CN107237651A - A kind of multi-level grouting water-tight reinforcement means of coal mine underground reservoir and reservoir dam - Google Patents

A kind of multi-level grouting water-tight reinforcement means of coal mine underground reservoir and reservoir dam Download PDF

Info

Publication number
CN107237651A
CN107237651A CN201710484672.8A CN201710484672A CN107237651A CN 107237651 A CN107237651 A CN 107237651A CN 201710484672 A CN201710484672 A CN 201710484672A CN 107237651 A CN107237651 A CN 107237651A
Authority
CN
China
Prior art keywords
tunnel
reservoir
coal
coal mine
mine underground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710484672.8A
Other languages
Chinese (zh)
Other versions
CN107237651B (en
Inventor
张农
张成浩
潘东江
钱德雨
谢正正
王朋
宋子杭
伍业伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201710484672.8A priority Critical patent/CN107237651B/en
Publication of CN107237651A publication Critical patent/CN107237651A/en
Priority to PCT/CN2018/078279 priority patent/WO2018233320A1/en
Application granted granted Critical
Publication of CN107237651B publication Critical patent/CN107237651B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/16Modification of mine passages or chambers for storage purposes, especially for liquids or gases
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/103Dams, e.g. for ventilation

Abstract

A kind of multi-level grouting water-tight reinforcement means of coal mine underground reservoir and reservoir dam, it is adaptable to coal mine underground construction field.Determine to set the area of groundwater reservoir and the position of coal column dam body by volume, tunnel groundwater reservoir both sides tunnel and withdraw tunnel, priority gunite concrete slurries and Ludox in wall, form concrete and Ludox spray-up, to both sides tunnel and withdraw tunnel and first constructed multiple shallow injected holes and hole-sealing grouting close to the side side of coal column dam body, after construct multiple deep injected holes and hole-sealing grouting, artificial checkdam enclosing tunnel is finally built, so as to form the coal mine underground reservoir of closing.Its coal column dam body to coal mine underground reservoir serves reinforcing and closing double effectses, and selected material is nanoscale and inorganic nature, and green high-efficient ensure that the antiseepage safety of coal column dam body, make coal mine underground reservoir lasting stability.

