CN216040465U - Ecological roadbed structure in sponge city based on original road - Google Patents

Ecological roadbed structure in sponge city based on original road Download PDF

Info

Publication number
CN216040465U
CN216040465U CN202122316538.1U CN202122316538U CN216040465U CN 216040465 U CN216040465 U CN 216040465U CN 202122316538 U CN202122316538 U CN 202122316538U CN 216040465 U CN216040465 U CN 216040465U
Authority
CN
China
Prior art keywords
original
retaining wall
road surface
original road
flexible
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122316538.1U
Other languages
Chinese (zh)
Inventor
张扬
戴珂
徐诗童
赵华
朱海苍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCTEG Chongqing Engineering Group Co Ltd
Original Assignee
CCTEG Chongqing Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCTEG Chongqing Engineering Group Co Ltd filed Critical CCTEG Chongqing Engineering Group Co Ltd
Priority to CN202122316538.1U priority Critical patent/CN216040465U/en
Application granted granted Critical
Publication of CN216040465U publication Critical patent/CN216040465U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a sponge city ecological roadbed structure based on an original road, which comprises an original retaining wall and an original road surface, wherein a lattice frame is covered on the outer wall of the original retaining wall, the lattice frame is fixedly connected with the original retaining wall through an anchor rod, an anchoring section of the anchor rod is anchored into bedrock, a plant bag is arranged in the lattice frame, a plurality of first geogrids are arranged on one side, close to the original retaining wall, below the original road surface, a water-resisting layer and an unloading plate are sequentially arranged above the first geogrids, a flexible retaining structure is arranged above the unloading plate, the inner side end of the flexible retaining structure extends to the upper side of the original road surface, and a pervious concrete road surface is laid above the flexible retaining structure. The vertical space utilization in city has been improved, the dead weight of upper portion road structure has been reduced, has alleviateed the pressure of magma stone retaining wall, has improved the efficiency of construction simultaneously effectively.

