CN110106836A - A kind of Face Rockfill Dam reversed construction method - Google Patents
A kind of Face Rockfill Dam reversed construction method Download PDFInfo
- Publication number
- CN110106836A CN110106836A CN201910319146.5A CN201910319146A CN110106836A CN 110106836 A CN110106836 A CN 110106836A CN 201910319146 A CN201910319146 A CN 201910319146A CN 110106836 A CN110106836 A CN 110106836A
- Authority
- CN
- China
- Prior art keywords
- construction
- dam
- rockfill
- reversed
- construction method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B7/00—Barrages or weirs; Layout, construction, methods of, or devices for, making same
- E02B7/02—Fixed barrages
- E02B7/04—Dams across valleys
- E02B7/06—Earth-fill dams; Rock-fill dams
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/40—Foundations for dams across valleys or for dam constructions
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Mechanical Engineering (AREA)
- Revetment (AREA)
Abstract
The present invention provides a kind of Face Rockfill Dam reversed construction method, shut off including construction dam abutment, construction diversion hole and cofferdam, the dam foundation of constructing, while secondary rockfill area filling construction, it carries out toe board to excavate with pouring construction, main rockfill area filling construction, after panel pouring construction finishes, construction terminates.Using technical solution of the present invention, the construction period can be greatly shortened in two working procedure parallel operations, during filling construction, for diversion tunnel, the materials such as building stones needed for the construction that toe board slot excavates, it can be used as needed, it does not need to build corresponding rickyard, for material temporarily to be stored or is transported, save the construction investment fund of rickyard, the material that reserved Shang Ba highway is used to use needed for transporting while carrying out secondary rockfill area filling construction, facilitate the instant transport of material in subsequent construction process, compared to enjoying technology, the construction period has been greatly shortened in the present invention, improve construction efficiency.
Description
Technical field
The present invention relates to technical field of wind power generator, particularly relate to a kind of Face Rockfill Dam reversed construction method.
Background technique
Rock is using rockfill as supporting structure, and casting concrete panel in surface is as leakage preventing structure at its upstream
Rock-fill dams, rock is mainly made of rockfill and seepage control system, it may be assumed that panel, toe board, bed course, transition zone, main enrockment
Area, secondary rockfill area composition.In the prior art, the sequence of construction constructed rock usually according to such as Fig. 1, it may be assumed that first
First carry out leading river closure construction and abutment excavation, then carry out dam foundation treatment, then again the excavation of toe board with pour, finally again successively
Fill dam body.It is carried out after general dam embankment should be checked and accepted in the dam foundation, two sides bank processing and corresponding toe board is constructed.Existing panel
Rock-fill dam construction technique, which has the following deficiencies:, is carrying out dam embankment after the completion of dam filling construction this first will wait toe boards to pour,
Filling for toe board cannot many times carry out simultaneously with filling for dam body, and the duration is longer.Secondly excavated in diversion tunnel, toe board slot etc.
Process, many can materials dug out before filling and cannot but go up dam, need rickyard to store and transhipment, increase construction investment.
Summary of the invention
In order to solve the above technical problems, the present invention provides a kind of Face Rockfill Dam reversed construction methods.
The present invention is achieved by the following technical programs.
The present invention provides a kind of Face Rockfill Dam reversed construction methods, comprising the following steps:
Step 1: construction dam abutment;
Step 2: construction diversion hole and cofferdam are shut off;
Step 3: the construction dam foundation;
Step 4: while secondary rockfill area filling construction, toe board excavation and pouring construction are carried out;
Step 5: main rockfill area filling construction;
Step 6: after panel pouring construction finishes, construction terminates.
Step 1 can construct simultaneously with step 2.
The construction dam foundation described in step 3 includes main rockfill area dam foundation construction and time rockfill area dam foundation construction.
Time rockfill area filling construction described in step 4 refers to by the way of layered rolling filling construction.
The secondary rockfill area up stream slope plane inclination is 1:2.