Description

A kind of multi-level grouting water-tight reinforcement means of coal mine underground reservoir and reservoir dam
Technical field
The present invention relates to a kind of coal mine underground reservoir and the multi-level grouting water-tight reinforcement means of reservoir dam, it is adaptable to applies Work coal mine underground reservoir, underground storage chamber are used.
Background technology
In recent years, the center of gravity of coal in China production is gradually to western part transfer, and west area (Jin, Shaanxi and Inner Mongolia Ning Ganwu provinces and regions) are visited Bright coal resources reserves account for the 71.6% of the whole nation, and its water resource only accounts for the 3.9% of national water resource, belongs to severe water deficient regions Domain.Arrange ground outside Technique of Coal Mine Drainage now simultaneously and not only pollute environment, and be drained through a large amount of evaporations of Cheng Zhongshui outside and more exacerbate water The shortage of resource, therefore the deficient of water resource turns into the bottleneck of restriction coal mining, in order to solve this problem, a kind of " ore deposit The distributed storage method of well underground water " (CN102862775) arises at the historic moment, and this method is mined out using what is formed after coal mining Area, goaf both sides tunnel and the coal column dam body for withdrawing tunnel, and the artificial checkdam built in tunnel are built into jointly Coal mine underground reservoir.Water storage is carried out using huge goaf space, filtration, purification is carried out to water body using goaf spoil, then Supplied water using nature pressure difference, realize the not outer row of mine water, underground water supply, drainage underground, sewage disposal, water damage prevent and treat, The comprehensive benefit of environmental protection, is used comprehensively in infrared ray light shine.Safety is primary productive force, the safety of coal mine underground reservoir Problem is also the most important thing, and the safety problem of coal mine underground reservoir is mainly the safety and stability problem of its coal column dam body, coal column dam Body is by comprehensive functions such as ore deposit pressure, hydraulic pressure, once occur seepage failure, it will serious floods accident is caused, brings huge to colliery Big personnel and economic loss, it is therefore necessary to consider the problems such as coal column dam body anti-blends reliability.For this safety problem Research, " a kind of anti-seepage method for mine underground reservoirs " (CN102767395) is proposed with cement rendering dado layer, anti-seepage geotextile and water Mud impervious barrier combines composition cut-pff wall to carry out antiseepage." anti-seepage method of groundwater reservoir and the ground with antiseepage function Lower storage reservoir " (CN102926574) constructs antiseepage using antiseepage, normality, grinding coagulation soil and anti-seepage geotextile, smolmitza combination Layer.But the cement used in the above method, inherently a kind of poromerics of concrete, it there is crack and crack;It is black Clay does not only exist microcrack, microfissure and elapses over time, some seasons these cracks and crack can also develop expansion Exhibition;Anti-seepage geotextile is due to the limitation of construction, it is impossible to be paved with whole tunnel face, in addition after the completion of geotextiles construction, or it is many or Few always have some defects, including the bad formation of joining quality seam, construction when be punctured, by lower packing course bursting, tunnel These defects such as the uneven tear geotextiles of wall directly affect the barrier performance of dam body.
Due to presence of the above-mentioned research method using crack, crack caused by the shortcoming and defect of material, in a short time dam Body has certain anti-seepage effect, but coal mine underground reservoir is a prolonged water storage place, over time, underground water Water and hydrone in storehouse are oozed slowly by microfissure, ultimately cause the immersion for a long time of coal column dam body, and intensity decreases, unstability is broken Bad, water body pours out in reservoir, causes great colliery floods accident.Therefore existing method all can not fundamentally solve dam The antiseepage problem of body.
The content of the invention
Technical problem:For above-mentioned technology weak point there is provided a kind of method is simple, create convenient, using concrete, Cement mortar and nanometer materials Ludox, you can the multi-level slip casting of the coal mine underground reservoir and reservoir dam of effective waterproof is prevented Ooze reinforcement means.
Technical scheme:To realize above-mentioned technical purpose, a kind of coal mine underground reservoir of the invention, it includes empty as water storage Between coal mine gob space, coal mine gob space above be face roof, lower section is floor undulation, coal mine gob Both sides tunnel is tunneled out in space symmetr both sides respectively, and withdraws tunnel and artificial checkdam, both sides in other symmetrical both sides construction Tunnel and tunnel is withdrawn provided with anchor, and be successively provided with concrete layer and silica sol layer in outer layer, both sides tunnel and return Multiple shallow injected holes and multiple deep injected holes are inserted between the side side construction above for the close coal column dam body for removing tunnel.
A kind of multi-level grouting water-tight reinforcement means of the coal mine underground reservoir dam of coal mine underground reservoir, according to the hydrology Matter data determines bank underground water content, the volume according to needed for water content calculates water storage, and is configured by volume determination The area of lower storage reservoir and the position of coal column dam body, tunnel groundwater reservoir both sides tunnel and withdraw tunnel, in wall successively Gunite concrete slurries and Ludox, form concrete and Ludox spray-up, to both sides tunnel and withdraw tunnel close to coal column dam The side side of body is first constructed multiple shallow injected holes and hole-sealing grouting, and construct afterwards multiple deep injected holes and hole-sealing grouting finally build people Work checkdam enclosing tunnel, so as to form the coal mine underground reservoir of closing.
