CN108286429A - The partition method of more space water passages - Google Patents

The partition method of more space water passages Download PDF

Info

Publication number
CN108286429A
CN108286429A CN201810059690.6A CN201810059690A CN108286429A CN 108286429 A CN108286429 A CN 108286429A CN 201810059690 A CN201810059690 A CN 201810059690A CN 108286429 A CN108286429 A CN 108286429A
Authority
CN
China
Prior art keywords
open
air pit
goaf
bottom wall
space
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810059690.6A
Other languages
Chinese (zh)
Inventor
谢盛青
杜贵文
李浩宇
张少杰
逄铭璋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China ENFI Engineering Corp
Original Assignee
China ENFI Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China ENFI Engineering Corp filed Critical China ENFI Engineering Corp
Priority to CN201810059690.6A priority Critical patent/CN108286429A/en
Publication of CN108286429A publication Critical patent/CN108286429A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/32Reclamation of surface-mined areas
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention discloses a kind of partition method of more space water passages, the partition method of more space water passages according to the ... of the embodiment of the present invention, the partition method includes the following steps for filling open-air pit:S1:Detect goaf existing for the underground space below the open-air pit;S2:Setting is connected to the grout hole in the goaf on the bottom wall of the open-air pit;S3:Through the grout hole towards goaf perfusion the first filling slurry to block the goaf;S4:False top is constructed in the bottom wall of the open-air pit, the vacation is very useful to flow into the underground space in the top for reinforcing the underground space and prevention surface water.The blocking-up method of the water passage in more spaces according to the ... of the embodiment of the present invention, due to constructing two step of Man-made False on the bottom wall including grout sealing goaf and open-air pit, open-air pit and the infiltration of recovery of subterranean space are more effectively blocked, and construction technology is relatively simple, construction cost is relatively low.

Description

The partition method of more space water passages
Technical field
The present invention relates to mine open-air pit processing technology field more particularly to a kind of partition sides of more space water passages Method.
Background technology
There is many and be different from independent outdoor or underground mining mine problem to be solved in open air trestle mining, Such as transitional period mining sequence, transitional period mining methods, flood control and water drain, outdoor the problems such as exploitation is cooperateed with underground, wherein controlling flood It is one of the critical issue that should be solved first.General opencut has more complicated water passage with underground mining stope so that top The Atmospheric precipitation that opencut is collected directly pours into underground production system, constitutes a serious threat to underground mining.Water passage with The modes such as waste roadway, unfilled goaf, solution cavity, crack, subsidence area exist, and find out and separate waterpower and control flood as opencut The key breakthrough points.
Have some mine open-air pits in currently available technology and the water passage of underground mine is handled.For example, mine Mountain open air trestle grouting curtain measure.Mine is combined surface and underground mining, due to the residual mine exploitation of hole bottom ore body, in -234 m Horizontal prospect tunnel blow out after, it is permeable that the broken water-bearing zone on quick-fried logical ore body periphery causes open-air pit.After letting out under water, go out at hole bottom 3 sinkholes are showed, wherein 2 in the open-air pit south, lower part is people exploiting field, another is on open-air pit water area east casting side Slope slope foot, lower part flow to unknown.There is a Collapse Pit in open-air pit refuse dump south slope afterwards, and underground stope is not caving, in -185m Section, top courtyard and connection roadway are intact, water burst also no abnormality seen.In permeable initial 37.5h, water yield reaches 97562m3, average Water yield 2602m3/ h, initial 61.5h water yields reach 123445m3, average water yield 2007m3/h.Permeable initial stage water is more clear, after Come more muddy, the silt particle amount brought out is not totally very big, does not embody the silt particle amount of Nan Keng losses, illustrates there is a large amount of silt particle It is deposited in unknown dead zone, forms potential threat.To prevent extra torrential rain from causing underground gushing water excessive, note is set in open-air pit It starches curtain and builds sump and auxiliary facility.Using in plane be in closed, section on belong to semienclosed curtain layout pattern, Curtain bottom connects opposite aquitard.The wide 450m of griotte rock zone in open-air pit, downpayment curtain line slip casting length 120m block underground and go out Fault belt at water has such as reached water plugging effect, then later stage grouting curtain engineering of no longer constructing;Such as fall flat, Whole grouting curtain engineerings are then completed, take closed grouting water-tight curtain, full curtain line slip casting length 450m in the plane.
In another example the open-air pit bottom seepage control measure after the open air trestle of certain iron ore.It is since iron ore open-air pit dumps object Aqueous 20% or so CHARACTERISTICS OF TAILINGS SAND, and open-air pit bottom and highwall understand the hole there are many random distribution due to production resettlement etc. Gap and crack, in the state of tailings discharging, necessarily with the presence of water in these holes and crack.Ponding not only makes the mechanics of rock mass Property further deteriorates, and tailing water oozes people and will apply normal osmosis pressure and tangent hauling force to crack wall, thus shape At seepage field can influence the stability of stope.Therefore, to ensure the production safety in mine, iron ore is in the southern exploiting field ore body time of acceleration While adopting, it is necessary to carry out seepage control measure.After strip mining transformation, open-air pit bottom certainly exists some barren rocks, and outdoor It is also rugged to cheat bottom topography.Therefore, it when designing seepage control measure, first has in the glutinous of one layer of 30cm thickness of open-air pit bottom laying Soil, and pave, spreading, accomplish to keep clay layer relatively flat as far as possible, after qualified by inspection, then lays geotechnique on clay layer Film.The geotechnological film quality of selection is answered relatively good, and film bursting strength, film tensile strength and film ductility are as high as possible, in this way Geomembrane could be unlikely to rupture in the construction process.
In conclusion open air trestle flood control measure mainly has grouting curtain and hole bottom setting impervious barrier at present.The former adopts With being in belong to semienclosed curtain layout pattern on closed, section in plane, curtain bottom connects opposite aquitard, has construction multiple Miscellaneous, investment is larger, and curtain body is easy to be influenced by hole bottom explosion.The latter is flattened by place, is laid with sodium bentonite blanket, geotechnique Film, short fibre geomembrane etc., to prevent geomembrane drawing crack, must also set anchoring groove.Have the characteristics that construction investment is big, construction is complicated, Cheating bottom water passage simultaneously does not use closure to handle, and impervious barrier is easy to be stretched destruction.
Invention content
The present invention is directed at least solve one of the technical problems existing in the prior art.For this purpose, the present invention proposes that one kind is more The partition method of space water passage, the partition method can more efficiently block open-air pit and recovery of subterranean space waterpower Channel prevents earth's surface charge for remittance from pouring into underground by open-air pit, and construction technology is relatively simple, and construction cost is relatively low.
The partition method of more space water passages according to the ... of the embodiment of the present invention, the partition method are outdoor for filling Hole, includes the following steps:
S1:Detect goaf existing for the underground space below the open-air pit;
S2:Setting is connected to the grout hole in the goaf on the bottom wall of the open-air pit;
S3:Through the grout hole towards goaf perfusion the first filling slurry to block the goaf;
S4:Construct false top in the bottom wall of the open-air pit, the vacation it is very useful in the top for reinforcing the underground space and Surface water is prevented to flow into the underground space.
The blocking-up method of the water passage in more spaces according to the ... of the embodiment of the present invention, due to include grout sealing goaf and Two step of Man-made False is constructed on the bottom wall of open-air pit, is more effectively blocked open-air pit and recovery of subterranean space water passage, is prevented Earth's surface charge for remittance pours into underground and ensures underground mining safety, and construction technology is relatively simple, and construction cost is relatively low.
In some embodiments, step S4 includes the following steps:
Q1:Reference plane is chosen on the bottom wall of the open-air pit;
Q2:Part to being higher or lower than the reference plane on the bottom wall of the open-air pit is cut or is filled and led up;
Q4;The second filling slurry of perfusion is to form the false top on the bottom wall of the open-air pit.
Specifically, further include step Q3 between step Q2 and Q4:It is laid with bar-mat reinforcement on the bottom wall of the open-air pit.
In some embodiments, the first filling slurry is crude tailings cementitious slurry.
In some embodiments, the second filling slurry is the mixed slurry of gel rubber material and crude tailings material.
In some optional embodiments, the upper surface on the false top is located at below earth's surface.
Specifically, the superjacent air space on the false top is equipped with filled layer, and the upper surface of the filled layer is concordant with earth's surface.
The additional aspect and advantage of the present invention will be set forth in part in the description, and will partly become from the following description Obviously, or practice through the invention is recognized.
Description of the drawings
The above-mentioned and/or additional aspect and advantage of the present invention will become in the description from combination following accompanying drawings to embodiment Obviously and it is readily appreciated that, wherein:
Fig. 1 using more space water passages partition method treated open-air pit of the embodiment of the present invention structural representation Figure.
Reference numeral:
Open-air pit 100, false top 200, bar-mat reinforcement 300, goaf 400, filled layer 500.
Specific implementation mode
The embodiment of the present invention is described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning to end Same or similar label indicates same or similar element or element with the same or similar functions.Below with reference to attached The embodiment of figure description is exemplary, and is only used for explaining the present invention, and is not considered as limiting the invention.
In the description of the present invention, it is to be understood that, term "center", " longitudinal direction ", " transverse direction ", " length ", " width ", " thickness ", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom" "inner", "outside", " up time The orientation or positional relationship of the instructions such as needle ", " counterclockwise ", " axial direction ", " radial direction ", " circumferential direction " be orientation based on ... shown in the drawings or Position relationship is merely for convenience of description of the present invention and simplification of the description, and does not indicate or imply the indicated device or element must There must be specific orientation, with specific azimuth configuration and operation, therefore be not considered as limiting the invention.In addition, limit There is the feature of " first ", " second " to can explicitly or implicitly include one or more this feature surely.The present invention's In description, unless otherwise indicated, the meaning of " plurality " is two or more.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can Can also be electrical connection to be mechanical connection;It can be directly connected, can also indirectly connected through an intermediary, Ke Yishi Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood at this with concrete condition Concrete meaning in invention.
The partition method of more space water passages according to the ... of the embodiment of the present invention is described below with reference to Fig. 1.
It should be noted that it is understood that there are flood control and water drain, usual feelings in open air trestle mining Under condition, open-air pit 100 has more complicated water passage with underground mining stope so that the air drop that top open-air pit 100 is collected Water directly pours into underground production system, constitutes a serious threat to underground mining.More space water passages of the embodiment of the present invention Blocking-up method is exactly to discard after open air trestle exploitation and fill open-air pit 100 using crude tailings when open-air pit recycles, from And it realizes and blocks open-air pit 100 and water passage present in the production system of underground.
The partition method of more space water passages according to the ... of the embodiment of the present invention includes the following steps:
S1:Detect goaf 400 existing for the underground space of 100 lower section of open-air pit;
S2:The grout hole in setting connection goaf 400 on the bottom wall of open-air pit 100;
S3:Through grout hole towards the perfusion of goaf 400 first filling slurry to block goaf 400;
S4:False top 200, top and prevention of the vacation top 200 for reinforcing the underground space are constructed in the bottom wall of open-air pit 100 Surface water flows into the underground space.
It is understood that being constructed on the bottom wall of open-air pit 100 before false top 200 first by adopting below open-air pit 100 Dead zone 400 with first filling slurry filling block, can not only prevent the ponding in goaf 400 permeate the ground mining space, It can also avoid the phenomenon that goaf 400 caves in occur when constructing false top 200.At the same time, goaf 400 is being blocked Construct false top 200 on the bottom wall of open-air pit 100 afterwards, vacation top 200 can be good at preventing surface water from permeating the ground in mining space, Preferable flooding action can be played.Since false top 200 strengthens the roof in underground mining space to a certain extent, further Prevent the generation of cave-in accident.The mode of grouting curtain or hole bottom setting anti-seepage geomembrane compared with prior art, this hair The method for filling of bright embodiment is relatively simple, and construction cost is relatively low.
The blocking-up method of the water passage in more spaces according to the ... of the embodiment of the present invention, due to including grout sealing goaf 400 and open-air pit 100 bottom wall on construct 200 liang of Man-made False step, more effectively block open-air pit 100 and recovery of subterranean empty Between water passage, prevent earth's surface charge for remittance from pouring into underground, and construction technology is relatively simple, construction cost is relatively low.
In some optional embodiments, the mode in detection goaf 400 can be physical detecting method and bore detecting Method one of which or the two are used in mixed way, thus, it is possible to relatively accurately detect the specific location in goaf 400.
In some embodiments, step S4 includes the following steps:
Q1:Reference plane is chosen on the bottom wall of open-air pit 100;
Q2:Part to being higher or lower than reference plane on the bottom wall of open-air pit 100 is cut or is filled and led up;
Q4;The second filling slurry of perfusion is to form false top 200 on the bottom wall of open-air pit 100.
What needs to be explained here is that the hole bottom of open-air pit 100 is uneven under normal conditions, and have barren rock residue etc. Deng therefore, the second filling slurry is perfused directly on the bottom wall of open-air pit 100 forming false top 200 can cause false top 200 closely knit Degree not enough occurs so as to cause the bad phenomenon of water isolating.As a result, before perfusion the second filling slurry forms false top 200, First cut convex recess reason of filling out to the bottom wall of open-air pit 100 and ensure that the bottom wall of open-air pit 100 is more smooth so that vacation top 200 Compactness it is higher, to ensure that the water-resisting property on false top 200.
Specifically, further include step Q3 between step Q2 and Q4:Bar-mat reinforcement 300 is laid on the bottom wall of open-air pit 100. It is understood that the intensity on false top 200 can be reinforced by being laid with bar-mat reinforcement 300 on the bottom wall of open-air pit 100, further increase The reinforcement effect of the 200 pairs of underground mining space roofs in false top, largely avoids the phenomenon that collapsing.It needs to illustrate , the position of bar-mat reinforcement 300 can be configured according to the position in goaf 400, and goaf 400 is more intensive Multi-story steel mesh 300 can be arranged in ground.
Advantageous, vacation top 200 once is perfused to be formed when weather is fine.It is possible thereby to improve the intensity on false top 200 with it is close Solidity.
In some embodiments, first filling slurry be crude tailings cementitious slurry, second filling slurry be gel rubber material with The mixed slurry of crude tailings material.What needs to be explained here is that the selection of the first filling slurry and the second filling slurry needs root It makes and being adaptively adjusted according to the practical geology of open-air pit 100, the size in goaf 400, the practical geology in entire minery, also It is to say, the material of the first filling slurry and the second filling slurry is not limited to above-mentioned material.
It should be added that the first filling slurry and the second filling slurry all have certain mobility, thus may be used To allow filling slurry to penetrate into the geology crack in open-air pit 100 or goaf 400 naturally, allow after open-air pit 100 and filling Goaf 400 preferably forms entirety, to improve the anti-collapse performance in underground mining space.
In some optional embodiments, the upper surface on vacation top 200 is located at below earth's surface.It is understood that usual feelings Under condition, the depth of open-air pit 100 is deeper, if the upper surface on false top 200 is concordant with earth's surface, although having extremely strong waterproof effect And consolidation effect, but the thickness too conference on false top 200 makes cost greatly increase.Therefore, in practical operation, vacation top 200 Upper surface is generally placed at below earth's surface, compresses construction cost while ensureing the waterproof effect and processing effect on false top 200.
Specifically, the superjacent air space on false top 200 is equipped with filled layer 500, and the upper surface of filled layer 500 is concordant with earth's surface. It should be noted that filled layer 500 may be used more loose sandstone or ettle etc. formation, filled layer 500 it is upper Surface applications earth's surface can concordantly improve the aesthetic measure in mining area, and facilitate the traffic in mining area to a certain extent.
The partition method of more space water passages of a specific embodiment of the invention is described below.
The partition method of the present embodiment includes the following steps:
W1:Existing for the underground space using 100 lower section of the associated form of physical detecting and bore detecting detection open-air pit Goaf 400;
W2:The grout hole in setting connection goaf 400 on the bottom wall of open-air pit 100;
W3:All-tailing cemented filling material slurry is perfused to block goaf 400 towards goaf 400 through grout hole;
W4:Choose reference plane on the bottom wall of open-air pit 100, reference plane is apart from 84 meters of earth's surface;
W5:Part to being higher or lower than reference plane on the bottom wall of open-air pit 100 is cut or is filled and led up;
W6:Bar-mat reinforcement 300 is laid on the bottom wall of open-air pit 100.
W7:The second filling slurry of perfusion to be to form false top 200 on the bottom wall of open-air pit 100, the upper surface on vacation top 200 away from From earth's surface 63m;
W8:Upper surface setting filled layer 500 on false top 200 makes the upper surface of filled layer 500 concordant with earth's surface.
The partition method of more space water passages of the present embodiment has the following advantages
(1) construction is simple, small investment.Goaf 400 is detected using the method for visual physical detecting+bore detecting, Then false top 200 is formed on the bottom wall of open-air pit 100, there is no later maintenance similar to the curtain body of grouting curtain formula, is also not required to The bottom wall that largely excavate and flatten open-air pit 100 carries out antiseepage.
(2) be conducive to high gradient slope improvement.Processing goaf 400 is starched using all-tailing cemented filling material, filling slurry is same When penetrate into geology crack, allow the underground space of goaf 400 and open-air pit 100 to form an entirety, while false top 200 also may be used To reduce the height of high gradient slope.
In the description of this specification, reference term " one embodiment ", " some embodiments ", " illustrative examples ", The description of " example ", " specific example " or " some examples " etc. means specific features described in conjunction with this embodiment or example, knot Structure, material or feature are included at least one embodiment or example of the invention.In the present specification, to above-mentioned term Schematic representation may not refer to the same embodiment or example.Moreover, specific features, structure, material or the spy of description Point can be combined in any suitable manner in any one or more of the embodiments or examples.
Although an embodiment of the present invention has been shown and described, it will be understood by those skilled in the art that:Not In the case of being detached from the principle of the present invention and objective a variety of change, modification, replacement and modification can be carried out to these embodiments, this The range of invention is limited by claim and its equivalent.

Claims (7)

1. a kind of partition method of more space water passages, the partition method is for filling open-air pit, which is characterized in that including Following steps:
S1:Detect goaf existing for the underground space below the open-air pit;
S2:Setting is connected to the grout hole in the goaf on the bottom wall of the open-air pit;
S3:Through the grout hole towards goaf perfusion the first filling slurry to block the goaf;
S4:False top is constructed in the bottom wall of the open-air pit, the vacation is very useful in the top for reinforcing the underground space and prevention Surface water flows into the underground space.
2. the partition method of more space water passages according to claim 1, which is characterized in that step S4 includes following step Suddenly:
Q1:Reference plane is chosen on the bottom wall of the open-air pit;
Q2:Part to being higher or lower than the reference plane on the bottom wall of the open-air pit is cut or is filled and led up;
Q4;The second filling slurry of perfusion is to form the false top on the bottom wall of the open-air pit.
3. the partition method of more space water passages according to claim 2, which is characterized in that between step Q2 and Q4 Further include step Q3:It is laid with bar-mat reinforcement on the bottom wall of the open-air pit.
4. the partition method of more space water passages according to claim 1, which is characterized in that the first filling slurry For crude tailings cementitious slurry.
5. the partition method of more space water passages according to claim 2, which is characterized in that the second filling slurry For the mixed slurry of gel rubber material and crude tailings material.
6. wanting the partition method of more space water passages described in 2 according to right, which is characterized in that the upper surface position on the false top Below earth's surface.
7. the partition method of more space water passages according to claim 6, which is characterized in that the top on the false top is empty Between be equipped with filled layer, the upper surface of the filled layer is concordant with earth's surface.
CN201810059690.6A 2018-01-22 2018-01-22 The partition method of more space water passages Pending CN108286429A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810059690.6A CN108286429A (en) 2018-01-22 2018-01-22 The partition method of more space water passages

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810059690.6A CN108286429A (en) 2018-01-22 2018-01-22 The partition method of more space water passages

Publications (1)

Publication Number Publication Date
CN108286429A true CN108286429A (en) 2018-07-17

Family

ID=62835573

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810059690.6A Pending CN108286429A (en) 2018-01-22 2018-01-22 The partition method of more space water passages

Country Status (1)

Country Link
CN (1) CN108286429A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102644464A (en) * 2012-04-12 2012-08-22 东北大学 Constructing method for mining embedded artificial boundary ore pillar from open-pit to underground mine
CN103924976A (en) * 2014-04-04 2014-07-16 太原理工大学 Method for re-mining over-residual coal area outdoors
CN104653224A (en) * 2014-12-12 2015-05-27 河北联合大学 Open pit tailing cemented filling treatment method
CN105240047A (en) * 2015-09-16 2016-01-13 鞍钢集团矿业公司 Filling reinforcement method for managing underground mined area of open-pit mine
CN105971610A (en) * 2016-06-27 2016-09-28 安徽金联地矿科技有限公司 Process for recycling and collecting open residual ore
CN106168133A (en) * 2016-08-25 2016-11-30 中国恩菲工程技术有限公司 Open-air pit fill method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102644464A (en) * 2012-04-12 2012-08-22 东北大学 Constructing method for mining embedded artificial boundary ore pillar from open-pit to underground mine
CN103924976A (en) * 2014-04-04 2014-07-16 太原理工大学 Method for re-mining over-residual coal area outdoors
CN104653224A (en) * 2014-12-12 2015-05-27 河北联合大学 Open pit tailing cemented filling treatment method
CN105240047A (en) * 2015-09-16 2016-01-13 鞍钢集团矿业公司 Filling reinforcement method for managing underground mined area of open-pit mine
CN105971610A (en) * 2016-06-27 2016-09-28 安徽金联地矿科技有限公司 Process for recycling and collecting open residual ore
CN106168133A (en) * 2016-08-25 2016-11-30 中国恩菲工程技术有限公司 Open-air pit fill method

Similar Documents

Publication Publication Date Title
CN105422170B (en) Middle deep goaf grouting reinforcing and processing method under a kind of building foundation
CN105041325B (en) Construction method of high-tension water-rich extra-large-section weak breccia tunnel
CN103334770B (en) One is grown up reverse-slope tunnel ultra high water pressure rich water zone of fracture construction method
CN106437726B (en) Shallow-depth-excavation tunnel crosses ground fissure crushed zone construction method
CN105715296B (en) Sand blowing, backfilling and grouting construction method for tunnel to penetrate through coal mine goaf
CN107762533B (en) A kind of front pre-grouting method of high-pressure water-enriched weak surrounding rock mountain tunnel
CN106907159A (en) A kind of Shallow Covered Metro Station separates open type structure and its construction method
CN110685714B (en) Micro-step reserved core soil construction structure and method for shallow-buried bias tunnel under phyllite geology
CN105781571A (en) Construction method for soft rock deformation tunnel lining support dismantling-replacing arch
CN206722878U (en) A kind of mining light-duty filling counterfort
CN107237651A (en) A kind of multi-level grouting water-tight reinforcement means of coal mine underground reservoir and reservoir dam
CN105239598A (en) Integral sinking construction method for well-type full-automatic stereo garage
AU2021355609B2 (en) Method for mining by filling and caving
CN103032097A (en) Tunnel drainage structure applicable to water-rich strata under unsymmetrical pressure and construction method thereof
CN109595029A (en) Goaf partial stowage supporting structure and its construction method under the conditions of tight roof
CN108797641A (en) A kind of structure and its construction method of Underground Subway Station construction period full station sealing
CN106640096A (en) Construction method for penetrating through tunnel of backfilling soil section and transition section
CN105156114A (en) Enlarging repair and reinforcement method of roadways at crossing
CN102808627A (en) Underground excavation construction method of steel pipe shed
CN206888990U (en) A kind of Shallow Covered Metro Station separates open type structure
CN110485444B (en) Construction method for seepage prevention and reinforcement of deepwater cofferdam
CN103572764A (en) Watertight structure for retaining wall of ultra-deep manually excavated pile and construction method thereof
CN107245989A (en) Bear the tunnel structure and its construction technology of external water pressure in height
CN203050779U (en) Tunnel drainage structure suitable for bias pressure rich water strata
CN102425179B (en) Reinforced soil infiltration ditch structure supported by miniature steel pipe cast-in-place pile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180717