CN109594527A - A kind of artificial dam body of the groundwater reservoir with zigzag card slot - Google Patents

A kind of artificial dam body of the groundwater reservoir with zigzag card slot Download PDF

Info

Publication number
CN109594527A
CN109594527A CN201811487696.XA CN201811487696A CN109594527A CN 109594527 A CN109594527 A CN 109594527A CN 201811487696 A CN201811487696 A CN 201811487696A CN 109594527 A CN109594527 A CN 109594527A
Authority
CN
China
Prior art keywords
dam body
coal column
card slot
slip casting
artificial
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811487696.XA
Other languages
Chinese (zh)
Inventor
庞冬冬
李传明
史文豹
程文青
黄玉杰
吴希雅
魏凯
杨洪强
裴卓玥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui University of Science and Technology
Original Assignee
Anhui University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui University of Science and Technology filed Critical Anhui University of Science and Technology
Priority to CN201811487696.XA priority Critical patent/CN109594527A/en
Publication of CN109594527A publication Critical patent/CN109594527A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Mechanical Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The present invention provides a kind of artificial dam body of the groundwater reservoir with zigzag card slot, it is related to protection of groundwater resource field, including artificial dam body and it is located at artificial dam body two sides coal column dam body, artificial dam body includes side portion's Seal Kit and dam body module, side portion's Seal Kit includes uniform slip casting elasticity steel pipe and inlet well, dam body module includes the dam body module with zigzag card slot and common dam body module, the outside of coal column dam body is equipped with several uniform slip casting elasticity steel pipes, the other end of uniform slip casting elasticity steel pipe is arranged in the zigzag card slot of the dam body module with zigzag card slot, the uniform slip casting elasticity steel pipe of same vertical direction is communicated with inlet well, the end of inlet well extends to outside coal column dam body, it is fixedly connected between dam body module with zigzag card slot by common dam body module, the present invention is quickly building groundwater reservoir artificial dam Body while reducing the period for building reservoir and cost, improves the leakproofness in portion, groundwater reservoir coal column side and artificial dam body.

Description

A kind of artificial dam body of the groundwater reservoir with zigzag card slot
Technical field
The present invention relates to protection of groundwater resource fields, and in particular to a kind of groundwater reservoir artificial dam with zigzag card slot Body.
Background technique
Groundwater reservoir is corresponding with Surface reservoir, is collection Water Resource Adjustment And Control, the rain built using natural groundwater storage space The big vast utilization of resources and water ecological environment reparation are that the water system of natural environment syntonic type is ruled in the ecological hydro-junction engineering of one Science and engineering journey.Groundwater reservoir enhances connecting each other and converting for surface and ground water, both has adjusted surface water resources, also regulates and stores Groundwater resources, the joint for realizing surface water and groundwater utilize.
But coal mine underground reservoir and groundwater reservoir are different concept again, and coal mine underground reservoir is to utilize artificial work Industry manually builds reservoir dam using the goaf of downhole coal mine as water holding space, in the building course of entire groundwater reservoir most Important and maximal workload thing is exactly the build of artificial dam body;Current artificial dam body main material is brick, sandstone and Cobblestone etc., main technique are to build in layer;This technique construction-time is too long, it is also necessary to arrive equipment and manpower movement Next dam body build area greatly improves the construction and draining cost of reservoir;
Therefore accelerate construction speed, improve and build intensity and sealing performance, ensure that reservoir safety is urgently to be solved at present Problem.
Summary of the invention
(1) the technical issues of solving
In view of the deficiencies of the prior art, the present invention provides a kind of artificial dam body of the groundwater reservoir with zigzag card slot, The artificial dam body of groundwater reservoir is quickly built, while reducing the period for building reservoir and cost, improves portion, groundwater reservoir coal column side With the leakproofness of artificial dam body.
(2) technical solution
In order to achieve the above object, the present invention is achieved by the following technical programs:
A kind of artificial dam body of the groundwater reservoir with zigzag card slot, including artificial dam body and be located at the artificial dam body two sides Coal column dam body, the artificial dam body include side portion's Seal Kit and dam body module, and the portion, side Seal Kit includes uniform slip casting Elastic steel pipe and inlet well, the dam body module include the dam body module with zigzag card slot and common dam body module, described The outside of coal column dam body is equipped with several uniform slip casting elasticity steel pipes, and one end of the uniform slip casting elasticity steel pipe is arranged described At 60 ° of acute angles in coal column dam body and with the trend in tunnel, the other end of the uniform slip casting elasticity steel pipe is arranged in the band saw In the zigzag card slot of the dam body module of dentation card slot, the uniform slip casting elasticity steel pipe of same vertical direction with the note Slurry drilling communicates, and the end of inlet well extends to outside the coal column dam body, between the dam body module with zigzag card slot It is fixedly connected by common dam body module.
Preferably, the length of the uniform slip casting elasticity steel pipe is 2.2-2.5m, overall diameter 0.08m, and wall thickness is 0.02m has note inside the coal column by being formed by inside slip casting porose area, coal column without slip casting porose area, coal column outside area inside coal column Starching the length ratio without slip casting porose area, the coal column outside area inside porose area and the coal column is 10:1:1, the uniform slip casting bullet Property steel pipe material be high strength steel, there is inside the coal column slip casting porose area to be equipped with injected hole, the slip casting bore dia 0.0040-0.0048m, array pitch 0.10-0.18m, spacing 0.020-0.28m.
Preferably, the diameter of the inlet well is 0.10-0.18m.
Preferably, the bevel edge of sawtooth and horizontal direction angle are 60 ° in the dam body module with zigzag card slot, horizontal Side length is 0.10-0.18m, tilts long 0.20-0.25m.
The above-mentioned artificial dam body of the groundwater reservoir with zigzag card slot, construction technology the following steps are included:
(1) expand side: rejecting some broken loose coal petrographys in portion, coal column dam body side surface, expand the length of side by following Two conditions:
1. length is greater than 0.4m
2. guaranteeing last two, to help intermediate distance be 1+0.3t, and t is integer, and t is the dam body mould with zigzag card slot The number of rows of block;
(2) in coal column dam body side portion's drilling, the uniform slip casting elasticity steel pipe, the uniform slip casting elasticity are installed 30 ° of steel pipe and coal column surface angle, are referred to as layer in short transverse, layer is array pitch on front-rear direction, arranges away from being 0.60-0.64m Away from for 0.50-0.55m;
(3) inlet well, the inlet well end and coal column dam body inside are beaten on the coal column dam body Distance is the 20% of coal column dam body width, if coal column dam body width is lower than 5m, the inlet well end and the coal column dam Internal lateral extent is 1m;
(4) uniformly slip casting elasticity steel pipe is connect with the dam body module with zigzag card slot, the band zigzag card It is fixed between the dam body module of slot by several common dam body module fillings.
Preferably, when the Roof rock feature in the tunnel be it is hard, in it is hard, it is described whole when soft stratum and dead-soft incompetent beds The width of a artificial dam body can take 6-7m, 5-6m, 4-5m and 4m respectively.
Preferably, the dam body module is suppressed by concrete, and concrete brick material mixture ratio is cement: water: flyash: Haydite: inorganic aluminate water-proof agent=1:0.35:1:3.5:0.25, cement use 42.5Mpa grade ordinary portland cement, fine coal For ash using I, II grade of flyash for complying with standard specification, haydite uses leca, and maximum particle diameter is no more than 0.016m.
(3) beneficial effect
The present invention provides a kind of artificial dam bodys of the groundwater reservoir with zigzag card slot, have the advantages that
In the practical building course of the artificial dam body of groundwater reservoir, as long as manual operation, will result in the pine of contact surface The problem of relaxing and broken, and then cannot be completely eliminated poor permeability, especially between artificial dam body and coal column dam body.
Firstly, in view of the deficiencies of the prior art, the present invention, will by the design of uniform slip casting elasticity steel pipe and inlet well Leakproofness between artificial dam body and coal column dam body is operated to be operated at the inlet well other than 1m, artificial at sealing in the past Dynamic operation become " static state " slip casting of distant place, the coal petrography other than 1m all has good integrality, and slip casting will not be to it Integrality has any destruction, both eliminates man's activity, improves density also by slip casting.
Secondly, solving the problems, such as that coal column contact surface broken caused density in two sides is bad, by the slip casting with permeability hole Pipe is evenly distributed on the most broken place in portion, coal column side, by internal high pressure slip casting, realizes sealing.
Finally, present invention process is simple simultaneously, realize that the installation of the artificial dam body of groundwater reservoir is quick, is improving top plate and people Construction cost is effectively reduced while the sealing performance of work dam body, is suitble to large-scale promotion.
Detailed description of the invention
Fig. 1 is the build area schematic diagram of artificial dam body;
Fig. 2 is the structural schematic diagram of uniform slip casting elasticity steel pipe in the embodiment of the present invention 1;
Fig. 3 is the processing technology figure of the common dam body module of the present invention;
Fig. 4 is the processing technology figure of the dam body module of the invention with zigzag card slot;
Fig. 5 is the final effect figure of the artificial dam body of the present invention;
The top view of dam body module of Fig. 6 present invention with zigzag card slot;
Fig. 7 is the side view of the dam body module of inventive belt zigzag card slot;
Fig. 8 is the main view of the dam body module of inventive belt zigzag card slot;
The artificial dam body build area of 1-;2- coal column dam body;The tunnel 3-;The coal seam 4-;5- groundwater reservoir region;Inside 6- coal column There is slip casting porose area;Without slip casting porose area inside 7- coal column;8- coal column outside area;9- injected hole;The uniform slip casting elasticity steel pipe of 10-;11- Common dam body module;12- mold base;13- mold baffle;14- marking line;15- top mold plate;16- marking line;17- band saw The dam body module of dentation card slot;Mold base of the 18- with zigzag fixture block;19- inlet well.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention, Technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is the present invention one Divide embodiment, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art are not making Every other embodiment obtained, shall fall within the protection scope of the present invention under the premise of creative work.
Embodiment 1:
As shown in Figure 1, a kind of artificial dam body of the groundwater reservoir with zigzag card slot, including artificial 1 He of dam body build area Coal column dam body 2 positioned at artificial 1 two sides of dam body build area, groundwater reservoir region 5 are coal mining goafs, and outside is tunnel 3 and unquarried coal seam 4 or rock stratum;The key of groundwater reservoir is exactly that the water sealed inside reservoir does not allow it to flow out, so manually The leakproofness of dam body is particularly important.
As shown in Fig. 2, uniform slip casting elasticity steel pipe 10 total length 2.2m, overall diameter 0.08m, wall thickness 0.02m, by coal column Portion is formed by inside slip casting porose area 6 (2m), coal column without slip casting porose area 7 (0.2m), coal column outside area 8 (0.2m), is had inside coal column The length ratio without slip casting porose area, coal column outside area is 10:1:1, the material of uniform slip casting elasticity steel pipe inside slip casting porose area and coal column Matter is high strength steel, and material is high strength steel;9 diameter of injected hole is 0.004m, and array pitch is 0.1m (alongst), spacing For 0.02m (direction that outside one is enclosed).
A kind of construction technology of the artificial dam body of the groundwater reservoir with zigzag card slot, comprising the following steps:
(1) preparation of dam body module.
1. the preparation of common dam body module 11, includes the next steps: as shown in figure 3, mould will be installed on mold base 12 Has baffle 13, concrete is loaded in mold baffle 13, and (concrete brick arrives marking line having a size of length, width and height 300*300*300mm) 14, installation mold top plate 15, pressurization, until being compressed to top mold plate 15 to marking line 16.
2. the preparation of the dam body module 17 with zigzag card slot, includes the next steps: as shown in figure 4, will be with zigzag card Installation mold baffle 13 on the mold base 18 of block loads concrete (having a size of length, width and height 500*500* in mold baffle 13 600mm), marking line 14, installation mold top plate 15, pressurization, until being compressed to top mold plate 15 to marking line 16 are arrived.
As shown in figs 6-8, the bevel edge of the sawtooth and horizontal direction angle are 60 °, a length of 0.1m of horizontal sides, inclination length 0.2m。
(2) expand side: rejecting coal column dam body 2 and help some broken loose coal petrographys in portion surface, expand the length of side by following two A condition:
1. length is greater than 0.4m
2. guaranteeing last two, to help intermediate distance be 1+0.3t, and t is integer, and t is the dam body module 17 with zigzag card slot Number of rows;
When the Roof rock feature in the tunnel be it is hard, in it is hard, when soft stratum and dead-soft incompetent beds, the entire artificial dam The width of body can take 6m, 6m, 4m and 4m respectively.
(3) as shown in figure 5, helping portion's drilling in coal column dam body 2, uniform slip casting elasticity steel pipe 10, uniform slip casting bullet are installed Property steel pipe 10 and 30 ° of 2 surface angle of coal column dam body, be referred to as layer in short transverse, layer is arranged on front-rear direction away from being 0.6m Away from array pitch 0.5m;
(4) as shown in figure 5, measurement 2 width of coal column dam body, beats inlet well 19,10 end of inlet well on coal column dam body 2 End and 20% that 2 inner distance of coal column dam body is 2 width of coal column dam body, if 2 width of coal column dam body is lower than 5m, inlet well 19 End and 2 inner distance of coal column dam body are 1m.
Wherein, the diameter of inlet well is 0.1m.
(5) as shown in figure 5, uniform slip casting elasticity steel pipe 10 is connect with the dam body module 17 with zigzag card slot, band It is fixed between the dam body module 17 of zigzag card slot by several common fillings of dam body module 11.
Embodiment 2:
As shown in Figure 1, a kind of artificial dam body of the groundwater reservoir with zigzag card slot, including artificial 1 He of dam body build area Coal column dam body 2 positioned at artificial 1 two sides of dam body build area, groundwater reservoir region 5 are coal mining goafs, and outside is tunnel 3 and unquarried coal seam 4 or rock stratum;The key of groundwater reservoir is exactly that the water sealed inside reservoir does not allow it to flow out, so manually The leakproofness of dam body is particularly important.
Uniform slip casting elasticity steel pipe 10 total length 2.3m, overall diameter 0.08m, wall thickness 0.02m, by having injected hole inside coal column It is formed inside area 6 (1.92m), coal column without slip casting porose area 7 (0.19m), coal column outside area 8 (0.19m), has note inside the coal column The length inside porose area and the coal column without slip casting porose area, the coal column outside area is starched than being about 10:1:1, the uniform slip casting The material of elastic steel pipe is high strength steel, and material is high strength steel;9 diameter of injected hole be 0.0041m, array pitch be 0.12m (along Length direction), spacing is (direction that outside one is enclosed) 0.022m.
A kind of construction technology of the artificial dam body of the groundwater reservoir with zigzag card slot, comprising the following steps:
(1) preparation of dam body module.
1. the preparation of common dam body module 11, includes the next steps: as shown in figure 3, mould will be installed on mold base 12 Has baffle 13, concrete is loaded in mold baffle 13, and (concrete brick arrives marking line having a size of length, width and height 300*300*300mm) 14, installation mold top plate 15, pressurization, until being compressed to top mold plate 15 to marking line 16.
2. the preparation of the dam body module 17 with zigzag card slot, includes the next steps: as shown in figure 4, will be with zigzag card Installation mold baffle 13 on the mold base 18 of block loads concrete (having a size of length, width and height 500*500* in mold baffle 13 600mm), marking line 14, installation mold top plate 15, pressurization, until being compressed to top mold plate 15 to marking line 16 are arrived.
As shown in figs 6-8, the bevel edge of the sawtooth and horizontal direction angle are 60 °, a length of 0.13m of horizontal sides, inclination length 0.21m。
(2) expand side: rejecting coal column dam body 2 and help some broken loose coal petrographys in portion surface, expand the length of side by following two A condition:
1. length is greater than 0.4m
2. guaranteeing last two, to help intermediate distance be 1+0.3t, and t is integer, and t is the dam body module 17 with zigzag card slot Number of rows;
When the Roof rock feature in the tunnel be it is hard, in it is hard, when soft stratum and dead-soft incompetent beds, the entire artificial dam The width of body can take 7m, 5m, 5m and 4m respectively.
(3) as shown in figure 5, helping portion's drilling in coal column dam body 2, uniform slip casting elasticity steel pipe 10, uniform slip casting bullet are installed Property steel pipe 10 and 30 ° of 2 surface angle of coal column dam body, be referred to as layer in short transverse, layer is arranged on front-rear direction away from being 0.62m Away from array pitch 0.51m;
(4) as shown in figure 5, measurement 2 width of coal column dam body, beats inlet well 19,10 end of inlet well on coal column dam body 2 End and 20% that 2 inner distance of coal column dam body is 2 width of coal column dam body, if 2 width of coal column dam body is lower than 5m, inlet well 19 End and 2 inner distance of coal column dam body are 1m.
Wherein, the diameter of inlet well is 0.12m.
(5) as shown in figure 5, uniform slip casting elasticity steel pipe 10 is connect with the dam body module 17 with zigzag card slot, band It is fixed between the dam body module 17 of zigzag card slot by several common fillings of dam body module 11.
Embodiment 3:
As shown in Figure 1, a kind of artificial dam body of the groundwater reservoir with zigzag card slot, including artificial 1 He of dam body build area Coal column dam body 2 positioned at artificial 1 two sides of dam body build area, groundwater reservoir region 5 are coal mining goafs, and outside is tunnel 3 and unquarried coal seam 4 or rock stratum;The key of groundwater reservoir is exactly that the water sealed inside reservoir does not allow it to flow out, so manually The leakproofness of dam body is particularly important.
Uniform slip casting elasticity steel pipe 10 total length 2.4m, overall diameter 0.08m, wall thickness 0.02m, by having injected hole inside coal column It is formed inside area 6 (2m), coal column without slip casting porose area 7 (0.2m), coal column outside area 8 (0.2m), has injected hole inside the coal column Length inside area and the coal column without slip casting porose area, the coal column outside area is than being about 10:1:1, the uniform slip casting elasticity The material of steel pipe is high strength steel, and material is high strength steel;9 diameter of injected hole is 0.0043m, and array pitch is 0.14m (along length Direction), spacing is (direction that outside one is enclosed) 0.025m.
A kind of construction technology of the artificial dam body of the groundwater reservoir with zigzag card slot, comprising the following steps:
(1) preparation of dam body module.
1. the preparation of common dam body module 11, includes the next steps: as shown in figure 3, mould will be installed on mold base 12 Has baffle 13, concrete is loaded in mold baffle 13, and (concrete brick arrives marking line having a size of length, width and height 300*300*300mm) 14, installation mold top plate 15, pressurization, until being compressed to top mold plate 15 to marking line 16.
2. the preparation of the dam body module 17 with zigzag card slot, includes the next steps: as shown in figure 4, will be with zigzag card Installation mold baffle 13 on the mold base 18 of block loads concrete (having a size of length, width and height 500*500* in mold baffle 13 600mm), marking line 14, installation mold top plate 15, pressurization, until being compressed to top mold plate 15 to marking line 16 are arrived.
As shown in figs 6-8, the bevel edge of the sawtooth and horizontal direction angle are 60 °, a length of 0.15m of horizontal sides, inclination length 0.24m。
(2) expand side: rejecting coal column dam body 2 and help some broken loose coal petrographys in portion surface, expand the length of side by following two A condition:
1. length is greater than 0.4m
2. guaranteeing last two, to help intermediate distance be 1+0.3t, and t is integer, and t is the dam body module 17 with zigzag card slot Number of rows;
When the Roof rock feature in the tunnel be it is hard, in it is hard, when soft stratum and dead-soft incompetent beds, the entire artificial dam The width of body can take 6.5m, 5.4m, 4.6m and 4m respectively.
(3) as shown in figure 5, helping portion's drilling in coal column dam body 2, uniform slip casting elasticity steel pipe 10, uniform slip casting bullet are installed Property steel pipe 10 and 30 ° of 2 surface angle of coal column dam body, be referred to as layer in short transverse, layer is arranged on front-rear direction away from being 0.64m Away from array pitch 0.53m;
(4) as shown in figure 5, measurement 2 width of coal column dam body, beats inlet well 19,10 end of inlet well on coal column dam body 2 End and 20% that 2 inner distance of coal column dam body is 2 width of coal column dam body, if 2 width of coal column dam body is lower than 5m, inlet well 19 End and 2 inner distance of coal column dam body are 1m.
Wherein, the diameter of inlet well is 0.14m.
(5) as shown in figure 5, uniform slip casting elasticity steel pipe 10 is connect with the dam body module 17 with zigzag card slot, band It is fixed between the dam body module 17 of zigzag card slot by several common fillings of dam body module 11.
Embodiment 4:
As shown in Figure 1, a kind of artificial dam body of the groundwater reservoir with zigzag card slot, including artificial 1 He of dam body build area Coal column dam body 2 positioned at artificial 1 two sides of dam body build area, groundwater reservoir region 5 are coal mining goafs, and outside is tunnel 3 and unquarried coal seam 4 or rock stratum;The key of groundwater reservoir is exactly that the water sealed inside reservoir does not allow it to flow out, so manually The leakproofness of dam body is particularly important.
As shown in Fig. 2, uniform slip casting elasticity steel pipe 10 total length 2.5m, overall diameter 0.08m, wall thickness 0.02m, by coal column Portion is formed by inside slip casting porose area 6 (2.1m), coal column without slip casting porose area 7 (0.2m), coal column outside area 8 (0.2m), the coal column Inside has the length inside slip casting porose area and the coal column without slip casting porose area, the coal column outside area than being about 10:1:1, described The material of uniform slip casting elasticity steel pipe is high strength steel, and material is high strength steel;9 diameter of injected hole is 0.0048m, and array pitch is 0.18m (alongst), spacing are (direction that outside one is enclosed) 0.28m.
A kind of construction technology of the artificial dam body of the groundwater reservoir with zigzag card slot, comprising the following steps:
(1) preparation of dam body module.
1. the preparation of common dam body module 11, includes the next steps: as shown in figure 3, mould will be installed on mold base 12 Has baffle 13, concrete is loaded in mold baffle 13, and (concrete brick arrives marking line having a size of length, width and height 300*300*300mm) 14, installation mold top plate 15, pressurization, until being compressed to top mold plate 15 to marking line 16.
2. the preparation of the dam body module 17 with zigzag card slot, includes the next steps: as shown in figure 4, will be with zigzag card Installation mold baffle 13 on the mold base 18 of block loads concrete (having a size of length, width and height 500*500* in mold baffle 13 600mm), marking line 14, installation mold top plate 15, pressurization, until being compressed to top mold plate 15 to marking line 16 are arrived.
As shown in figs 6-8, the bevel edge of the sawtooth and horizontal direction angle are 60 °, a length of 0.18m of horizontal sides, inclination length 0.25m。
(2) expand side: rejecting coal column dam body 2 and help some broken loose coal petrographys in portion surface, expand the length of side by following two A condition:
1. length is greater than 0.4m
2. guaranteeing last two, to help intermediate distance be 1+0.3t, and t is integer, and t is the dam body module 17 with zigzag card slot Number of rows;
When the Roof rock feature in the tunnel be it is hard, in it is hard, when soft stratum and dead-soft incompetent beds, the entire artificial dam The width of body can take 6-m, 6m, 4m and 4m respectively.
(3) as shown in figure 5, helping portion's drilling in coal column dam body 2, uniform slip casting elasticity steel pipe 10, uniform slip casting bullet are installed Property steel pipe 10 and 30 ° of 2 surface angle of coal column dam body, be referred to as layer in short transverse, layer is arranged on front-rear direction away from being 0.64m Away from array pitch 0.55m;
(4) as shown in figure 5, measurement 2 width of coal column dam body, beats inlet well 19,10 end of inlet well on coal column dam body 2 End and 20% that 2 inner distance of coal column dam body is 2 width of coal column dam body, if 2 width of coal column dam body is lower than 5m, inlet well 19 End and 2 inner distance of coal column dam body are 1m.
Wherein, the diameter of inlet well is 0.18m.
(5) as shown in figure 5, uniform slip casting elasticity steel pipe 10 is connect with the dam body module 17 with zigzag card slot, band It is fixed between the dam body module 17 of zigzag card slot by several common fillings of dam body module 11.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.In the absence of more restrictions, including the element that sentence "including a ..." limits, it is not excluded that There is also other identical elements in the process, method, article or equipment for including element.
The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations, although with reference to the foregoing embodiments Invention is explained in detail, those skilled in the art should understand that: it still can be to aforementioned each implementation Technical solution documented by example is modified or equivalent replacement of some of the technical features;And these modification or Replacement, the spirit and scope for technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution.

Claims (7)

1. a kind of artificial dam body of the groundwater reservoir with zigzag card slot, including artificial dam body and it is located at the artificial dam body two sides coal Column dam body, which is characterized in that the artificial dam body includes side portion's Seal Kit and dam body module, and the portion, side Seal Kit includes Uniform slip casting elasticity steel pipe and inlet well, the dam body module include the dam body module with zigzag card slot and common dam body mould The outside of block, the coal column dam body is equipped with several uniform slip casting elasticity steel pipes, and one end of the uniform slip casting elasticity steel pipe is set It sets in the coal column dam body and with the trend in tunnel into 60 ° of acute angles, the other end setting of the uniform slip casting elasticity steel pipe exists In the zigzag card slot of the dam body module with zigzag card slot, the uniform slip casting elasticity steel pipe of same vertical direction is equal It is communicated with the inlet well, the end of inlet well extends to outside the coal column dam body, the dam body with zigzag card slot It is fixedly connected between module by common dam body module.
2. the artificial dam body of groundwater reservoir as described in claim 1 with zigzag card slot, which is characterized in that the uniform slip casting The length of elastic steel pipe is 2.2-2.5m, overall diameter 0.08m, wall thickness 0.02m, by having slip casting porose area, coal column inside coal column Inside is formed without slip casting porose area, coal column outside area, have inside the coal column inside slip casting porose area and the coal column without slip casting porose area, The length ratio of the coal column outside area is 10:1:1, and the material of the uniform slip casting elasticity steel pipe is high strength steel, the coal column Inside has slip casting porose area to be equipped with injected hole, the slip casting bore dia 0.0040-0.0048m, array pitch 0.10-0.18m, spacing For 0.020-0.28m.
3. the artificial dam body of groundwater reservoir as described in claim 1 with zigzag card slot, which is characterized in that the inlet well Diameter be 0.10-0.18m.
4. the artificial dam body of groundwater reservoir as described in claim 1 with zigzag card slot, which is characterized in that the band zigzag The bevel edge of sawtooth and horizontal direction angle are 60 ° in the dam body module of card slot, a length of 0.10-0.18m of horizontal sides, inclination length 0.20-0.25m。
5. the artificial dam body of the groundwater reservoir with zigzag card slot a method as claimed in any one of claims 1 to 5, which is characterized in that construction work Skill the following steps are included:
(1) expand side: rejecting some broken loose coal petrographys in portion, coal column dam body side surface, expand the length of side by following two Condition:
1. length is greater than 0.4m
2. guaranteeing last two, to help intermediate distance be 1+0.3t, and t is integer, and t is the dam body module with zigzag card slot Number of rows;
(2) in coal column dam body side portion's drilling, the uniform slip casting elasticity steel pipe, the uniform slip casting elasticity steel pipe are installed With 30 ° of coal column surface angle, it is referred to as layer in short transverse, layer is array pitch on front-rear direction, array pitch is away from being 0.60-0.64m 0.50-0.55m;
(3) inlet well, the inlet well end and the coal column dam body inner distance are beaten on the coal column dam body It is the 20% of coal column dam body width, if coal column dam body width is lower than 5m, in the inlet well end and the coal column dam body Lateral extent is 1m;
(4) uniformly slip casting elasticity steel pipe is connect with the dam body module with zigzag card slot, described with zigzag card slot It is fixed between dam body module by several common dam body module fillings.
6. the artificial dam body of groundwater reservoir as described in claim 1 with zigzag card slot, which is characterized in that when the tunnel Roof rock feature be it is hard, in it is hard, when soft stratum and dead-soft incompetent beds, the width of the entire artificial dam body can take 6- respectively 7m, 5-6m, 4-5m and 4m.
7. the artificial dam body of groundwater reservoir as described in claim 1 with zigzag card slot, which is characterized in that the dam body module It is suppressed by concrete, concrete brick material mixture ratio is cement: water: flyash: haydite: inorganic aluminate water-proof agent=1: 0.35:1:3.5:0.25, cement use 42.5Mpa grade ordinary portland cement, flyash using comply with standard specification I, II grade of flyash, haydite use leca, and maximum particle diameter is no more than 0.016m.
CN201811487696.XA 2018-12-06 2018-12-06 A kind of artificial dam body of the groundwater reservoir with zigzag card slot Pending CN109594527A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811487696.XA CN109594527A (en) 2018-12-06 2018-12-06 A kind of artificial dam body of the groundwater reservoir with zigzag card slot

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811487696.XA CN109594527A (en) 2018-12-06 2018-12-06 A kind of artificial dam body of the groundwater reservoir with zigzag card slot

Publications (1)

Publication Number Publication Date
CN109594527A true CN109594527A (en) 2019-04-09

Family

ID=65962259

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811487696.XA Pending CN109594527A (en) 2018-12-06 2018-12-06 A kind of artificial dam body of the groundwater reservoir with zigzag card slot

Country Status (1)

Country Link
CN (1) CN109594527A (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103422469A (en) * 2013-08-14 2013-12-04 中国神华能源股份有限公司 Artificial retaining dam for coal mine underground reservoir and connecting method of artificial retaining dam and coal pillar dam bodies as well as surrounding rocks
CN103758569A (en) * 2014-01-26 2014-04-30 山东科技大学 Cracked roof caving region grouting filling system
CN204299622U (en) * 2014-11-06 2015-04-29 中国神华能源股份有限公司 A kind of artificial checkdam of coal mine underground reservoir
JP2016003514A (en) * 2014-06-18 2016-01-12 大成建設株式会社 Flow countermeasure structure
CN205134271U (en) * 2015-10-19 2016-04-06 中国神华能源股份有限公司 Artifical dam body of groundwater reservoir
CN105971640A (en) * 2016-07-08 2016-09-28 西安科技大学 Strengthening method for gob-side entrydriving narrow coal pillar
CN107237651A (en) * 2017-06-23 2017-10-10 中国矿业大学 A kind of multi-level grouting water-tight reinforcement means of coal mine underground reservoir and reservoir dam
CN107524154A (en) * 2017-09-15 2017-12-29 神华集团有限责任公司 The artificial dam apparatus for building and construction process of coal seam goaf
CN108060656A (en) * 2017-11-29 2018-05-22 中国神华能源股份有限公司 The artificial dam body of groundwater reservoir and coal column dam body connection structure and its construction technology
CN108590751A (en) * 2018-06-26 2018-09-28 中南大学 A kind of mine down-hole tailings water in-situ treatment method and permeable reaction filling counterfort

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103422469A (en) * 2013-08-14 2013-12-04 中国神华能源股份有限公司 Artificial retaining dam for coal mine underground reservoir and connecting method of artificial retaining dam and coal pillar dam bodies as well as surrounding rocks
CN103758569A (en) * 2014-01-26 2014-04-30 山东科技大学 Cracked roof caving region grouting filling system
JP2016003514A (en) * 2014-06-18 2016-01-12 大成建設株式会社 Flow countermeasure structure
CN204299622U (en) * 2014-11-06 2015-04-29 中国神华能源股份有限公司 A kind of artificial checkdam of coal mine underground reservoir
CN205134271U (en) * 2015-10-19 2016-04-06 中国神华能源股份有限公司 Artifical dam body of groundwater reservoir
CN105971640A (en) * 2016-07-08 2016-09-28 西安科技大学 Strengthening method for gob-side entrydriving narrow coal pillar
CN107237651A (en) * 2017-06-23 2017-10-10 中国矿业大学 A kind of multi-level grouting water-tight reinforcement means of coal mine underground reservoir and reservoir dam
CN107524154A (en) * 2017-09-15 2017-12-29 神华集团有限责任公司 The artificial dam apparatus for building and construction process of coal seam goaf
CN108060656A (en) * 2017-11-29 2018-05-22 中国神华能源股份有限公司 The artificial dam body of groundwater reservoir and coal column dam body connection structure and its construction technology
CN108590751A (en) * 2018-06-26 2018-09-28 中南大学 A kind of mine down-hole tailings water in-situ treatment method and permeable reaction filling counterfort

Similar Documents

Publication Publication Date Title
CN109322699B (en) Pollution isolation and plugging technology under mine
CN102011588A (en) House pillar type cutting and filling method of medium coal seam for controlling movement deformation of overlying rock
CN102011611A (en) Strip-type filling method of high water-swelling material for controlling movement and deformation of overlying strata
CN106545361B (en) A kind of mine down-hole high permeability filling counterfort and its construction method
CN108104865A (en) A kind of concordant drilling Anti-air-leakage gas pumping method
CN107975044B (en) Method for backfilling collapse method mine by utilizing tailing surface collapse pits
CN108612547A (en) A kind of tunnel repair system with underground pipe gallery percolating water
CN109898992A (en) It is a kind of that disaster-ridden source ore bed safe working method is administered using surface orientation drilling in advance
CN107012832A (en) Plugging structure and method under a kind of CFRD percolating water
CN106150545A (en) A kind of method carrying out goaf part filling according to roof caving feature
CN113107489A (en) High-ground-pressure three-soft coal seam along-empty crossheading advanced grouting reinforcement method
CN102102518A (en) Top coal caving coordinated mining method for thick coal seam under dam body of reservoir
CN109578738B (en) Piping-preventing directional drilling pipeline isolation pipe plugging device
CN109594527A (en) A kind of artificial dam body of the groundwater reservoir with zigzag card slot
CN105669238A (en) Environmentally friendly building heat-insulation material, heat insulation board, seam covering plate and environmentally friendly heat-insulation wall
CN106761841B (en) Working face tailgate fractured coal grouting reinforcement method
CN206337714U (en) A kind of waterproof autoclave aerated concrete building block
CN209855821U (en) Drilling hole for improving water-rich characteristic of thick loose aquifer through grouting
CN210002429U (en) ultra-deep foundation pit enclosure water stop structure
CN205400810U (en) Mine sealing wall
CN115095387B (en) Sealing and storing CO of underground return airway by using filling material 2 Is a method of (2)
CN112983479B (en) Roadway surrounding rock sealing protection method
Wang et al. Rock backfill and hazard control of abandoned stopes: a case study
CN111485883B (en) High ground stress environment low-cost mining method based on paste-multi-medium collaborative filling
CN208502792U (en) A kind of advanced double-deck ductule of crushed zone tunnel advanced support

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190409

WD01 Invention patent application deemed withdrawn after publication