Main rockfill area filling construction described in step 5 refers to by the way of layered rolling filling construction.
The main rockfill area downstream slope surface gradient is 1:2.
The Face Rockfill Dam reversed construction method is further comprising the steps of:
Step 1: described in step 4 while secondary rockfill area filling construction, reserving Shang Ba highway;
Step 2: described in step 5 while main rockfill area filling construction, using in upper dam highway transportation work progress
Required material.
The beneficial effects of the present invention are: technical solution of the present invention is used, the same of time rockfill area filling construction is being carried out
When, the excavation of toe board slot and the pouring construction of toe board are carried out, construction work can be greatly shortened in two working procedure parallel operations
Phase, during filling construction, the materials such as building stones needed for the construction excavated for diversion tunnel, toe board slot, can with take with
With not needing to build corresponding rickyard, for material temporarily to be stored or transported, save the construction investment of rickyard
Fund, the material that reserved Shang Ba highway is used to use needed for transporting while carrying out secondary rockfill area filling construction, after facilitating
The instant transport of material in continuous working procedure, lays a good foundation to improve filling construction quality.Compared to technology of enjoying, the present invention is big
Amplitude shortens the construction period, improves construction efficiency.
Detailed description of the invention
Fig. 1 is the construction flow chart of rock in the prior art;
Fig. 2 is the construction flow chart of first embodiment of the invention;
Fig. 3 is the construction flow chart of second embodiment of the invention.
Specific embodiment
Be described further below technical solution of the present invention, but claimed range be not limited to it is described.
Embodiment 1:
As shown in Fig. 2, the present invention provides a kind of Face Rockfill Dam reversed construction methods, comprising the following steps:
Step 1: construction dam abutment;
Step 2: construction diversion hole and cofferdam are shut off;Further, step 1 is constructed simultaneously with step 2.
Step 3: the construction dam foundation;The construction dam foundation includes main rockfill area dam foundation construction and time rockfill area dam foundation construction.
Step 4: while secondary rockfill area filling construction, toe board excavation and pouring construction are carried out;Further, described
Secondary rockfill area filling construction refers to by the way of layered rolling filling construction.And the secondary rockfill area up stream slope plane inclination
For 1:2.
Step 5: main rockfill area filling construction;Further, the main rockfill area filling construction refers to using layered rolling
The mode of filling construction.The main rockfill area downstream slope surface gradient is 1:2.
Step 6: after panel pouring construction finishes, construction terminates.
In addition, the Face Rockfill Dam reversed construction method is further comprising the steps of:
Step 1: described in step 4 while secondary rockfill area filling construction, reserving Shang Ba highway;
Step 2: described in step 5 while main rockfill area filling construction, using in upper dam highway transportation work progress
Required material.
Embodiment 1:
As shown in figure 3, the present invention provides a kind of Face Rockfill Dam reversed construction methods, comprising the following steps:
Step 1: construction dam abutment;
Step 2: construction diversion hole and cofferdam are shut off;Further, step 1 is constructed simultaneously with step 2.
Step 3: the construction dam foundation;
Step 4: while secondary rockfill area filling construction, toe board excavation and pouring construction are carried out;Further, described
Secondary rockfill area filling construction refers to by the way of layered rolling filling construction.And the secondary rockfill area up stream slope plane inclination
For 1:2.
Step 5: main rockfill area filling construction;Further, the main rockfill area filling construction refers to using layered rolling
The mode of filling construction.The main rockfill area downstream slope surface gradient is 1:2.
Step 6: after panel pouring construction finishes, construction terminates.
In addition, the Face Rockfill Dam reversed construction method is further comprising the steps of:
Step 1: described in step 4 while secondary rockfill area filling construction, reserving Shang Ba highway;
Step 2: described in step 5 while main rockfill area filling construction, using in upper dam highway transportation work progress
Required material.
