JP6368555B2 - Flow countermeasure structure - Google Patents

Flow countermeasure structure Download PDF

Info

Publication number
JP6368555B2
JP6368555B2 JP2014125304A JP2014125304A JP6368555B2 JP 6368555 B2 JP6368555 B2 JP 6368555B2 JP 2014125304 A JP2014125304 A JP 2014125304A JP 2014125304 A JP2014125304 A JP 2014125304A JP 6368555 B2 JP6368555 B2 JP 6368555B2
Authority
JP
Japan
Prior art keywords
improvement
improvement body
dam
slope
surface layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2014125304A
Other languages
Japanese (ja)
Other versions
JP2016003514A (en
Inventor
章 立石
章 立石
誉 中西
誉 中西
敬嗣 広重
敬嗣 広重
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP2014125304A priority Critical patent/JP6368555B2/en
Publication of JP2016003514A publication Critical patent/JP2016003514A/en
Application granted granted Critical
Publication of JP6368555B2 publication Critical patent/JP6368555B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Description

本発明は、流動対策構造に関する。   The present invention relates to a flow countermeasure structure.

鉱さい堆積場は、鉱石を選鉱した後の鉱さいを堆積・管理するための施設であって、選鉱場に近い沢や谷に形成されることが多い。
鉱さい堆積場のうち、内盛式と呼ばれる構造では、沢等の下流側に基礎かん止堤(鉱さいの堆積および脱水を目的とした堰堤)を形成し、その背後に鉱さいを堆積する。
The mine tailings are facilities for depositing and managing the slag after ore beneficiation, and are often formed in the valleys and valleys close to the beneficiation sites.
Among the mine deposits, in the structure called the inner-side type, a foundation pier (dam for the purpose of depositing and dewatering) is formed on the downstream side of the rivers, and slag is deposited behind it.

鉱さいには、粘着力を有していない性質のものが含まれているため、鉱さい堆積場に堆積された鉱さいは地震時に液状化する可能性がある。
沢等の斜面に形成された鉱さい堆積場の鉱さいが液状化すると、重力により流動して、基礎かん止堤を乗り越えて流出するおそれがある。
また、鉱さい堆積場に限らず、斜面に堆積した土砂や盛土等についても、地震時の液状化による流出が懸念される。
Since the slag contains a property that does not have adhesive strength, the slag deposited in the mine deposit site may be liquefied during an earthquake.
If the slag of the mine deposit site formed on the slopes of rivers and the like liquefies, it may flow due to gravity and flow over the foundation embankment.
In addition to sediment deposits, sediments and embankments deposited on slopes are also feared to leak due to liquefaction during an earthquake.

このような斜面部の流動対策工としては、例えば、鉱さいや土砂等に対して液状化対策工を施す方法や、堰堤等を嵩上げする方法が採用されている。   For example, a method of applying a liquefaction countermeasure to slag, earth and sand, or a method of raising a dam or the like is adopted as such a countermeasure for the flow of the slope.

液状化対策工としては、例えば特許文献1の造成方法のように、格子状に地盤改良を行うことで、斜面全域の液状化を防止するものがある。
また、堰堤の嵩上げは、鉱さいや土砂等の全てが液状化して流動した場合であっても、流出することがない高さになるまでロック材料や土材料等を盛りたてることにより行う。
As a liquefaction countermeasure work, there is one that prevents liquefaction of the entire slope by performing ground improvement in a lattice shape, for example, as in the construction method of Patent Document 1.
Moreover, even when all of the slag, earth and sand, etc. are liquefied and flow, the dam is raised by adding rock material, earth material, etc. until it reaches a height that does not flow out.

特公平4−54004号公報Japanese Examined Patent Publication No. 4-54004

液状化対策工による流動対策工は、斜面全域に対して、非液状化層に到達するように地盤改良を行う必要があるため、改良体積が大きく、費用および手間がかかる。   Since the flow countermeasure work by the liquefaction countermeasure work needs to improve the ground so as to reach the non-liquefied layer over the entire slope surface, the improvement volume is large, and costs and labor are required.

また、堰堤の嵩上げによる流動対策工は、現地の沢の地形が堰堤の嵩上げに適している必要がある。すなわち、堰堤の両脇の尾根(山)がかさ上げされた堰堤よりも低いと、流動した鉱さいや土砂等の流出を防止することができない。
また、堰堤をかさ上げするには、嵩上げ用の材料(ロック材料や土材料)の調達等に費用がかかってしまう。
In addition, the flow control work by raising the dam needs to be suitable for raising the dam because of the local topography. That is, if the ridges (mountains) on both sides of the dam are lower than the raised dam, it is not possible to prevent the outflow of fluid slag and earth and sand.
Moreover, in order to raise the dam, it is expensive to procure materials for raising the bulk (locking material or earth material).

このような観点から、本発明は、現地の地形に限定されることなく、簡易かつ安価に構築することができる流動対策構造を提案することを課題とする。   From such a viewpoint, an object of the present invention is to propose a flow countermeasure structure that can be easily and inexpensively constructed without being limited to local terrain.

前記課題を解決するために、本発明は、斜面部の下流側に設けられた堰堤と、前記斜面部の表面を覆う改良体である表層改良体と、前記斜面部の側部に形成された改良体である側部改良体とを備える流動対策構造であって、前記表層改良体は、前記堰堤に当接しており、前記側部改良体が非液状化層に着底または根入れされているとともに、前記堰堤および前記表層改良体に当接していることを特徴としている。 In order to solve the above problems, the present invention is formed on a dam provided on the downstream side of a slope portion, a surface layer improvement body that is an improvement body covering the surface of the slope portion, and a side portion of the slope portion. A flow countermeasure structure comprising a side improvement body which is an improvement body, wherein the surface layer improvement body is in contact with the dam, and the side portion improvement body is bottomed or embedded in a non-liquefied layer. And is in contact with the dam and the surface improvement body .

かかる流動対策構造によれば、表層改良体と側部改良体により周囲が囲まれているため、鉱さい堆積場内の鉱さいや斜面部の土砂等に液状化が発生した場合であっても、鉱さいや土砂等の流出を防止することができる。   According to such a flow countermeasure structure, since the periphery is surrounded by the surface layer improvement body and the side part improvement body, even if liquefaction occurs in the slag in the mine deposit site or the earth and sand of the slope part, The outflow of earth and sand can be prevented.

また、前記堰堤の背面に沿って設けられた改良体である下端改良体を備えていてもよい。
さらに、前記斜面部の中央部に形成された改良体である複数の壁状改良体が、互いに間隔をあけて設けられていてもよい。
これらの改良体を備えていれば、より効果的に液状化した鉱さいの流出を防止することができる。
なお、前記表層改良体、前記側部改良体、前記下端改良体および前記壁状改良体のうちの少なくとも一つが、平面視格子状に形成されていてもよい。
Moreover, you may provide the lower end improvement body which is an improvement body provided along the back surface of the said dam.
Furthermore, a plurality of wall-like improvement bodies, which are improvement bodies formed in the central portion of the slope portion, may be provided at intervals.
If these improved bodies are provided, it is possible to more effectively prevent the liquefied slag outflow.
Incidentally, the surface layer improved body, the side improvements body, wherein at least one of the bottom improved body and the wall-like improved body, but may be formed in plan view a grid.

本発明の流動対策構造によれば、表層改良体、側部改良体、下端改良体、壁状改良体等により部分的に改良することで、斜面部を全面的に改良する場合に比べて、改良体体積を減らし、かつ、工事期間を短縮し、なおかつ、工事費を低減することができるため、現地の地形に限定されることなく、簡易かつ安価に信頼性の高い流動対策構造を構築することが可能となる。   According to the flow countermeasure structure of the present invention, by partially improving the surface layer improvement body, the side part improvement body, the lower end improvement body, the wall-like improvement body, etc., compared with the case of improving the slope part entirely, Since the volume of the improved body can be reduced, the construction period can be shortened, and the construction cost can be reduced, a highly reliable flow control structure can be constructed easily and inexpensively without being limited to the local topography. It becomes possible.

(a)は第一の実施形態の流動対策構造を示す平面図、(b)は同縦断面図である。(A) is a top view which shows the flow countermeasure structure of 1st embodiment, (b) is the longitudinal cross-sectional view. (a)は図1のA−A断面図、(b)は同B−B断面図、(c)は同C−C断面図である。(A) is AA sectional drawing of FIG. 1, (b) is the BB sectional drawing, (c) is the CC sectional drawing. (a)は第二の実施形態の流動対策構造を示す平面図、(b)は同縦断面図である。(A) is a top view which shows the flow countermeasure structure of 2nd embodiment, (b) is the longitudinal cross-sectional view. (a)は図3のD−D断面図、(b)は同E−E断面図、(c)は同F−F断面図である。(A) is DD sectional drawing of FIG. 3, (b) is the EE sectional view, (c) is the FF sectional view.

<第一の実施形態>
第一の実施形態では、図1に示すように、斜面部11と平場部12とを有した鉱さい堆積場の流動対策構造1について説明する。
本実施形態の流動対策構造1は、堰堤2と、表層改良体3と、側部改良体4,4とを備えている。
本実施形態の鉱さい堆積場は、岩盤層Rに表土や崖錐堆積物(以下、単に「非液状化層13」という)が積層された箇所に形成されている。
<First embodiment>
In the first embodiment, as shown in FIG. 1, a description will be given of a flow countermeasure structure 1 for a slag deposition site having a slope portion 11 and a flat field portion 12.
The flow countermeasure structure 1 of the present embodiment includes a dam 2, a surface layer improvement body 3, and side part improvement bodies 4 and 4.
The mine deposit site of the present embodiment is formed at a location where topsoil and cliff deposits (hereinafter simply referred to as “non-liquefied layer 13”) are stacked on the rock layer R.

斜面部11は、沢地形箇所に鉱さい10を堆積させて形成した部分である。斜面部11では、図1の(b)に示すように、鉱さい10(表層改良体3)の表面(上面)が傾斜している。   The slope portion 11 is a portion formed by depositing the slag 10 on the topography. In the slope 11, as shown in FIG. 1B, the surface (upper surface) of the slag 10 (surface improvement body 3) is inclined.

平場部12は、斜面部11の上流側に鉱さい10を堆積させて形成した比較的平坦な部分である。平場部12では、鉱さい10の表面(上面)が平坦(略水平)になるように鉱さい10を堆積させている。
なお、本実施形態では、鉱さい10が非液状化層13の上に直接堆積されている。
The flat field portion 12 is a relatively flat portion formed by depositing the slag 10 on the upstream side of the slope portion 11. In the flat field portion 12, the slag 10 is deposited so that the surface (upper surface) of the slag 10 is flat (substantially horizontal).
In the present embodiment, the slag 10 is directly deposited on the non-liquefied layer 13.

堰堤2は、堆積された鉱さい10をせき止めるために、斜面部11よりも下流側に設けられた基礎かん止堤である。
本実施形態の堰堤2は、岩石を積み上げてなる、いわゆるロックフィルダムである。なお、堰堤2の構造は限定されるものではなく、例えば、土を盛りたてることにより形成する、いわゆるアースダムであってもよいし、コンクリートダムであってもよい。
The dam 2 is a foundation pier provided on the downstream side of the slope portion 11 in order to dam the deposited slag 10.
The dam 2 of the present embodiment is a so-called rockfill dam formed by stacking rocks. In addition, the structure of the dam 2 is not limited, For example, what is called an earth dam formed by piling up soil and a concrete dam may be sufficient.

堰堤2は、図1の(b)に示すように、断面視台形状に形成されている。なお、堰堤2の高さは、鉱さい堆積場が形成される原地形と堆積される鉱さいの量に応じて適宜設定する。また、堰堤2の断面形状は台形に限定されない。   The dam 2 is formed in a trapezoidal cross-sectional shape as shown in FIG. In addition, the height of the dam 2 is appropriately set according to the original topography on which the mine deposit field is formed and the amount of the mine deposit to be deposited. Moreover, the cross-sectional shape of the dam 2 is not limited to a trapezoid.

表層改良体3は、斜面部11に堆積する鉱さい10の表面を覆う改良体である。
表層改良体3は、鉱さい10の表面部(表層部)にセメント等の固化材を撹拌混合(浅層改良)することにより形成する。なお、表層改良体3の厚さ(高さ)は限定されるものではないが、例えば、1〜10m程度である。
The surface layer improvement body 3 is an improvement body that covers the surface of the slag 10 deposited on the slope portion 11.
The surface layer improved body 3 is formed by stirring and mixing (shallow layer improvement) a solidifying material such as cement on the surface portion (surface layer portion) of the slag 10. In addition, although the thickness (height) of the surface layer improvement body 3 is not limited, For example, it is about 1-10 m.

本実施形態では、斜面部11に堆積する鉱さい10の表層部を全面的に表層改良することにより表層改良体3を形成するが、表層改良体3は、鉱さい10の表層部を平面視格子状に改良してもよい。   In the present embodiment, the surface layer improvement body 3 is formed by improving the entire surface layer of the slag 10 deposited on the slope portion 11, but the surface layer improvement body 3 is formed in a lattice shape in a plan view. It may be improved.

側部改良体4は、図1の(a)および図2に示すように、斜面部11に堆積する鉱さい10の両岸(図2における左右の側部)に形成された改良体である。
側部改良体4は、斜面部11に堆積する鉱さい10の両岸部(両側部)において、鉱さい10にセメント等の固化材を撹拌混合することにより形成する。なお、側部改良体4の形成方法(改良方法)は限定されない。
As shown in FIG. 1A and FIG. 2, the side portion improvement body 4 is an improvement body formed on both banks (left and right side portions in FIG. 2) of the slag 10 deposited on the slope portion 11.
The side improvement body 4 is formed by stirring and mixing a solidifying material such as cement into the slag 10 on both sides (both sides) of the slag 10 deposited on the slope 11. In addition, the formation method (improvement method) of the side part improvement body 4 is not limited.

側部改良体4は、図2に示すように、非液状化層13に根入れされている。すなわち、側部改良体4は、改良体底面において滑動抵抗力を期待するため、斜面部11に堆積する鉱さい10の表面から非液状化層13に達するように形成され、非液状化層13に着底するか、もしくは、非液状化層13に根入れするものとする。   As shown in FIG. 2, the side improvement body 4 is embedded in the non-liquefaction layer 13. That is, the side portion improvement body 4 is formed so as to reach the non-liquefied layer 13 from the surface of the slag 10 deposited on the slope portion 11 in order to expect sliding resistance at the bottom surface of the improved body. It is assumed that it is settled or is embedded in the non-liquefied layer 13.

本実施形態では、斜面部11の側部を改良することにより壁状の側部改良体4を形成しているが、側部改良体4は、平面視格子状に改良してもよい。
なお、側部改良体4は、表層改良体3と当接するように形成する。
In the present embodiment, the wall-shaped side portion improvement body 4 is formed by improving the side portion of the slope portion 11, but the side portion improvement body 4 may be improved in a plan view lattice shape.
In addition, the side part improvement body 4 is formed so that the surface layer improvement body 3 may contact | abut.

以上、本実施形態の流動対策構造1によれば、斜面部11に堆積された鉱さい10に地震時等に液状化が発生した場合であっても、鉱さい10が鉱さい堆積場の外部に流出することを防止することができる。
すなわち堰堤2、表層改良体3および側部改良体4,4とにより斜面部11に堆積された鉱さい10の下流側と表面と両岸(両側部)を囲っているため、鉱さい10の流下を防止している。なお、平場部12の鉱さい10は、下流側の斜面部11に堆積された鉱さい10の移動が流動対策構造1(堰堤2、表層改良体3および側部改良体4,4)により抑制されているため、下流側に移動することがなく、したがって、鉱さい堆積場の外部に流出することもない。
As described above, according to the flow countermeasure structure 1 of the present embodiment, even when liquefaction occurs in the slag 10 deposited on the slope 11 during an earthquake or the like, the slag 10 flows out of the slag deposition site. This can be prevented.
That is, since the downstream side, the surface, and both banks (both sides) of the slag 10 deposited on the slope portion 11 by the dam 2, the surface layer improvement body 3 and the side part improvement bodies 4 and 4 are enclosed, It is preventing. In addition, the movement of the slag 10 deposited on the slope 11 on the downstream side of the slag 10 in the flat field portion 12 is suppressed by the flow countermeasure structure 1 (the dam 2, the surface layer improvement body 3, and the side part improvement bodies 4, 4). Therefore, it does not move downstream, and therefore does not flow out of the mine deposit site.

なお、斜面部11の鉱さい10に液状化が生じた場合、表層改良体3および側部改良体4,4に発生する慣性力が堰堤2に直接作用するが、本実施形態の流動対策構造1によれば、非液状化層13に根入れまたは着底した側部改良体4,4の底面と非液状化層13との間の滑動抵抗力が期待できるので、堰堤2に作用する慣性力に抵抗することができる。   In addition, when liquefaction arises in the slag 10 of the slope part 11, although the inertial force which generate | occur | produces in the surface layer improvement body 3 and the side part improvement bodies 4 and 4 acts directly on the dam 2, the flow countermeasure structure 1 of this embodiment Since the sliding resistance force between the bottom surfaces of the side improvement bodies 4 and 4 rooted in or grounded to the non-liquefaction layer 13 and the non-liquefaction layer 13 can be expected, the inertial force acting on the dam 2 Can resist.

また、斜面部11の鉱さい10に液状化が生じると、斜面部11の高低差に伴う揚圧力により表層改良体3が押し上げられ、液状化した鉱さい10が流出して堰堤2を乗り越えて流出するおそれがある。ところが、本実施形態の流動対策構造1によれば、鉱さい10の液状化に伴う揚圧力を、表層改良体3と側部改良体4,4の重量により抵抗することで、鉱さい10の流出を防止することができる。   Further, when liquefaction occurs in the slag 10 of the slope 11, the surface improvement body 3 is pushed up by the lifting pressure associated with the height difference of the slope 11, and the liquefied slag 10 flows out and crosses the dam 2 and flows out. There is a fear. However, according to the flow countermeasure structure 1 of this embodiment, the outflow of the slag 10 is prevented by resisting the lifting pressure accompanying the liquefaction of the slag 10 by the weight of the surface layer improvement body 3 and the side part improvement bodies 4 and 4. Can be prevented.

このように、斜面部11の鉱さい10に対し、局所的に液状化を許しても、発生する改良体の慣性力および揚圧力に抵抗し、かつ液状化した鉱さい10が鉱さい堆積場の外部に流出することを防止することができる。   In this way, even if liquefaction is allowed locally on the slag 10 of the slope 11, it resists the inertial force and lifting pressure of the generated improved body, and the liquefied slag 10 is outside the mine deposit site. It is possible to prevent outflow.

<第二の実施形態>
第二の実施形態では、図3に示すように、斜面部11と平場部12とを有した鉱さい堆積場の流動対策構造1について説明する。
本実施形態の流動対策構造1は、堰堤2と、表層改良体3と、側部改良体4と、下端改良体5と、壁状改良体6とを備えている。
堰堤2、表層改良体3および側部改良体4の詳細は、第一の実施形態で示した内容と同様なため、詳細な説明は省略する。
<Second Embodiment>
In the second embodiment, as shown in FIG. 3, a description will be given of a flow countermeasure structure 1 for a slag deposition site having a slope portion 11 and a flat field portion 12.
The flow countermeasure structure 1 of this embodiment includes a dam 2, a surface layer improvement body 3, a side portion improvement body 4, a lower end improvement body 5, and a wall-like improvement body 6.
Since the details of the dam 2, the surface layer improvement body 3, and the side part improvement body 4 are the same as the content shown in 1st embodiment, detailed description is abbreviate | omitted.

下端改良体5は、斜面部11の下流側であって、堰堤2の背面に沿って形成された改良体である。
本実施形態では、斜面部11に堆積する鉱さい10にセメント等の固化材を撹拌混合することにより下部改良体5を形成するが、下部改良体5の施工方法は限定されない。
The lower end improvement body 5 is an improvement body formed on the downstream side of the slope portion 11 and along the back surface of the dam 2.
In the present embodiment, the lower improvement body 5 is formed by stirring and mixing a solidified material such as cement with the mineral slag 10 deposited on the slope portion 11, but the construction method of the lower improvement body 5 is not limited.

下端改良体5は、図3の(b)および図4の(a)に示すように、非液状化層13に着底している。すなわち、下端改良体5は、表層改良体3の下面から非液状化層13に達する範囲を改良することにより形成する。   The lower end improvement body 5 is attached to the non-liquefied layer 13 as shown in (b) of FIG. 3 and (a) of FIG. That is, the lower end improvement body 5 is formed by improving the range reaching the non-liquefied layer 13 from the lower surface of the surface layer improvement body 3.

本実施形態では、堰堤2の背面を全面または平面視格子状に改良することにより下端改良体5が形成される。
また、下端改良体5の下端は、下端改良体5と非液状化層13との間の滑動抵抗力を期待するため、非液状化層13に根入れまたは着底させる。
なお、下端改良体5の上端は、表層改良体3に当接している。
In this embodiment, the lower end improvement body 5 is formed by improving the back surface of the dam 2 to the whole surface or a planar view grid shape.
Further, the lower end of the lower end improvement body 5 is rooted or grounded in the non-liquefaction layer 13 in order to expect a sliding resistance force between the lower end improvement body 5 and the non-liquefaction layer 13.
The upper end of the lower end improvement body 5 is in contact with the surface layer improvement body 3.

本実施形態では、図3の(a)に示すように、複数の壁状改良体6,6,…が、二列配置されている。
上流側の壁状改良体6の列は、斜面部11の上端縁に沿って形成されている。下流側の壁状改良体6の列は、上流側の列と堰堤2との間に配置されている。
In this embodiment, as shown in FIG. 3A, a plurality of wall-like improvement bodies 6, 6,... Are arranged in two rows.
The row of the upstream wall-like improvement bodies 6 is formed along the upper edge of the slope portion 11. The column of the wall-like improvement bodies 6 on the downstream side is disposed between the column on the upstream side and the dam 2.

下流側の列には3つの壁状改良体6,6,6が間隔をあけて設けられている。
両脇に配設された壁状改良体6,6はそれぞれ側部改良体4に当接している。また、中央に配設された壁状改良体6は、鉱さい堆積場の中心線上に形成されている。
In the downstream row, three wall-like improvement bodies 6, 6 and 6 are provided at intervals.
The wall-like improvement bodies 6, 6 arranged on both sides are in contact with the side part improvement bodies 4. Moreover, the wall-shaped improvement body 6 arrange | positioned in the center is formed on the centerline of a mine deposit field.

上流側の列には4つの壁状改良体6,6,…が間隔をあけて設けられている。
上流側の列の壁状改良体6,6,…は、斜面部11の上端縁(斜面部11と平場部12との境界部)に形成されている。
両脇に配設された壁状改良体6,6は、それぞれ側部改良体4に当接している。
In the upstream row, four wall-like improvement bodies 6, 6,.
The wall-like improvement bodies 6, 6,... In the upstream row are formed at the upper end edge of the slope portion 11 (the boundary portion between the slope portion 11 and the flat field portion 12).
The wall-like improvement bodies 6, 6 arranged on both sides are in contact with the side part improvement bodies 4.

なお、壁状改良体6の配置や数は限定されるものではない。例えば、両脇に配設された壁状改良体6,6は、側部改良体4との間に隙間を有していてもよい。
また、壁状改良体6は、縦方向または横方向に連続していてもよいし、平面視格子状に配置されていてもよい。
In addition, arrangement | positioning and the number of the wall-shaped improvement body 6 are not limited. For example, the wall-like improvement bodies 6 and 6 disposed on both sides may have a gap between the side improvement bodies 4.
Moreover, the wall-shaped improvement body 6 may be continuing in the vertical direction or the horizontal direction, and may be arrange | positioned at planar view lattice shape.

各壁状改良体6は、図3の(b)および図4の(b)、(c)に示すように、非液状化層13に着底している。壁状改良体6は、鉱さい10を改良することで形成する。すなわち、壁状改良体6は、表層改良体3の下面から非液状化層13に達する範囲を改良することにより形成する。
なお、壁状改良体6の上端は、表層改良体3に当接している。また、壁状改良体6は、壁状改良体6と非液状化層13との間の滑動抵抗力を期待する必要がない場合は、必ずしも非液状化層13に根入れまたは着底している必要はなく、壁状改良体6の下端と非液状化層13との間に隙間(鉱さい10の非改良部分)を有していてもよい。
As shown in FIG. 3B and FIG. 4B and FIG. 4C, each wall-like improvement body 6 is attached to the non-liquefied layer 13. The wall-like improvement body 6 is formed by improving the slag 10. That is, the wall-like improvement body 6 is formed by improving the range reaching the non-liquefied layer 13 from the lower surface of the surface layer improvement body 3.
The upper end of the wall-shaped improvement body 6 is in contact with the surface layer improvement body 3. In addition, the wall-like improved body 6 is not necessarily rooted or grounded in the non-liquefied layer 13 when it is not necessary to expect the sliding resistance between the wall-like improved body 6 and the non-liquefied layer 13. It is not necessary to have a gap (a non-improved portion of the slag 10) between the lower end of the wall-like improved body 6 and the non-liquefied layer 13.

以上、本実施形態の流動対策構造1によれば、斜面部11に堆積する鉱さい10に液状化が生じた場合に表層改良体3、側部改良体4、下端改良体5および壁状改良体6に発生する慣性力に対して効果的に抵抗することができる。
すなわち、側部改良体4,4に加えて、下端改良体5および壁状改良体6,6,…の底面と非形状下層13との間の滑動抵抗力により、堰堤2に作用する慣性力をより効果的に抑制することができる。
As described above, according to the flow countermeasure structure 1 of the present embodiment, when liquefaction occurs in the slag 10 deposited on the slope portion 11, the surface layer improvement body 3, the side portion improvement body 4, the lower end improvement body 5, and the wall-like improvement body. 6 can effectively resist the inertial force generated at 6.
That is, the inertial force acting on the dam 2 due to the sliding resistance between the bottom surface of the lower end improvement body 5 and the wall-like improvement bodies 6, 6,. Can be more effectively suppressed.

また、斜面部11の高低差に伴う揚圧力に対しても、より効果的に抵抗することができる。
すなわち、下端改良体5および壁状改良体6,6,…により、表層改良体3を押し上げる揚圧力に抵抗する重量が増加するため、より効果的に鉱さい10の流出を防止することができる。
Further, it is possible to more effectively resist the lifting pressure associated with the height difference of the slope 11.
That is, since the weight which resists the lifting pressure which pushes up the surface layer improvement body 3 increases by the lower end improvement body 5 and the wall-like improvement bodies 6, 6,..., The outflow of the slag 10 can be more effectively prevented.

この他の第二の実施形態の流動対策構造1による作用効果は、第一の実施形態で示した内容と同様なため、詳細な説明は省略する。   Since the effect by the flow countermeasure structure 1 of other 2nd embodiment is the same as the content shown in 1st embodiment, detailed description is abbreviate | omitted.

以上、本発明の実施形態について説明した。しかし、本発明は、前述の実施形態に限られず、前記の各構成要素については、本発明の趣旨を逸脱しない範囲で、適宜変更が可能である。
例えば、鉱さい堆積場の形状は前記各実施形態で示した形状に限定されるものではない。また、平場部は必ずしも形成されている必要はない。
The embodiment of the present invention has been described above. However, the present invention is not limited to the above-described embodiment, and the above-described components can be appropriately changed without departing from the spirit of the present invention.
For example, the shape of the slag deposition site is not limited to the shape shown in the above embodiments. Further, the flat field portion is not necessarily formed.

また、表層改良体、側部改良体、下端改良体および壁状改良体の改良寸法、根入れ深さや配置等は、慣性力や揚圧力に対して十分な抵抗力を発揮するように、簡便な設計計算により適宜設定すればよい。   In addition, the improved dimensions, penetration depth and arrangement of the surface layer improved body, side improved body, lower end improved body and wall-shaped improved body are simple so as to exert sufficient resistance against inertial force and lifting pressure. It may be set as appropriate by appropriate design calculation.

表層改良体、側部改良体、下端改良体または壁状改良体を格子状に改良すれば、固化材の使用量を低減させることで工事費の削減を図ることができる。   If the surface layer improved body, the side portion improved body, the lower end improved body or the wall-like improved body is improved in a lattice shape, the construction cost can be reduced by reducing the amount of the solidifying material used.

前記各実施形態では、斜面部のみに各改良体を形成する場合について説明したが、平場部にも改良体を形成してもよい。
流動対策構造の採用箇所は、鉱さい堆積場に限定されるものではない。
側部改良体が、平場部から堰堤までの区間において、全長にわたって形成されている場合について説明したが、側部改良体は当該区間に部分的に形成されていてもよい。
In each of the above embodiments, the case where each improved body is formed only on the slope portion has been described, but the improved body may also be formed on the flat field portion.
The location where the flow countermeasure structure is adopted is not limited to the mine deposit site.
Although the case where the side part improvement body was formed over the full length in the area from a flat place part to a dam was demonstrated, the side part improvement body may be partially formed in the said area.

1 流動対策構造
10 鉱さい
11 斜面部
12 平場部
13 非液状化層
2 堰堤
3 表層改良体
4 側部改良体
5 下端改良体
6 壁状改良体
DESCRIPTION OF SYMBOLS 1 Flow countermeasure structure 10 Mineral pad 11 Slope part 12 Flat part 13 Non-liquefaction layer 2 Weir 3 Surface improvement body 4 Side part improvement body 5 Lower end improvement body 6 Wall-like improvement body

Claims (4)

斜面部の下流側に設けられた堰堤と、
前記斜面部の表面を覆う改良体である表層改良体と、
前記斜面部の側部に形成された改良体である側部改良体と、を備える流動対策構造であって、
前記表層改良体は、前記堰堤に当接しており、
前記側部改良体は、非液状化層に着底または根入れされているとともに、前記堰堤および前記表層改良体に当接していることを特徴とする、流動対策構造。
A dam provided on the downstream side of the slope,
A surface layer improvement body which is an improvement body covering the surface of the slope portion;
A flow countermeasure structure comprising a side improvement body, which is an improvement body formed on a side portion of the slope portion,
The surface layer improvement body is in contact with the dam,
The flow countermeasure structure according to claim 1, wherein the side portion improvement body is bottomed or embedded in a non-liquefaction layer and is in contact with the dam and the surface layer improvement body .
前記堰堤の背面に沿って設けられた改良体である下端改良体をさらに備えていることを特徴とする、請求項1に記載の流動対策構造。   The flow countermeasure structure according to claim 1, further comprising a lower end improvement body which is an improvement body provided along a back surface of the dam. 前記斜面部の中央部に形成された改良体である複数の壁状改良体をさらに備えており、
前記壁状改良体は、互いに間隔をあけて設けられていることを特徴とする、請求項1または請求項2に記載の流動対策構造。
It further comprises a plurality of wall-like improvement bodies which are improvement bodies formed in the central part of the slope part,
The flow countermeasure structure according to claim 1, wherein the wall-like improvement bodies are provided to be spaced apart from each other.
斜面部の下流側に設けられた堰堤と、
前記斜面部の表面を覆う改良体である表層改良体と、
前記斜面部の側部に形成された改良体である側部改良体と、
前記堰堤の背面に沿って設けられた改良体である下端改良体と、
前記斜面部の中央部に形成された改良体である複数の壁状改良体と、を備える流動対策構造であって、
前記表層改良体は、前記堰堤に当接しており、
前記側部改良体は、非液状化層に着底または根入れされているとともに、前記堰堤および前記表層改良体に当接していて、
前記壁状改良体は、互いに間隔をあけて設けられており、
前記表層改良体、前記側部改良体、前記下端改良体および前記壁状改良体のうちの少なくとも一つが、平面視格子状に形成されていることを特徴とする、流動対策構造。
A dam provided on the downstream side of the slope,
A surface layer improvement body which is an improvement body covering the surface of the slope portion;
A side improvement body which is an improvement body formed on the side portion of the slope portion;
A lower end improvement body which is an improvement body provided along the back surface of the dam,
A flow countermeasure structure comprising a plurality of wall-like improvement bodies, which are improvement bodies formed in the central portion of the slope portion,
The surface layer improvement body is in contact with the dam,
The side improvement body is in contact with the dam and the surface layer improvement body while being settled or embedded in a non-liquefaction layer,
The wall-shaped improvement bodies are provided at intervals from each other,
The surface layer improved body, the side improvements body, wherein at least one of the bottom improved body and the wall-like improved body, characterized in that it is formed in plan view grid pattern, liquidity measures structure.
JP2014125304A 2014-06-18 2014-06-18 Flow countermeasure structure Active JP6368555B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014125304A JP6368555B2 (en) 2014-06-18 2014-06-18 Flow countermeasure structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014125304A JP6368555B2 (en) 2014-06-18 2014-06-18 Flow countermeasure structure

Publications (2)

Publication Number Publication Date
JP2016003514A JP2016003514A (en) 2016-01-12
JP6368555B2 true JP6368555B2 (en) 2018-08-01

Family

ID=55223003

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014125304A Active JP6368555B2 (en) 2014-06-18 2014-06-18 Flow countermeasure structure

Country Status (1)

Country Link
JP (1) JP6368555B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110106836A (en) * 2019-04-19 2019-08-09 中国电建集团贵阳勘测设计研究院有限公司 Reverse construction method for toe board of concrete faced rockfill dam

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6438711B2 (en) * 2014-08-28 2018-12-19 大成建設株式会社 Slope stabilization structure
CN109594527A (en) * 2018-12-06 2019-04-09 安徽理工大学 A kind of artificial dam body of the groundwater reservoir with zigzag card slot

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09316865A (en) * 1996-05-30 1997-12-09 Hazama Gumi Ltd Structure for preventing side flowing
JP3616891B2 (en) * 1997-02-27 2005-02-02 清水建設株式会社 Ground lateral flow countermeasure structure
JP4036989B2 (en) * 1998-11-26 2008-01-23 株式会社間組 Embankment structure to control / prevent soil acidification
JP4903467B2 (en) * 2006-03-24 2012-03-28 株式会社不動テトラ Improved ground structure considering ground flow countermeasures during liquefaction
JP2009108658A (en) * 2007-11-01 2009-05-21 Takenaka Komuten Co Ltd Construction method for preventing liquefaction of ground directly under existing building

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110106836A (en) * 2019-04-19 2019-08-09 中国电建集团贵阳勘测设计研究院有限公司 Reverse construction method for toe board of concrete faced rockfill dam

Also Published As

Publication number Publication date
JP2016003514A (en) 2016-01-12

Similar Documents

Publication Publication Date Title
CN103266622A (en) L-shaped retaining wall structure with cross-over type special-shaped counterfort
JP5471797B2 (en) Seismic reinforcement structure of revetment structure and existing revetment structure
JP5124697B1 (en) Liquefaction prevention structure and liquefaction prevention method
JP6368555B2 (en) Flow countermeasure structure
JP2011179247A (en) Large water depth quay wall structure
JP6082916B2 (en) Underground steel wall structure and construction method of underground steel wall structure
CN207047796U (en) A kind of light-duty mud-rock flow arch blocking dam
CN105064373B (en) Foundation pit supporting structure of bridge main pier bearing platform on river channel steep slope bedrock and construction method thereof
KR101156873B1 (en) Upper structure to increase the height of dam/bank levee crown
JP5488125B2 (en) Filling reinforcement structure
JP4310502B1 (en) Reinforcement structure for embankment support ground
JP2011214252A (en) Structure for reinforcing embankment
JP6881916B2 (en) How to install the structure
JP6558890B2 (en) Slope stabilization structure
CN104099894B (en) A kind of without anchor deep-cement sheet-pile wharf
CN204875807U (en) Bridge main pier cushion cap foundation pit supporting structure on river channel abrupt slope basement rock
JP6438711B2 (en) Slope stabilization structure
JP2015004177A (en) Reinforcement structure of existing breakwater, reinforcement method of existing breakwater, and reinforcement body
JP5983436B2 (en) Gravity breakwater
JP6017302B2 (en) Construction and its construction method
JP6590767B2 (en) Liquefaction countermeasure method
JP6679287B2 (en) Liquefaction countermeasure construction method for underground structures
JP2017150208A (en) Settlement prevention structure of linear construction, and construction method for the same
JP7469608B2 (en) Support structure, gravity breakwater and construction method of gravity breakwater
CN210459242U (en) Highway edge guard structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20170418

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20180221

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20180313

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180424

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20180703

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20180709