CN208072453U - High-speed railway, highway pile foundation joist buttress type pallet subgrade support retainer structure - Google Patents

High-speed railway, highway pile foundation joist buttress type pallet subgrade support retainer structure Download PDF

Info

Publication number
CN208072453U
CN208072453U CN201820248625.3U CN201820248625U CN208072453U CN 208072453 U CN208072453 U CN 208072453U CN 201820248625 U CN201820248625 U CN 201820248625U CN 208072453 U CN208072453 U CN 208072453U
Authority
CN
China
Prior art keywords
pile foundation
joist
type pallet
buttress type
speed railway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820248625.3U
Other languages
Chinese (zh)
Inventor
薛海洋
赵青海
胡会星
陈伟志
曾永红
吴沛沛
龚建辉
李宁
李震
郭在旭
孙晓
张耀
隆琨
冉令
胡超
唐第甲
梅万波
李高明
林东升
秦谢宇
姚昊宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201820248625.3U priority Critical patent/CN208072453U/en
Application granted granted Critical
Publication of CN208072453U publication Critical patent/CN208072453U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

Project cost is greatly lowered effectively to solve high-speed railway, the technical barriers such as limited, stringent, the construction investment saving of engineering environment protection control of land used range that highway faces in high-speed railway, highway pile foundation joist buttress type pallet subgrade support retainer structure.Including:Pile foundation and joist, pile foundation is arranged in rows along circuit extending direction interval, and joist is set to the top of pile foundation and consolidates therewith;Buttress type pallet retaining wall, is located on joist, and reinforced concrete structure main body includes heel slab, counterfort and cornices, and has lateral displacement restraining structure between heel slab and joist, cornices and drain hole is arranged along circuit extending direction interval with heel slab intersection;Loaded filter is laid with along cornice inner wall and heel slab roof of counterfort;Roadbed filling body, placement in layers is in the groove profile cavity on loaded filter.

Description

High-speed railway, highway pile foundation joist buttress type pallet subgrade support retainer structure
Technical field
The utility model is related to high-speed railway, highway subgrade technical field, more particularly to high-speed railway, highway is filled out digging and is handed over Relatively steep, the conventional retaining structure closing slope difficulty of boundary, lateral slope of ground, earth's surface Lack of support, riverfront roadbed are washed away larger, water by river water The cross a river of environmentally sensitive areas and suitable river subgrade engineering.
Background technology
High-speed railway, highway require stringent due to the linear control of circuit, and face downtown areas, ecological protection region and use Serial problem, especially partly the filling out in ecological environment sensitizing range such as ground is limited, working space is narrow, soil and water resources protection Half digs, along river, riverfront and cross a river section subgrade engineering, due under the control of the factors such as geology, the hydrology.If high-speed railway, highway with Bridge or Tunnel Engineering pass through, and line position need to be raised or be reduced to circuit, easily cause along construction investment be significantly increased;If with roadbed Pass through, conventional retaining engineering may cause roadbed land used range to significantly increase due to closing slope difficulty, former natural environment disturbed Greatly or since geological and hydrological conditions are excessively high to engineering later stage operating and maintenance requirements.To solve above-mentioned problem, there is an urgent need for propose a kind of knot Structure, reaches that high-speed railway, highway subgrade are minimum by such region land used, meet the requirements such as environmental protection, investment reduction, and structure tool There is feature safe and reliable, easy for construction.
Utility model content
The technical problem to be solved by the utility model is to provide a kind of high-speed railway, highway pile foundation joist buttress type pallets Subgrade support retainer structure, effectively to solve high-speed railway, the land used range that highway faces is limited, engineering environment protection control is stringent, engineering The technical barriers such as investment saving, are greatly lowered project cost.
The technical solution that the utility model solves used by above-mentioned technology is as follows:
The high-speed railway of the utility model, highway pile foundation joist buttress type pallet subgrade support retainer structure, it is characterized in that it is wrapped It includes:Pile foundation and joist, pile foundation is arranged in rows along circuit extending direction interval, and joist is set to the top of pile foundation and consolidates therewith; Buttress type pallet retaining wall, is located on joist, and reinforced concrete structure main body includes heel slab, counterfort and cornices, heel slab with There is lateral displacement restraining structure between joist, cornice and drain hole is set along circuit extending direction interval with heel slab intersection;Instead Filtering layer is laid with along cornice inner wall and heel slab roof of counterfort;Roadbed filling body, groove profile cavity of the placement in layers on loaded filter It is interior.
The lateral displacement restraining structure includes being raised up to form anti-skidding falcon by joist outer top surface, and by heel slab by choosing Eaves side bottom surface raises up the anti-skidding falcon slot to be formed, and anti-skidding falcon, anti-skidding falcon groove location is corresponding, is highly adapted.
The pile foundation is single-row along the setting of circuit extending direction, and the buttress type pallet retaining wall is set to roadbed filling body Lateral side, the groove profile cavity are formed by the side buttress type pallet retaining wall and other side massif slope surface.
The pile foundation is horizontally arranged at interval two row along circuit extending direction, and the buttress type pallet retaining wall is set to roadbed The both lateral sides of filling body, the both sides buttress type pallet retaining wall heel slab connection is integral, the groove profile cavity by this two Side buttress type pallet retaining wall is formed.
The utility model has the beneficial effects that buttress type pallet under the premise of ensure that width of the subgrade surface, reduces roadbed The width filled, reduces the height and the width of retaining structure closing slope protection, and enhances the reliability of engineering entirety, compares Bridge, tunnel engineering enhance the economy of engineering, and upper load is evenly transferred to lower part pile foundation by joist, and pile foundation is in abrupt slope, shore The regions such as river, Shun He, cross a river provide the exploitativeness of roadbed;The structure can effectively solve the problem that high-speed railway, highway abrupt slope, The regions such as riverfront, Shun He, cross a river routine supporting and retaining system closing slope is difficult, disturbance is destroyed to natural environment greatly, engineering cost is higher, the later stage is foster The serial problem such as scheme that shield is difficult and roadbed is crossed a river, have the characteristics that structure novel, securely and reliably, construction is simple, meet environmental protection, Project cost can be greatly lowered.
Description of the drawings
Fig. 1 be the utility model high-speed railway, highway pile foundation joist buttress type pallet subgrade support retainer constructive embodiment 1 it is disconnected Face figure;
Fig. 2 be the utility model high-speed railway, highway pile foundation joist buttress type pallet subgrade support retainer constructive embodiment 1 it is vertical Body figure;
Fig. 3 be the utility model high-speed railway, highway pile foundation joist buttress type pallet subgrade support retainer constructive embodiment 2 it is disconnected Face figure;
Fig. 4 be the utility model high-speed railway, highway pile foundation joist buttress type pallet subgrade support retainer constructive embodiment 2 it is vertical Body figure.
Component name and corresponding label are shown in figure:Buttress type pallet retaining wall 10, heel slab 11, counterfort 12, anti-filter Layer 13, drain hole 14, the 15, joist 20 that cornices, anti-skidding falcon 21, pile foundation 30, roadbed filling body 40.
Specific implementation mode
The utility model is further illustrated below by specific embodiment and in conjunction with attached drawing.
With reference to figure 1 and Fig. 2, the high-speed railway of the utility model, highway pile foundation joist buttress type pallet subgrade support retainer structure It includes:Pile foundation 30 and joist 20, pile foundation 30 is arranged in rows along circuit extending direction interval, and joist 20 is set to the top of pile foundation 30 It portion and consolidates therewith;Buttress type pallet retaining wall 10, is located on joist 20, and reinforced concrete structure main body includes heel slab 11,15 are corniced counterfort 12 and, there is lateral displacement restraining structure between heel slab 11 and joist 20, cornice 15 crosses with heel slab 11 Drain hole 14 is arranged along circuit extending direction interval in place;Loaded filter 13, along 15 inner walls and the laying of 11 roof of heel slab of cornicing;Roadbed is filled out Building body 40, placement in layers is in the groove profile cavity on loaded filter 13.
Referring to Figure 1 and Figure 3, buttress type pallet reduces the width of roadbed filling under the premise of ensure that width of the subgrade surface, The height and the width of retaining structure closing slope protection are reduced, and enhance the reliability of engineering entirety, comparison bridge, the enhancing of tunnel engineering Upper load is evenly transferred to lower part pile foundation by the economy of engineering, joist, and pile foundation is in abrupt slope, riverfront, Shun He, cross a river etc. Region provides the exploitativeness of roadbed;The structure can effectively solve the problem that high-speed railway, highway in abrupt slope, riverfront, Shun He, cross a river Equal regions routine supporting and retaining system closing slope is difficult, disturbance is destroyed to natural environment greatly, engineering cost is higher, late maintaining is difficult and roadbed crosses River scheme etc. series problem, have the characteristics that structure novel, securely and reliably, construction is simple, meet environmental protection, work can be greatly lowered Journey cost.
Referring to figs. 1 to Fig. 4, the lateral displacement restraining structure include raised up by 20 outer top surface of joist formed it is anti-skidding Falcon 21, and raised up the anti-skidding falcon slot formed by 15 side bottom surfaces of cornicing by heel slab 11, anti-skidding falcon 21, anti-skidding falcon groove location are opposite It answers, be highly adapted.The joist 20 is poured using the armored concrete not less than C35, and 20 length of joist is not preferably greater than Mono- width of 13m can suitably adjust every width length according to concrete engineering situation.The height of anti-skidding falcon 21 is generally 0.5m joists 20 and cuts Face size should be determined in conjunction with upper load, meet structure self-strength requirement.
Referring to Figures 1 and 2, the buttress type pallet retaining wall 10 is poured using the armored concrete not less than C35, Sectional dimension should meet structure self-strength requirement.The height of buttress type pallet retaining wall 10, the length of heel slab 11 and cornice 15 Gradient should calculate and determine in conjunction with roadbed upper load situation, make that it meets the requirement of structure self stability and substructure is wanted It asks.For 12 inclined side angle of the counterfort with 10 chamfer angle of pallet retaining wall, it is strong that 12 structural thickness of counterfort should meet structure itself Degree requires, and setting spacing should meet the requirement of 10 overall structure of buttress type pallet retaining wall.14 generally use diameter of the drain hole The pvc pipe of 50mm is embedded in advance in buttress type pallet retaining wall 10, and a hole is arranged in longitudinally spaced 3.0m.11 roof of the heel slab has Have not less than 2% draining longitudinal slope, effect promotes water infiltration to be within the walls discharged to drain hole 14 in time.The loaded filter 13 includes being laid with In the composite drainage network for 11 roof of 15 inner walls and heel slab that cornices, and it is laid on the online packed sand pebble layer of the composite, water-drain.
Referring to Fig.1, the pile foundation 30 is poured using the armored concrete not less than C35, and stake spacing should be according to top Joist stressing conditions rationally determine, stake is long and sectional dimension is transferred to the axle power, moment of flexure, shear force calculation of stake top according to superstructure It determines, riverfront roadbed or cross a river roadbed pile body are also contemplated that the influence of century-old water level and ordinary water level to structure, it is whole need to meet structure Body safety requirements.0.05m in joist 20 is stretched at the top of the pile foundation 30, and the anchorage length that main reinforcement stretches into joist 20 is not small In 35 times of main reinforcement diameter.The pile foundation 30 can hand excavation's pile foundation area be rectangular caisson, unsuitable hand excavation's pile foundation Area is circular bore stake.
The buttress type pallet retaining wall 10 can be arranged by roadbed half range or full width.It is shown referring to Figures 1 and 2 to implement Example 1, the stake 30 is single-row along the setting of circuit extending direction, and the buttress type pallet retaining wall 10 is set to roadbed filling body 40 Lateral side, the groove profile cavity are formed by the side buttress type pallet retaining wall 10 and other side massif slope surface.With reference to by Fig. 3 and Embodiment 2 shown in Fig. 4, the pile foundation 30 are horizontally arranged at interval two row along circuit extending direction, the buttress type pallet earth-retaining Wall 10 is set to the both lateral sides of roadbed filling body 40, and it is whole that the heel slab 11 of the both sides buttress type pallet retaining wall 10 is connected as one Body, the groove profile cavity are formed by the both sides buttress type pallet retaining wall 10.
The above is only using diagram illustrating the utility model high-speed railway, highway pile foundation joist buttress type pallet roadbed Some principles of retaining structure are not intended to for the utility model to be confined to shown and described concrete structure and the scope of application It is interior, therefore every corresponding modification for being possible to be utilized and equivalent, belong to the apllied the scope of the claims of the utility model.

Claims (7)

1. high-speed railway, highway pile foundation joist buttress type pallet subgrade support retainer structure, it is characterized in that it includes:Pile foundation (30) and support Beam (20), pile foundation (30) is arranged in rows along circuit extending direction interval, and joist (20) is set to the top of pile foundation (30) and therewith Consolidation;Buttress type pallet retaining wall (10) is located on joist (20), reinforced concrete structure main body include heel slab (11), It counterfort (12) and cornices (15), there is lateral displacement restraining structure, cornice (15) and heel slab between heel slab (11) and joist (20) (11) intersection is along circuit extending direction interval setting drain hole (14);Loaded filter (13), along cornice (15) inner wall and heel slab (11) roof is laid with;Roadbed filling body (40), placement in layers is in the groove profile cavity on the loaded filter (13).
2. high-speed railway as described in claim 1, highway pile foundation joist buttress type pallet subgrade support retainer structure, it is characterized in that: The lateral displacement restraining structure includes being raised up to form anti-skidding falcon (21) by joist (20) outer top surface, and by heel slab (11) It raises up the anti-skidding falcon slot to be formed by (15) side bottom surface of cornicing, anti-skidding falcon (21), anti-skidding falcon groove location are corresponding, height is mutually fitted Match.
3. high-speed railway as claimed in claim 2, highway pile foundation joist buttress type pallet subgrade support retainer structure, it is characterized in that: The pile foundation (30) is single-row along the setting of circuit extending direction, and the buttress type pallet retaining wall (10) is set to roadbed filling body (40) lateral side, the groove profile cavity are formed by the side buttress type pallet retaining wall (10) and other side massif slope surface.
4. high-speed railway as claimed in claim 2, highway pile foundation joist buttress type pallet subgrade support retainer structure, it is characterized in that: The pile foundation (30) is horizontally arranged at interval two row along circuit extending direction, and the buttress type pallet retaining wall (10) is set to roadbed Heel slab (11) connection of the both lateral sides of filling body (40), the both sides buttress type pallet retaining wall (10) is integral, the slot Type cavity is formed by the both sides buttress type pallet retaining wall (10).
5. high-speed railway as claimed in claim 2, highway pile foundation joist buttress type pallet subgrade support retainer structure, it is characterized in that: The loaded filter (13) includes being layed in the composite drainage network of cornice (15) inner wall and heel slab (11) roof, and be laid on this and answer Close the packed sand pebble layer on drainage network.
6. high-speed railway as claimed in claim 2, highway pile foundation joist buttress type pallet subgrade support retainer structure, it is characterized in that: Joist (20) interior 0.05m is stretched at the top of the pile foundation (30), main reinforcement stretches into the anchorage length in joist (20) not less than master 35 times of muscle diameter.
7. high-speed railway as claimed in claim 2, highway pile foundation joist buttress type pallet subgrade support retainer structure, it is characterized in that: The rectangular caisson of the pile foundation (30) or circular bore stake.
CN201820248625.3U 2018-02-12 2018-02-12 High-speed railway, highway pile foundation joist buttress type pallet subgrade support retainer structure Expired - Fee Related CN208072453U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820248625.3U CN208072453U (en) 2018-02-12 2018-02-12 High-speed railway, highway pile foundation joist buttress type pallet subgrade support retainer structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820248625.3U CN208072453U (en) 2018-02-12 2018-02-12 High-speed railway, highway pile foundation joist buttress type pallet subgrade support retainer structure

Publications (1)

Publication Number Publication Date
CN208072453U true CN208072453U (en) 2018-11-09

Family

ID=64036285

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820248625.3U Expired - Fee Related CN208072453U (en) 2018-02-12 2018-02-12 High-speed railway, highway pile foundation joist buttress type pallet subgrade support retainer structure

Country Status (1)

Country Link
CN (1) CN208072453U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108222060A (en) * 2018-02-12 2018-06-29 中铁二院工程集团有限责任公司 High-speed railway, highway pile foundation joist buttress type pallet subgrade support retainer structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108222060A (en) * 2018-02-12 2018-06-29 中铁二院工程集团有限责任公司 High-speed railway, highway pile foundation joist buttress type pallet subgrade support retainer structure

Similar Documents

Publication Publication Date Title
US20180044907A1 (en) Inverse construction method for deep, large and long pit assembling structure of suspension-type envelope enclosure
CN105386408B (en) Deep-water bridge pile foundation construction method
CN107503257B (en) One kind being close to mountain high-filled subgrade stabilization and Deformation control structure and construction method
CN108222060A (en) High-speed railway, highway pile foundation joist buttress type pallet subgrade support retainer structure
CN102505695B (en) Construction method for deep foundation pit of three-dimensional garage
Etcheverry Irrigation Practice and Engineering...
CN207760804U (en) A kind of Multi-functional economy dike structure
CN111101540B (en) Construction method for passing existing electric power tunnel on open cut tunnel
CN207109475U (en) It is close to mountain high-filled subgrade stabilization and Deformation control structure
CN109183809B (en) Construction method for replacing support of composite support of muddy clay deep foundation pit engineering
CN101914882B (en) Low embankment structure in phreatic high slity soil region and construction method thereof
CN110644294A (en) Anti-bulging and anti-sliding structure of ballastless track high-speed railway and construction method
CN1605679A (en) Anchor cable retaining wall road bank and cantilevered structured combined road
CN207525567U (en) A kind of pile plate composite structure suitable for Steep Slope Embankment
CN105064373B (en) Foundation pit supporting structure of bridge main pier bearing platform on river channel steep slope bedrock and construction method thereof
CN208072453U (en) High-speed railway, highway pile foundation joist buttress type pallet subgrade support retainer structure
CN107700514B (en) Processing method for selecting structural style of soft foundation
CN110205982A (en) Improve the channel design and its construction method of existing river levee flood control standard
CN114351567B (en) Road bridge connection structure and construction method
CN115506382A (en) Construction method for pile plate wall of island building platform
CN214737069U (en) Anti-skidding-sinking-control type reinforcing unit and reinforcing structure for near-landslide embankment
CN211471980U (en) Anti-bump anti-skid structure of ballastless track high-speed railway
CN211523176U (en) River valley type debris flow ditch waste slag and land making structure
CN204875807U (en) Bridge main pier cushion cap foundation pit supporting structure on river channel abrupt slope basement rock
CN204510181U (en) A kind of phytal zone drilling platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181109

CF01 Termination of patent right due to non-payment of annual fee