CN105064373B - Foundation pit supporting structure of bridge main pier bearing platform on river channel steep slope bedrock and construction method thereof - Google Patents

Foundation pit supporting structure of bridge main pier bearing platform on river channel steep slope bedrock and construction method thereof Download PDF

Info

Publication number
CN105064373B
CN105064373B CN201510447090.3A CN201510447090A CN105064373B CN 105064373 B CN105064373 B CN 105064373B CN 201510447090 A CN201510447090 A CN 201510447090A CN 105064373 B CN105064373 B CN 105064373B
Authority
CN
China
Prior art keywords
steel sheet
sheet pile
arch ring
water
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510447090.3A
Other languages
Chinese (zh)
Other versions
CN105064373A (en
Inventor
刘平
许明君
陈德华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 19th Metallurgical Group Co ltd
Original Assignee
China 19th Metallurgical Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 19th Metallurgical Group Co ltd filed Critical China 19th Metallurgical Group Co ltd
Priority to CN201510447090.3A priority Critical patent/CN105064373B/en
Publication of CN105064373A publication Critical patent/CN105064373A/en
Application granted granted Critical
Publication of CN105064373B publication Critical patent/CN105064373B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)
  • Bridges Or Land Bridges (AREA)
  • Foundations (AREA)

Abstract

The invention discloses a foundation pit supporting structure of a bridge main pier bearing platform on riverway steep slope bedrock and a construction method thereof, and the foundation pit supporting structure comprises a cofferdam island and is characterized in that a steel sheet pile waterproof curtain is arranged on one side of the cofferdam island close to a riverway waterway, the steel sheet pile waterproof curtain is composed of a plurality of steel sheet piles which are vertically arranged side by side, the side edges of the adjacent steel sheet piles are mutually occluded to form the waterproof curtain, a construction access way which is composed of annular sandstone-clay layers is arranged on one side of the steel sheet pile waterproof curtain back to the waterway, the plane of the construction access way is lower than the top surface of the steel sheet pile waterproof curtain, and an annular reinforced concrete arch ring is arranged on one side of the construction access way back to the waterway, the construction progress and quality are improved, and the construction cost is reduced.

