horizontal stripe water-permeable brick II respectively.The utility model osculum is set in water-permeable brick brick body, after rainwater enters water-permeable brick by gap, is discharged by the osculum of brick body itself, without buffer layer being set to provide passing away for flowing water, and then reduce the investment for being laid with buffer layer in brick bottom.

Description

A kind of novel water permeable brick structure
Technical field
The utility model is related to a kind of novel water permeable brick structures, belong to conservation technology field.
Background technology
With development in science and technology and social progress, water-permeable brick is widely used to urban infrastructure construction and other productions and builds If in project, it is mainly used for the laying in the regions such as pavement, parking lot.The application of water-permeable brick, by region Quick drainage of being mated formation, It prevents raindrop splash erosion from providing new method, can effectively alleviate the flood discharge pressure of sewerage system, be pavement, parking stall etc. Region provides a kind of draining new approaches, is infiltration technology important in sponge urban design theory, to city water and soil is promoted to protect Positive effect is played in the development for holding work.
Present situation water-permeable brick is divided into draining two kinds of discharging modes in gap between own material draining and brick, by own material draining For water-permeable brick since permeable hole is smaller, drainage speed is slow, and cross flow of catchmenting is be easy to cause when rainfall is larger;By the water-permeable brick of gap draining Between reserving gaps, buffer layer is laid under water-permeable brick in addition, for people when walking on water-permeable brick, water-permeable brick or so can generate phase up and down It to larger displacement, is easily destroyed, increases maintenance and replacement frequency, and then increase cost of investment, and by gap discharging mode When rainy, preservation is easily squeezed out from gap in the rainwater at brick bottom, gets footgear and clothing wet.Therefore, no matter using which Kind discharging mode, water-permeable brick lower floor are both needed to setting buffer layer and carry out charge for remittance, and be connected to gutter eventually by drainpipe, buffer The construction of layer increases investment of mating formation.
Utility model content
In order to solve the above technical problems, the utility model provides a kind of novel water permeable brick structure, the novel water permeable brick knot Structure is improved traditional water-permeable brick on the basis of traditional water-permeable brick, from water and soil conservation angle, using the row of setting in brick body The mode in water hole carries out draining, can ground solve existing water-permeable brick buffer layer, maintenance and the high technology of replacement frequency need to be set to lack Point reaches simple laying, maintenance and the smaller purpose of replacement frequency, is conducive to water and soil conservation, by brick body draining, reduces investment outlay.
The utility model is achieved by the following technical programs.
A kind of novel water permeable brick structure provided by the utility model, including water-permeable brick group;The water-permeable brick group is by several Water-permeable brick forms, and water-permeable brick includes horizontal stripe water-permeable brick I, horizontal stripe water-permeable brick II and horizontal stripe water-permeable brick III, the side of horizontal stripe water-permeable brick I It is connect with one end of horizontal stripe water-permeable brick II, the other end of horizontal stripe water-permeable brick II is connect with the side of horizontal stripe water-permeable brick III, and horizontal stripe is saturating Gapless between water brick I, horizontal stripe water-permeable brick II and horizontal stripe water-permeable brick III;One end of the horizontal stripe water-permeable brick III is equipped with and raises up Pillar, the other end be equipped with downward indent connector.
It is closely connected between the pillar, connector and horizontal stripe water-permeable brick III.
The length of the horizontal stripe water-permeable brick I and horizontal stripe water-permeable brick III is more than the length of horizontal stripe water-permeable brick II, horizontal stripe water-permeable brick I Length be less than horizontal stripe water-permeable brick III length.
The horizontal stripe water-permeable brick I is equal with the height of horizontal stripe water-permeable brick III, the height of horizontal stripe water-permeable brick I and horizontal stripe water-permeable brick III Degree is more than the height of horizontal stripe water-permeable brick II.
The horizontal stripe water-permeable brick I, horizontal stripe water-permeable brick II and horizontal stripe water-permeable brick III form I-shaped.
The pillar, connector form osculum between horizontal stripe water-permeable brick II respectively
The beneficial effects of the utility model are:
1. osculum is set in water-permeable brick brick body, after rainwater enters water-permeable brick by gap, by the osculum of brick body itself Discharge, without buffer layer being set to provide passing away for flowing water, and then reduce the investment for being laid with buffer layer in brick bottom;
