CN103696775B - The descending slip casting method of the high many group aquifer segmentations of large section - Google Patents
The descending slip casting method of the high many group aquifer segmentations of large section Download PDFInfo
- Publication number
- CN103696775B CN103696775B CN201310714779.9A CN201310714779A CN103696775B CN 103696775 B CN103696775 B CN 103696775B CN 201310714779 A CN201310714779 A CN 201310714779A CN 103696775 B CN103696775 B CN 103696775B
- Authority
- CN
- China
- Prior art keywords
- injected hole
- hole
- grouting
- slip casting
- pressure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000007569 slipcasting Methods 0.000 title claims abstract description 32
- 238000000034 method Methods 0.000 title claims abstract description 20
- 230000011218 segmentation Effects 0.000 title claims abstract description 11
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 48
- 239000002002 slurry Substances 0.000 claims abstract description 24
- 239000011440 grout Substances 0.000 claims abstract description 19
- 230000002706 hydrostatic effect Effects 0.000 claims abstract description 18
- 238000005553 drilling Methods 0.000 claims abstract description 5
- 230000035515 penetration Effects 0.000 claims abstract description 4
- 239000011148 porous material Substances 0.000 claims description 10
- 229910000831 Steel Inorganic materials 0.000 claims description 6
- 239000010959 steel Substances 0.000 claims description 6
- 238000004519 manufacturing process Methods 0.000 claims description 3
- 238000003756 stirring Methods 0.000 claims description 3
- 238000003466 welding Methods 0.000 claims description 3
- 230000008901 benefit Effects 0.000 abstract description 7
- 230000000903 blocking effect Effects 0.000 abstract description 3
- 239000011435 rock Substances 0.000 description 14
- 238000010276 construction Methods 0.000 description 9
- 239000010410 layer Substances 0.000 description 8
- 239000004568 cement Substances 0.000 description 6
- 230000000694 effects Effects 0.000 description 5
- 238000005516 engineering process Methods 0.000 description 5
- 238000007689 inspection Methods 0.000 description 5
- 230000004888 barrier function Effects 0.000 description 4
- 238000009412 basement excavation Methods 0.000 description 4
- 238000004140 cleaning Methods 0.000 description 4
- 239000003245 coal Substances 0.000 description 4
- 238000009792 diffusion process Methods 0.000 description 4
- 239000002699 waste material Substances 0.000 description 4
- 229920001131 Pulp (paper) Polymers 0.000 description 3
- 230000015572 biosynthetic process Effects 0.000 description 3
- 238000007596 consolidation process Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 239000004575 stone Substances 0.000 description 3
- 230000004520 agglutination Effects 0.000 description 2
- 238000000151 deposition Methods 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 238000009826 distribution Methods 0.000 description 2
- 239000012634 fragment Substances 0.000 description 2
- 238000002347 injection Methods 0.000 description 2
- 239000007924 injection Substances 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 239000004570 mortar (masonry) Substances 0.000 description 2
- 239000004576 sand Substances 0.000 description 2
- 239000002356 single layer Substances 0.000 description 2
- 239000000243 solution Substances 0.000 description 2
- 238000000638 solvent extraction Methods 0.000 description 2
- 239000007921 spray Substances 0.000 description 2
- 201000004569 Blindness Diseases 0.000 description 1
- 235000019738 Limestone Nutrition 0.000 description 1
- 241000238370 Sepia Species 0.000 description 1
- 244000061458 Solanum melongena Species 0.000 description 1
- 239000000654 additive Substances 0.000 description 1
- 230000000996 additive effect Effects 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000018109 developmental process Effects 0.000 description 1
- 239000006185 dispersion Substances 0.000 description 1
- 230000007717 exclusion Effects 0.000 description 1
- 230000008014 freezing Effects 0.000 description 1
- 238000007710 freezing Methods 0.000 description 1
- 239000006028 limestone Substances 0.000 description 1
- 239000002245 particle Substances 0.000 description 1
- 229910002059 quaternary alloy Inorganic materials 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 230000001502 supplementing effect Effects 0.000 description 1
- 238000012549 training Methods 0.000 description 1
- 230000001755 vocal effect Effects 0.000 description 1
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
The invention discloses the descending slip casting method of the high many group aquifer segmentations of a kind of large section, layer grouting for water blocking field, possession.Comprise and beat injected hole; Injected hole divides inside and outside two circles to arrange, the circle footpath of inner ring injected hole, hole count are less than outer ring injected hole, and the radial angle of inner ring injected hole is greater than outer ring injected hole; Adopt the high boring of large section; Drill employing hydraulic tunnel drilling machine, rate of penetration 10m/h, has the function of automatically unloading bar; Injected hole meets the high condition of boring note of large section; In injected hole, Grouting Pipe is installed, and Grouting Pipe is connected with slurry filling machine, between slurry filling machine and Grouting Pipe, establish grout cover; Slip casting: grouting pressure optionally descends the 2-4 of hydrostatic pressure doubly; In earlier stage the larger crack of shutoff, 2 times that get hydrostatic pressure; Later stage, for rimala, hole, gets the 3-4 of hydrostatic pressure doubly.There is the features such as expense is low, speed of application is fast, social benefit is good.
Description
Technical field
The present invention relates to the descending slip casting method of the high many group aquifer segmentations of a kind of large section, possession layer grouting for water blocking construction technology.Mainly be applicable to note chemical grout for the large section of formation pore hydromining high (aquifer thickness is greater than 120m), this slurry injection technique can be similar water exclusion of stratum work and provides effective experience for reference, especially one of pre grouting from the working face technology important supplementing.
Background technology
Along with the expansion of underground mine engineer exploitation scale, increasing engineering usually runs into the bad grounds such as various aquifer, sandstone crack, pore water, limestone solution cave water, fault belt water, Genesis of Karst Subsided Column water, old empty water, these stratum often abundant water, water yield is large, gushing water may be caused, cave in, the accident such as inbreak, even cause and flood the security incident such as well and casualties.Stratum grouting for water blocking construction technology, is administer these bad grounds, eliminates and may occur or one of the effective technology method that water damage has occurred.
When shaft of vertical well aquifer is more, and under the condition that interlamellar spacing is comparatively large or buried depth is darker, method of harnessing the river uses additive method, and as freezing process, surface advance grouting slurry processes, its duration is longer or cost is larger.For this kind of roadway, chamber water blockoff, pre grouting from the working face is first-selected method.
Along with the development of national economy, energy demand gets more and more, and superficial part field with "nine squares" major part is developed, and coal resources can not regenerate, and newly-built pit shaft is more and more darker, and geological conditions is corresponding poor.Particularly the Northwest, exploitation be Yanan Formation, Jurassic System layer.Jurassic stratum rock-forming time is more late, and rock is half diagenesis, weak consolidation shape, and well side country rock meets the easy argillization of water, collapse side.There is difference on character and the Permo-Carboniferous system stratum in aquifer.Permo-Carboniferous system aquifer is generally the sandstone that degree of consolidation is harder, and aquifer is based on crevice water, and its thickness in monolayer is no more than 50m.And Jurassic system aquifer is generally the packsand of sand argillaceous agglutination, middle sandstone, gritstone, conglomerate aquifer, based on pore water, thickness is larger, as the mine such as Cui Mu, Shao Zhai of Bin County northwest, the full section of Jurassic system Luo He group is moisture, thickness 250-300m, straight sieve group strong aquifer thickness about the 120m in Yinchuan of Ningxia Province south, the Jurassic system aquifer thickness in monolayer of the most of mine in the Inner Mongol is all more than 100m.The pit shaft that the ground such as Henan, Anhui, Shandong are darker, top is coated with thick-layer Jurassic system aquifer.These stratum are due to complex geologic conditions, and slip casting is harnessed the river and is concealed work, often due to theoretical and lack experience in construction, with blindness and randomness, cause the especially soft rock pore water slip casting of some Grouting engineering, spent very large cost, but fallen flat.
