CN217870559U - Inclined wall geomembrane earth-rock cofferdam structure suitable for higher manger plate flood peak of geomembrane - Google Patents

Inclined wall geomembrane earth-rock cofferdam structure suitable for higher manger plate flood peak of geomembrane Download PDF

Info

Publication number
CN217870559U
CN217870559U CN202221267090.7U CN202221267090U CN217870559U CN 217870559 U CN217870559 U CN 217870559U CN 202221267090 U CN202221267090 U CN 202221267090U CN 217870559 U CN217870559 U CN 217870559U
Authority
CN
China
Prior art keywords
geomembrane
cofferdam
wall
earth
structure suitable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221267090.7U
Other languages
Chinese (zh)
Inventor
梁现培
周垂一
王永明
钟伟斌
李军
任金明
邬志
蔡建国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Zhejiang Huadong Engineering Construction Management Co Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Zhejiang Huadong Engineering Construction Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd, Zhejiang Huadong Engineering Construction Management Co Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN202221267090.7U priority Critical patent/CN217870559U/en
Application granted granted Critical
Publication of CN217870559U publication Critical patent/CN217870559U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses an inclined wall geomembrane earth-rock cofferdam structure suitable for a geomembrane with a higher water retaining head, which comprises a cofferdam body, a seepage-proofing wall arranged at the water facing side of the cofferdam body and a protective structure arranged at the top of the seepage-proofing wall and having a certain width; a berm with a certain width is arranged on a slope between the protective structure and the top of the cofferdam body, and a geomembrane is laid on the slope from top to bottom; all be provided with the anchor ditch that is used for fixed geomembrane on cofferdam body top and the packway, wherein the packway sets up two anchor ditches. The structural form has the characteristics of small difficulty in geomembrane welding construction, simple and convenient construction of the transverse expansion joint, high safety and stability of the cofferdam side slope and the like.

Description

适用于土工膜较高挡水水头的斜墙土工膜土石围堰结构Inclined wall geomembrane earth-rock cofferdam structure suitable for high water retaining head of geomembrane

技术领域technical field

本实用新型涉及大中型水利水电工程中围护枢纽工程基坑干地施工的河流上游临时挡水领域,具体涉及适用于土工膜较高挡水水头的斜墙土工膜土石围堰结构。The utility model relates to the field of temporary water retaining in the upper reaches of rivers in the dry land construction of foundation pits of enclosing key projects in large and medium-sized water conservancy and hydropower projects, in particular to an inclined-wall geomembrane earth-rock cofferdam structure suitable for relatively high water retaining head of the geomembrane.

背景技术Background technique

斜墙土工膜土石围堰具有堰体填筑上升速度快,土工膜铺设焊接方便,堰体填筑与土工膜铺设互不干扰,后期检修方便等特点,在水利水电建设工程中得到了广泛应用,斜墙土工膜挡水水头一般在35m以下,随着西部一批巨型水电工程的开发建设,如锦屏一级、白鹤滩两个水电工程的上游斜墙土工膜土石围堰,斜墙土工膜挡水水头均达到了43m,得到了很大提高。在斜墙土工膜挡水水头较高(大于35m)的情况下,铺设土工膜的围堰单级坡度较高,由于中间缺少作业平台,土工膜铺设施工与焊接难度增大,间接影响土工膜的防渗性能;其次,土工膜设计挡水水头高,挡水后变形相应增大,需设置相应的伸缩节,在较高的单级围堰土石边坡斜面上,伸缩节设置施工十分不便,影响土工膜的施工质量和挡水后的防渗性能;最后,较高(大于35m)的单级围堰土石边坡,土工膜与围堰边坡垫层之间的层间稳定性若局部不满足要求,在重力作用下,可能会牵连影响上方整个坡面的土工膜与围岩边坡垫层之间的稳定。Inclined wall geomembrane earth-rock cofferdam has the characteristics of fast rising of weir body filling, convenient welding of geomembrane laying, non-interference between weir body filling and geomembrane laying, and convenient maintenance in the later period, etc., and has been widely used in water conservancy and hydropower construction projects , the water retaining head of the inclined wall geomembrane is generally below 35m. With the development and construction of a number of giant hydropower projects in the west, such as the upstream inclined wall geomembrane earth-rock cofferdam of the two hydropower projects of Jinping I and Baihetan, the inclined wall geomembrane The water retaining head of the membrane has reached 43m, which has been greatly improved. In the case of a high retaining head (greater than 35m) of the inclined wall geomembrane, the single-stage slope of the cofferdam where the geomembrane is laid is relatively high. Due to the lack of a working platform in the middle, the construction and welding of the geomembrane are more difficult, which indirectly affects the geomembrane. Second, the design of the geomembrane retains water with a high water head, and the deformation increases accordingly after retaining the water. Corresponding expansion joints need to be installed. On the slope of a relatively high single-stage cofferdam earth-rock slope, the installation and construction of expansion joints is very inconvenient , which affects the construction quality of the geomembrane and the anti-seepage performance after water blocking; finally, for a relatively high (greater than 35m) single-stage cofferdam earth-rock slope, the interlayer stability between the geomembrane and the cofferdam slope cushion is weak. If the requirements are not met locally, under the action of gravity, it may affect the stability between the geomembrane and the surrounding rock slope cushion on the entire slope above.

基于上述情况,本实用新型提出了适用于土工膜较高挡水水头的斜墙土工膜土石围堰结构,可有效解决以上问题。Based on the above situation, the utility model proposes an inclined-wall geomembrane earth-rock cofferdam structure suitable for a relatively high retaining head of the geomembrane, which can effectively solve the above problems.

实用新型内容Utility model content

为解决上述问题,本实用新型的主要目的在于提供一种适用于土工膜较高挡水水头(大于35m)斜墙土工膜围堰结构型式,该结构型式具有土工膜焊接施工难度小、横向伸缩节施工简便、围堰边坡安全稳定性高等特点。In order to solve the above problems, the main purpose of this utility model is to provide a kind of oblique wall geomembrane cofferdam structure type suitable for geomembrane higher water retaining head (greater than 35m). It has the characteristics of simple and convenient construction and high safety and stability of cofferdam slope.

为解决上述技术问题,本实用新型通过下述技术方案实现:In order to solve the above technical problems, the utility model is realized through the following technical solutions:

适用于土工膜较高挡水水头的斜墙土工膜土石围堰结构,包括围堰本体、设于围堰本体迎水侧的防渗墙以及布置于防渗墙顶部具有一定宽度的防护结构;所述防护结构与围堰本体顶部之间的斜坡上设置有一定宽度的马道,该斜坡上自上而下铺设土工膜;所述围堰本体顶部和马道上均设置有用于固定土工膜的锚固沟,其中马道上的设置双锚固沟,使土工膜布置呈几字形。It is suitable for the inclined wall geomembrane earth-rock cofferdam structure with high water retaining head of the geomembrane, including the cofferdam body, the cut-off wall on the upstream side of the cofferdam body, and the protective structure with a certain width arranged on the top of the cut-off wall; The slope between the protective structure and the top of the cofferdam body is provided with a certain width of the horseway, and the geomembrane is laid on the slope from top to bottom; the top of the cofferdam body and the horseway are all provided with anchors for fixing the geomembrane. Ditch, in which the double anchoring ditch is set on the horseway, so that the geomembrane layout is in the shape of a few characters.

优选的是,所述围堰本体两侧岸坡布置有混凝土板,所述土工膜与防渗墙顶部的盖帽混凝土以及混凝土板之间通过埋置或锚固方式相连接,防渗墙底部及混凝土板上布置帷幕灌浆,形成一道封闭的防渗体系。Preferably, concrete slabs are arranged on both sides of the cofferdam body, the geomembrane is connected to the cap concrete on the top of the cutoff wall and the concrete slab by embedding or anchoring, and the bottom of the cutoff wall and the concrete Curtain grouting is arranged on the board to form a closed anti-seepage system.

优选的是,所述围堰本体包括防护结构高程以下的防渗段和高程以上的挡水段,所述防渗段包括沿水流方向依次布置的大块石、第二过渡料、细石渣料、第一石渣料、第一过渡料、截流戗堤、第二石渣料以及排水棱体,所述挡水段包括位于防渗段上方的碾压石渣料。Preferably, the cofferdam body includes an anti-seepage section below the elevation of the protective structure and a water-retaining section above the elevation, and the anti-seepage section includes large stones, second transition material, and fine gravel arranged in sequence along the water flow direction. material, the first gravel material, the first transition material, the intercepting embankment, the second gravel material and the drainage prism, and the water retaining section includes the rolled gravel material located above the anti-seepage section.

进一步优选的是,所述截流戗堤位于防渗墙下游侧,截流戗堤迎水侧坡脚距离防渗墙轴线的水平距离不小于15m。Further preferably, the cut-off embankment is located on the downstream side of the cut-off wall, and the horizontal distance between the slope foot of the cut-off dike on the upstream side and the axis of the cut-off wall is not less than 15m.

优选的是,所述马道上还设置有两道土工膜锚固沟,土工膜呈几字形布置兼起伸缩节作用。Preferably, two geomembrane anchoring grooves are also arranged on the horseway, and the geomembrane is arranged in a zigzag shape and also functions as an expansion joint.

优选的是,所述土工膜上方设有喷混凝土,下方铺设有垫层料和第三过渡料。Preferably, shotcrete is provided above the geomembrane, and a cushion material and a third transition material are laid below.

优选的是,所述围堰本体的背水侧布置“之”字形道路至围堰背水侧基坑,“之”字形道路宽度为5m~10m。Preferably, a zigzag road is arranged on the backwater side of the cofferdam body to the foundation pit on the backwater side of the cofferdam, and the width of the zigzag road is 5m-10m.

优选的是,所述防护结构高程以上边坡坡比为1:2~2.5,以下边坡坡比为1:1.5,背水侧坡比1:1.6~1.8。Preferably, the slope ratio of the slope above the protection structure elevation is 1:2-2.5, the slope ratio of the slope below is 1:1.5, and the slope ratio of the backwater side is 1:1.6-1.8.

优选的是,所述防护结构宽度不小于20m,其包括由上至下依次布置的干砌块石、第四过渡料、垫层料和碎石土组成。Preferably, the protective structure is not less than 20m in width, and consists of dry block stones, fourth transition material, cushion material and gravel soil arranged in sequence from top to bottom.

优选的是,所述马道宽度为3m~5m。Preferably, the width of the carriageway is 3m-5m.

本实用新型与现有技术相比,具有以下优点及有益效果:Compared with the prior art, the utility model has the following advantages and beneficial effects:

(1)斜墙土工膜下方堰坡中间设置马道,降低了单级边坡作业高度,增加了作业平台,方便了土工膜施工焊接,有利于提高土工膜焊接质量和土工膜挡水性能;(2)在铺设斜墙土工膜的堰坡中间设置一级马道,提高了围堰迎水面边坡的稳定性;(3)在马道上设置土工膜双锚固沟,使土工膜呈几字形兼起伸缩节作用,提高了土工膜与堰坡之间的层面稳定性,同时有利于适应土工膜的变形,降低土工膜撕裂破坏的可能性。(1) A horse path is set in the middle of the weir slope under the geomembrane of the inclined wall, which reduces the operation height of the single-stage slope, increases the operating platform, facilitates the construction and welding of the geomembrane, and is conducive to improving the welding quality of the geomembrane and the water-retaining performance of the geomembrane; ( 2) Set a first-level horse track in the middle of the weir slope where the inclined wall geomembrane is laid, which improves the stability of the slope on the water face of the cofferdam; The function of the expansion joint improves the layer stability between the geomembrane and the weir slope, and at the same time helps to adapt to the deformation of the geomembrane and reduces the possibility of tearing and damage of the geomembrane.

附图说明Description of drawings

图1是本实用新型的围堰平面布置结构示意图;Fig. 1 is a schematic diagram of the cofferdam plane layout structure of the present utility model;

图2是本实用新型的围堰典型断面结构示意图;Fig. 2 is a schematic diagram of a typical section structure of a cofferdam of the present utility model;

图3是图2中A处的防护结构详细结构示意图;Fig. 3 is a schematic diagram of the detailed structure of the protective structure at A in Fig. 2;

图4是图2中B处的马道详细结构示意图。Fig. 4 is a schematic diagram of the detailed structure of the horse track at B in Fig. 2 .

附图标记:1—帷幕灌浆;2—混凝土板;3—马道;4—“之”字形道路;5—截流戗堤;601—第一过渡料;602—第二过渡料;603-第三过渡料;604—第四过渡料;701—第一石渣料;702—第二石渣料;8—细石渣料;9—防渗墙;901—盖帽混凝土;10—大块石;11—排水棱体;12—碾压石渣料;13—垫层料;14—土工膜;15—喷混凝土;16—碎石土;17—干砌块石;18—覆盖层;19—基岩。Reference signs: 1—curtain grouting; 2—concrete slab; 3—horse path; 4—"zigzag" road; 5—closing embankment; 601—first transition material; Transition material; 604—the fourth transition material; 701—the first gravel material; 702—the second gravel material; 8—fine gravel material; 9—impervious wall; 901—capping concrete; 10—large stone; 11—Drainage prism; 12—Rolled gravel material; 13—Cushion material; 14—Geomembrane; 15—Shotcrete; 16—Gravel soil; 17—Dry block stone; 18—Cover layer; 19— bedrock.

具体实施方式Detailed ways

为了使本领域的技术人员更好地理解本实用新型的技术方案,下面结合具体实施例对本实用新型的优选实施方案进行描述,但是应当理解,附图仅用于示例性说明,不能理解为对本专利的限制;为了更好说明本实施例,附图某些部件会有省略、放大或缩小,并不代表实际产品的尺寸;对于本领域技术人员来说,附图中某些公知结构及其说明可能省略是可以理解的。附图中描述位置关系仅用于示例性说明,不能理解为对本专利的限制。In order to enable those skilled in the art to better understand the technical solutions of the present utility model, the preferred embodiments of the present utility model are described below in conjunction with specific examples, but it should be understood that the accompanying drawings are only for illustrative purposes and cannot be interpreted as a description of the present invention. Patent restrictions; in order to better illustrate this embodiment, some parts in the drawings will be omitted, enlarged or reduced, and do not represent the size of the actual product; for those skilled in the art, some known structures and their It is understandable that the description may be omitted. The positional relationship described in the drawings is for illustrative purposes only, and should not be construed as a limitation on this patent.

下面结合附图1~4和实施例对本实用新型作进一步的说明,但并不作为对本实用新型限制的依据。The utility model will be further described below in conjunction with accompanying drawings 1 to 4 and the embodiments, but not as a basis for limiting the utility model.

如图1至4所示,本实施例提供一种适用于土工膜较高挡水水头的斜墙土工膜土石围堰结构,包括围堰本体、设于围堰本体迎水侧的防渗墙9以及布置于防渗墙9顶部具有一定宽度的防护结构;所述防护结构与围堰本体顶部之间的斜坡上设置有一定宽度的马道3,该斜坡上自上而下铺设土工膜14;所述围堰本体顶部和马道3上均设置有用于固定土工膜14的双锚固沟,所述马道3上的土工膜14结合双锚固沟呈几字形,兼起伸缩节作用,所述马道3宽度为3m~5m。所述土工膜14上方设有喷混凝土15cm~20cm,喷混凝土15按3m×3m分块,下方铺设有垫层料13和第三过渡料603。As shown in Figures 1 to 4, this embodiment provides an inclined-wall geomembrane earth-rock cofferdam structure suitable for a relatively high retaining head of the geomembrane, including a cofferdam body and an anti-seepage wall arranged on the upstream side of the cofferdam body 9 and a protective structure with a certain width arranged on the top of the cutoff wall 9; a horseway 3 with a certain width is arranged on the slope between the protective structure and the top of the cofferdam body, and a geomembrane 14 is laid on the slope from top to bottom; Both the top of the cofferdam body and the horseway 3 are provided with double anchoring grooves for fixing the geomembrane 14, and the geomembrane 14 on the horseway 3 combines the double anchorage grooves to form a few characters, which also acts as a telescopic joint. The width is 3m ~ 5m. Above the geomembrane 14 is sprayed concrete 15cm-20cm, the sprayed concrete 15 is divided into blocks of 3m×3m, and the cushion material 13 and the third transition material 603 are laid below.

本实施例中,所述围堰本体包括防护结构高程以下的防渗段和高程以上的挡水段,所述防渗段包括沿水流方向依次布置的大块石10、第二过渡料602、细石渣料8、第一石渣料701、第一过渡料601、截流戗堤5、第二石渣料702以及排水棱体11,所述挡水段包括位于防渗段上方的碾压石渣料12。所述围堰本体的背水侧布置“之”字形道路4至围堰背水侧基坑,“之”字形道路4宽度为5m~10m。In this embodiment, the cofferdam body includes an anti-seepage section below the elevation of the protective structure and a water-retaining section above the elevation, and the anti-seepage section includes large stones 10, second transition materials 602, Fine gravel material 8, the first gravel material 701, the first transition material 601, the intercepting embankment 5, the second gravel material 702 and the drainage prism 11, the water retaining section includes a rolling mill located above the anti-seepage section Gravel material 12. A zigzag road 4 is arranged on the backwater side of the cofferdam body to the foundation pit on the backwater side of the cofferdam, and the width of the zigzag road 4 is 5m-10m.

本实施例中,所述围堰本体两侧岸坡布置有混凝土板2,所述土工膜14与防渗墙9顶部的盖帽混凝土901以及混凝土板2之间通过埋置或锚固方式相连接,防渗墙9底部及混凝土板2上布置帷幕灌浆1,帷幕灌浆1按相关规范要求确定穿过覆盖层18并深入基岩19内一定深度,形成一道封闭的防渗体系。In this embodiment, concrete slabs 2 are arranged on both sides of the cofferdam body, and the geomembrane 14 is connected to the capping concrete 901 on the top of the cutoff wall 9 and the concrete slab 2 by embedding or anchoring. The curtain grouting 1 is arranged on the bottom of the cutoff wall 9 and the concrete slab 2. The curtain grouting 1 is determined to pass through the covering layer 18 and penetrate into the bedrock 19 to a certain depth according to the requirements of relevant specifications, forming a closed seepage prevention system.

进一步地,所述截流戗堤5位于防渗墙9下游侧,截流戗堤5迎水侧坡脚距离防渗墙9轴线的水平距离不小于15m。Further, the cut-off dike 5 is located on the downstream side of the cut-off wall 9, and the horizontal distance between the toe of the cut-off dike 5 on the upstream side and the axis of the cut-off wall 9 is not less than 15m.

本实施例中,所述防护结构高程以上边坡坡比为1:2~2.5,以下边坡坡比为1:1.5,背水侧坡比1:1.6~1.8。所述防护结构宽度不小于20m,其包括由上至下依次布置的干砌块石17、第四过渡料604、垫层料13和碎石土16组成。In this embodiment, the slope ratio of the slope above the protection structure elevation is 1:2-2.5, the slope ratio of the slope below is 1:1.5, and the slope ratio of the backwater side is 1:1.6-1.8. The protective structure is not less than 20m in width, and consists of dry block stones 17 , fourth transition material 604 , cushion material 13 and gravel soil 16 arranged in sequence from top to bottom.

基于上述结构,本实施例还提供一种围堰结构的施工方法,包括如下步骤:Based on the above structure, the present embodiment also provides a construction method of a cofferdam structure, comprising the following steps:

1、防护结构高程以下部分填筑1. Filling of the part below the elevation of the protective structure

对围堰两侧岸坡开挖支护,浇筑两侧岸坡混凝土板2→截流戗堤5进占、开始两岸交通洞内帷幕灌浆1施工→戗堤上游第一过渡料601填筑→细石渣料8填筑→第一石渣料701填筑、第二过渡料602填筑→大块石10填筑→排水棱体11填筑→第二石渣料702填筑。Excavate and support the bank slopes on both sides of the cofferdam, pour concrete slabs on both sides of the bank slope 2 → fill in the closure embankment 5, start curtain grouting 1 construction in the traffic tunnel on both sides → fill the first transition material 601 upstream of the embankment → fine stone Filling with slag material 8→filling with first gravel material 701, filling with second transition material 602→filling with large stone 10→filling with drainage prism 11→filling with second gravel material 702.

2、防护结构高程以上部分填筑2. Filling of the part above the elevation of the protective structure

碾压石渣料12填筑→第三过渡料603、垫层料13填筑。Filling of the rolled gravel material 12 → filling of the third transition material 603 and cushion material 13.

3、防渗墙9施工3. Construction of anti-seepage wall 9

大块石10完工后,在其他部位填筑施工的同时,开始防渗墙9和防渗墙9底部帷幕灌浆1施工。After the large stone 10 is completed, the construction of the anti-seepage wall 9 and the curtain grouting 1 at the bottom of the anti-seepage wall 9 is started while other parts are being filled.

3、土工膜14施工3. Construction of geomembrane 14

在中间马道3位置开挖双锚固沟→沿围堰上游坡面自上而下铺设土工膜14→土工膜14与防渗墙9顶部的盖帽混凝土901及两侧岸坡混凝土板2通过埋置或锚固方式连接→锚固沟部位土工膜14填筑垫层料13。Excavate double anchorage ditch at position 3 of the middle roadway → Lay geomembrane 14 from top to bottom along the upstream slope of the cofferdam → Geomembrane 14 is embedded with the capping concrete 901 on the top of the cut-off wall 9 and the concrete slabs 2 on both sides of the bank Or anchoring mode connection → filling the cushion material 13 with the geomembrane 14 at the anchoring ditch.

4、喷混凝土15施工4. Sprayed concrete 15 construction

在土工膜14表面喷20cm厚混凝土,喷混凝土15按3m×3m分缝。Spray 20cm thick concrete on the surface of the geomembrane 14, and the sprayed concrete 15 is divided into joints according to 3m×3m.

5、防护结构施工5. Construction of protective structure

自下而上依次填筑碎石土16、垫层料13、第四过渡料604、干砌块石17。Fill in gravel soil 16, cushion material 13, fourth transition material 604, and dry block stone 17 sequentially from bottom to top.

依据本实用新型的描述及附图,本领域技术人员很容易制造或使用本实用新型的适用于土工膜较高挡水水头的斜墙土工膜土石围堰结构,并且能够产生本实用新型所记载的积极效果。According to the description and drawings of the utility model, those skilled in the art can easily manufacture or use the oblique wall geomembrane earth-rock cofferdam structure of the utility model which is suitable for the higher retaining head of the geomembrane, and can produce the structure described in the utility model. positive effect.

如无特殊说明,本实用新型中,若有术语“长度”、“宽度”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”、“内”、“外”、“顺时针”、“逆时针”、“轴向”、“径向”、“周向”等指示的方位或位置关系是基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此本实用新型中描述方位或位置关系的用语仅用于示例性说明,不能理解为对本专利的限制,对于本领域的普通技术人员而言,可以结合附图,并根据具体情况理解上述术语的具体含义。此外,术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。Unless otherwise specified, in the present utility model, if there are terms "length", "width", "upper", "lower", "front", "back", "left", "right", "vertical", Orientation or position indicated by "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", "axial", "radial", "circumferential", etc. The relationship is based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, Therefore, the terms describing orientation or positional relationship in the utility model are only used for exemplary illustration, and cannot be interpreted as a limitation to this patent. Concrete meaning. In addition, the terms "first" and "second" are used for descriptive purposes only, and cannot be interpreted as indicating or implying relative importance or implicitly specifying the quantity of indicated technical features.

除非另有明确的规定和限定,本实用新型中,若有术语“设置”、“相连”及“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本实用新型中的具体含义。Unless otherwise clearly stipulated and limited, in the present utility model, if there are terms "setting", "connecting" and "connecting", they should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integrated Connection; it can be a direct connection or an indirect connection through an intermediary, and it can be an internal connection between two elements. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present utility model in specific situations.

以上所述,仅是本实用新型的较佳实施例,并非对本实用新型做任何形式上的限制,凡是依据本实用新型的技术实质对以上实施例所作的任何简单修改、等同变化,均落入本实用新型的保护范围“之”内。The above is only a preferred embodiment of the utility model, and does not limit the utility model in any form. Any simple modification or equivalent change made to the above embodiments according to the technical essence of the utility model falls within the scope of the present utility model. Within the protection scope of the present utility model "of".

Claims (10)

1. Inclined wall geomembrane earth rock cofferdam structure suitable for the higher manger plate flood peak of geomembrane, its characterized in that: the cofferdam comprises a cofferdam body, an impervious wall (9) arranged on the water facing side of the cofferdam body and a protective structure with a certain width arranged at the top of the impervious wall (9); a ramp between the protective structure and the top of the cofferdam body is provided with a berm (3) with a certain width, and a geomembrane (14) is paved on the ramp from top to bottom; and the top of the cofferdam body and the pavement (3) are both provided with anchoring ditches for fixing the geomembrane (14).
2. The inclined-wall geomembrane earth rock cofferdam structure suitable for the higher water-retaining head of geomembrane of claim 1, characterized in that: concrete plates (2) are arranged on bank slopes on two sides of the cofferdam body, the geomembrane (14) is connected with the cap concrete (901) on the top of the impervious wall (9) and the concrete plates (2) in a burying or anchoring mode, and curtain grouting (1) is arranged on the bottom of the impervious wall (9) and the concrete plates (2) to form a closed impervious system.
3. The inclined-wall geomembrane earth rock cofferdam structure suitable for the higher water-retaining head of geomembrane of claim 1, characterized in that: the cofferdam body comprises an anti-seepage section below the elevation of the protective structure and a water retaining section above the elevation, the anti-seepage section comprises large stones (10), second transition materials (602), fine stone slag materials (8), first stone slag materials (701), first transition materials (601), a closure dike (5), second stone slag materials (702) and a drainage ridge body (11) which are sequentially arranged along the water flow direction, and the water retaining section comprises rolling stone slag materials (12) located above the anti-seepage section.
4. The inclined-wall geomembrane earth rock cofferdam structure suitable for the higher water-retaining head of geomembrane of claim 3, characterized in that: the interception dike (5) is positioned at the downstream side of the impervious wall (9), and the horizontal distance between the water-facing side slope foot of the interception dike (5) and the axis of the impervious wall (9) is not less than 15m.
5. The inclined-wall geomembrane earth rock cofferdam structure suitable for the higher water-retaining head of geomembrane of claim 1, characterized in that: the geomembrane on the berm (3) is combined with the double anchoring ditches to be shaped like a Chinese character 'ji', and the geomembrane also plays a role of an expansion joint.
6. The inclined-wall geomembrane earth-rock cofferdam structure suitable for the geomembrane with the higher water retaining head according to claim 1, characterized in that: concrete spraying (15) is arranged above the geomembrane (14), and a bedding material (13) and a third transition material (603) are laid below the geomembrane.
7. The inclined-wall geomembrane earth rock cofferdam structure suitable for the higher water-retaining head of geomembrane of claim 1, characterized in that: the backwater side of the cofferdam body is provided with a zigzag road (4) to a foundation pit at the backwater side of the cofferdam, and the width of the zigzag road (4) is 5-10 m.
8. The inclined-wall geomembrane earth-rock cofferdam structure suitable for the geomembrane with the higher water retaining head according to claim 1, characterized in that: the slope ratio of the side slope above the elevation of the protective structure is 1:2-2.5, the slope ratio of the side slope below the elevation of the protective structure is 1.5, and the slope ratio of the backwater side is 1.6-1.8.
9. The inclined-wall geomembrane earth-rock cofferdam structure suitable for the geomembrane with the higher water retaining head according to claim 1, characterized in that: the width of the protective structure is not less than 20m, and the protective structure comprises dry masonry stones (17), a fourth transition material (604), a bedding material (13) and gravel soil (16) which are sequentially arranged from top to bottom.
10. The inclined-wall geomembrane earth rock cofferdam structure suitable for the higher water-retaining head of geomembrane of claim 1, characterized in that: the width of the pavement (3) is 3-5 m.
CN202221267090.7U 2022-05-24 2022-05-24 Inclined wall geomembrane earth-rock cofferdam structure suitable for higher manger plate flood peak of geomembrane Active CN217870559U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221267090.7U CN217870559U (en) 2022-05-24 2022-05-24 Inclined wall geomembrane earth-rock cofferdam structure suitable for higher manger plate flood peak of geomembrane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221267090.7U CN217870559U (en) 2022-05-24 2022-05-24 Inclined wall geomembrane earth-rock cofferdam structure suitable for higher manger plate flood peak of geomembrane

Publications (1)

Publication Number Publication Date
CN217870559U true CN217870559U (en) 2022-11-22

Family

ID=84091293

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221267090.7U Active CN217870559U (en) 2022-05-24 2022-05-24 Inclined wall geomembrane earth-rock cofferdam structure suitable for higher manger plate flood peak of geomembrane

Country Status (1)

Country Link
CN (1) CN217870559U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114960707A (en) * 2022-05-24 2022-08-30 浙江华东工程建设管理有限公司 Inclined wall geomembrane earth rock cofferdam structure suitable for higher manger plate flood peak of geomembrane

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114960707A (en) * 2022-05-24 2022-08-30 浙江华东工程建设管理有限公司 Inclined wall geomembrane earth rock cofferdam structure suitable for higher manger plate flood peak of geomembrane
CN114960707B (en) * 2022-05-24 2024-10-22 浙江华东工程建设管理有限公司 Applicable to inclined wall geomembrane earth-rock cofferdam structure with water head greater than 35 meters

Similar Documents

Publication Publication Date Title
CN108457249B (en) Structural design and construction method of a composite face sand-gravel dam
CN102797241B (en) Resin face rock dam and its face construction method
CN111305027A (en) Rapid repairing construction method and repairing structure for subsidence of karst area pavement
CN106640091A (en) Shallow-buried tunnel section construction method
CN107288120A (en) A kind of stabilization by drainage structure of new and old roadbed in the firm splicing of watersplash
CN106049379A (en) Temporary power generation method during construction lag of downstream of spillway and rockfill self-breaking dam
CN111894017A (en) Miniature pile group slope reinforcing structure
CN114960707B (en) Applicable to inclined wall geomembrane earth-rock cofferdam structure with water head greater than 35 meters
CN207032212U (en) A kind of stabilization by drainage structure of new and old roadbed in the firm splicing of watersplash
CN105970882B (en) Solve the structure and its building method of face dam construction time dam body reverse osmosis water problems
CN204849791U (en) Structure of earth-rock cofferdam seepage-proofing system
CN222525062U (en) A composite reinforced soil retaining wall suitable for high-speed railway embankment
CN205907658U (en) Be used for anti - structure that seeps water of concrete -faced rockfill dam construction time dam body
CN210421127U (en) Tunnel engineering back pressure backfill structure for treating shallow buried bias voltage diseases
CN119061752A (en) Uneven settlement control structure and construction method of road-bridge transition section in permafrost region
CN112813931A (en) Heightening mixed dam structure combined with built earth-rock dam and construction method thereof
CN208293317U (en) A kind of Plateau Permafrost Areas high-speed railway cutting water blocking discharge structure
CN216194149U (en) Assembled layering culvert
CN205062744U (en) Half gravity type two -stage view anti -flood wall on half cantilever
CN113373865B (en) Frame type embankment structure
Pinchard et al. Spillway capacity upgrade at Malarce dam: Construction of an additional piano key weir spillway
CN115710933A (en) Construction method of gravity retaining wall under wading condition
CN108505547A (en) A kind of structural system and method for the antiseismic liquefaction uplifting in subway station
CN215977136U (en) Concrete panel rock-fill dam structure with foundation grouting gallery
CN221895821U (en) Anchor plate type retaining wall for high-fill half-filled embankment