2. the pillar of each water-permeable brick is combined closely with connector, position is relatively fixed after spreading bricks, does not occur substantially Displacement is not easy to be destroyed, and reduces maintenance and the fund input with changing;
3. osculum is located in brick body, controlled by brick body self-strength, people, which steps on, makes not flow in osculum in brick body Into extruding, flow is not easy to rebound, and gets footgear and clothing wet.
Description of the drawings
Fig. 1 is the structure diagram of the utility model;
Fig. 2 is the structure diagram of the utility model water-permeable brick group;
Fig. 3 is that the utility model is mated formation schematic diagram;
In figure:1- rammed earth layers, 2- bed courses, 3- bases, 4- cement sand beds, 5- water-permeable brick groups, 51- water-permeable bricks, 511- horizontal stripes water-permeable brick I, 512- horizontal stripes water-permeable brick II, 513- horizontal stripes water-permeable brick III, 6- osculums, 7- drainpipes, 8- gutters, 9- gaps, 10- pillars, 11- connectors.
Specific embodiment
Be described further below the technical solution of the utility model, but claimed range be not limited to it is described.
As shown in Figure 1, a kind of novel water permeable brick structure, including water-permeable brick group 5;The water-permeable brick group 5 is permeable by several Brick 51 forms, and water-permeable brick 51 includes horizontal stripe water-permeable brick I 511, horizontal stripe water-permeable brick II 512 and horizontal stripe water-permeable brick III 513, and horizontal stripe is permeable The side of brick I 511 is connect with one end of horizontal stripe water-permeable brick II 512, the other end and the horizontal stripe water-permeable brick III of horizontal stripe water-permeable brick II 512 513 side connection, gapless between horizontal stripe water-permeable brick I 511, horizontal stripe water-permeable brick II 512 and horizontal stripe water-permeable brick III 513;It is described One end of horizontal stripe water-permeable brick III 513 is equipped with the pillar 10 to raise up, and the other end is equipped with the connector 11 of downward indent;The branch Column 10, connector 11 form osculum 6 between horizontal stripe water-permeable brick II 512 respectively.
It is closely connected between the pillar 10, connector 11 and horizontal stripe water-permeable brick III 513, forms one so that Mei Getou Displacement will not be generated between water brick 51.
The length of the horizontal stripe water-permeable brick I 511 and horizontal stripe water-permeable brick III 513 is more than the length of horizontal stripe water-permeable brick II 512, horizontal The length of water-permeable brick I 511 is less than the length of horizontal stripe water-permeable brick III 513;The horizontal stripe water-permeable brick I 511 and horizontal stripe water-permeable brick III 513 height is equal, and the height of horizontal stripe water-permeable brick I 511 and horizontal stripe water-permeable brick III 513 is more than the height of horizontal stripe water-permeable brick II 512; The horizontal stripe water-permeable brick I 511, horizontal stripe water-permeable brick II 512 and the composition of horizontal stripe water-permeable brick III 513 are I-shaped, simple in structure, convenient for peace Dress saves material.
As shown in figure 3, the construction procedure of the utility model is as follows:
1. connect water-permeable brick 51:Multiple water-permeable bricks 51 are attached, form water-permeable brick group 5;
2. ditching is tamped:Ditching is carried out, and compacting processing is carried out in ditch, forms rammed earth layer 1;
3. it is laid with:Bed course 2, base 3, cement sand bed 4, water-permeable brick group 5 are laid with successively on rammed earth layer 1, saturating It is equipped with osculum 6 in water brick 51, during installation, each 6 correspond, and reach the flowing water drop-over that 51 brick body of water-permeable brick is collected to arranging The purpose in ditch 8;
4. gutter 8 is set:Gutter 8 is set in one end of bed course 2, base 3, cement sand bed 4, water-permeable brick group 5, and Through-hole is equipped in the one end in gutter 8;
5. drainpipe 7 is installed:Drainpipe 7 is mounted in through-hole, and is connect with osculum 6.
The step 4. in, the height in gutter 8 be equal to bed course 2, base 3, cement sand bed 4, water-permeable brick group 5 total height Degree.
1. the step is divided into following steps:
(1.1) water-permeable brick 51 is made of horizontal stripe water-permeable brick I 511, horizontal stripe water-permeable brick II 512 and horizontal stripe water-permeable brick III 513, horizontal The close connection successively of water-permeable brick I 511, horizontal stripe water-permeable brick II 512 and horizontal stripe water-permeable brick III 513;
(1.2) one end of each horizontal stripe water-permeable brick III 513 is equipped with pillar 10, and the other end is equipped with connector 11, several Snapping is carried out by pillar 10 and connector 11 between a water-permeable brick 51, osculum 6 is formed in each water-permeable brick 51, it is each horizontal Gap 9 is formed between water-permeable brick I 511, as shown in Fig. 2, wherein flowing water enters the osculum 6 of 51 brick body of water-permeable brick through gap 9, By 7 drop-over of drainpipe of connection osculum 6 to gutter 8;
(1.3) step (1.1)~(1.2) are repeated, obtain water-permeable brick group 5.
The step 5. in, drainpipe 7 is connect with the osculum 6 of beginning water-permeable brick 51.