Using technical solution of the present invention, while carrying out time rockfill area filling construction, carry out the excavation of toe board slot with
The pouring construction of toe board, the construction period can be greatly shortened in two working procedure parallel operations, during filling construction, use
The materials such as the building stones needed for the construction that diversion tunnel, toe board slot excavate, can be used as needed, does not need to build corresponding windrow
, for material temporarily to be stored or transported, the construction investment fund of rickyard is saved, is filled carrying out time rockfill area
The material that Shang Ba highway is used to use needed for transporting is reserved while construction, facilitates the i.e. luck of material in subsequent construction process
It is defeated, it lays a good foundation to improve filling construction quality.Compared to technology of enjoying, the construction period has been greatly shortened in the present invention, is improved
Construction efficiency.
Claims (8)
1. a kind of Face Rockfill Dam reversed construction method, it is characterised in that: the following steps are included:
Step 1: construction dam abutment;
Step 2: construction diversion hole and cofferdam are shut off;
Step 3: the construction dam foundation;
Step 4: while secondary rockfill area filling construction, toe board excavation and pouring construction are carried out;
Step 5: main rockfill area filling construction;
Step 6: after panel pouring construction finishes, construction terminates.
2. Face Rockfill Dam reversed construction method as described in claim 1, it is characterised in that: step 1 and step 2 can
It constructs simultaneously.
3. Face Rockfill Dam reversed construction method as described in claim 1, it is characterised in that: construct described in step 3
The dam foundation includes main rockfill area dam foundation construction and time rockfill area dam foundation construction.
4. Face Rockfill Dam reversed construction method as described in claim 1, it is characterised in that: time heap described in step 4
Stone area filling construction refers to by the way of layered rolling filling construction.
5. Face Rockfill Dam reversed construction method as described in claim 1, it is characterised in that: the secondary rockfill area upstream
Slope surface gradient is 1:2.
6. Face Rockfill Dam reversed construction method as described in claim 1, it is characterised in that: main heap described in step 5
Stone area filling construction refers to by the way of layered rolling filling construction.
7. Face Rockfill Dam reversed construction method as described in claim 1, it is characterised in that: the main rockfill area downstream
Slope surface gradient is 1:2.
8. Face Rockfill Dam reversed construction method as described in claim 1, it is characterised in that: the rock toe
Plate reversed construction method is further comprising the steps of:
Step 1: described in step 4 while secondary rockfill area filling construction, reserving Shang Ba highway;
Step 2: described in step 5 while main rockfill area filling construction, needed in upper dam highway transportation work progress
Material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910319146.5A CN110106836A (en) | 2019-04-19 | 2019-04-19 | A kind of Face Rockfill Dam reversed construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910319146.5A CN110106836A (en) | 2019-04-19 | 2019-04-19 | A kind of Face Rockfill Dam reversed construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110106836A true CN110106836A (en) | 2019-08-09 |
Family
ID=67486073
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910319146.5A Pending CN110106836A (en) | 2019-04-19 | 2019-04-19 | A kind of Face Rockfill Dam reversed construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110106836A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114622524A (en) * | 2022-03-24 | 2022-06-14 | 中国水利水电第五工程局有限公司 | Construction method of concrete faced rockfill dam for rapidly filling rockfill |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103225285A (en) * | 2013-05-11 | 2013-07-31 | 天津大学 | Steel membrane concrete faced rockfill dam |
CN105297686A (en) * | 2015-11-25 | 2016-02-03 | 河海大学 | Grid type concrete faced rockfill dam |
CN107354917A (en) * | 2017-07-28 | 2017-11-17 | 昆明理工大学 | A kind of gravity rock and its construction method |
JP6368555B2 (en) * | 2014-06-18 | 2018-08-01 | 大成建設株式会社 | Flow countermeasure structure |
CN108439867A (en) * | 2018-04-16 | 2018-08-24 | 河海大学 | Using the rock-fill dams and its construction method of seamless panel |
CN208023515U (en) * | 2018-03-12 | 2018-10-30 | 云南润晶水利电力工程技术股份有限公司 | A kind of concrete face rockfill dam |
-
2019
- 2019-04-19 CN CN201910319146.5A patent/CN110106836A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103225285A (en) * | 2013-05-11 | 2013-07-31 | 天津大学 | Steel membrane concrete faced rockfill dam |
JP6368555B2 (en) * | 2014-06-18 | 2018-08-01 | 大成建設株式会社 | Flow countermeasure structure |
CN105297686A (en) * | 2015-11-25 | 2016-02-03 | 河海大学 | Grid type concrete faced rockfill dam |
CN107354917A (en) * | 2017-07-28 | 2017-11-17 | 昆明理工大学 | A kind of gravity rock and its construction method |
CN208023515U (en) * | 2018-03-12 | 2018-10-30 | 云南润晶水利电力工程技术股份有限公司 | A kind of concrete face rockfill dam |
CN108439867A (en) * | 2018-04-16 | 2018-08-24 | 河海大学 | Using the rock-fill dams and its construction method of seamless panel |
Non-Patent Citations (1)
Title |
---|
喻玥等: "水布垭水电站面板堆石坝坝体填筑施工", 《水利水电工程设计》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114622524A (en) * | 2022-03-24 | 2022-06-14 | 中国水利水电第五工程局有限公司 | Construction method of concrete faced rockfill dam for rapidly filling rockfill |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106499413B (en) | A kind of Shallow-buried section tunnel stratum consolidation construction method | |
CN105697021B (en) | The prefabricated tunnel and construction method in the shallow earthing riverbed of shield crossing | |
WO2020248596A1 (en) | Protection structure for preventing ground heave caused by tunnel grouting reinforcement and grouting method | |
CN109488313B (en) | V-level surrounding rock micro-step excavation construction process | |
CN105201448A (en) | Method for water-stopping grouting plugging in high-pressure high-flow water gush channel | |
CN103526766A (en) | Method for plugging relief well of deep foundation pit | |
CN106761778A (en) | A kind of underground digging in subway station construction technology suitable for upper-soft lower-hard ground | |
CN104131575A (en) | Plugging and drainage method for dam foundation on karst highly developed stratum | |
CN108457656A (en) | A kind of unearthed method for tunnel construction | |
CN105297685B (en) | A kind of pedestal CFRD and its construction method | |
CN106499399A (en) | A kind of Shield Construction Method Used method of overlapping tunnel in rich water powder land floor | |
CN108797641A (en) | A kind of structure and its construction method of Underground Subway Station construction period full station sealing | |
CN108412503A (en) | Bias shallow tunnel entrance construction safeguard structure and its construction method | |
CN208965598U (en) | The Anti-seeping technology structure of grout curtain and underground chamber intersection area | |
CN106759223A (en) | Controllable rigid pile+displacement hull+reinforcement cushion combined composite foundation | |
WO2024099477A1 (en) | Construction method for remodeling and extending ship lock in situ | |
CN107905798A (en) | The method that flat top wall boring construction is carried out using central drift method | |
CN106592614A (en) | Water leakage point blockage method in foundation pit water stop curtain | |
CN105350511A (en) | Border dike water bag strip, water storing border dike, and method for performing water bag strip pile-loading and prepressing | |
CN104652371A (en) | Overflow cemented rock-fill dam established based on old dam and construction method thereof | |
CN206448284U (en) | Suitable for the cofferdam structure on soft soil foundation | |
CN106884427A (en) | Immersed tube tunnel and immersed tube tunnel changeover portion soft soil foundation reinforcing method under water | |
CN110106836A (en) | A kind of Face Rockfill Dam reversed construction method | |
CN109898556A (en) | A kind of underground pipe gallery structure and sunk type construction method | |
CN109630138A (en) | The steelframe dike combined support partial excavation method of enlarging large section tunnel in situ |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190809 |
|
RJ01 | Rejection of invention patent application after publication |