Description

Main Pier of Bridges cushion cap foundation pit supporting construction on the basement rock of abrupt slope, river course and construction method thereof
Technical field
The present invention relates to a kind of foundation pit supporting construction building Main Pier of Bridges cushion cap on the basement rock of abrupt slope, river course, tool The saying of body relates to foundation pit supporting construction and the construction method thereof building Main Pier of Bridges cushion cap on the basement rock of abrupt slope, river course.
Background technology
In the wild in large bridge construction, it is frequently encountered by the large bridges construction of crossing river channel, Jiang Dao Building, the main pier of described large bridge is a lot, and different main pier bearing platforms can be built in different positions, in the face of different Geographical position, lineament and geological structure.The such as Main Pier of Bridges cushion cap at crossing river channel, Jiang Dao is built Time, part main pier bearing platform can be built in crossing river channel, the littoral position of Jiang Dao, and described littoral position is ground sometimes The basement rock that gesture is steeper, earth and lithosphere are in relatively steep to downslope trend and the gradient, and about 30 to 50 spend scopes, Owing to Main Pier of Bridges cushion cap is reinforced concrete construction, its size is relatively big, and the main pier bearing platform described in one side needs Carrying bridge weight, higher to its construction quality and security requirement, on the other hand, described main pier bearing platform needs Will be in the face of complicated lineament and geological structure, sandstone dirt bed riverbank as steeper in the gradient constructs holds to main pier Platform construction brings difficulty, and a cushion cap part is positioned on the abrupt slope basement rock on riverbank, another part go deep into river or River, Ji Shi navigation channel, side, the inevitable SEA LEVEL VARIATION in the face of the water surface of its bearing platform construction and river immersion pressure, Side slope construction by navigation channel is unstable, faced by hydraulic pressure relatively big and pressure change exists uncertainty, bridge A couple of days at least main pier bearing platform engineering time, the several months at most, such as the boundary time of flood season and non-flood period, more should Pay attention to its working security and quality, so the construction of described Main Pier of Bridges cushion cap foundation ditch needs in the face of complicated ground Matter, the hydrology construct, and difficulty of construction and requirement are higher.
The construction of prior art, constructs in particular for the Main Pier of Bridges foundation pit supporting construction on the basement rock of abrupt slope, river course General employing can overcome hard architectonic static-pressure pile planting machine to construct, and builds in cofferdam and carries out cushion cap foundation ditch on island Build and on foundation ditch, build main pier bearing platform.But prior art cost is the highest, it addition, in foundation ditch Effect waterproof, sealing is the most undesirable, so needing a kind of more preferably construction on the basement rock of abrupt slope, river course The foundation pit supporting construction of Main Pier of Bridges cushion cap.
Summary of the invention
Present invention aims to prior art defect, it is provided that a kind of construction bridge on the basement rock of abrupt slope, river course The foundation pit supporting construction of beam main pier bearing platform, provides a kind of specifically and builds bridge main on the basement rock of abrupt slope, river course The foundation pit supporting construction of pier cushion cap and construction method thereof, present invention solves the technical problem that be lineament with And geology, the hydrology construct the cushion cap foundation pit supporting construction building Main Pier of Bridges on complicated abrupt slope, river course basement rock, have Effect realizes the sealing of foundation ditch, waterproof, ensures underwater support table deep pit construction and the smooth construction of cushion cap part, While guaranteeing deep pit monitor, improve construction speed and quality, reduce construction cost.
Technical scheme is as described below:
Main Pier of Bridges cushion cap foundation pit supporting construction on the basement rock of abrupt slope, a kind of river course, builds island including a cofferdam, It is characterized in that, described cofferdam is built island and the side near navigation channel, river course is provided with steel sheet pile water-stop curtain, institute The steel sheet pile that the steel sheet pile water-stop curtain stated vertically is arranged side by side by several is constituted, described adjacent steel sheet pile Side is engaged formation water-stop curtain each other, and described steel sheet pile water-stop curtain is arranged in the side in navigation channel dorsad Having the builder's road that the sandstone dirt bed of annular is constituted, described builder's road plane is less than described steel sheet pile The end face of water-stop curtain, described builder's road is provided with the reinforced concrete arch of annular in the side in navigation channel dorsad Circle, described armored concrete arch ring is layered setting from top to bottom, from outside to inside, and next stringcourse circle internal diameter is little In adjacent last layer arch ring internal diameter, between the arch ring that every two-layer is adjacent engaged reach sealing and support also The effect of fixation steel plate pile water stopping curtain, described arch ring is from top to bottom 3 to 6 layers.
According to the present invention of said structure, being further characterized in that, described each steel sheet pile cross section is " C " type Structure, adjacent steel sheet pile is relative two-by-two, and side is engaged formation water-stop curtain each other.