Comprise the following steps that:
A. according to needed for hydrogeologic data determines bank underground water content, calculating storage bank underground water content Groundwater reservoir volume, using working face mining height as height and with reference to coal mining region coefficient of storage, determines the area that groundwater reservoir needs, So as to be determined to set the position of groundwater reservoir coal column dam body according to goaf;
B. with the exploitation in coal seam, groundwater reservoir both sides tunnel is normally tunneled out at selected groundwater reservoir construction and is returned Tunnel is removed, change and the hole cranny development of each roadway surrounding rock property are monitored when tunneling groundwater reservoir both sides tunnel and withdrawing tunnel Situation;
C. with groundwater reservoir both sides tunnel and the driving for withdrawing tunnel, to the both sides tunnel that has constituted and tunnel lane is withdrawn Road wall is anchored, and the gunite concrete slurries in wall, after after concrete slurry solidification, to tunnel close to coal column dam body Side side concrete outer layer spray Ludox again;
D. after after the solidification of Ludox spray-up, to both sides tunnel and to withdraw tunnel multiple shallow close to the side side construction of coal column dam body Injected hole, and inject cement mortar;
E. after after the cement slurry sets that shallow injected hole is noted, tunnel is constructed multiple deep slip castings close to the side side of coal column dam body Hole, and Ludox is injected, wait Ludox solidification;
F. after the completion of coal-face back production, it is determined that groundwater reservoir built between the coal column dam body of main entry manually Checkdam enclosing tunnel, so as to form the coal mine underground reservoir of closing.
Concrete thickness after the concrete slurry solidification is 50-100mm, and the silica gel thickness after Ludox solidification is sprayed again 2-5mm, the Ludox used is the nanometer materials that granularity is 8-20nm.
The length of the shallow injected hole is 1.5-2.5m, and grouting pressure is 1-2MPa.
The length of the deep injected hole is 4-6m, and grouting pressure is 0.5-0.8MPa.
The shallow injected hole and deep injected hole arrangement interleave setting, are specially to be pressed in tunnel on the side side of coal column dam body It is arranged alternately according to the deep injected hole of a row below the shallow injected hole of a row.
Beneficial effect:
The application protects coal column dam body surface using concrete and Ludox spray-up, effectively prevents table after the compression of coal column dam body Face avalanche;Injection cement mortar primarily serves dam body consolidation fracture area country rock, changes dam body stress, lifts coal column dam body intensity Effect;The Ludox of injection is filled into micropore crack, blocks hydrone seepage channel, forms one layer of fine and close wall, thoroughly Hinder the seepage flow of hydrone.Material Ludox used in this application, particle is careful, and the property noted is very high, is easy to be packed into fine fisssure Seam, micropore, and with the lengthening of time, consolidate gel, effectively block micropore crack.Other Ludox is a kind of inorganic material Material, its composition is nontoxic, to water body nonstaining property, it can be ensured that the safety of water quality.
The effect of reservoir coal column dam body in itself, concrete, cement mortar, Ludox three and coal column dam body sheet are given full play to Body is fitted close, and is collectively forming one and is blocked up fine and close reinforcing anti-seepage wall, rather than simple use material separately builds a stifled cut-pff wall, its The effect of reinforcing anti-seepage also will be many times than the effect of simple cut-pff wall.
Due to the concrete used, cement mortar, Ludox property is constantly to condense reinforcing over time, so with The increase of time, the reinforcing anti-seepage effect of coal column dam body is more stable, and coal mine underground reservoir safety is more solid and reliable, is available for long-term Water storage.
From coal column dam body surface to coal column dam body, inside carries out many gradient anti-seepage reinforcings.Gunite concrete protects table, injects water Mud mainly plays reinforcement effect, and injection Ludox filling micropore crack antiseepage, three's division of labor is clear and definite, works closely, combines coal column Dam body forms a range of fine and close anti-seepage reinforcing layer in itself, on the one hand strengthens dam body, dam body is effectively kept out Ore deposit pressure, hydraulic pressure effect, another aspect nanometer materials Ludox block the micropore crack passage needed for water and hydrone infiltration, delay The great colliery floods accident that solution is likely to result in due to the presence in micropore crack.Method is simple, creates convenient, using concrete, Cement mortar and nanometer materials Ludox, Stability Analysis of Structures, water resistance are good.
Brief description of the drawings
Fig. 1 is the coal mine underground reservoir structural representation of the present invention.
Fig. 2 is the coal column dam body preventing slurry injection front view of the present invention.
Fig. 3 is the coal column dam body preventing slurry injection side view of the present invention.
In figure:1- coal column dam bodys;2- both sides tunnel;3- withdraws tunnel;4- coal-faces;5- stope drift active workings;6- is artificial Checkdam;7- main entrys;8- goafs;9- concrete and Ludox spray-up;10- Grouting Pipes;The shallow injected holes of 11-;12- depth slip castings Hole;13- overlying rocks;Rock stratum under 14-.
Embodiment
One embodiment of the present of invention is further described below in conjunction with the accompanying drawings:
As shown in figure 1, the coal mine underground reservoir of the present invention, it includes the coal mine gob space as water space, coal Ore goaf space above is overlying rock 13, and lower section is lower rock stratum 14, and coal mine gob space symmetr both sides are tunneled respectively Go out both sides tunnel 2, and tunnel 3 and artificial checkdam 6 are withdrawn in other symmetrical both sides construction, both sides tunnel 2 and withdraw tunnel 3 Anchor is provided with, and concrete layer and silica sol layer are successively provided with outer layer, both sides tunnel 2 and the close of tunnel 3 is withdrawn Multiple shallow injected holes 11 and multiple deep injected holes 12 are inserted between the side side construction of coal column dam body 1 is upper.
As shown in Figures 2 and 3, the multi-level grouting water-tight reinforcement means of coal mine underground reservoir dam of the invention, according to Hydrogeologic data determines bank underground water content, the volume according to needed for water content calculates water storage, and is determined by volume The area of groundwater reservoir and the position of coal column dam body 1 are set, groundwater reservoir both sides tunnel 2 is tunneled and withdraws tunnel 3, in tunnel Priority gunite concrete slurries and Ludox on wall, form concrete and Ludox spray-up 9, to both sides tunnel 2 and withdraw tunnel 3 First constructed multiple shallow injected holes 11 and hole-sealing grouting, construct afterwards multiple deep injected holes 12 and sealing of hole close to the side side of coal column dam body 1 Slip casting, finally builds the artificial enclosing tunnel of checkdam 6, so as to form the coal mine underground reservoir of closing.
Comprise the following steps that:
A. according to needed for hydrogeologic data determines bank underground water content, calculating storage bank underground water content Groundwater reservoir volume, using working face mining height as height, and refers to certain coefficient of storage, determines the area that groundwater reservoir needs, So as to the position of the groundwater reservoir coal column dam body 1 according to the determination of goaf 8 groundwater reservoir;
B. with the exploitation in coal seam, the He of groundwater reservoir both sides tunnel 2 normally tunneled out at selected groundwater reservoir construction Tunnel 3 is withdrawn, the change of monitoring roadway surrounding rock property and porous dehiscence gap when tunneling groundwater reservoir both sides tunnel 2 and withdrawing tunnel 3 The situation of development;
C. with groundwater reservoir both sides tunnel and the driving for withdrawing tunnel, the wall to composition is anchored, and upper Gunite concrete slurries in wall between rock stratum 13 and lower rock stratum 14, after after concrete slurry solidification, are leaned on to tunnel Coal column dam body side side concrete outer layer sprays Ludox again, ultimately forms concrete and Ludox spray-up 9;Wherein concrete slurry coagulates Gu after concrete thickness be 50-100mm, again spray Ludox solidification after silica gel thickness 2-5mm, Ludox is that granularity is 8- 20nm nanometer materials;
D. after after the solidification of Ludox spray-up, tunnel is constructed shallow injected hole 11 close to the side side of coal column dam body, and utilize note The injection cement mortar of pipe 10 is starched, the length of the shallow injected hole 11 is 1.5-2.5m, and grouting pressure is 1-2MPa;
E. after after the cement slurry sets in injected hole, tunnel is constructed deep injected hole 12 close to the side side of coal column, and utilizes Grouting Pipe 10 injects Ludox, waits Ludox solidification, the length of the deep injected hole 12 is 4-6m, and grouting pressure is 0.5- 0.8MPa;
F. after the completion of coal-face back production, it is determined that groundwater reservoir build people between the coal column dam body 1 of main entry 7 The enclosing tunnel of work checkdam 6, it is anti-that the artificial dam body 6 is followed successively by brick mix structure supporting layer, spoil or the structure of loess from inside to outside The composite construction that concrete in infiltration layer and embedded coal column is constituted, so as to form the coal mine underground reservoir of closing;
The crack of formation after being collapsed using top plate constitutes groundwater reservoir water space, and the underground water produced during coal mining is natural Seepage flow is to the groundwater reservoir water space.
Embodiment 1:
Certain colliery coal seam overlying aquifer 0.10m~27.48m, average 8.24m, goaf constantly receives surface water, loosely The supply of aquifer water and bedrock aquifer water, mine norm al discharge rate is 486m3/ h, hydrogeological type of mine is medium.
Consider that coefficient of storage determines to build a complete coal mine underground reservoir, underground by six work face goafs after calculating Reservoir both sides tunnel 2 is rectangular cross section, the high 4.4m in tunnel, the wide 30m of coal column dam body with tunnel equal 3 is withdrawn.
Groundwater reservoir both sides tunnel 2 and withdraw tunnel 3 tunnel after, the wall to composition is anchored in time, after anchoring Gunite concrete slurries in the wall between overlying rock 13 and lower rock stratum 14, are mixed after after concrete slurry solidification immediately Solidifying soil outer layer sprays Ludox again, ultimately forms concrete and Ludox spray-up 9, the jet thickness of concrete is 100mm, and silicon is sprayed again Colloidal sol, thickness is 2mm;Used concrete, three kinds of material parameters of cement mortar and Ludox are:Normal concrete, cement mortar The ratio of mud=0.8:1;Ludox A expects:B material=4:1, A material is silicon dioxide colloid, and B material are catalyst sodium chloride solution,.
After concrete and Ludox spray-up 9 condense, in tunnel close to the shallow injected hole 11 of side side construction of coal column dam body, hole depth 2m, spacing and array pitch are 20 ° of shallow injected hole and horizontal direction angle at the top and bottom of 1.5m, dam body, and remaining shallow injected hole is equal Vertical perforating, refers to Fig. 2, installs Grouting Pipe 10 and sealing of hole, injects cement mortar, grouting pressure is 1.5MPa, voltage stabling control 20min。
After the cement mortar of injection condenses, deep note Ludox, Ludox A material are carried out:B material=9:1, in tunnel close to coal column The deep injected hole 12 of side side construction of dam body, hole depth 4m, spacing and array pitch are 1.5m, the deep equal vertical perforating of injected hole, refer to figure 2, grouting pressure is 0.5MPa, voltage stabling control 120min.
Scene shows, the multi-level grouting water-tight reinforcement means of a kind of coal mine underground reservoir dam of invention, to coal column dam Body serves reinforcing and antiseepage double effectses, adds the reliability of coal mine underground reservoir.

Claims (7)

1. a kind of coal mine underground reservoir, it is characterised in that:It includes the coal mine gob space as water space, and colliery is mined out Area space above is face roof, and lower section is floor undulation, and both sides are tunneled out in coal mine gob space symmetr both sides respectively Tunnel, and tunnel and artificial checkdam are withdrawn in other symmetrical both sides construction, both sides tunnel is filled with tunnel is withdrawn provided with anchoring Put, and concrete layer and silica sol layer, both sides tunnel and the side side for the close coal column dam body for withdrawing tunnel are successively provided with outer layer Multiple shallow injected holes and multiple deep injected holes are inserted between in construction.
2. the multi-level grouting water-tight of the coal mine underground reservoir dam of coal mine underground reservoir is reinforced described in a kind of usage right requirement 1 Method, it is characterised in that:Bank underground water content is determined according to hydrogeologic data, according to needed for water content calculates water storage Volume, and determine the area of setting groundwater reservoir and the position of coal column dam body, to tunnel groundwater reservoir both sides tunnel by volume With withdraw tunnel, priority gunite concrete slurries and Ludox in wall form concrete and Ludox spray-up, to both sides Tunnel and withdraw tunnel and first constructed multiple shallow injected holes and hole-sealing grouting, multiple deep slip castings of constructing afterwards close to the side side of coal column dam body Hole and hole-sealing grouting, finally build artificial checkdam enclosing tunnel, so as to form the coal mine underground reservoir of closing.
3. the multi-level grouting water-tight reinforcement means of coal mine underground reservoir dam as claimed in claim 2, it is characterised in that tool Body step is as follows:
A. bank underground water content is determined according to hydrogeologic data, calculates the ground needed for storage bank underground water content Lower storage reservoir volume, using working face mining height as height and with reference to coal mining region coefficient of storage, determines the area that groundwater reservoir needs, from And determined to set the position of groundwater reservoir coal column dam body according to goaf;
B. with the exploitation in coal seam, groundwater reservoir both sides tunnel is normally tunneled out at selected groundwater reservoir construction and is withdrawn Tunnel, in driving groundwater reservoir both sides tunnel and the change and hole cranny development that each roadway surrounding rock property is monitored when withdrawing tunnel Situation;
C. with groundwater reservoir both sides tunnel and the driving for withdrawing tunnel, to the both sides tunnel that has constituted and tunnel tunnel is withdrawn Wall is anchored, and the gunite concrete slurries in wall, after after concrete slurry solidification, to tunnel close to coal column dam body Side side concrete outer layer sprays Ludox again;
D. after after the solidification of Ludox spray-up, to both sides tunnel and withdraw tunnel and constructed multiple shallow notes close to the side side of coal column dam body Hole is starched, and injects cement mortar;
E. after after the cement slurry sets that shallow injected hole is noted, tunnel is constructed multiple deep injected holes close to the side side of coal column dam body, and Ludox is injected, Ludox solidification is waited;
F. after the completion of coal-face back production, it is determined that groundwater reservoir artificial gear is built between the coal column dam body of main entry Dam enclosing tunnel, so as to form the coal mine underground reservoir of closing.
4. the multi-level grouting water-tight reinforcement means of coal mine underground reservoir dam as claimed in claim 3, it is characterised in that:Institute It is 50-100mm to state the concrete thickness after concrete slurry solidification, and the silica gel thickness 2-5mm after Ludox solidification is sprayed again, is used Ludox be nanometer materials that granularity is 8-20nm.
5. the multi-level grouting water-tight reinforcement means of coal mine underground reservoir dam as claimed in claim 3, it is characterised in that:Institute The length for stating shallow injected hole is 1.5-2.5m, and grouting pressure is 1-2MPa.
6. the multi-level grouting water-tight reinforcement means of coal mine underground reservoir dam as claimed in claim 3, it is characterised in that:Institute The length for stating deep injected hole is 4-6m, and grouting pressure is 0.5-0.8MPa.
7. the multi-level grouting water-tight reinforcement means of the coal mine underground reservoir dam as described in claim 5 or 6, its feature exists In:The shallow injected hole and deep injected hole arrangement interleave settings, specially tunnel on the side side of coal column dam body according to one The deep injected hole of a row below shallow injected hole is arranged to be arranged alternately.
CN201710484672.8A 2017-06-23 2017-06-23 A kind of multi-level grouting water-tight reinforcement means of coal mine underground reservoir and reservoir dam Active CN107237651B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201710484672.8A CN107237651B (en) 2017-06-23 2017-06-23 A kind of multi-level grouting water-tight reinforcement means of coal mine underground reservoir and reservoir dam
PCT/CN2018/078279 WO2018233320A1 (en) 2017-06-23 2018-03-07 Coal mine underground reservoir and multi-layer grouting-based anti-seepage reinforcement method for reservoir dam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710484672.8A CN107237651B (en) 2017-06-23 2017-06-23 A kind of multi-level grouting water-tight reinforcement means of coal mine underground reservoir and reservoir dam

Publications (2)

Publication Number Publication Date
CN107237651A true CN107237651A (en) 2017-10-10
CN107237651B CN107237651B (en) 2019-10-01

Family

ID=59986711

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710484672.8A Active CN107237651B (en) 2017-06-23 2017-06-23 A kind of multi-level grouting water-tight reinforcement means of coal mine underground reservoir and reservoir dam

Country Status (2)

Country Link
CN (1) CN107237651B (en)
WO (1) WO2018233320A1 (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108643971A (en) * 2018-04-30 2018-10-12 西安科技大学 Down-hole oil-gas storage cavern and its construction method
WO2018233320A1 (en) * 2017-06-23 2018-12-27 中国矿业大学 Coal mine underground reservoir and multi-layer grouting-based anti-seepage reinforcement method for reservoir dam
CN109236373A (en) * 2018-08-27 2019-01-18 清华大学 A kind of pervasive coal mine underground reservoir and its method of construction
CN109594527A (en) * 2018-12-06 2019-04-09 安徽理工大学 A kind of artificial dam body of the groundwater reservoir with zigzag card slot
CN110219696A (en) * 2019-07-08 2019-09-10 国家能源投资集团有限责任公司 Groundwater reservoir and reconstruction method
CN112096112A (en) * 2020-09-11 2020-12-18 西安建筑科技大学 Silica sol slurry-infiltrated reinforced ancient building brick wall and reinforcing construction process thereof
CN112267884A (en) * 2020-10-27 2021-01-26 陕西煤业化工技术研究院有限责任公司 Composite nano grouting sealing-based gob-side entry driving construction method for remaining small coal pillar
CN113026678A (en) * 2021-04-05 2021-06-25 天地科技股份有限公司 But take automatic tensioning function's reuse colliery underground reservoir dam body
CN113803087A (en) * 2021-09-07 2021-12-17 山西晋煤集团技术研究院有限责任公司 Small coal pillar gob-side entry driving broken surrounding rock grouting reinforcement method
CN114033489A (en) * 2021-11-18 2022-02-11 国家能源投资集团有限责任公司 Seepage-proofing system of dam body of coal mine underground reservoir
CN114044652A (en) * 2021-11-08 2022-02-15 中煤科工集团西安研究院有限公司 Mine anti-fouling and anti-seepage treatment method for waste incineration fly ash disposal and anti-seepage layer
CN114109456A (en) * 2020-08-28 2022-03-01 神华神东煤炭集团有限责任公司 Monitoring and early warning method and system for coal mine underground reservoir coal pillar dam body structure
CN114109492A (en) * 2021-12-10 2022-03-01 国家能源投资集团有限责任公司 Construction method of coal mine double-layer underground reservoir
CN114135316A (en) * 2021-11-22 2022-03-04 紫金矿业集团股份有限公司 Multi-directional composite hole nail injection and reinforcement method suitable for tuff roadway
WO2022187999A1 (en) * 2021-03-08 2022-09-15 兰州有色冶金设计研究院有限公司 Anti-seepage concrete progressive structure for underground goaf and construction method therefor
CN116219949A (en) * 2023-02-07 2023-06-06 国能经济技术研究院有限责任公司 Artificial dam structure of coal mine underground reservoir and coal mine underground reservoir