Claims (6)

1. a kind of novel water permeable brick structure, including water-permeable brick group (5), it is characterised in that:The water-permeable brick group (5) is saturating by several Water brick (51) forms, and water-permeable brick (51) includes horizontal stripe water-permeable brick I (511), horizontal stripe water-permeable brick II (512) and horizontal stripe water-permeable brick III (513), the side of horizontal stripe water-permeable brick I (511) is connect with one end of horizontal stripe water-permeable brick II (512), horizontal stripe water-permeable brick II (512) The other end is connect with the side of horizontal stripe water-permeable brick III (513), horizontal stripe water-permeable brick I (511), horizontal stripe water-permeable brick II (512) and horizontal stripe Gapless between water-permeable brick III (513);One end of the horizontal stripe water-permeable brick III (513) is equipped with the pillar (10) to raise up, separately One end is equipped with the connector (11) of downward indent.
2. novel water permeable brick structure as described in claim 1, it is characterised in that:The pillar (10), connector (11) and horizontal stroke It is closely connected between water-permeable brick III (513).
3. novel water permeable brick structure as described in claim 1, it is characterised in that:The horizontal stripe water-permeable brick I (511) and horizontal stripe are saturating The length of water brick III (513) is more than the length of horizontal stripe water-permeable brick II (512), and the length of horizontal stripe water-permeable brick I (511) is saturating less than horizontal stripe The length of water brick III (513).
4. novel water permeable brick structure as described in claim 1, it is characterised in that:The horizontal stripe water-permeable brick I (511) and horizontal stripe are saturating The height of water brick III (513) is equal, and the height of horizontal stripe water-permeable brick I (511) and horizontal stripe water-permeable brick III (513) is more than horizontal stripe water-permeable brick The height of II (512).
5. novel water permeable brick structure as described in claim 1, it is characterised in that:The horizontal stripe water-permeable brick I (511), horizontal stripe are saturating Water brick II (512) and horizontal stripe water-permeable brick III (513) form I-shaped.
6. novel water permeable brick structure as described in claim 1, it is characterised in that:The pillar (10), connector (11) are respectively Osculum (6) is formed between horizontal stripe water-permeable brick II (512).
CN201721608145.5U 2017-11-27 2017-11-27 A kind of novel water permeable brick structure Active CN207525575U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721608145.5U CN207525575U (en) 2017-11-27 2017-11-27 A kind of novel water permeable brick structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721608145.5U CN207525575U (en) 2017-11-27 2017-11-27 A kind of novel water permeable brick structure

Publications (1)

Publication Number Publication Date
CN207525575U true CN207525575U (en) 2018-06-22

Family

ID=62580531

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721608145.5U Active CN207525575U (en) 2017-11-27 2017-11-27 A kind of novel water permeable brick structure

Country Status (1)

Country Link
CN (1) CN207525575U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107724201A (en) * 2017-11-27 2018-02-23 中国电建集团贵阳勘测设计研究院有限公司 A kind of novel water permeable brick structure and method for paving

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107724201A (en) * 2017-11-27 2018-02-23 中国电建集团贵阳勘测设计研究院有限公司 A kind of novel water permeable brick structure and method for paving

Similar Documents

Publication Publication Date Title
CN106351105A (en) Porous pavement for sponge city
CN206352331U (en) The concave herbaceous field structure of sponge the idea of the city
CN104313967B (en) Row's water-seepage type is mated formation combining structure
CN209099113U (en) A kind of pavement pavement structure
CN107724201A (en) A kind of novel water permeable brick structure and method for paving
CN107152012A (en) Sluice construction technique
CN202627166U (en) Novel water-discharging ecological zone for town road
CN207484193U (en) Permeable road structure
CN207700330U (en) A kind of concave herbaceous field grass-planting ecological ditch
CN207228298U (en) A kind of landscape drought small stream structure
CN207525575U (en) A kind of novel water permeable brick structure
CN207567892U (en) A kind of large size karst depression flood drainage system
CN209211198U (en) A kind of urban environmental protection road surface
CN104594155A (en) Permeable pavement laying method
CN207469190U (en) A kind of infitration galleries structure of efficient draining
CN204608544U (en) A kind of water conservation layer of water permeable pavement
CN206971040U (en) A kind of special discharge structure in walking road surface
CN206545257U (en) A kind of novel greening band water storage structure
CN107386053A (en) A kind of construction method on pavement
CN108179677A (en) Sponge urban water-through pavement
CN107366209A (en) A kind of walkway system
CN106996063A (en) A kind of pavement structure of permeable road
CN208815366U (en) A kind of assembled macrovoid asphalt paving
CN208486146U (en) A kind of novel filter infiltration garden road step and sunk type square laying structure
CN208685362U (en) The arragement construction of city non-motorized lane

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant