CN110106836A
CN110106836A CN201910319146.5A CN201910319146A CN110106836A CN 110106836 A CN110106836 A CN 110106836A CN 201910319146 A CN201910319146 A CN 201910319146A CN 110106836 A CN110106836 A CN 110106836A
Authority
CN
China
Prior art keywords
construction
dam
rockfill
reversed
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910319146.5A
Other languages
Chinese (zh)
Inventor
刘孟
丁国珍
刘慧婷
罗姗姗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201910319146.5A priority Critical patent/CN110106836A/en
Publication of CN110106836A publication Critical patent/CN110106836A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/02Fixed barrages
    • E02B7/04Dams across valleys
    • E02B7/06Earth-fill dams; Rock-fill dams
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/40Foundations for dams across valleys or for dam constructions

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Mechanical Engineering (AREA)
  • Revetment (AREA)

Abstract

The present invention provides a kind of Face Rockfill Dam reversed construction method, shut off including construction dam abutment, construction diversion hole and cofferdam, the dam foundation of constructing, while secondary rockfill area filling construction, it carries out toe board to excavate with pouring construction, main rockfill area filling construction, after panel pouring construction finishes, construction terminates.Using technical solution of the present invention, the construction period can be greatly shortened in two working procedure parallel operations, during filling construction, for diversion tunnel, the materials such as building stones needed for the construction that toe board slot excavates, it can be used as needed, it does not need to build corresponding rickyard, for material temporarily to be stored or is transported, save the construction investment fund of rickyard, the material that reserved Shang Ba highway is used to use needed for transporting while carrying out secondary rockfill area filling construction, facilitate the instant transport of material in subsequent construction process, compared to enjoying technology, the construction period has been greatly shortened in the present invention, improve construction efficiency.

Description

A kind of Face Rockfill Dam reversed construction method
Technical field
The present invention relates to technical field of wind power generator, particularly relate to a kind of Face Rockfill Dam reversed construction method.
Background technique
Rock is using rockfill as supporting structure, and casting concrete panel in surface is as leakage preventing structure at its upstream Rock-fill dams, rock is mainly made of rockfill and seepage control system, it may be assumed that panel, toe board, bed course, transition zone, main enrockment Area, secondary rockfill area composition.In the prior art, the sequence of construction constructed rock usually according to such as Fig. 1, it may be assumed that first First carry out leading river closure construction and abutment excavation, then carry out dam foundation treatment, then again the excavation of toe board with pour, finally again successively Fill dam body.It is carried out after general dam embankment should be checked and accepted in the dam foundation, two sides bank processing and corresponding toe board is constructed.Existing panel Rock-fill dam construction technique, which has the following deficiencies:, is carrying out dam embankment after the completion of dam filling construction this first will wait toe boards to pour, Filling for toe board cannot many times carry out simultaneously with filling for dam body, and the duration is longer.Secondly excavated in diversion tunnel, toe board slot etc. Process, many can materials dug out before filling and cannot but go up dam, need rickyard to store and transhipment, increase construction investment.
Summary of the invention
In order to solve the above technical problems, the present invention provides a kind of Face Rockfill Dam reversed construction methods.
The present invention is achieved by the following technical programs.
The present invention provides a kind of Face Rockfill Dam reversed construction methods, comprising the following steps:
Step 1: construction dam abutment;
Step 2: construction diversion hole and cofferdam are shut off;
Step 3: the construction dam foundation;
Step 4: while secondary rockfill area filling construction, toe board excavation and pouring construction are carried out;
Step 5: main rockfill area filling construction;
Step 6: after panel pouring construction finishes, construction terminates.
Step 1 can construct simultaneously with step 2.
The construction dam foundation described in step 3 includes main rockfill area dam foundation construction and time rockfill area dam foundation construction.
Time rockfill area filling construction described in step 4 refers to by the way of layered rolling filling construction.
The secondary rockfill area up stream slope plane inclination is 1:2.
Main rockfill area filling construction described in step 5 refers to by the way of layered rolling filling construction.
The main rockfill area downstream slope surface gradient is 1:2.
The Face Rockfill Dam reversed construction method is further comprising the steps of:
Step 1: described in step 4 while secondary rockfill area filling construction, reserving Shang Ba highway;
Step 2: described in step 5 while main rockfill area filling construction, using in upper dam highway transportation work progress Required material.
The beneficial effects of the present invention are: technical solution of the present invention is used, the same of time rockfill area filling construction is being carried out When, the excavation of toe board slot and the pouring construction of toe board are carried out, construction work can be greatly shortened in two working procedure parallel operations Phase, during filling construction, the materials such as building stones needed for the construction excavated for diversion tunnel, toe board slot, can with take with With not needing to build corresponding rickyard, for material temporarily to be stored or transported, save the construction investment of rickyard Fund, the material that reserved Shang Ba highway is used to use needed for transporting while carrying out secondary rockfill area filling construction, after facilitating The instant transport of material in continuous working procedure, lays a good foundation to improve filling construction quality.Compared to technology of enjoying, the present invention is big Amplitude shortens the construction period, improves construction efficiency.
Detailed description of the invention
Fig. 1 is the construction flow chart of rock in the prior art;
Fig. 2 is the construction flow chart of first embodiment of the invention;
Fig. 3 is the construction flow chart of second embodiment of the invention.
Specific embodiment
Be described further below technical solution of the present invention, but claimed range be not limited to it is described.
Embodiment 1:
As shown in Fig. 2, the present invention provides a kind of Face Rockfill Dam reversed construction methods, comprising the following steps:
Step 1: construction dam abutment;
Step 2: construction diversion hole and cofferdam are shut off;Further, step 1 is constructed simultaneously with step 2.
Step 3: the construction dam foundation;The construction dam foundation includes main rockfill area dam foundation construction and time rockfill area dam foundation construction.
Step 4: while secondary rockfill area filling construction, toe board excavation and pouring construction are carried out;Further, described Secondary rockfill area filling construction refers to by the way of layered rolling filling construction.And the secondary rockfill area up stream slope plane inclination For 1:2.
Step 5: main rockfill area filling construction;Further, the main rockfill area filling construction refers to using layered rolling The mode of filling construction.The main rockfill area downstream slope surface gradient is 1:2.
Step 6: after panel pouring construction finishes, construction terminates.
In addition, the Face Rockfill Dam reversed construction method is further comprising the steps of:
Step 1: described in step 4 while secondary rockfill area filling construction, reserving Shang Ba highway;
Step 2: described in step 5 while main rockfill area filling construction, using in upper dam highway transportation work progress Required material.
Embodiment 1:
As shown in figure 3, the present invention provides a kind of Face Rockfill Dam reversed construction methods, comprising the following steps:
Step 1: construction dam abutment;
Step 2: construction diversion hole and cofferdam are shut off;Further, step 1 is constructed simultaneously with step 2.
Step 3: the construction dam foundation;
Step 4: while secondary rockfill area filling construction, toe board excavation and pouring construction are carried out;Further, described Secondary rockfill area filling construction refers to by the way of layered rolling filling construction.And the secondary rockfill area up stream slope plane inclination For 1:2.
Step 5: main rockfill area filling construction;Further, the main rockfill area filling construction refers to using layered rolling The mode of filling construction.The main rockfill area downstream slope surface gradient is 1:2.
Step 6: after panel pouring construction finishes, construction terminates.
In addition, the Face Rockfill Dam reversed construction method is further comprising the steps of:
Step 1: described in step 4 while secondary rockfill area filling construction, reserving Shang Ba highway;
Step 2: described in step 5 while main rockfill area filling construction, using in upper dam highway transportation work progress Required material.
Using technical solution of the present invention, while carrying out time rockfill area filling construction, carry out the excavation of toe board slot with The pouring construction of toe board, the construction period can be greatly shortened in two working procedure parallel operations, during filling construction, use The materials such as the building stones needed for the construction that diversion tunnel, toe board slot excavate, can be used as needed, does not need to build corresponding windrow , for material temporarily to be stored or transported, the construction investment fund of rickyard is saved, is filled carrying out time rockfill area The material that Shang Ba highway is used to use needed for transporting is reserved while construction, facilitates the i.e. luck of material in subsequent construction process It is defeated, it lays a good foundation to improve filling construction quality.Compared to technology of enjoying, the construction period has been greatly shortened in the present invention, is improved Construction efficiency.

Claims (8)

1. a kind of Face Rockfill Dam reversed construction method, it is characterised in that: the following steps are included:
Step 1: construction dam abutment;
Step 2: construction diversion hole and cofferdam are shut off;
Step 3: the construction dam foundation;
Step 4: while secondary rockfill area filling construction, toe board excavation and pouring construction are carried out;
Step 5: main rockfill area filling construction;
Step 6: after panel pouring construction finishes, construction terminates.
2. Face Rockfill Dam reversed construction method as described in claim 1, it is characterised in that: step 1 and step 2 can It constructs simultaneously.
3. Face Rockfill Dam reversed construction method as described in claim 1, it is characterised in that: construct described in step 3 The dam foundation includes main rockfill area dam foundation construction and time rockfill area dam foundation construction.
4. Face Rockfill Dam reversed construction method as described in claim 1, it is characterised in that: time heap described in step 4 Stone area filling construction refers to by the way of layered rolling filling construction.
5. Face Rockfill Dam reversed construction method as described in claim 1, it is characterised in that: the secondary rockfill area upstream Slope surface gradient is 1:2.
6. Face Rockfill Dam reversed construction method as described in claim 1, it is characterised in that: main heap described in step 5 Stone area filling construction refers to by the way of layered rolling filling construction.
7. Face Rockfill Dam reversed construction method as described in claim 1, it is characterised in that: the main rockfill area downstream Slope surface gradient is 1:2.
8. Face Rockfill Dam reversed construction method as described in claim 1, it is characterised in that: the rock toe Plate reversed construction method is further comprising the steps of:
Step 1: described in step 4 while secondary rockfill area filling construction, reserving Shang Ba highway;
Step 2: described in step 5 while main rockfill area filling construction, needed in upper dam highway transportation work progress Material.
CN201910319146.5A 2019-04-19 2019-04-19 A kind of Face Rockfill Dam reversed construction method Pending CN110106836A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910319146.5A CN110106836A (en) 2019-04-19 2019-04-19 A kind of Face Rockfill Dam reversed construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910319146.5A CN110106836A (en) 2019-04-19 2019-04-19 A kind of Face Rockfill Dam reversed construction method

Publications (1)

Publication Number Publication Date
CN110106836A true CN110106836A (en) 2019-08-09

Family

ID=67486073

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910319146.5A Pending CN110106836A (en) 2019-04-19 2019-04-19 A kind of Face Rockfill Dam reversed construction method

Country Status (1)

Country Link
CN (1) CN110106836A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114622524A (en) * 2022-03-24 2022-06-14 中国水利水电第五工程局有限公司 Construction method of concrete faced rockfill dam for rapidly filling rockfill

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103225285A (en) * 2013-05-11 2013-07-31 天津大学 Steel membrane concrete faced rockfill dam
CN105297686A (en) * 2015-11-25 2016-02-03 河海大学 Grid type concrete faced rockfill dam
CN107354917A (en) * 2017-07-28 2017-11-17 昆明理工大学 A kind of gravity rock and its construction method
JP6368555B2 (en) * 2014-06-18 2018-08-01 大成建設株式会社 Flow countermeasure structure
CN108439867A (en) * 2018-04-16 2018-08-24 河海大学 Using the rock-fill dams and its construction method of seamless panel
CN208023515U (en) * 2018-03-12 2018-10-30 云南润晶水利电力工程技术股份有限公司 A kind of concrete face rockfill dam

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103225285A (en) * 2013-05-11 2013-07-31 天津大学 Steel membrane concrete faced rockfill dam
JP6368555B2 (en) * 2014-06-18 2018-08-01 大成建設株式会社 Flow countermeasure structure
CN105297686A (en) * 2015-11-25 2016-02-03 河海大学 Grid type concrete faced rockfill dam
CN107354917A (en) * 2017-07-28 2017-11-17 昆明理工大学 A kind of gravity rock and its construction method
CN208023515U (en) * 2018-03-12 2018-10-30 云南润晶水利电力工程技术股份有限公司 A kind of concrete face rockfill dam
CN108439867A (en) * 2018-04-16 2018-08-24 河海大学 Using the rock-fill dams and its construction method of seamless panel

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
喻玥等: "水布垭水电站面板堆石坝坝体填筑施工", 《水利水电工程设计》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114622524A (en) * 2022-03-24 2022-06-14 中国水利水电第五工程局有限公司 Construction method of concrete faced rockfill dam for rapidly filling rockfill

Similar Documents

Publication Publication Date Title
CN106499413B (en) A kind of Shallow-buried section tunnel stratum consolidation construction method
WO2020248596A1 (en) Protection structure for preventing ground heave caused by tunnel grouting reinforcement and grouting method
CN105697021B (en) The prefabricated tunnel and construction method in the shallow earthing riverbed of shield crossing
CN109488313B (en) V-level surrounding rock micro-step excavation construction process
CN105201448A (en) Method for water-stopping grouting plugging in high-pressure high-flow water gush channel
CN103526766A (en) Method for plugging relief well of deep foundation pit
CN106761778A (en) A kind of underground digging in subway station construction technology suitable for upper-soft lower-hard ground
CN108457656A (en) A kind of unearthed method for tunnel construction
CN105297685B (en) A kind of pedestal CFRD and its construction method
CN106499399A (en) A kind of Shield Construction Method Used method of overlapping tunnel in rich water powder land floor
CN108797641A (en) A kind of structure and its construction method of Underground Subway Station construction period full station sealing
CN108412503A (en) Bias shallow tunnel entrance construction safeguard structure and its construction method
CN208965598U (en) The Anti-seeping technology structure of grout curtain and underground chamber intersection area
CN106759223A (en) Controllable rigid pile+displacement hull+reinforcement cushion combined composite foundation
WO2024099477A1 (en) Construction method for remodeling and extending ship lock in situ
CN107905798A (en) The method that flat top wall boring construction is carried out using central drift method
CN106592614A (en) Water leakage point blockage method in foundation pit water stop curtain
CN105350511A (en) Border dike water bag strip, water storing border dike, and method for performing water bag strip pile-loading and prepressing
CN104652371A (en) Overflow cemented rock-fill dam established based on old dam and construction method thereof
CN206448284U (en) Suitable for the cofferdam structure on soft soil foundation
CN106884427A (en) Immersed tube tunnel and immersed tube tunnel changeover portion soft soil foundation reinforcing method under water
CN110106836A (en) A kind of Face Rockfill Dam reversed construction method
CN109630138A (en) The steelframe dike combined support partial excavation method of enlarging large section tunnel in situ
CN203742622U (en) Seep-proof component for constructing bearing structure
CN105970882B (en) Solve the structure and its building method of face dam construction time dam body reverse osmosis water problems

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190809

RJ01 Rejection of invention patent application after publication