According to the present invention of said structure, being further characterized in that, the plane of described the superiors arch ring is less than construction The plane of sidewalk.
According to the present invention of said structure, being further characterized in that, described armored concrete arch ring is the most horizontal Cross section width 80cm × high 150cm, between levels arch ring, length of action is 30cm in the direction of the width, high On degree direction, length of action is 10cm, forms waterstop between levels arch ring.
According to the present invention of said structure, builder's road for big machineries such as excavators or manually can be executed Work uses, steel sheet pile water-stop curtain can effective sealing, several layers of armored concrete arch ring in addition to can be with sealing, Steel sheet pile water-stop curtain can also be formed powerful support and fix, it is ensured that the stability of supporting construction.In boat Cushion cap foundation ditch is excavated in building the arch ring on island in artificial cofferdam, side, road, can carry out executing smoothly of Main Pier of Bridges cushion cap Work, effectively overcomes the geology by side, navigation channel complexity, hydrology structure and feature to Main Pier of Bridges bearing platform construction Adverse effect, solve river water level change, river pressure and river immerse foundation ditch affects Main Pier of Bridges The construction problem of cushion cap.
According to the construction method of the Main Pier of Bridges cushion cap foundation pit supporting construction on the basement rock of abrupt slope, above-mentioned river course, it is special Levy and be, comprise the steps:
1) the intersection construction in abrupt slope, river course basement rock and navigation channel forms cofferdam and builds island, by sandstone dirt bed Landfill, is formed and builds island higher than the cofferdam of urban river water plane;
2) at the cofferdam Zhu Dao edge inserted to play steel sheet pile water-stop curtain by side, navigation channel, described steel sheet pile is only The steel sheet pile that water curtain is vertically arranged side by side by several is constituted, and described adjacent steel sheet pile side is each other Occlusion, prevents the infiltration of river;
3) in steel sheet pile water-stop curtain side, navigation channel dorsad, arranging builder's road, described builder's road is for along enclosing The annular sandstone dirt bed on Yan Zhu island is constituted, and described builder's road plane is less than described steel sheet pile sealing curtain The end face of curtain;
4) described builder's road pours the armored concrete arch ring of annular, described steel in the side in navigation channel dorsad Reinforced concrete arch ring from top to bottom, placement layer by layer from outside to inside, next stringcourse circle internal diameter is less than adjacent upper one Stringcourse circle internal diameter, the engaged stagnant water effect that reaches, top concrete arch between the arch ring that every two-layer is adjacent The end face of circle is less than the plane of builder's road, and described arch ring is 3 to 6 layers, the most transversal face width of arch ring 80cm × high 150cm, between levels arch ring, length of action is 30cm in the direction of the width, in short transverse Length of action is 10cm, forms waterstop between levels arch ring;
5) carrying out inside described arch ring excavating forming cushion cap foundation ditch, in described foundation ditch, the infiltration of a small amount of river uses Water pumper is uninterruptedly extracted out, it is simple to carry out the smooth construction of Main Pier of Bridges cushion cap.
According to said structure and the present invention of construction method, it has the beneficial effects that: builder's road can be for digging Big machineries such as pick machine or manually carry out construction usage, steel sheet pile water-stop curtain can effectively sealing, several layers of steel Reinforced concrete arch ring is in addition to can be with sealing, it is also possible to steel sheet pile water-stop curtain is formed powerful support and fixes Effect, it is ensured that the stability of supporting construction, carries out excavating also in the arch ring on island is built in artificial cofferdam, side, navigation channel Form cushion cap foundation ditch, the smooth construction of Main Pier of Bridges cushion cap can be carried out, effectively overcome by side, navigation channel complicated Geology, the hydrology structure and the feature adverse effect to Main Pier of Bridges bearing platform construction, solve river water level become Change, river pressure and river immerse foundation ditch and affect the construction problem of Main Pier of Bridges cushion cap, and the present invention can have Effect realizes the sealing of foundation ditch, waterproof, ensures underwater support table deep pit construction and the smooth construction of cushion cap part, While guaranteeing deep pit monitor, improve construction speed and quality, reduce construction cost.
Accompanying drawing explanation
Below in conjunction with the accompanying drawings and the present invention is conducted further description by embodiment:
Fig. 1 is the Main Pier of Bridges cushion cap foundation pit supporting construction vertical section schematic diagram on the basement rock of abrupt slope, river course of the present invention;
Fig. 2 is the Main Pier of Bridges cushion cap foundation pit supporting construction solid section signal on the basement rock of abrupt slope, river course of the present invention Figure;
Fig. 3 is steel sheet pile water-stop curtain of the present invention and armored concrete arch ring top view;
Fig. 4 is armored concrete arch ring vertical section of the present invention schematic diagram.
In the drawings, 1, island is built in cofferdam;2, cushion cap;3, Main Pier of Bridges;4, abrupt slope basement rock;5, arch ring; 6, steel sheet pile;7, river;8, builder's road;9, foundation ditch.
Detailed description of the invention
As shown in Figure 1,2,3, 4, the Main Pier of Bridges cushion cap foundation ditch on the basement rock of abrupt slope, a kind of river course of the present invention props up Protection structure, builds island 1 including a cofferdam, it is characterised in that island 1 is built near navigation channel, river course in described cofferdam Side is provided with steel sheet pile water-stop curtain, and described steel sheet pile water-stop curtain is vertically arranged side by side by several Steel sheet pile 6 is constituted, and described adjacent steel sheet pile 6 side is engaged formation water-stop curtain, described steel each other Sheet pile water-stop curtain is provided with the builder's road 8 that the sandstone dirt bed of annular is constituted, institute in the side in navigation channel dorsad Builder's road 8 plane stated is less than the end face of described steel sheet pile water-stop curtain, and described builder's road 8 is at the back of the body Be provided with the armored concrete arch ring 5 of annular to the side in navigation channel, described armored concrete arch ring 5 is by up to Under, be layered setting from outside to inside, next stringcourse circle 5 internal diameter is less than adjacent last layer arch ring 5 internal diameter, often The engaged effect reaching sealing and supporting also fixation steel plate pile water stopping curtain between the arch ring 5 that two-layer is adjacent, Described arch ring 5 is from top to bottom 3 to 6 layers.
As shown in Figure 2,3, described each steel sheet pile 6 cross section is " C " type structure, adjacent steel sheet pile 6 Relative two-by-two, side is engaged formation water-stop curtain each other.
As shown in Fig. 1,2,4, the plane of described the superiors arch ring 5 is less than the plane of builder's road 8.
As shown in Figure 2,4, described the most transversal face width 80cm of armored concrete arch ring 5 × high 150cm, Between levels arch ring, length of action is 30cm in the direction of the width, and in short transverse, length of action is 10cm, Waterstop is formed between levels arch ring.
As shown in Figure 1,2,3, 4, according to the Main Pier of Bridges cushion cap pattern foundation pit supporting structure on the basement rock of abrupt slope, above-mentioned river course The construction method of structure, it is characterised in that comprise the steps:
1) the intersection construction in abrupt slope, river course basement rock and navigation channel forms cofferdam and builds island 1, by sandstone dirt bed Landfill, formed and build island 1 higher than the cofferdam of urban river water plane;
2) at the cofferdam Zhu Dao 1 edge inserted to play steel sheet pile water-stop curtain by side, navigation channel, described steel sheet pile The steel sheet pile 6 that water-stop curtain is vertically arranged side by side by several is constituted, described adjacent steel sheet pile 6 side that This is engaged, prevents the infiltration of river;
3) in steel sheet pile water-stop curtain side, navigation channel dorsad, arranging builder's road 8, described builder's road 8 is The annular sandstone dirt bed building island 1 along cofferdam is constituted, and described builder's road 8 plane is less than described steel plate The end face of pile water stopping curtain;
4) described builder's road 8 pours the armored concrete arch ring 5 of annular in the side in navigation channel dorsad, described Armored concrete arch ring 5 from top to bottom, placement layer by layer from outside to inside, next stringcourse circle 5 internal diameter is less than phase Adjacent last layer arch ring 5 internal diameter, engaged between the arch ring 5 that every two-layer is adjacent reaches stagnant water effect, The end face of top layer concrete arch ring 5 is less than the plane of builder's road 8, and described arch ring is 3 to 6 layers, arch Enclosing the most transversal face width 80cm × high 150cm, between levels arch ring, length of action is in the direction of the width 30cm, in short transverse, length of action is 10cm, forms waterstop between levels arch ring;
5) carrying out inside described arch ring 5 excavating forming cushion cap foundation ditch 9, in described foundation ditch 9, a small amount of river oozes Hydromining water pumper is uninterruptedly extracted out, it is simple to carry out the smooth construction of Main Pier of Bridges cushion cap.
Applicating example of the present invention:
Zigong City Fushun County, Sichuan Province of China a small bay in a river Jiang Sanqiao 2# cushion cap deep foundation pit supporting structure and construction method are i.e. It is the example of the application present invention, Fu Shi town, big spanning locality and East Lake town, across a small bay in a river rivers, apply the present invention 2# cushion cap deep foundation pit supporting structure be that bridge smooth construction lays the foundation, this engineering construction be completed after, with four River provincial highway S305 line connects, and is formed rich and smooth around city circuit, greatly improves the traffic shape of Fushun County access way Condition.
Although the present invention describes with reference to the above embodiments, but those of ordinary skill in the art Be fully able to will be apparent from recognizes that above embodiment is only for the present invention is described, wherein can make various change Change and amendment and in a broad sense without departing from the present invention, so being not intended as limitation of the invention, if In the spirit of the present invention, change, deformation to embodiment described above fall within the present invention and want Within the protection domain asked.

Claims (5)

1. the Main Pier of Bridges cushion cap foundation pit supporting construction on the basement rock of abrupt slope, river course, builds island including a cofferdam, It is characterized in that, described cofferdam is built island and the side near navigation channel, river course is provided with steel sheet pile water-stop curtain, institute The steel sheet pile that the steel sheet pile water-stop curtain stated vertically is arranged side by side by several is constituted, described adjacent steel sheet pile Side is engaged formation water-stop curtain each other, and described steel sheet pile water-stop curtain is arranged in the side in navigation channel dorsad Having the builder's road that the sandstone dirt bed of annular is constituted, described builder's road plane is less than described steel sheet pile The end face of water-stop curtain, described builder's road is provided with the reinforced concrete arch of annular in the side in navigation channel dorsad Circle, described armored concrete arch ring is layered setting from top to bottom, from outside to inside, and next stringcourse circle internal diameter is little In adjacent last layer arch ring internal diameter, between the arch ring that every two-layer is adjacent engaged reach sealing and support also The effect of fixation steel plate pile water stopping curtain, described arch ring is from top to bottom 3 to 6 layers.
Main Pier of Bridges cushion cap foundation pit supporting construction on the basement rock of abrupt slope, river course the most according to claim 1, Being further characterized in that, described each steel sheet pile cross section is " C " type structure, and adjacent steel sheet pile is relative two-by-two, Side is engaged formation water-stop curtain each other.
Main Pier of Bridges cushion cap foundation pit supporting construction on the basement rock of abrupt slope, river course the most according to claim 1, Being further characterized in that, the plane of described the superiors arch ring is less than the plane of builder's road.
Main Pier of Bridges cushion cap foundation pit supporting construction on the basement rock of abrupt slope, river course the most according to claim 1, It is further characterized in that, described the most transversal face width 80cm of armored concrete arch ring × high 150cm, up and down Between stringcourse circle, length of action is 30cm in the direction of the width, and in short transverse, length of action is 10cm, up and down Waterstop is formed between stringcourse circle.
5. a construction method for the Main Pier of Bridges cushion cap foundation pit supporting construction on the basement rock of abrupt slope, river course, its feature It is, comprises the steps:
1) the intersection construction in abrupt slope, river course basement rock and navigation channel forms cofferdam and builds island, by sandstone dirt bed Landfill, is formed and builds island higher than the cofferdam of urban river water plane;
2) at the cofferdam Zhu Dao edge inserted to play steel sheet pile water-stop curtain by side, navigation channel, described steel sheet pile is only The steel sheet pile that water curtain is vertically arranged side by side by several is constituted, and described adjacent steel sheet pile side is each other Occlusion, prevents the infiltration of river;
3) in steel sheet pile water-stop curtain side, navigation channel dorsad, arranging builder's road, described builder's road is for along enclosing The annular sandstone dirt bed on Yan Zhu island is constituted, and described builder's road plane is less than described steel sheet pile sealing curtain The end face of curtain;
4) described builder's road pours the armored concrete arch ring of annular, described steel in the side in navigation channel dorsad Reinforced concrete arch ring from top to bottom, placement layer by layer from outside to inside, next stringcourse circle internal diameter is less than adjacent upper one Stringcourse circle internal diameter, the engaged stagnant water effect that reaches, top concrete arch between the arch ring that every two-layer is adjacent The end face of circle is less than the plane of builder's road, and described arch ring is 3 to 6 layers, the most transversal face width of arch ring 80cm × high 150cm, between levels arch ring, length of action is 30cm in the direction of the width, in short transverse Length of action is 10cm, forms waterstop between levels arch ring;
5) carrying out inside described arch ring excavating forming cushion cap foundation ditch, in described foundation ditch, the infiltration of a small amount of river uses Water pumper is uninterruptedly extracted out, it is simple to carry out the smooth construction of Main Pier of Bridges cushion cap.
CN201510447090.3A 2015-07-28 2015-07-28 Foundation pit supporting structure of bridge main pier bearing platform on river channel steep slope bedrock and construction method thereof Expired - Fee Related CN105064373B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510447090.3A CN105064373B (en) 2015-07-28 2015-07-28 Foundation pit supporting structure of bridge main pier bearing platform on river channel steep slope bedrock and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510447090.3A CN105064373B (en) 2015-07-28 2015-07-28 Foundation pit supporting structure of bridge main pier bearing platform on river channel steep slope bedrock and construction method thereof