Description

Ecological roadbed structure in sponge city based on original road
Technical Field
The utility model relates to the technical field of geotechnical engineering, in particular to a sponge city ecological roadbed structure based on an original road.
Background
With the rapid development of the economy of China, various civil engineering works are spread in every corner of the whole country. In the road reconstruction construction process, the situation that the elevation of the road pavement is increased is difficult to avoid, and the original road foundation retaining structure must be processed.
The existing roadbed retaining structure engineering mainly adopts a retaining wall structure, and in order to ensure the safety of the newly-built roadbed retaining structure, the existing main processing method is to demolish the original retaining wall and rebuild a retaining wall, so that the construction is troublesome and the cost is high.
Disclosure of Invention
Aiming at the defects of the prior art, the utility model aims to provide a sponge urban ecological roadbed structure based on the original road, which can overcome the defect that the utilization of the vertical space of the existing city is tense, can facilitate construction, improve the material utilization rate, has low modification cost and can reduce the waste of resources.
In order to achieve the purpose, the technical scheme adopted by the utility model is as follows:
the utility model provides an ecological road bed structure in sponge city based on original road, its key lies in: the soil retaining wall comprises an original retaining wall and an original road surface, wherein a lattice frame is covered on the outer wall of the original retaining wall and is fixedly connected with the original retaining wall through anchor rods, anchoring sections of the anchor rods are anchored into bedrock, plant bags are arranged in the lattice frame, a plurality of first geogrids are arranged on one side, close to the original retaining wall, of the lower portion of the original road surface, a water-proof layer and an unloading plate are sequentially arranged above the first geogrids, the bottom of the outer side of the unloading plate is in contact with the top of the lattice frame, a flexible retaining structure is arranged above the unloading plate, the inner side end of the flexible retaining structure extends to the upper portion of the original road surface, and a pervious concrete road surface is laid above the flexible retaining structure.
Furthermore, flexible retaining structure includes afforestation check room, geotechnological check room and the second geogrid that a plurality of layers outside-in set gradually, and the afforestation check room and the geotechnological check room of superiors and the concrete road surface parallel and level that permeates water afforestation check indoor packing has planting soil geotechnological check room and the filling of second geogrid have the hollow filler piece of EPS light laid lay on the second geogrid of superiors the concrete road surface that permeates water is formed with the gutter between the inboard and the basement rock of the second geogrid of superiors the bottom of gutter has been laid first rubble water filtering layer.
Furthermore, the flexible soil retaining structure is also provided with a drainage blind pipe, the drainage blind pipe is embedded in each layer of greening grid chamber, the geotechnical grid chamber and the second geogrid, and two ends of the drainage blind pipe penetrate through the flexible soil retaining structure.
Furthermore, the horizontal spacing of the drainage blind pipes is not more than 2m, and the longitudinal spacing is not more than 1 m.
Furthermore, hinge type bolts are fixedly connected between the greening lattice chambers and the geocell, anchor bolts are fixedly connected between the upper layer of greening lattice chambers and the lower layer of greening lattice chambers and between the geocell, the longitudinal interval of the anchor bolts is not more than 2m, and the transverse interval of the anchor bolts is not more than 1 m.
Furthermore, the unloading plate is L-shaped, a water permeable ditch is formed between the vertical part of the unloading plate and the flexible soil retaining structure, a plurality of water permeable grooves are formed in the unloading plate below the water permeable ditch and communicated with the plant bag, and a second gravel water filtering layer is filled in the head water groove.
Further, the unloading plate is fixedly connected with the original retaining wall and the bedrock through a grouting steel bar sleeve, and the row spacing between the steel bar sleeves is not more than 1.2 m.
Further, the row spacing between the anchor rods is not more than 2m, and the total height of the plurality of first geogrids is not more than 1.5 m.
The utility model has the following remarkable effects:
the method has the advantages that the assembled lattice frame and the novel glass fiber reinforced plastic anchor rods are adopted to reinforce the original masonry retaining wall, dust damage in the construction process is reduced by the novel materials, economic and environmental benefits are fully considered, and under the condition that the use safety of an original road is guaranteed, the newly-added composite ecological flexible retaining structure and the upper and lower boundary positions of the original masonry retaining wall adopt clay water-proof layers to prevent rainwater from seeping into filling soil behind the original masonry retaining wall;
by utilizing the integral mechanical properties of the composite ecological flexible retaining structure and the flexible material, the utilization rate of the vertical space of a city is improved, the self weight of the upper road structure is reduced, the pressure of the original pulp masonry retaining wall is reduced, the construction efficiency is effectively improved, and the engineering construction progress is well guaranteed;
the EPS light hollow filler block has light weight, high strength, strong chemical stability and water stability and good mechanical property, and can better solve the excessive settlement and differential settlement of the newly-built roadbed;
through the arrangement of the L-shaped unloading plate with the water permeable groove, the soil pressure is further effectively controlled, and the positive effect of heightening the raw stone retaining wall is achieved;
the ecological flexible retaining structure internal and external drainage system supplies ecological water required by the plant bag through the transmission connection of the water bodies of the pervious concrete pavement and the full-length drainage blind pipe, so that the aims of reducing the waste of resources and saving the engineering cost are fulfilled, the engineering investment is reduced to a great extent, the structure is more reasonable and economical, the construction efficiency is effectively improved, and the engineering construction progress is well guaranteed.
Drawings
Fig. 1 is a schematic structural view of the present invention.
Detailed Description
The following provides a more detailed description of the embodiments and the operation of the present invention with reference to the accompanying drawings.
As shown in figure 1, the sponge city ecological roadbed structure based on the original road is characterized in that an original retaining wall is subjected to ecological reinforcement treatment on the basis of the original road and the constructed retaining wall, and a combined type ecological assembly retaining structure is additionally arranged on the upper side of the original retaining wall. Specifically, the method comprises the following steps: the soil retaining wall comprises an original retaining wall 1 and an original pavement 5, wherein a lattice frame 2 is covered on the outer wall of the original retaining wall 1, the lattice frame 2 is fixedly connected with the original retaining wall 1 through an inclined anchor rod 3 made of glass fiber reinforced plastics, an anchoring section of the anchor rod 3 is anchored into a bed rock 18, a plant bag 4 is arranged in the lattice frame 2, the plant bag 4 is fastened with the original retaining wall 1 through a short anchor through short wool, a half-width roadbed is excavated on one side, close to the original retaining wall 1, below the original pavement 5, a plurality of steel-plastic first geogrids 6 are arranged in an excavation channel after excavation, a water-proof layer 7 and an unloading plate 8 are sequentially arranged above the first geogrid 6 and are formed by clay compaction, the water-proof layer 7 is as same as the elevation of the original pavement 5, and the bottom of the outer side of the unloading plate 8 is contacted with the top of the lattice frame 2, a flexible soil retaining structure is arranged above the unloading plate 8 for heightening, the inner side end of the flexible soil retaining structure extends to the upper part of the original road surface 5, and a pervious concrete road surface 16 is laid above the flexible soil retaining structure.
As can be seen from figure 1, the flexible soil retaining structure comprises a plurality of layers of greening grid cells 10, geotechnical grid cells 11 and steel-plastic second geogrids 17 which are sequentially arranged from outside to inside, the greening grid cells 10 and the geotechnical grid cells 11 on the uppermost layer are flush with the pervious concrete pavement 16, planting soil is filled in the greening grid cells 10, EPS light hollow filler blocks 12 are filled in the geotechnical grid cells 11 and the second geogrids 17, the pervious concrete pavement 16 is laid on the second geogrids 17 on the uppermost layer, a side ditch 14 is formed between the inner side of the second geogrids 17 on the uppermost layer and a foundation rock 18, a first gravel water filtering layer 15 is laid at the bottom of the side ditch 14 and used for water delivery of the ecological side ditch 14 and the interior of a roadbed and ecological water supplement of a plant bag 4, a drainage blind pipe 13 is further arranged on the flexible soil retaining structure, and the drainage blind pipe 13 is buried in each layer of greening grid cells 10, the geotechnical grid cells 11 and the steel-plastic second geogrids 17, and the drainage blind pipe 13 are arranged in sequence from outside to inside the uppermost layer, And the two ends of the drainage blind pipe 13 penetrate through the flexible soil retaining structure in the geocell 11 and the second geogrid 17.
In this embodiment, the horizontal spacing of the drainage blind pipes 13 is not more than 2m, and the longitudinal spacing is not more than 1 m.
Furthermore, hinge type bolts are adopted for fixedly connecting the greening cells 10 with the geocells 11, anchor bolts are adopted for fixedly connecting the upper and lower layers of greening cells 10 and the geocells 11, the longitudinal interval of the anchor bolts is not more than 2m, and the transverse interval of the anchor bolts is not more than 1 m.
As can be seen from fig. 1, the unloading plate 8 is L-shaped, a water permeable trench 19 is formed between the vertical portion of the unloading plate 8 and the flexible soil retaining structure, a plurality of water permeable grooves are formed in the unloading plate 8 below the water permeable trench 19, the water permeable grooves are communicated with the plant bags 4, the head water grooves are filled with second gravel water-filtering layers 20, and water is supplied to the plant bags 4 below the water permeable grooves through the second gravel water-filtering layers 20.
Further, the unloading plate 8 is fixedly connected with the original retaining wall 1 and the bedrock 18 through a grouted steel bar sleeve 9, and the row spacing between the steel bar sleeves 9 is not more than 1.2 m.
Further, the row spacing of the anchor rods 3 is not more than 2m, and the total height of the plurality of first geogrids 6 is not more than 1.5 m.
In the embodiment, the prefabricated lattice frame 2 and the novel glass fiber reinforced plastic anchor rods 3 are adopted to reinforce the original retaining wall 1 of the masonry, the novel material is utilized to reduce dust hazard in the construction process, and under the condition of ensuring the safe use of the original road, the clay water barrier layer 7 is adopted at the lower boundary position of the newly-added composite ecological flexible retaining structure and the original retaining wall 1 to prevent rainwater from infiltrating into the filling soil behind the original retaining wall 1;
the EPS light backfill material has light weight, high strength, strong chemical stability and water stability and good mechanical property, and can better solve the excessive settlement and differential settlement of the newly-built roadbed;
through the arrangement of the L-shaped unloading plate 8 with the water permeable groove, the soil pressure is further effectively controlled, and the positive effect of heightening the original retaining wall 1 is achieved;
the drainage system of the internal and external measurement of the combined type ecological flexible soil retaining structure is in transmission connection with the water body of the full-length drainage blind pipe 13 through the pervious concrete pavement 16, supplies ecological water required by the plant bag 4, achieves the purposes of reducing resource waste and saving engineering cost, reduces engineering investment to a great extent, enables the structure to be more reasonable and economical, effectively improves construction efficiency, and well guarantees the engineering construction progress.
The technical solution provided by the present invention is described in detail above. The principles and embodiments of the present invention are explained herein using specific examples, which are presented only to assist in understanding the method and its core concepts. It should be noted that, for those skilled in the art, it is possible to make various improvements and modifications to the present invention without departing from the principle of the present invention, and those improvements and modifications also fall within the scope of the claims of the present invention.

Claims (8)

1. The utility model provides an ecological roadbed structure in sponge city based on original road, includes original retaining wall and original road surface, its characterized in that: the outer wall of original retaining wall coats and is equipped with the lattice frame, and this lattice frame passes through stock and original retaining wall fastening connection, just in the anchor section anchor of stock goes into the basement rock the built-in plant bag that is equipped with of lattice frame one side that the below on original road surface is close to original retaining wall is provided with the first geogrid of a plurality of ways the top of first geogrid is equipped with water barrier and off-load board in proper order, just the outside bottom of off-load board with the top contact of lattice frame the top of off-load board sets up flexible retaining structure, and the medial extremity of this flexible retaining structure extends to the top on original road surface permeable concrete road surface is laid to the top of flexible retaining structure.
2. The sponge city ecological subgrade structure based on the original road as claimed in claim 1, is characterized in that: flexible retaining structure includes afforestation check room, geotechnological check room and the second geogrid that a plurality of layers of outside-in set gradually, and the afforestation check room and the geotechnological check room of superiors with the concrete road surface parallel and level of permeating water afforestation check indoor packing has planting soil geotechnological check room and second geogrid intussuseption are filled with the hollow filled block of EPS light lay mat formation on the second geogrid of superiors the concrete road surface of permeating water is formed with the gutter between the inboard of the second geogrid of superiors and basement rock first rubble drainage layer has been laid to the bottom of gutter.
3. The sponge city ecological subgrade structure based on the original road as claimed in claim 2, is characterized in that: the flexible soil retaining structure is also provided with a drainage blind pipe, the drainage blind pipe is embedded in each layer of greening grid chamber, geotechnical grid chamber and second geogrid, and two ends of the drainage blind pipe penetrate through the flexible soil retaining structure.
4. The sponge city ecological subgrade structure based on the original road as claimed in claim 3, is characterized in that: the horizontal distance of the drainage blind pipes is not more than 2m, and the longitudinal distance of the drainage blind pipes is not more than 1 m.
5. The sponge urban ecological subgrade structure based on the original road according to any one of claims 2 to 4, which is characterized in that: the greening lattice chambers are fixedly connected with the geocell through hinge type bolts, the greening lattice chambers on the upper layer and the greening lattice chambers on the lower layer and the geocell are fixedly connected through anchor bolts, the longitudinal interval of the anchor bolts is not more than 2m, and the transverse interval of the anchor bolts is not more than 1 m.
6. The sponge city ecological subgrade structure based on the original road as claimed in claim 1, is characterized in that: the unloading plate is L-shaped, a water permeable ditch is formed between the vertical part of the unloading plate and the flexible soil retaining structure, a plurality of water permeable grooves are formed in the unloading plate below the water permeable ditch and communicated with the plant bag, and second gravel water filtering layers are filled in the water permeable grooves.
7. The sponge city ecological subgrade structure based on the original road as claimed in claim 1 or 6, which is characterized in that: the unloading plate is fixedly connected with the original retaining wall and the bedrock through a grouting steel bar sleeve, and the row spacing between the steel bar sleeves is not more than 1.2 m.
8. The sponge city ecological subgrade structure based on the original road as claimed in claim 1, is characterized in that: the row spacing of the anchor rods is not more than 2m, and the total height of the plurality of first geogrids is not more than 1.5 m.
CN202122316538.1U 2021-09-24 2021-09-24 Ecological roadbed structure in sponge city based on original road Active CN216040465U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122316538.1U CN216040465U (en) 2021-09-24 2021-09-24 Ecological roadbed structure in sponge city based on original road

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122316538.1U CN216040465U (en) 2021-09-24 2021-09-24 Ecological roadbed structure in sponge city based on original road

Publications (1)

Publication Number Publication Date
CN216040465U true CN216040465U (en) 2022-03-15

Family

ID=80600165

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122316538.1U Active CN216040465U (en) 2021-09-24 2021-09-24 Ecological roadbed structure in sponge city based on original road

Country Status (1)

Country Link
CN (1) CN216040465U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113818300A (en) * 2021-09-24 2021-12-21 中煤科工重庆设计研究院(集团)有限公司 Sponge urban ecological roadbed structure based on original road and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113818300A (en) * 2021-09-24 2021-12-21 中煤科工重庆设计研究院(集团)有限公司 Sponge urban ecological roadbed structure based on original road and construction method thereof

Similar Documents

Publication Publication Date Title
CN204530620U (en) A kind of novel combination type Ecological Retaining Wall
CN102995599B (en) Anti-freeze anti-seepage water diversion treatment method of collapsible loess water-conveyance canal
CN113818300B (en) Sponge city ecological roadbed structure based on original road and construction method thereof
CN207092159U (en) A kind of swelled ground area basement building float Structure
CN107447613A (en) A kind of deep super embankment on soft soil and construction method
CN102359096A (en) Method for strengthening deep soft soil foundation by sealing
CN106640096A (en) Construction method for penetrating through tunnel of backfilling soil section and transition section
CN210002425U (en) structure of seepage roadbed side slope drainage system
CN216040465U (en) Ecological roadbed structure in sponge city based on original road
CN205348221U (en) Merogenesis formula prefabricated barricade building block and retaining wall structure on an empty stomach
CN205134303U (en) Compound reinforced structure of soft base of ecological bamboo raft among road engineering of field
CN106836034B (en) High-fill cover plate culvert flexible load shedding system and construction method
CN205382942U (en) Multilayer underground space curtain posture subsurface excavated construction's supporting construction under existing facility
CN1837514A (en) Column supported underground continuous wall
CN102943480A (en) Loess foundation pit supporting method
CN114109394B (en) Method for determining pile length of tunnel shallow-buried weak surrounding rock high-pressure jet grouting pile method ground surface reinforcement
CN209482302U (en) Sanitary filling field laying assembled anchor structure
CN211079770U (en) Anti-bump supporting structure of ballastless track high-speed railway
CN210458817U (en) Prevent road settlement's foundation structure
CN207017097U (en) Deep super embankment on soft soil
CN112030870B (en) Building rubbish reinforcing river levee under sandy soil geology
CN204282397U (en) Three soil-baffling structures of villa basement
CN215330015U (en) Assembled tunnel portal structure
CN219973154U (en) High water level shallow foundation pit soft foundation treatment construction structure
CN219951578U (en) Non-excavation reinforced structure of urban road collapsibility loess road bed

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant