CN105240047A - Filling reinforcement method for managing underground mined area of open-pit mine - Google Patents

Filling reinforcement method for managing underground mined area of open-pit mine Download PDF

Info

Publication number
CN105240047A
CN105240047A CN201510585644.6A CN201510585644A CN105240047A CN 105240047 A CN105240047 A CN 105240047A CN 201510585644 A CN201510585644 A CN 201510585644A CN 105240047 A CN105240047 A CN 105240047A
Authority
CN
China
Prior art keywords
filling
goaf
sand
grouting
borehole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510585644.6A
Other languages
Chinese (zh)
Inventor
肖键
刘文胜
程杰
张洪贵
修德江
王璐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Angang Group Mining Co Ltd
Original Assignee
Angang Group Mining Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Angang Group Mining Co Ltd filed Critical Angang Group Mining Co Ltd
Priority to CN201510585644.6A priority Critical patent/CN105240047A/en
Publication of CN105240047A publication Critical patent/CN105240047A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings

Abstract

The invention relates to a filling reinforcement method for managing an underground mined area of an open-pit mine. The filling reinforcement method is characterized by including the following steps: determining filling drill holes according to the occurrence form of the underground mined area; inserting feeding pipes with trays into the drill holes, inserting grouting pipes in a manner of being spaced by one or multiple feeding pipes, injecting cement mortar, putting granular sand-gravel aggregate into the mined area through the feeding pipes until reaching a top plate of the mined area, and injecting cement mortar through the grouting pipes to form a concrete sandwiched wall in the granular sand-gravel aggregate; finally completing filling reinforcement construction of the whole mined area. The filling reinforcement method has the advantages that strength of a filling body is greatly improved when compared with that of dry filling of loose sand-gravel, deformation and movement of surrounding rock of the mined area can be limited effectively, and satisfactory filling reinforcement effect can be acquired. Compared with grouting cementation filling methods, the filling reinforcement method has the advantages that the defect that layered grouting has quite long construction period can be overcome, so that cost can be saved greatly, and construction efficiency can be improved substantially.