Publications (2)

Publication Number Publication Date
CN105064373A CN105064373A (en) 2015-11-18
CN105064373B true CN105064373B (en) 2016-09-21

Family

ID=54493860

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510447090.3A Expired - Fee Related CN105064373B (en) 2015-07-28 2015-07-28 Foundation pit supporting structure of bridge main pier bearing platform on river channel steep slope bedrock and construction method thereof

Country Status (1)

Country Link
CN (1) CN105064373B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110952605A (en) * 2019-10-23 2020-04-03 中船第九设计研究院工程有限公司 Operation platform is consolidated to river bank building foundation
CN113463518B (en) * 2021-06-21 2022-12-09 中铁十九局集团第五工程有限公司 Anti-leakage construction method for soil between piles of existing bridge pile foundation
CN114232647A (en) * 2021-11-30 2022-03-25 中交路桥建设有限公司 Foundation pile reinforced structure, cofferdam and foundation pit construction structure

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1034233C (en) * 1992-09-18 1997-03-12 中国建筑科学研究院珠海科研设计部 Closed arch ring retaining structure and its construction method
KR20110120627A (en) * 2010-04-29 2011-11-04 남봉수 Method of construction for scour prevension and reinforcement of bridge pier, and structure of the same
CN204875807U (en) * 2015-07-28 2015-12-16 中国十九冶集团有限公司 Bridge main pier cushion cap foundation pit supporting structure on river channel abrupt slope basement rock

Also Published As

Publication number Publication date
CN105064373A (en) 2015-11-18

Similar Documents

Publication Publication Date Title
CN105040595B (en) Bridge main pier bearing platform foundation pit supporting structure on gentle slope riverbed bedrock and construction method thereof
CN105544607B (en) There is the subway station side wall outsourcing waterproof construction method of boatswain chair beam
CN205134193U (en) Bridge main pier cushion cap foundation pit supporting structure on gentle slope riverbed bedrock
US7377726B2 (en) Method and apparatus for building reinforced sea walls and levees
Nikonorov et al. Use of enclosing and temporary special structures under the reconstruction of hydraulic facilities in Saint-Petersburg
CN105421464B (en) Small-scale pit earthwork digging method
CN105569064A (en) Arrangement type sunk well foundation construction method applicable to deepwater bare rock
CN104762982B (en) The construction method that a kind of rich water red sandstone geology level of ground water controls
CN105064373B (en) Foundation pit supporting structure of bridge main pier bearing platform on river channel steep slope bedrock and construction method thereof
CN105239578A (en) Water-rich sand layer deep foundation pit underwater construction method
CN108222060A (en) High-speed railway, highway pile foundation joist buttress type pallet subgrade support retainer structure
CN208517810U (en) A kind of temporary trestle bridge for deep big foundation pit excavation construction
CN204875807U (en) Bridge main pier cushion cap foundation pit supporting structure on river channel abrupt slope basement rock
CN101319501B (en) Construction method of deep foundation ditch
JP4982631B2 (en) Liquefaction countermeasure method under breakwater by underground wall construction
CN105155421B (en) Complete embedding circular construction method in a kind of single pile Single column pier river course shallow water
CN107119716B (en) Construction method of highway tunnel in tidal bore area of tidal marsh
CN208072453U (en) High-speed railway, highway pile foundation joist buttress type pallet subgrade support retainer structure
CN206815381U (en) A kind of tidal land tidal bore area vcehicular tunnel builds structure
CN110284511A (en) The cofferdam open cutting construction method of the more storehouse rollers of overlength lake Tunnel
CN105350493B (en) The method and structure of rapid expansion islands and reefs area
CN220953191U (en) Under pass railway bridge river course and open up construction structure
CN203022005U (en) Protective structure of tidal flat reclamation district deep foundation pit retaining and protecting structure
RU2770187C1 (en) Method for structure construction in the under-runner space of rivers and canals in urban development
CN108532611A (en) A kind of foundation pit supporting construction and construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160921

Termination date: 20200728