Summary of the invention
The invention provides the descending slip casting method of the high many group aquifer segmentations of a kind of large section, there is the features such as expense is low, speed of application is fast, social benefit is good.
The present invention realizes with following technical scheme: the descending slip casting method of the high many group aquifer segmentations of a kind of large section, and concrete steps are as follows:
1) injected hole is beaten; Injected hole divides inside and outside two circles to arrange, the circle footpath of inner ring hole, hole count are less than cycle hole, and the radial angle of inner ring hole is greater than cycle hole; Cycle hole is used for shutoff pore water, crevice water; Adopt the high boring of large section; Drill employing hydraulic tunnel drilling machine, rate of penetration 10m/h, has the function of automatically unloading bar, hole depth 150m; Injected hole meets the high condition of boring note of large section;
2) in injected hole, Grouting Pipe is installed, and Grouting Pipe is connected with slurry filling machine, between slurry filling machine and Grouting Pipe, establish grout cover; Grout cover must can bear final grouting pressure; In pit shaft, grouting pipeline adopts Φ 51 × 6mm seamless steel pipe, and the ball valve pressure that orifice tube connects is 32 Μ pa; Drainage bucket in drainage layer adopts Φ 325mm or Φ 273mm steel pipe manufacturing, upper end welding high pressure flange, lower end closed;
3) slip casting: grouting pressure optionally descends the 2-4 of hydrostatic pressure doubly; In earlier stage the larger crack of shutoff, 2 times that get hydrostatic pressure; Later stage, for rimala, hole, gets the 3-4 of hydrostatic pressure doubly; 2/3 of the maximum pressure of described slurry filling machine need reach final pressure, prevents because long time running causes facility fault at full capacity; The stratum good to the property noted, selects 2 slurry filling machines to carry out slip casting simultaneously, shortens the slip casting time; The stirring of slurries adopts pit shaft build 2 concrete mixers of concrete and arrange a secondary agitator.
The invention has the beneficial effects as follows: work plane large section of high pre-pouring grout is to the aquifer of different depth, there is flexibility, specific aim, and have and reduce expenses and the advantage such as duration, the series of problems that operation conversion occurs is decreased with short section high ratio, as repeatedly stopped work, return to work, vocational training for the workers and staff is on duty, the maintenance, buying etc. of equipment and materials.Therefore, the high soft rock slip casting of large section of work plane administers to the complicated water bearing ground of all kinds of different depth to have verified a new approach.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the present invention is further described.
Accompanying drawing 1 is the injected hole distribution map of the descending slip casting method of the high many group aquifer segmentations of large section.
In figure: 1, outer ring injected hole, 2, inner ring injected hole.
Detailed description of the invention
The descending slip casting method of the high many group aquifer segmentations of a kind of large section, concrete steps are as follows:
1) injected hole is beaten; As shown in Figure 1, the feature according to the hydrogeology on noted stratum arranges injected hole, and injected hole divides inside and outside two circles to arrange, the circle footpath of inner ring injected hole 2, hole count are less than outer ring injected hole 1, and the radial angle of inner ring injected hole 2 is greater than outer ring injected hole; Outer ring injected hole is used for shutoff pore water, crevice water; Adopt the high boring of large section; Drill employing hydraulic tunnel drilling machine, rate of penetration 10m/h, has the function of automatically unloading bar, hole depth 150m; Injected hole meets the high condition of boring note of large section.Can also arrange whole hole broken to upper strata lithology, spray rock fragment section is reinforced.
2) in injected hole, Grouting Pipe is installed, and Grouting Pipe is connected with slurry filling machine, between slurry filling machine and Grouting Pipe, establish grout cover; Grout cover must can bear final grouting pressure; In pit shaft, grouting pipeline adopts Φ 51 × 6mm seamless steel pipe, and the ball valve pressure that orifice tube connects is 32 Μ pa; Drainage bucket in drainage layer adopts Φ 325mm or Φ 273mm steel pipe manufacturing, upper end welding high pressure flange, lower end closed;
3) slip casting: grouting pressure be promote slurries in crack, flow of pore, diffusion filling, compacting power, be one of key factor controlling slurries diffusion length, grouting pressure generally optionally descend 2-4 times of hydrostatic pressure; The larger crack of shutoff, got low value, was 2 times of hydrostatic pressure early stage; Later stage, for rimala, hole, gets high level, is 3-4 times of hydrostatic pressure; 2/3 of the maximum pressure of described slurry filling machine need reach final pressure, prevents because long time running causes facility fault at full capacity; The stratum good to the property noted, selects 2 slurry filling machines to carry out slip casting simultaneously, shortens the slip casting time; The stirring of slurries adopts pit shaft build 2 concrete mixers of concrete and arrange a secondary agitator.
Injecting paste material is selected according to special formation (Porosity Aquifer); More practical material is pollopas.
Application example 1
1. live in peace the construction of colliery auxiliary shaft pre grouting from the working face in Shandong
The clean diameter 6.5m of colliery auxiliary shaft of living in peace, is Jurassic stratum in-730 ~-885m section (thickness 155m), is made up of rufous, aubergine mudstone, siltstone, packsand, middle sandstone, gritstone, argillaceous agglutination, lithology is loose, and coefficient of softening is less than 0.75, easy argillization.Aquifer vertical distribution compares dispersion.Water content along with the increase of rock sand content, the increase of particle and increasing.Belong to large section aquifer.The character in aquifer belongs to hole, crack artesian water.Bore flooding quantity 28m3/h, estimate inflow of water 80m3/h, Methods of Water Conservancy takes pre grouting from the working face.Injected hole 22, radial angle 2.5 degree, pitch of holes 0.68m, whole pitch of holes 2.05m, the waste footpath 3m of whole pitch-row.Duan Gao overall length 155m, utilizes a grout cover, and point 4 subsection slip castings, partitioning standards determines with lithology and bore flooding quantity size, and the start-stop degree of depth of 4 subsections is 0-45m, 45-80m, 80-116m, 116-155m.Boring note order is treat that a segmentation reaches slip casting ending standard, then drills from aperture and extend to next section high.
Slip casting ending standard is 2-3 times of grouting pressure 18-26 Μ pa(hydrostatic pressure), through cleaning bottom of hole inspection, bore flooding quantity is less than 0.5m3/h.Inject cement 2830t altogether, pollopas 110t.Every meter of pit shaft cement 16t, pollopas 0.7t.
Shaft excavation has no water burst, and achieve and beat dry-well, and strengthen pit shaft country rock, achieving good economic benefit and social benefit, is harnessing the river of similar projects, provides successful New technical use example.
2. Shandong justice can the construction of coal master's well shaft pre grouting from the working face
The clean diameter 5m of Shandong justice energy coal master's well shaft, be Jurassic system and Permian System in-647 ~-770m section (thickness 123m), be made up of sepia, canescence siltstone, packsand, middle sandstone, gritstone, mud stone, basal water is middle sandstone, gritstone, water barrier is siltstone, mud stone, and aquifer and water barrier are alternating layers shapes, bore flooding quantity 26.6m3/h, estimate inflow of water 70m3/h, Methods of Water Conservancy takes pre grouting from the working face.Injected hole 16, radial angle 2.8 degree, pitch of holes 0.74m, whole pitch of holes 3.8m.Use this grout cover to divide 3 sections of slip castings, partitioning standards determines with lithology and bore flooding quantity size, and boring injecting method is treat that a segmentation reaches slip casting ending standard, then drills from aperture and extend to next section high.
Slip casting ending standard is 2.5-3 times of grouting pressure 19-23 Μ pa(hydrostatic pressure), through cleaning bottom of hole inspection, bore flooding quantity is less than 0.5m3/h.Inject cement 1200t altogether, pollopas 730T.Every meter of pit shaft cement 9.77t, pollopas 5.93t.
Shaft excavation water yield is less than 2m3/h, reaches slip casting desired effect, and strengthens pit shaft country rock, achieves good economic benefit and social benefit, is harnessing the river of similar projects, provides successful New technical use example.
The stratum that justice energy coal master well shaft inspection eye discloses has from top to bottom: Quaternary system, Jurassic system, Permian System, each stratum characteristic is described below respectively: show native section degree of depth 231m, the Jurassic system degree of depth 231 ~ 765m, thick 534m, by variegated siltstone, mud stone and grey packsand, middle sandstone, forms containing gravel gritstone.High angle tiny crack is comparatively grown, loose containing hole, crack artesian water lithology, easy argillization.Stratigraphic dip 6 ° ~ 8 °, checks that boring does not find fault belt and solution cavity.
1. grouting design
This grouting horizon is Jurassic system aquifer, and the slip casting section start-stop degree of depth is 620m(water barrier rock cap 10m)-775m(enters water barrier 10m), total length 155m.Grouting borehole design 35, point 2 circles are arranged, inner ring hole circle footpath φ 3.6m, hole count 15, and radial angle 5 °, drops on 3.2m outside waste footpath at the bottom of the 50m location hole of whole hole, and effect is broken for upper strata lithology, and spray rock fragment section is reinforced.Cycle hole circle footpath φ 3.8m, hole count 20, radial angle 2.5 °, drops on 3.2m, 155m outside waste footpath and drops on 5.6m outside waste footpath at the bottom of 100m location hole.Effect is shutoff pore water, crevice water.
Grouting pressure: grouting pressure be promote slurries in crack, flow of pore, diffusion filling, compacting power, be one of key factor controlling slurries diffusion length, 2-4 times that generally optionally descend hydrostatic pressure.Early stage, the larger crack of shutoff, got low value (2 times of hydrostatic pressure); Later stage, for rimala, hole, gets high level (3-4 of hydrostatic pressure doubly).
2. mortar depositing construction process and effect
Mortar depositing construction operation is: grout cover height of excavation section reach requirement → with umbrella bore to rock stratum, bottom carry out visit water (object verifies ceiling location and the water yield in aquifer, ensure to bury underground the quality of orifice tube) → above carry 3m to build wall large form → utilizations block wall large form and set up drilling machine platform → by rig and to be fixed on large form → to bury underground orifice tube and enter rock about 2m → bury underground drainage bucket and drainage layer → concreting and carry out grouting behind shaft or drift lining reinforcing to the grout cover top borehole wall during maintenance 7d() → beat relief hole → drainage layer and orifice tube reinforce → normally bores, note reaches designing requirement.
Main vertical shaft working surface pre-pouring grout engineering, terminates from grout cover construction on February 4th, 2011.Around the above 1.5m borehole wall of grout cover, be evenly arranged 6 relief holes, first to the borehole wall and grout cover consolidation grouting, prevent from slurries are altered and damage the borehole wall and grout cover by pressure, grouting pressure reaches 3 times of 23 Μ pa(hydrostatic pressures), the borehole wall, grout cover are safe and sound.。
Work plane 35 injected holes are divided into 3 groups, first group of hole 1#-15#, hole depth 50m, radial angle 5 °, constructs in advance, injects cement paste, the larger crack of main shutoff.Second group, the 3rd group amounts to 20 holes, point 2 groups of constructions, and second group of hole is odd numbers hole, i.e. 17#, 19#, 21#, 23#, 25#, 27# ... 35#, hole depth 100m, radial angle 2.5 °.3rd group of hole is even numbers hole, 16#, 18#, 20#, 22#, 24#, 26# ... 34#, hole depth 155m, radial angle 2.5 °, the grouting pressure in each group hole successively improves, and then again sweeps out second group of hole (odd numbers hole), be extended deep to 155m, high pressure injects chemical pulp.
End March 30, total lever factor 45d, altogether cleaning bottom of hole 4 times, injection rate cement paste 2040t, chemical pulp 1227t, under each section of duration, water yield, grouting pressure arrange:
First group of hole, bore note 14 days-February 20 February on date, boring maximum flooding quantity 29m3/h is down to 7m3/h, and other each bore flooding quantities are down to the cleaning bottom of hole water yield before the slip casting of 7-5m3/h(second time) final grouting pressure 15 Μ pa.
21 days-March 1 February on date noted by second group of hole drill, and boring maximum flooding quantity 14m3/h is down to 7m3/h, and other each bore flooding quantities are down to 5-3m3/h, final grouting pressure 18 Μ pa.
2 days-March 14 March on date noted by 3rd group of hole drill, and boring maximum flooding quantity 15m3/h is down to below 2m3/h, and other bore flooding quantities are down to 2m3/h, final grouting pressure 23 Μ pa.
15 days-March 30 March on date noted by second group of odd numbers hole drill, and boring maximum flooding quantity 5m3/h is down to 1.5m3/h, final grouting pressure 24 Μ pa.
Inspection eye: the boring that rear borehole inspection of constructing first is constructed, second group of hole checks the water yield of first group of hole more than 50m, 3rd group of hole checks the water yield of second group of hole more than 100m, noting again until the 3rd group of hole reaches after bore flooding quantity is less than 2m3/h, 4th group of hole and former second group of hole depth are extended deep to 155m by former 100m, inject chemical pulp, reach single hole water yield and be less than 1.5m3/h.
Check slip casting effect after Shaft Excavation, pit shaft total yield 6m3/h, reaches sinking and drifting code requirement.
1. layout of holing is shown in Fig. 1.
2. main shaft rock section column is in table 1.
3. main shaft rock section pre grouting from the working face parameter is in table 2.
Table 1 main shaft geology column table
Claims (1)
1. the descending slip casting method of the high many group aquifer segmentations of large section, is characterized in that: concrete steps are as follows:
1) injected hole is beaten; Injected hole divides inside and outside two circles to arrange, the circle footpath of inner ring injected hole, hole count are less than outer ring injected hole, and the radial angle of inner ring injected hole is greater than outer ring injected hole; Outer ring injected hole is used for shutoff pore water, crevice water; Adopt the high boring of large section; Drill employing hydraulic tunnel drilling machine, rate of penetration 10m/h, has the function of automatically unloading bar, hole depth 150m; Injected hole meets the high condition of boring note of large section;
2) in injected hole, Grouting Pipe is installed, and Grouting Pipe is connected with slurry filling machine, between slurry filling machine and Grouting Pipe, establish grout cover; Grout cover must can bear final grouting pressure; In pit shaft, grouting pipeline adopts Φ 51 × 6mm seamless steel pipe, and the ball valve pressure that orifice tube connects is 32 Μ pa; Drainage bucket in drainage layer adopts Φ 325mm or Φ 273mm steel pipe manufacturing, upper end welding high pressure flange, lower end closed;
3) slip casting: grouting pressure optionally descends the 2-4 of hydrostatic pressure doubly; In earlier stage the larger crack of shutoff, 2 times that get hydrostatic pressure; Later stage, for rimala, hole, gets the 3-4 of hydrostatic pressure doubly; 2/3 of the maximum pressure of described slurry filling machine need reach final pressure, prevents because long time running causes facility fault at full capacity; The stratum good to the property noted, selects 2 slurry filling machines to carry out slip casting simultaneously, shortens the slip casting time; The stirring of slurries adopts pit shaft build 2 concrete mixers of concrete and arrange a secondary agitator.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310714779.9A CN103696775B (en) | 2013-12-20 | 2013-12-20 | The descending slip casting method of the high many group aquifer segmentations of large section |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310714779.9A CN103696775B (en) | 2013-12-20 | 2013-12-20 | The descending slip casting method of the high many group aquifer segmentations of large section |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103696775A CN103696775A (en) | 2014-04-02 |
CN103696775B true CN103696775B (en) | 2016-02-24 |
Family
ID=50358421
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310714779.9A Expired - Fee Related CN103696775B (en) | 2013-12-20 | 2013-12-20 | The descending slip casting method of the high many group aquifer segmentations of large section |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103696775B (en) |
Families Citing this family (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106351662B (en) * | 2016-08-29 | 2017-10-17 | 济南力稳岩土工程有限公司 | Cellular-type segmenting slip casting reinforcement means, construction method and application |
CN107060767B (en) * | 2017-05-25 | 2018-04-03 | 安徽理工大学 | Deep vertical stratum consolidation filling system and its grouting method under existing wellbore conditions |
CN107035389B (en) * | 2017-06-01 | 2019-12-03 | 新疆北新路桥集团股份有限公司 | A kind of construction method for grouting reinforcement and earth's surface construction method |
CN107246267B (en) * | 2017-07-25 | 2023-07-04 | 马钢(集团)控股有限公司 | Vertical shaft wall structure in bad stratum, construction device and construction method |
CN107191188B (en) * | 2017-07-25 | 2023-06-06 | 马钢(集团)控股有限公司 | Bedrock section bad aquifer positioning and targeting grouting vertical shaft wall structure, construction device and construction method |
CN108119143B (en) * | 2017-12-20 | 2019-11-15 | 湖南科技大学 | A kind of vertical shaft working surface cement soluble glass paste combines grouting method with chemical grout double-round curtain |
CN111365002B (en) * | 2020-03-30 | 2021-07-30 | 北京中煤矿山工程有限公司 | Ground pre-grouting method for small-section high wellbore in complex stratum |
CN111550250A (en) * | 2020-05-15 | 2020-08-18 | 陕西延长石油巴拉素煤业有限公司 | Water prevention and control protection method for safe excavation of water-rich coal seam section of vertical shaft |
CN112253186A (en) * | 2020-07-26 | 2021-01-22 | 中铁二院工程集团有限责任公司 | Method for stopping leakage of working faces at different layer depths of railway tunnel shaft |
CN112012770A (en) * | 2020-07-26 | 2020-12-01 | 中铁二院工程集团有限责任公司 | Underground water advanced treatment structure and construction method for ultra-deep vertical shaft of railway tunnel |
CN113006795B (en) * | 2021-04-09 | 2023-10-20 | 中国煤炭地质总局勘查研究总院 | Treatment method of dwarf coal field roof sandstone water |
CN113153212B (en) * | 2021-04-30 | 2023-04-11 | 北京科技大学 | Vertical shaft high-water-pressure stratum grouting device and construction method |
CN113464144A (en) * | 2021-06-16 | 2021-10-01 | 枣庄矿业(集团)有限责任公司 | Ground grouting process for treating water leakage and cracks of coal mine shaft in Lunan region |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU773279A1 (en) * | 1979-04-09 | 1980-10-23 | Всесоюзный научно-исследовательский и проектный институт галургии | Method of forming a hydraulic insulation curtain in shafts |
CN101105130A (en) * | 2006-07-11 | 2008-01-16 | 盛天宝 | Fast slip casting technique between composite well wall |
CN101173516A (en) * | 2007-11-29 | 2008-05-07 | 中铁大桥局股份有限公司 | Method for preventing slurry leakage and hole collapse of large-diameter deep-borehole cast-in-situ bored pile by casting curtain method |
CN102425421A (en) * | 2011-11-08 | 2012-04-25 | 中蓝连海设计研究院 | Novel water control method suitable for mine shafts |
CN202370525U (en) * | 2011-12-28 | 2012-08-08 | 陕西煤业化工建设(集团)有限公司 | Post grouting construction structure of shaft wall of weathering bed rock section of return air vertical shaft |
CN202370524U (en) * | 2011-12-28 | 2012-08-08 | 陕西煤业化工建设(集团)有限公司 | Water control construction structure for working face of shaft body of air return vertical shaft |
CN103046932A (en) * | 2012-12-22 | 2013-04-17 | 中冶集团武汉勘察研究院有限公司 | Pre-grouting and water plugging method for permeable layer in vertical shaft |
-
2013
- 2013-12-20 CN CN201310714779.9A patent/CN103696775B/en not_active Expired - Fee Related
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU773279A1 (en) * | 1979-04-09 | 1980-10-23 | Всесоюзный научно-исследовательский и проектный институт галургии | Method of forming a hydraulic insulation curtain in shafts |
CN101105130A (en) * | 2006-07-11 | 2008-01-16 | 盛天宝 | Fast slip casting technique between composite well wall |
CN101173516A (en) * | 2007-11-29 | 2008-05-07 | 中铁大桥局股份有限公司 | Method for preventing slurry leakage and hole collapse of large-diameter deep-borehole cast-in-situ bored pile by casting curtain method |
CN102425421A (en) * | 2011-11-08 | 2012-04-25 | 中蓝连海设计研究院 | Novel water control method suitable for mine shafts |
CN202370525U (en) * | 2011-12-28 | 2012-08-08 | 陕西煤业化工建设(集团)有限公司 | Post grouting construction structure of shaft wall of weathering bed rock section of return air vertical shaft |
CN202370524U (en) * | 2011-12-28 | 2012-08-08 | 陕西煤业化工建设(集团)有限公司 | Water control construction structure for working face of shaft body of air return vertical shaft |
CN103046932A (en) * | 2012-12-22 | 2013-04-17 | 中冶集团武汉勘察研究院有限公司 | Pre-grouting and water plugging method for permeable layer in vertical shaft |
Also Published As
Publication number | Publication date |
---|---|
CN103696775A (en) | 2014-04-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103696775B (en) | The descending slip casting method of the high many group aquifer segmentations of large section | |
CN105422170B (en) | Middle deep goaf grouting reinforcing and processing method under a kind of building foundation | |
CN103089275B (en) | Control method of surrounding rocks in water-rich very-broken surrounding rock tunnel collapse sections | |
CN105201448B (en) | Block water slip casting method for blocking in a kind of high-pressure high-flow water gushing channelway | |
CN108060908A (en) | Water-rich sand layer long range horizontal orientation drilling grouting and reinforcing technology under groups of building | |
CN106948843B (en) | A kind of bilayer multiple-limb concordant bored grouting transformation dual limestone aquifer method of roof and floor | |
CN102705005B (en) | Technology for plugging water bursting in mine by directional diversion grouting | |
CN103835729B (en) | Deep distance roadway surrounding rock pre grouting from the surface reinforcement process | |
Yang et al. | Pre-grouting reinforcement of underwater karst area for shield tunneling passing through Xiangjiang River in Changsha, China | |
CN108843345B (en) | Divide sequence grouting and reinforcing Treatment Methods after a kind of city tunnel vault depression | |
CN103437339A (en) | Construction method for sealing karst cave near trench wall of underground continuous wall in karst stratum | |
CN104278667A (en) | Underground karst cave filling treatment method | |
CN105155563A (en) | Reinforcing and treating method for water burst of soft-flow muddy stratum of foundation pit | |
CN105484269B (en) | Foundation pit enclosure structure seepage prevention and treatment construction method under blasting condition | |
CN102011591A (en) | Grouting process for working surface of deep well | |
CN108999181A (en) | Molten, soil cave injecting treatment construction method and its application | |
CN105625293A (en) | Dissolution rock strong-development construction site filling-type geological processing structure and construction method thereof | |
CN103835723A (en) | Comprehensive pretreatment method for shaft penetration in mined-out area stratum | |
CN108797620A (en) | A kind of OPT construction method of interlocking pile | |
CN107503362A (en) | A kind of compound antiskid piling wall retaining structure and construction method suitable for reservoir stability | |
CN109026010A (en) | A kind of mine seepage well slip casting type sinking shaft construction method | |
CN109593957A (en) | A kind of active method for extracting of in-situ leaching ion type rareearth ore | |
CN106014419A (en) | Multi-branch-pore ground pre-grouting and water plugging construction method | |
CN106837382A (en) | A kind of subway tunnel country rock pre grouting from the surface reinforcement process | |
CN107178077A (en) | Overburden layer grouting and reinforcing structure and its design method on a kind of karst area solution cavity |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20151231 Address after: 221016 Huaihai Road Jiangsu city of Xuzhou province No. 241 Applicant after: CHINA COAL NO.5 CONSTRUCTION Co. Address before: West Sanhuan Dagushan 221016 Jiangsu city of Xuzhou province two Applicant before: China Coal First Construction Co.,Ltd. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160224 |