Description

A kind of filling reinforcement means administering opencut Goaf Area
Technical field
The invention belongs to mining technique field, particularly a kind of filling reinforcement means administering opencut Goaf Area.
Background technology
At present, for the old goaf of opencut be detection limit, limit process, the distribution of opencut Mined-out Areas is comparatively complicated, due to a long history, relevant data disappearance, the occurrence status for wherein quite a few old goaf is delphic, often the unpredictable definite position that may subside in advance, thus along with the exploitation of opencut, subsiding of the old goaf of Local topography can cause paroxysmal security incident.
In the method that process Mined-out Areas adopts, filling method is more a kind of method of application.According to the type of goaf filling material is different and the mode of conveying, the filling in goaf can be divided into three kinds of modes.
dry stowing: dry stowing is that namely the loose rubble in goaf, sand, mine tailing, slag etc. do not have cementing material to carry out filling with bulk material as filler.The cost of dry stowing is low, but strength of filling mass is lower, has larger compressible type.
hydraulic fill:water conservancy filling is pumped (conveying) medium with water, utilizes natural pressure head or pump pressure, from preparation station along pipeline or the boring that is connected with pipeline, by material with water profit conveyings such as mountain sand, river sand, broken sand, mine tailings be filled to goaf.In stowing operation, obturation needs dehydration, and needs to build drainage system and discharged by water.
consolidated fill:consolidated fill has certain particle size grating discrete material (such as fine sand, broken building stones etc.) by what process, mix appropriate cementitious material, the mix and blend that adds water is prepared into consolidated fill slurry, the conveying and pouring into along pipeline, boring etc. to goaf, is formed that have a some strength with obturation that is globality.
For guaranteeing safety, opencut Goaf Area forbids personnel to enter, therefore the method being not suitable for adopting water conservancy filling is reinforced in filling, cannot build dehydration and draining that drainage system carries out obturation, and a large amount of water has certain adverse effect for the stability of opencut rock mass slope.The cost of dry stowing is lower, but loose obturation compressibility is larger, and initial compressive strength is very low, to goaf top covering rockmass distortion restriction and support force all undesirable, larger depression can be there is toward contact in earth's surface.Consolidated fill can obtain the intensity of higher obturation, and mechanization of building operation degree is also higher, and filling effect is more satisfactory, but relative higher of filling cost expense, if when needing grouting filling cementing to goaf layering, the cycle of construction is very long.
Summary of the invention
The object of the present invention is to provide one that the layering cementing grouting filling construction period can be avoided very long, the drawback that cost is higher, can save a large amount of costs, increases substantially the filling reinforcement means of the improvement opencut Goaf Area of efficiency of construction.
The object of the present invention is achieved like this, according to a kind of filling reinforcement means administering opencut Goaf Area of the present invention, it is characterized in that comprising the steps:
1) determine the arrangement of filling borehole in Goaf Area and bore filling borehole, filling borehole penetrates rock stratum to goaf top plate, when determining filling borehole arrangement, for long and narrow goaf, as the width≤5m in goaf, when height H is within 2m ~ 2.5m, filling borehole adopts single filling borehole along the trend in goaf; As the height H > 2.5m in goaf, during width G reatT.GreaT.GT 5m, filling borehole moves towards along goaf the filling borehole adopting double or many rows;
2) in each filling borehole, plug-in mounting is provided with the commissioning pipe of pallet, and the lower nozzle of described commissioning pipe extend into top board place, Goaf Area;
3) insert Grouting Pipe at interval of in one or several commissioning pipe, the bottom of its Grouting Pipe will arrive the base plate place in goaf;
4) in goaf, prose style free from parallelism sand material is dropped into by each commissioning pipe, until the top board in goaf;
5) then in the sand material of a prose style free from parallelism, cement mortar is injected by Grouting Pipe, grout material is injected in prose style free from parallelism sand material with the form of extruding under the pressure effect of grouting pump, maximum grouting pressure controls at below 2.5Mpa, grout material spreads and is extruded to surrounding by a part of prose style free from parallelism sand material simultaneously in prose style free from parallelism sand material, thus forms an obconic concrete sandwich wall in prose style free from parallelism sand material; The uniaxial compressive strength of its concrete sandwich wall reaches 4.2Mpa, until complete the filling strengthening construction in whole goaf.
Diameter 20mm ~ the 30mm less of bore diameter of described commissioning pipe, the upper orifice position surperficial 80mm ~ 100mm above Ground of commissioning pipe pallet.
The funnel being convenient to the big uncork fed intake is set at described commissioning pipe upper orifice place.
Cement in described cement mortar and the ratio of sand are 1:8 ~ 1:10, and cement is common 32.5 #portland cement, sand is the broken sand of river sand or mountain stone.
The lower end of described Grouting Pipe is the floral tube of porous, and the length of its porous floral tube is 2/3 of goaf height.
Advantage of the present invention is:
Adopt a kind of filling reinforcement means administering opencut Goaf Area of the present invention, the strength ratio of its obturation adopts the dry stowing of loosen loose sand building stones to strengthen greatly, effectively can limit distortion and the movement of goaf country rock, obtain satisfied filling consolidation effect.With slip casting consolidated fill Measures compare, the delamination pour slurry construction period can be avoided very long, the drawback that cost is higher, can a large amount of costs be saved, increase substantially efficiency of construction.
Accompanying drawing explanation
Fig. 1 is the structural representation that in the commissioning pipe of the present invention in filling borehole, compartment arranges Grouting Pipe.
Fig. 2 is the structural representation forming obconic concrete sandwich wall after injecting cement mortar in the sand material dropped in goaf in goaf.
Detailed description of the invention
As depicted in figs. 1 and 2, a kind of filling reinforcement means administering opencut Goaf Area of the present invention, is characterized in that comprising the steps:
1) determine the arrangement of filling borehole in Goaf Area and bore filling borehole, filling borehole 2 penetrates rock stratum 6 to goaf top plate 7, when determining filling borehole 2 arrangement, for long and narrow goaf 8, as the width≤5m in goaf, when height H is within 2m ~ 2.5m, filling borehole 2 adopts single filling borehole along the trend in goaf; As the height H > 2.5m in goaf 8, during width G reatT.GreaT.GT 5m, filling borehole 2 moves towards along goaf the filling borehole adopting double or many rows,
2) in each filling borehole 2, plug-in mounting is provided with the commissioning pipe 3 of pallet 4, and the lower nozzle of described commissioning pipe 3 extend into Goaf Area top board 7 place; Diameter 20mm ~ the 30mm less of filling borehole 2 diameter of described commissioning pipe 3, is convenient to commissioning pipe 3 like this and is plugged in filling borehole 2, and the upper orifice position of its commissioning pipe 3 pallet above Ground surface 1 is 80mm ~ 100mm, and its pallet 4 is used for holding commissioning pipe 3;
The present invention arranges the funnel being convenient to the material big uncork thrown at described commissioning pipe 3 upper orifice place, for throwing in prose style free from parallelism sand material;
3) insert Grouting Pipe 5 at interval of in one or several commissioning pipe 3, the bottom of its Grouting Pipe will arrive the base plate place 9 in goaf 8, and the lower end of described Grouting Pipe is the floral tube 10 of porous, and the length of its porous floral tube 10 is 2/3 ~ 3/4 of goaf height;
4) in goaf 8, prose style free from parallelism sand material is dropped into by each commissioning pipe 3, until the top board 7 in goaf;
5) then in the sand material of a prose style free from parallelism, cement mortar is injected by Grouting Pipe 5, its maximum grouting pressure controls at below 2.5Mpa, grout material spreads and is extruded to surrounding by a part of prose style free from parallelism sand material simultaneously in prose style free from parallelism sand material, thus in prose style free from parallelism sand material, form an obconic concrete sandwich wall 11, until complete the filling strengthening construction in whole goaf;
Cement in cement mortar of the present invention and the ratio of sand are 1:8 ~ 1:10, and cement is common 32.5 #portland cement, sand is the broken sand of river sand or mountain stone.
We test at certain large-scale outdoors iron ore stope, and iron ore stope lower wall is fixed in the below rock mass of-65 meters, side horizontal catalase station maintenance vehicle thoroughfare and found that there is goaf 8 in the open, is the left haulage drift of early stage underground mining.The country rock in goaf 8 is medium-hard migmatite, and geological structure is comparatively grown, and structural plane reaches more than three groups.Goaf 8 is 13 ~ 15 meters apart from the degree of depth on ground, and the height H in goaf is 2.5 meters, and width changes between 4 ~ 10 meters, and without seeping phenomenon, the gross area is about 2600 ㎡.According to the full grouting filling scheme of routine, budgetary estimate is 1,750,000 yuan, half a year duration.Now adopt construction method of the present invention, final accounts expense is 920,000 yuan, and the duration is 2.5 months.
To the filling reinforcement means that this administers opencut Goaf Area be:
1) determine the arrangement of filling borehole in Goaf Area 8 and bore filling borehole 2, filling borehole 2 penetrates the top board 7 in goaf; To whole goaf 8, when the width in goaf 8 is at≤5m, filling hole drill 2 adopts single boring along the trend in goaf; As the width G reatT.GreaT.GT 5m in goaf, filling borehole 2 moves towards along goaf the filling borehole adopting double or many rows, and its filling borehole diameter is 150mm, and pitch of holes is 6.5m; The aperture of filling borehole can between 150mm ~ 300mm, and largest hole spacing can be determined according to L=2H/tg α, and H is goaf height, and α is the natural repose angle of prose style free from parallelism sandstone casting resin;
2) in filling borehole 2, plug-in mounting is provided with the commissioning pipe 3 of pallet, the diameter 30mm less of bore diameter of commissioning pipe 3; The pallet 4 that the downward 80mm place weldering of commissioning pipe 3 upper orifice is arranged is used for holding commissioning pipe 3, and prevent commissioning pipe 3 from dropping, the lower nozzle of commissioning pipe 3 extend into Goaf Area top board 7;
3) in commissioning pipe 3, insert Grouting Pipe 5, the bottom of Grouting Pipe 5 will arrive the base plate 9 in goaf, and the lower end of Grouting Pipe 5 is the floral tube 10 of porous, and the length of porous floral tube 10 is 2/3 of goaf height;
4) in goaf 8, top board 7 position of prose style free from parallelism sand material to goaf is dropped into by commissioning pipe 3;
5) then in the sand material of a prose style free from parallelism, cement mortar is injected by Grouting Pipe 5, maximum grouting pressure controls at 2.3Mpa, grout material under pressure with extruding with to permeate and the form of depositing is injected in prose style free from parallelism sand material, grout material spreads and is extruded to surrounding by sand material loose for a part simultaneously in loose sand material, thus form an obconic concrete sandwich wall 11, the uniaxial compressive strength of its concrete sandwich wall 11 reaches 4.2Mpa, until complete the filling strengthening construction in whole goaf.
Adopt filling reinforcement means of the present invention to effectively limit distortion and the movement of goaf country rock, obtain satisfied filling consolidation effect.

Claims (5)

1. administer a filling reinforcement means for opencut Goaf Area, it is characterized in that comprising the steps:
1) determine the arrangement of filling borehole in Goaf Area and bore filling borehole, filling borehole penetrates rock stratum to goaf top plate, when determining filling borehole arrangement, for long and narrow goaf, as the width≤5m in goaf, when height H is within 2m ~ 2.5m, filling borehole adopts single filling borehole along the trend in goaf; As the height H > 2.5m in goaf, during width G reatT.GreaT.GT 5m, filling borehole moves towards along goaf the filling borehole adopting double or many rows;
2) in each filling borehole, plug-in mounting is provided with the commissioning pipe of pallet, and the lower nozzle of described commissioning pipe extend into top board place, Goaf Area;
3) insert Grouting Pipe at interval of in one or several commissioning pipe, the bottom of its Grouting Pipe will arrive the base plate place in goaf;
4) in goaf, prose style free from parallelism sand material is dropped into by each commissioning pipe, until the top board in goaf;
5) then in the sand material of a prose style free from parallelism, cement mortar is injected by Grouting Pipe, grout material under the pressure effect of grouting pump with extruding with to permeate and the form of depositing is injected in prose style free from parallelism sand material, maximum grouting pressure controls at below 2.5Mpa, grout material spreads and sand material loose for a part is expressed to surrounding simultaneously in loose sand material, thus forms an obconic concrete sandwich wall; The uniaxial compressive strength of its concrete sandwich wall reaches 4.2Mpa, until complete the filling strengthening construction in whole goaf.
2. a kind of filling reinforcement means administering opencut Goaf Area according to claim 1, it is characterized in that: the diameter 20mm ~ 30mm less of bore diameter of described commissioning pipe, the upper orifice position surperficial 80mm ~ 100mm above Ground of commissioning pipe pallet.
3. a kind of filling reinforcement means administering opencut Goaf Area according to claim 1, is characterized in that: arrange the funnel being convenient to the material big uncork thrown at described commissioning pipe upper orifice place.
4. a kind of filling reinforcement means administering opencut Goaf Area according to claim 1, it is characterized in that: the cement in described cement mortar and the ratio of sand are 1:8 ~ 1:10, cement is common 32.5 #portland cement, sand is the broken sand of river sand or mountain stone.
5. a kind of filling reinforcement means administering opencut Goaf Area according to claim 1, is characterized in that: the lower end of described Grouting Pipe is the floral tube of porous, and the length of its porous floral tube is 2/3 of goaf height.
CN201510585644.6A 2015-09-16 2015-09-16 Filling reinforcement method for managing underground mined area of open-pit mine Pending CN105240047A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510585644.6A CN105240047A (en) 2015-09-16 2015-09-16 Filling reinforcement method for managing underground mined area of open-pit mine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510585644.6A CN105240047A (en) 2015-09-16 2015-09-16 Filling reinforcement method for managing underground mined area of open-pit mine

Publications (1)

Publication Number Publication Date
CN105240047A true CN105240047A (en) 2016-01-13

Family

ID=55037838

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510585644.6A Pending CN105240047A (en) 2015-09-16 2015-09-16 Filling reinforcement method for managing underground mined area of open-pit mine

Country Status (1)

Country Link
CN (1) CN105240047A (en)

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106014477A (en) * 2016-06-15 2016-10-12 山东华联矿业股份有限公司 Stable filler filling method
CN106321105A (en) * 2016-09-30 2017-01-11 中国矿业大学 Paste filling method for end slope of opencut coal mine
CN106368731A (en) * 2016-11-16 2017-02-01 中国神华能源股份有限公司 Goaf disposal method
CN107701229A (en) * 2017-09-29 2018-02-16 华北理工大学 Surface mining landfill is administered and underground head stage casings goaf filling draining Synergistic method
CN108286429A (en) * 2018-01-22 2018-07-17 中国恩菲工程技术有限公司 The partition method of more space water passages
CN109267591A (en) * 2018-07-26 2019-01-25 中国建筑第六工程局有限公司 Pass through the closure reinforcement means of the antiaircraft tunnel of underground exterior-protected structure
CN109322699A (en) * 2018-09-29 2019-02-12 山东省地质矿产勘查开发局八0水文地质工程地质大队 Pollution isolation blocking technology under a kind of mine
CN109578070A (en) * 2018-12-14 2019-04-05 安徽马钢罗河矿业有限责任公司 Hole method is looked in a kind of filling borehole bottom
CN110425004A (en) * 2019-08-16 2019-11-08 徐州中国矿大岩土工程新技术发展有限公司 The floated guide and construction method in the underwater goaf of paste body filling
CN110566269A (en) * 2019-08-19 2019-12-13 西北矿冶研究院 Truss type filling method for underground goaf
CN110630321A (en) * 2019-10-29 2019-12-31 中冶沈勘秦皇岛工程设计研究总院有限公司 Goaf on-well filling equipment and method thereof
CN111365066A (en) * 2020-03-10 2020-07-03 中国平煤神马能源化工集团有限责任公司 Step-type water-filling goaf filling method
CN111535297A (en) * 2020-05-19 2020-08-14 河北建设勘察研究院有限公司 Method for filling underground cavity of foundation rock stratum by filler grouting and hydraulic filling device
CN111810230A (en) * 2020-07-20 2020-10-23 冒俊 Method for reinforcing ecological restoration backfill area of ore mining area
CN113187544A (en) * 2021-05-28 2021-07-30 辽宁科技大学 Large-scale underground dead zone treatment method of beam type roof structure
CN113833519A (en) * 2021-07-30 2021-12-24 北京中煤矿山工程有限公司 Metal mine goaf filling method
CN114352356A (en) * 2021-12-24 2022-04-15 鞍钢集团矿业有限公司 Partition wall for blocking through between main goaf and hidden goaf and construction method
CN115013048A (en) * 2022-06-01 2022-09-06 中南大学 Harmless treatment and reinforcement method for oil gas exploitation by filling coal gangue and injecting heat
CN116771417A (en) * 2021-10-29 2023-09-19 丛培杰 Mine goaf slurry backfilling method for preventing groundwater pollution
CN114352356B (en) * 2021-12-24 2024-05-03 鞍钢集团矿业有限公司 Partition wall for blocking penetration of main goaf and hidden goaf and construction method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4059963A (en) * 1976-08-19 1977-11-29 Joy Manufacturing Company Method of mine backfilling and material therefor
CN1032378A (en) * 1987-09-26 1989-04-12 抚顺矿务局 Slow down the method and the facilities and equipments thereof of bank surface subsidence
US6322292B1 (en) * 1997-01-29 2001-11-27 Lloyd P. Zenari Backfilling underground voids
CN101806059A (en) * 2010-04-02 2010-08-18 中铁二局股份有限公司 Drilling, grouting and sand-throwing process of ground surface of mined-out region under highway
US7832962B1 (en) * 2008-09-19 2010-11-16 Andreyev Engineering Independent Drilling, LLC Sand slurry injection systems and methods
CN102330567A (en) * 2011-08-19 2012-01-25 山西省交通规划勘察设计院 Goaf slip casting treatment method of road
CN102536317A (en) * 2012-01-20 2012-07-04 山东大学 Device and process for filling aggregate into stratum cavities through surface drilling
CN103498697A (en) * 2013-10-18 2014-01-08 中铁二十四局集团安徽工程有限公司 Filling and construction method for goaf below tunnel
CN103835723A (en) * 2013-11-11 2014-06-04 北京中煤矿山工程有限公司 Comprehensive pretreatment method for shaft penetration in mined-out area stratum

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4059963A (en) * 1976-08-19 1977-11-29 Joy Manufacturing Company Method of mine backfilling and material therefor
CN1032378A (en) * 1987-09-26 1989-04-12 抚顺矿务局 Slow down the method and the facilities and equipments thereof of bank surface subsidence
US6322292B1 (en) * 1997-01-29 2001-11-27 Lloyd P. Zenari Backfilling underground voids
US7832962B1 (en) * 2008-09-19 2010-11-16 Andreyev Engineering Independent Drilling, LLC Sand slurry injection systems and methods
CN101806059A (en) * 2010-04-02 2010-08-18 中铁二局股份有限公司 Drilling, grouting and sand-throwing process of ground surface of mined-out region under highway
CN102330567A (en) * 2011-08-19 2012-01-25 山西省交通规划勘察设计院 Goaf slip casting treatment method of road
CN102536317A (en) * 2012-01-20 2012-07-04 山东大学 Device and process for filling aggregate into stratum cavities through surface drilling
CN103498697A (en) * 2013-10-18 2014-01-08 中铁二十四局集团安徽工程有限公司 Filling and construction method for goaf below tunnel
CN103835723A (en) * 2013-11-11 2014-06-04 北京中煤矿山工程有限公司 Comprehensive pretreatment method for shaft penetration in mined-out area stratum

Cited By (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106014477A (en) * 2016-06-15 2016-10-12 山东华联矿业股份有限公司 Stable filler filling method
CN106321105A (en) * 2016-09-30 2017-01-11 中国矿业大学 Paste filling method for end slope of opencut coal mine
CN106321105B (en) * 2016-09-30 2018-11-30 中国矿业大学 A kind of open coal mine end side paste body filling method
CN106368731A (en) * 2016-11-16 2017-02-01 中国神华能源股份有限公司 Goaf disposal method
CN107701229A (en) * 2017-09-29 2018-02-16 华北理工大学 Surface mining landfill is administered and underground head stage casings goaf filling draining Synergistic method
CN108286429A (en) * 2018-01-22 2018-07-17 中国恩菲工程技术有限公司 The partition method of more space water passages
CN109267591A (en) * 2018-07-26 2019-01-25 中国建筑第六工程局有限公司 Pass through the closure reinforcement means of the antiaircraft tunnel of underground exterior-protected structure
CN109322699A (en) * 2018-09-29 2019-02-12 山东省地质矿产勘查开发局八0水文地质工程地质大队 Pollution isolation blocking technology under a kind of mine
CN109578070B (en) * 2018-12-14 2020-04-14 安徽马钢罗河矿业有限责任公司 Method for filling hole-finding at bottom of drill hole
CN109578070A (en) * 2018-12-14 2019-04-05 安徽马钢罗河矿业有限责任公司 Hole method is looked in a kind of filling borehole bottom
CN110425004A (en) * 2019-08-16 2019-11-08 徐州中国矿大岩土工程新技术发展有限公司 The floated guide and construction method in the underwater goaf of paste body filling
CN110566269A (en) * 2019-08-19 2019-12-13 西北矿冶研究院 Truss type filling method for underground goaf
CN110630321A (en) * 2019-10-29 2019-12-31 中冶沈勘秦皇岛工程设计研究总院有限公司 Goaf on-well filling equipment and method thereof
CN111365066B (en) * 2020-03-10 2021-08-03 中国平煤神马能源化工集团有限责任公司 Step-type water-filling goaf filling method
CN111365066A (en) * 2020-03-10 2020-07-03 中国平煤神马能源化工集团有限责任公司 Step-type water-filling goaf filling method
CN111535297A (en) * 2020-05-19 2020-08-14 河北建设勘察研究院有限公司 Method for filling underground cavity of foundation rock stratum by filler grouting and hydraulic filling device
CN111810230A (en) * 2020-07-20 2020-10-23 冒俊 Method for reinforcing ecological restoration backfill area of ore mining area
CN113187544A (en) * 2021-05-28 2021-07-30 辽宁科技大学 Large-scale underground dead zone treatment method of beam type roof structure
CN113833519A (en) * 2021-07-30 2021-12-24 北京中煤矿山工程有限公司 Metal mine goaf filling method
CN113833519B (en) * 2021-07-30 2024-03-26 北京中煤矿山工程有限公司 Filling method for goaf of metal mine
CN116771417A (en) * 2021-10-29 2023-09-19 丛培杰 Mine goaf slurry backfilling method for preventing groundwater pollution
CN114352356A (en) * 2021-12-24 2022-04-15 鞍钢集团矿业有限公司 Partition wall for blocking through between main goaf and hidden goaf and construction method
CN114352356B (en) * 2021-12-24 2024-05-03 鞍钢集团矿业有限公司 Partition wall for blocking penetration of main goaf and hidden goaf and construction method
CN115013048A (en) * 2022-06-01 2022-09-06 中南大学 Harmless treatment and reinforcement method for oil gas exploitation by filling coal gangue and injecting heat
CN115013048B (en) * 2022-06-01 2023-08-08 中南大学 Harmless treatment and reinforcement method for filling gangue heat injection exploitation oil gas

Similar Documents

Publication Publication Date Title
CN105240047A (en) Filling reinforcement method for managing underground mined area of open-pit mine
CN107237651B (en) A kind of multi-level grouting water-tight reinforcement means of coal mine underground reservoir and reservoir dam
CN104500082B (en) In Tunneling by mining method, shield receives construction method
CN103016053B (en) Method of local filling to control surface subsidence in gob
CN100543267C (en) A kind of rude ore mining method for ion type RE ore
CN103696775B (en) The descending slip casting method of the high many group aquifer segmentations of large section
CN104612134A (en) Cast-in place pile post-grouting construction method for pouring construction
CN102011588A (en) House pillar type cutting and filling method of medium coal seam for controlling movement deformation of overlying rock
CN103334770A (en) Construction method of superhigh water pressure water-affluent crushed zones of long-large counter-slope tunnels
CN108035769B (en) A kind of modified filling coal mining method of microorganism
CN111734482A (en) Method for reducing damage by utilizing gangue cementation and bag grouting combined support
CN101270672A (en) Artificial ore pillar construction method
CN103821538A (en) Ground preliminary grouting method for J-shaped horizontal wing-shaped branch holes
CN103790592A (en) End soil mass reinforcement system and method
CN110118089B (en) Mining FRP grid-coal gangue-self-compacting concrete regenerated top plate and construction method thereof
CN103388488A (en) Thin seam gob-side entry retaining filling method
CN102877470B (en) Combined soil nailing construction method for supporting
CN103806433A (en) Foundation backfill reinforcement method
CN103498697A (en) Filling and construction method for goaf below tunnel
CN103161498B (en) Half-edge coal seam section coal pillar roadside packing method
CN102011591A (en) Grouting process for working surface of deep well
CN106522981A (en) Support method for tunnel passing through goaf
CN107975044A (en) A kind of method that Caving Method with Large Space mine is backfilled using tailing surface subsidence hole
CN105971605B (en) A kind of underground mines exploration without waster method
CN105525605A (en) Basement backfill area reinforcing method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 114001 Anshan District, Liaoning, No. 219 Road, No. 39, Tiedong

Applicant after: Anshan Iron and Steel Group Mining Co., Ltd.

Address before: 114001 Anshan District, Liaoning, No. 219 Road, No. 39, Tiedong

Applicant before: Anshan Iron & Steel Group Mining Co., Ltd.

WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160113