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111472818A (en) * 2020-04-22 2020-07-31 中国五冶集团有限公司 Grouting construction method for water seepage of tunnel

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102767395A (en) * 2012-07-23 2012-11-07 中国神华能源股份有限公司 Anti-seepage method for mine underground reservoirs
CN103422469A (en) * 2013-08-14 2013-12-04 中国神华能源股份有限公司 Artificial retaining dam for coal mine underground reservoir and connecting method of artificial retaining dam and coal pillar dam bodies as well as surrounding rocks
CN103422886A (en) * 2013-08-14 2013-12-04 中国神华能源股份有限公司 Artificial retaining dam for coal mine distributed underground reservoir and damming method thereof
CN104153812A (en) * 2014-07-29 2014-11-19 中国神华能源股份有限公司 Underground reservoir with emergency water draining device and safe emergency treatment method for underground reservoir

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6840710B2 (en) * 2001-05-15 2005-01-11 Rar Group, Llc Underground alluvial water storage reservoir and method
CN102865103B (en) * 2012-04-28 2014-02-26 中国神华能源股份有限公司 Distributed using method for mine underground water
CN102767302B (en) * 2012-07-23 2014-08-13 中国神华能源股份有限公司 Distributed underground reservoir and construction method thereof
CN105201528B (en) * 2015-09-21 2017-10-27 中国矿业大学 A kind of Ludox of argillaceous soft rock oozes reinforcement means slowly
CN107237651B (en) * 2017-06-23 2019-10-01 中国矿业大学 A kind of multi-level grouting water-tight reinforcement means of coal mine underground reservoir and reservoir dam

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102767395A (en) * 2012-07-23 2012-11-07 中国神华能源股份有限公司 Anti-seepage method for mine underground reservoirs
CN103422469A (en) * 2013-08-14 2013-12-04 中国神华能源股份有限公司 Artificial retaining dam for coal mine underground reservoir and connecting method of artificial retaining dam and coal pillar dam bodies as well as surrounding rocks
CN103422886A (en) * 2013-08-14 2013-12-04 中国神华能源股份有限公司 Artificial retaining dam for coal mine distributed underground reservoir and damming method thereof
CN104153812A (en) * 2014-07-29 2014-11-19 中国神华能源股份有限公司 Underground reservoir with emergency water draining device and safe emergency treatment method for underground reservoir

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018233320A1 (en) * 2017-06-23 2018-12-27 中国矿业大学 Coal mine underground reservoir and multi-layer grouting-based anti-seepage reinforcement method for reservoir dam
CN108643971A (en) * 2018-04-30 2018-10-12 西安科技大学 Down-hole oil-gas storage cavern and its construction method
CN109236373B (en) * 2018-08-27 2024-04-16 清华大学 Universal coal mine underground reservoir and construction method thereof
CN109236373A (en) * 2018-08-27 2019-01-18 清华大学 A kind of pervasive coal mine underground reservoir and its method of construction
CN109594527A (en) * 2018-12-06 2019-04-09 安徽理工大学 A kind of artificial dam body of the groundwater reservoir with zigzag card slot
CN110219696A (en) * 2019-07-08 2019-09-10 国家能源投资集团有限责任公司 Groundwater reservoir and reconstruction method
CN114109456A (en) * 2020-08-28 2022-03-01 神华神东煤炭集团有限责任公司 Monitoring and early warning method and system for coal mine underground reservoir coal pillar dam body structure
CN112096112A (en) * 2020-09-11 2020-12-18 西安建筑科技大学 Silica sol slurry-infiltrated reinforced ancient building brick wall and reinforcing construction process thereof
CN112267884A (en) * 2020-10-27 2021-01-26 陕西煤业化工技术研究院有限责任公司 Composite nano grouting sealing-based gob-side entry driving construction method for remaining small coal pillar
WO2022187999A1 (en) * 2021-03-08 2022-09-15 兰州有色冶金设计研究院有限公司 Anti-seepage concrete progressive structure for underground goaf and construction method therefor
CN113026678A (en) * 2021-04-05 2021-06-25 天地科技股份有限公司 But take automatic tensioning function's reuse colliery underground reservoir dam body
CN113803087A (en) * 2021-09-07 2021-12-17 山西晋煤集团技术研究院有限责任公司 Small coal pillar gob-side entry driving broken surrounding rock grouting reinforcement method
CN113803087B (en) * 2021-09-07 2023-11-10 山西晋煤集团技术研究院有限责任公司 Small coal pillar gob-side entry driving broken surrounding rock grouting reinforcement method
CN114044652A (en) * 2021-11-08 2022-02-15 中煤科工集团西安研究院有限公司 Mine anti-fouling and anti-seepage treatment method for waste incineration fly ash disposal and anti-seepage layer
CN114033489A (en) * 2021-11-18 2022-02-11 国家能源投资集团有限责任公司 Seepage-proofing system of dam body of coal mine underground reservoir
CN114135316A (en) * 2021-11-22 2022-03-04 紫金矿业集团股份有限公司 Multi-directional composite hole nail injection and reinforcement method suitable for tuff roadway
CN114109492B (en) * 2021-12-10 2023-11-03 国家能源投资集团有限责任公司 Construction method of coal mine double-layer underground reservoir
CN114109492A (en) * 2021-12-10 2022-03-01 国家能源投资集团有限责任公司 Construction method of coal mine double-layer underground reservoir
CN116219949A (en) * 2023-02-07 2023-06-06 国能经济技术研究院有限责任公司 Artificial dam structure of coal mine underground reservoir and coal mine underground reservoir
CN116219949B (en) * 2023-02-07 2023-12-22 国能经济技术研究院有限责任公司 Artificial dam structure of coal mine underground reservoir and coal mine underground reservoir

Also Published As

Publication number Publication date
CN107237651B (en) 2019-10-01
WO2018233320A1 (en) 2018-12-27

Similar Documents

Publication Publication Date Title
CN107237651B (en) A kind of multi-level grouting water-tight reinforcement means of coal mine underground reservoir and reservoir dam
CN107083977B (en) A kind of grouting strengthening method of the more granularities of argillaceous soft rock tunnel subregion
CN108999634B (en) Surface drilling realizes that a hole of water damage prevention and treatment and surface settlement control is mostly used method
CN107503257B (en) One kind being close to mountain high-filled subgrade stabilization and Deformation control structure and construction method
WO2021223573A1 (en) Construction structure for communication and connection between newly added mined channel and existing station hall layer
CN106437726B (en) Shallow-depth-excavation tunnel crosses ground fissure crushed zone construction method
CN103422886A (en) Artificial retaining dam for coal mine distributed underground reservoir and damming method thereof
CN109630195B (en) Strong-wall seepage-blocking water retaining dam for coal mine underground reservoir
CN105240047A (en) Filling reinforcement method for managing underground mined area of open-pit mine
CN207109475U (en) It is close to mountain high-filled subgrade stabilization and Deformation control structure
CN206667278U (en) Lava crack Tunnel gushing treatment constructing structure
CN104806257A (en) Sandy gravel stratum shield construction cap-type ground advance reinforcement structure and sandy gravel stratum shield construction cap-type ground advance reinforcement method
CN111119128B (en) Danger-removing, reinforcing and seepage-proofing method for natural rock-fill dam of barrier lake
CN110469332B (en) Advanced support consolidation method for tunnel penetrating through debris flow accumulation body
CN112267884B (en) Composite nano grouting sealing-based gob-side entry driving construction method for remaining small coal pillar
CN203412629U (en) Artificial retaining dam of coal mine distributed type underground water reservoir
CN105731978A (en) Grouting slurry for reinforcing tunnel face of jacking culvert of fine-sand layer and grouting method
CN102174818A (en) Controlled impermeable leaking stoppage grout-extruding water-stopping technology of strong water permeable stratum of quaternary system
CN105525605A (en) Basement backfill area reinforcing method
CN108914911A (en) A kind of stratum prestress advanced excavation stability control method
CN202672132U (en) Reinforcing structure for basement backfilling
CN114075994A (en) Artificial retaining dam for coal mine underground reservoir
CN203050779U (en) Tunnel drainage structure suitable for bias pressure rich water strata
CN216040465U (en) Ecological roadbed structure in sponge city based on original road
CN108505547A (en) A kind of structural system and method for the antiseismic liquefaction uplifting in subway station

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant