CN1837514A - Column supported underground continuous wall - Google Patents

Column supported underground continuous wall Download PDF

Info

Publication number
CN1837514A
CN1837514A CN 200610035016 CN200610035016A CN1837514A CN 1837514 A CN1837514 A CN 1837514A CN 200610035016 CN200610035016 CN 200610035016 CN 200610035016 A CN200610035016 A CN 200610035016A CN 1837514 A CN1837514 A CN 1837514A
Authority
CN
China
Prior art keywords
wall
shallow
basement
inwall
underground continuous
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200610035016
Other languages
Chinese (zh)
Other versions
CN1333139C (en
Inventor
陈星�
蔡健
罗赤宇
孙礼军
马天洲
叶群英
林扑强
向前
吴建营
徐静
何锦超
王金锋
莫海鸿
陈颖
陈宗弼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB2006100350161A priority Critical patent/CN1333139C/en
Publication of CN1837514A publication Critical patent/CN1837514A/en
Application granted granted Critical
Publication of CN1333139C publication Critical patent/CN1333139C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention relates to a post underground continuous wall which is constructed via basement reverse method. It comprises: the underground wall along the basement, which is formed by shallow wall and deep wall, while the shallow is at the upper part of underground continuous wall, with general structure to form the closed wall as baffling sand, water and filtration; and said deep wall is under the shallow wall which is a post support wall whose rock embedded sections are distantly arranged, to support the shallow wall and be used as the vertical support element, to effectively control the vertical distortion of upper part pf underground continuous wall. The shallow wall can reduce the height of underground continuous wall and the deep wall can reduce the number of rock-embedded sections with high cost and hard construction. The invention can reduce the cost and shorten the construction time.

Description

A kind of column supported underground continuous wall
Technical field
The present invention relates to a kind of building diaphragm wall, particularly relate to a kind of column supported underground continuous wall that adopts the basement top-down method construction.
Background technology
The building diaphragm wall is a kind of foundation pit supporting system that is applied to a kind of dash soil-baffling structure of contrary sequence method basement structure construction, is the most frequently used a kind of in several Base hole supporting technology of basement top-down method because it has the big and good characteristics of barrier performance of integral rigidity.
In the prior art, multilayer basement of high-rise building and other multilayer underground structures often adopt reverse construction, promptly utilize the building cover structure of basement, comprise that beam, plate, post etc. and external wall structure are as the horizontal support system of foundation pit enclosure structure with go along with sb. to guard him system, contrary sequence method is the boundary with the datum layer, following each layer basement of datum layer constructed from top to bottom, and the construction from bottom to top simultaneously of above each layer of datum layer is so be called contrary sequence method.Because basement top-down method need guarantee that the basement of building has enough horizontal rigidities from top to bottom, foundation pit deformation is very few, therefore, down is arranged at the foundation pit supporting system that bad soil layer keeps off native usefulness by ground when needing to adopt diaphragm wall as construction.
Diaphragm wall need use special equipment to adopt mud off to excavate out a groove with certain width, thickness and degree of depth along deep foundation or the underground periphery of constructing, its thickness reaches 0.6 meter~1.2 meters, the degree of depth reaches tens meters~tens meters and does not wait, and determines according to the designing requirement and the geological condition of building.Reinforcing cage is set in groove, adopt tremie method concreting in mud, build up several meters wide unit wall section, sequence construction successively, the one continuous underground reinforced concrete wall that unit wall section is connected into certain jointing method, so that antiseepage during excavation of foundation pit, retaining soil, as the supporting on adjacent structure basis and the part that directly becomes the foundation structure of bearing direct load, diaphragm wall will be constructed than in the dark rock stratum more than 2 meters of basement bottom board usually.Its weak point is:
(1) because construction of diaphragm wall needs large-scale special-purpose machinery, and the groove section generally adopts brill, piercing and shaping die, mud off, the cost of operating expenses is higher.
(2) diaphragm wall in hard soil layer and rock stratum, excavate grooving difficulty, particularly rock stratum to bury more shallow be geological conditions when better, and be under the situation of multi-storey basement, the increase of going into rock is very expensive, the construction costs increase is bigger.
(3) being closely connected owing to diaphragm wall and contrary sequence method technology; the cost height of diaphragm wall directly influences basement top-down method The Application of Technology and popularization; but how in the safety of guaranteeing base pit engineering reduction of erection time again; simultaneously again can the Control Engineering cost, become the key issue that influences the contrary sequence method technical development.
Summary of the invention
But the object of the present invention is to provide and a kind ofly guaranteeing under the security situation of base pit engineering not only reduction of erection time but also column supported underground continuous wall that can the Control Engineering cost.
The present invention is a kind of column supported underground continuous wall that adopts the basement top-down method construction, comprise the underground wall body that is provided with along the basement periphery, it is characterized in that described underground wall body is made up of shallow body of wall and dark body of wall, described shallow body of wall is positioned at the top of diaphragm wall, has common diaphragm wall wall body structure, form the closed type body of wall along the basement periphery, retaining soil, dash, impervious when being used for the basement top-down method construction; Described dark body of wall is positioned at the below of shallow body of wall, with discontinuous manner the post that post props up formula embedding rock section is set and props up body of wall, is used to support shallow wall section and as basement floor vertical support structural element, can effectively controls the vertical deformation of diaphragm wall superstructure.Because shallow body of wall has reduced the height of diaphragm wall, dark body of wall post props up body of wall and has reduced the quantity that cost height, diaphragm wall that difficulty is big are gone into the dike section, thus reduction of erection time and reduce cost (referring to Fig. 2,3) greatly.
The present invention is divided into shallow body of wall and dark body of wall two parts with diaphragm wall, shallow body of wall at bad soil body position still adopts existing continuous underground wall structure, dark body of wall at the good position of geological conditions then no longer adopts diaphragm wall structure of the prior art, but having adopted the interruption wall construction, this technical scheme is to be based upon on the basis of the two big characteristics that basement top-down method has to realize.Described two big characteristics are: (1) has the existence of soil arching effect; (2) inner support of contrary sequence method diaphragm wall is protected, and promptly the overall structure of diaphragm wall, floor beam, plate and post formation is utilized its lateral rigidity, and the foundation ditch lateral earth pressure is played a stronger fixed level support effect.At large the technology of the present invention and notion are carried out a large amount of Finite Element Numerical Simulation analyses and monitored data checking and practical engineering application practice through system, confirmed feasibility of the present invention.
When basement top-down method is constructed, what construct at first is basement diaphragm wall all around, while is in relevant position (pillar or the partition wall intersection etc. of interior of building, calculate to determine as required) build or lay the intermediate support stake and post bore the superstructure deadweight and executes the support of load down as construction period before the base plate back cover, after diaphragm wall and the pile completion just from top to down successively carry out the construction of excavation of foundation pit and floor beam, plate.The beam slab floor structure of elder generation's construction datum layer, the first road horizontal support on the diaphragm wall top around forming, the significant horizontal rigidity of floor structure becomes the very big support of diaphragm wall, utilize diaphragm wall retaining soil subsequently, successively earth excavation and build each layer underground structure downwards until the base plate back cover.In this work progress, no matter whether underground diaphragm wall is added interim horizontal support with the soil pressure of balanced action on diaphragm wall, when whenever finishing first floor bent cap plate, the capital makes diaphragm wall form many one horizontal supports, make the inner support of diaphragm wall be protected, be that diaphragm wall, floor beam, plate and pile have formed an overall space structure that rigidity is huge, can play a stronger fixed level support effect the lateral earth pressure that acts on the diaphragm wall.
Although the geological condition of each building operations all is not quite similar, but the geological conditions of common buildings construction just comprises two parts soil body nothing more than, the part soil body is the bad soil body that is positioned at the ground table top, moisture water permeability is stronger, the soil is porous, represents the angle of internal friction α (referring to Fig. 1) of soil body stability less, when carrying out excavation of foundation pit in the mode of opening wide, cause soil body landslide easily, the angle on landslide and the angle of internal friction α of this soil body match.Miscellaneous fill layer, mud, layer of sand, plastic farinose argillic horizon etc. all belong to the bad soil body.Another part soil body is the good soil body that is positioned at bad soil body below, and soil (rock) matter is closely knit, and intensity hardness is higher, and bad hydraulic permeability is even not permeable, and angle of internal friction α is bigger, generally is severely-weathered to middle weathered rock formation and gentle breeze rock stratum.The degree of depth of the bad soil body of different regions can be different, and according to China's north and south geology difference condition, depth difference southern, the northern bad soil body can reach 20~30 meters more than, and the degree of depth of the southern bad soil body is less, and the degree of depth of the northern bad soil body is bigger.
When basement top-down method is constructed, be positioned at the bad soil body on foundation ditch top, owing to the basement overall structure that has diaphragm wall and flooring beam slab, pile etc. to form, its rigidity is huge, is enough to the slippage that stops that soil layer produces.Therefore, the sliding rupture of the foundation pit side-wall at bad soil body position is almost non-existent.And when soil (rock) layer position continuation preferably excavated downwards, the below soil body of excavation is not as the supporting-point of the soil mass of foundation pit of exposing out, the top basement of rigid body formula is then as foundation ditch upper support point, can in the excavation face soil body, form soil arching effect (referring to Fig. 4) after the last lower support, make that the soil pressure that acts on this position space enclosing structure is less with joint efforts, can play the effect that stops unsupported soil body slipping, protuberance.In suitable altitude range, adopt present technique, can reasonably utilize the physical characteristic of better soil layer itself to reach homeostatic effect, retaining soil to this position requires just can reduce greatly, if what enter is not weathering or gentle breeze rock stratum, even can consider to keep off native requirement, adding need not have the sealing requirement after entering waterproof soil (rock) layer yet, diaphragm wall at this position in fact only plays load-bearing, so, just need not the equal build-in of all wall sections and go into hard soil layer, only need post to be set and prop up body of wall with certain spacing, can realize the effect of its load-bearing and vertical supporting member, save most of conventional retaining wall member at this position and become possibility thereby make.
Shallow body of wall height of the present invention is as the criterion with the degree of depth of the bad soil body in the actual geology, and its height should be enough to cover whole bad solums, can fully play the effect of dash, retaining soil to guarantee shallow wall section.
Shallow wall section of the present invention preferably can extend under the basement superstructure absolute altitude at bad soil body depth capacity place, is beneficial to guarantee the firm of support system.
The height of dark wall section of the present invention is shallow wall section with down to place, the following rock stratum of base plate of foundation pit, and shallow wall section and dark wall section boundary should be located in the scope of the 300~1500mm of basement superstructure absolute altitude under sentencing, and preferable range is 400~1000mm.
The present invention can do following improvement: at described dark wall part, every two adjacent posts prop up spacing between the body of wall in 10~30 meters scope; Preferable range is 15~20 meters.
The present invention can do following improvement: because the discontinuous post of the dark body of wall of the present invention props up body of wall, make shallow body of wall become unsettled wall section in the wall section that two posts of dark body of wall prop up between the body of wall, and shallow body of wall is to divide a plurality of cell width construction molding and constituting one by one with whole diaphragm wall, general i shaped steel or the similar member of adopting vertically engages between each unit body of wall, therefore, for strengthening the transverse strength of diaphragm wall, described diaphragm wall and basement wall can be combined into an integral body, basement wall abbreviates the inwall wall as, and the transverse reinforcement structure that the inwall wall that utilizes construction successively to form is had improves the transverse strength of the unsettled wall section of diaphragm wall.Concrete technical measures are pre-buried a plurality of reinforcing bars that are used to connect the inwall wall on described diaphragm wall inner face, described inwall wall is close to the diaphragm wall moulding, the pre-buried reinforcing bar part of described diaphragm wall stretches in the inwall wall, when inwall wall moulding by casting, be fixed on wherein, thereby make two bodies of wall in conjunction with as a whole.
The present invention can also further be installed on the first floor collar tie beam top of the shallow body of wall section of diaphragm wall, and shallow body of wall top is provided with longitudinal reinforcement, links to each other with first floor collar tie beam, utilizes the transverse strength of collar tie beam to improve the transverse strength of shallow body of wall; Remaining every layer collar tie beam all is embedded in and waters into complete firm one in the diaphragm wall inwall wall in the lump, makes unsettled wall section of the shallow body of wall that is combined into one and inwall wall become Continuous Deep Beam, further strengthens the structural strength of the unsettled wall section of the shallow body of wall of diaphragm wall.
Diaphragm wall of the present invention is in all and flooring Vierendeel girder junction, pre-buried pvc pipe, chisel with Vierendeel girder with operation after an action of the bowels and to be connected, the reinforcing cage fixation of built-in fitting and crossbeam, flooring Vierendeel girder and diaphragm wall are rigidly connected, change the out-of-date methods of in the past using girder steel box built-in fitting, can save a large amount of steel, simplify working process.
The present invention can also do further improvement: prop up at adjacent two posts of described dark body of wall the combined bolting and shotcrete combined member is set between the body of wall, promptly when geological conditions is good, utilize between the upper strata support and the excavation face soil body and can form favourable soil arching effect, the foundation pit side-wall that post in per two following rock stratum of embedding base plate props up between the wall section is done combined bolting and shotcrete, comprise with anchor pole or soil nailing fixing with wire lath on foundation pit side-wall and sprayed mortar, form thin wall construction with the effect of certain retaining soil.Can in surpassing 10 meters dark deep layer basement foundation ditch sidewalls, use, in the reverse construction of ultra-deep foundation pit, save great amount of investment.
Compared with prior art there is following advantage in the present invention:
1, the present invention adopts the column supported underground continuous wall that comprises shallow body of wall and dark wall body structure as the bracing of foundation pit member, shallow body of wall is used conventional Diaphragm Wall, post in conjunction with the interval setting of body of wall deeply props up the formula body of wall, utilize the acting in conjunction of the horizontal support of the approximate rigid body that good native arching action and diaphragm wall top had, both guaranteed the homeostatic effect of lower floor's soil body, reduce the degree of depth of diaphragm wall again effectively and reduced the cost height, the diaphragm wall that difficulty is big is gone into the quantity of dike section, reduction reaches 20%~40%, thereby reduced material usage and gone along with sb. to guard him measure, shorten the construction period, greatly reduce engineering cost.
2, the present invention can be combined into an integral body with diaphragm wall and basement wall, both strengthened the transverse strength of the unsettled wall section of the shallow body of wall of diaphragm wall, and saved the enclosure wall of setting up separately again, and can in the land used scope, enlarge the effective usable floor area of basement to greatest extent;
3, it is one that the present invention waters complete strong bonded in the lump with the inwall wall at the first floor or every layer of collar tie beam and the unsettled wall section of shallow body of wall place, can prop up the wall section to post in the design and regard the bearing that suspends body of wall in midair as, unsettled wall section and inwall wall integrally combine and become Continuous Deep Beam, beam column and anchor pole by vertical direction supports again, constitute a stable space frame system, solved simple employing diaphragm wall well and made the high problem of pattern foundation pit supporting structure cost;
4, the present invention with diaphragm wall in conjunction with the combined bolting and shotcrete combined member, be implemented in the retaining soil effect that dark body of wall is interrupted the place, space with lower cost, can in surpassing 10 meters dark deep layer basement foundation ditch sidewalls, use, in the reverse construction of ultra-deep foundation pit, save great amount of investment.
5, the present invention is mainly used in the design and the construction of basement more than three layers, successfully apply to a plurality of high levels (superelevation layer) deep foundation pit of construction engineering, obtained remarkable economic efficiency, to the development of deep foundation ditch contrary sequence method design and construction technology and improve the deep foundation ditch soil body and the research of structure stress mechanism has great academic significance, and in engineering practice, have wide practical use.
Description of drawings
Fig. 1 is the soil pressure schematic diagram that the diaphragm wall of horizontal support is arranged;
Fig. 2 is the plan structure schematic diagram of the diaphragm wall of embodiments of the invention 1;
Fig. 3 is the integrally-built 1/4 sectional perspective structural representation of basement that diaphragm wall shown in Figure 2 combines with superstructure, beam, post;
Fig. 4 is the 1/4 sectional perspective structural representation that diaphragm wall shown in Figure 2 combines with beam;
Fig. 5 is the basement structure schematic front view that embodiments of the invention 1 show the subsoil arching action;
Fig. 6 is the basement structure schematic front view of the embodiment 2 of utility model of the present invention;
Fig. 7 bears the three-dimensional structure diagram of two floors lid and inwall wall for diaphragm wall shown in Figure 6 removes;
Fig. 8 is the plan structure schematic diagram that the diaphragm wall of embodiments of the invention 2 is connected with the inwall wall;
Fig. 9 is the main TV structure schematic diagram that the diaphragm wall of embodiments of the invention 2 is connected with the inwall wall;
Figure 10 is the structural representation that diaphragm wall and the collar tie beam of embodiments of the invention 2 is connected with the flooring beam slab.
The specific embodiment
Embodiment 1
A kind of column supported underground continuous wall that adopts basement top-down method to construct shown in Fig. 2~5 is one of embodiment of the invention, comprise the underground wall body that is provided with along the basement periphery, it is characterized in that described underground wall body is made up of shallow body of wall 11 and dark body of wall 12, described shallow body of wall 11 is positioned at the top of diaphragm wall 1, has common diaphragm wall wall body structure, form the closed type body of wall along the basement periphery, cover whole bad soil body A, retaining soil, dash, impervious when being used for the basement top-down method construction.Shallow body of wall combines the basement superstructure that constitutes with superstructure 4, beam 5 and post 3, have huge lateral rigidity, and suffered lateral earth pressure displacement is less, and the fixed level that can regard as the soil body supports.
Described dark body of wall 12 extends the embedding rock under the below of shallow body of wall, utilize completed basement superstructure as upper bracket, the hole hard soil in the end (rock) is as undersetting, under the effect of lateral earth pressure, form soil arching effect C and guarantee homeostasis, thereby can save the dash of this part, soil-baffling structure, with discontinuous manner the post that post props up formula embedding rock section is set and props up body of wall, the spacing that every two adjacent posts prop up between the body of wall is 18 meters, be used for supporting at the good foundation ditch soil layer position B of geological conditions, rise and support shallow body of wall 11 and, effectively control the vertical deformation of diaphragm wall superstructure as basement floor vertical support structural element.
Embodiment 2
Column supported underground continuous wall shown in Fig. 6~10 is two of embodiments of the invention, different with last example is, the spacing of propping up between the body of wall at dark body of wall 12 two the adjacent posts of diaphragm wall is 20 meters, combined bolting and shotcrete combined member 2 is set in this spacing, promptly prop up and use combined bolting and shotcrete between the body of wall instead at adjacent post, promptly wire lath is fixed on the foundation pit side-wall sprayed mortar again, forms thin wall construction with the effect of certain retaining soil with soil nailing 21 is fixing.In addition, anchor pole 22 is squeezed in also shallow body of wall bottom, with the horizontal support of the shallow body of wall of further reinforcement.
Shown in Fig. 6,8,9, the shallow body of wall of diaphragm wall is to divide a plurality of cell width construction molding and constituting one by one with whole diaphragm wall, the general i shaped steel 13 that adopts engages between each unit body of wall, and steel truss 14 and horizontal, vertical muscle 15 and 16 are all arranged in each unit wall.Diaphragm wall 1 is combined into an integral body with inwall wall 6, described inwall wall 6 is close to the diaphragm wall moulding, its height from shallow body of wall 11 tops until dark body of wall 12 bottoms, inwall is provided with within the walls and is provided with equally laterally, vertical muscle 61 and 62, and different is that horizontal bar 61 is to link up in whole body of wall.Inwall wall 6 is less at shallow body of wall 11 position thickness, and during to dark body of wall 12 positions, two posts prop up the below of the unsettled body of wall of shallow body of wall between the body of wall, and inwall wall 6 also is close to the combined bolting and shotcrete formable layer, fills up the space of the unsettled body of wall of shallow body of wall below.
As shown in Figure 9, pre-buried many connecting reinforcements 7 that are used to connect inwall wall 6 on described diaphragm wall 1 inner face, connecting reinforcement is made of one section reinforcing bar, it is embedded in the shallow body of wall 11 for straight pre-buried section 71 so that the centre is a bit of, pre-buried section two ends are to shallow body of wall inner surface direction cross folding, to fold the mode of pulling out with " * " at two ends 72 when carrying out the construction of inwall wall stretches in the inwall wall zone, when building moulding, the inwall wall is fixed on wherein, the inwall wall is close to the diaphragm wall moulding, makes two bodies of wall in conjunction with as a whole under the effect of connecting reinforcement 7.Be provided with complete vertical muscle and transverse reinforcement in the inwall wall, can improve the transverse strength of the unsettled wall section of shallow body of wall.
Shown in Fig. 6,7,10, basement first floor collar tie beam 51a is installed on the top of the shallow body of wall section of diaphragm wall, and shallow body of wall top is provided with longitudinal reinforcement, links to each other with first floor collar tie beam, utilizes the transverse strength of collar tie beam to improve the transverse strength of shallow body of wall; Remaining every layer collar tie beam 51b is embedded in the unsettled wall section of the diaphragm wall place inwall wall and waters into complete firm one in the lump, makes unsettled wall section of the shallow body of wall that is combined into one and inwall wall become Continuous Deep Beam.
Described diaphragm wall is in all and flooring Vierendeel girder junction, pre-buried pvc pipe and stiffener, so that dig out the connection breach, and Vierendeel girder reinforcing bar 52 is stretched into, flooring Vierendeel girder and diaphragm wall are rigidly connected, change the out-of-date methods of in the past using girder steel box built-in fitting, can save a large amount of steel, simplify working process.

Claims (10)

1. column supported underground continuous wall, comprise the underground wall body that is provided with along the basement periphery, it is characterized in that described underground wall body is made up of shallow body of wall (11) and dark body of wall (12), described shallow body of wall (11) is positioned at the top of diaphragm wall (1), has common diaphragm wall wall body structure, form the closed type body of wall along the basement periphery, retaining soil, dash, impervious when being used for the basement top-down method construction; Described dark body of wall (12) is positioned at the below of shallow body of wall, with discontinuous manner the post that post props up formula embedding rock section is set and props up body of wall, is used to support shallow wall section and as basement floor vertical support structural element.
2. column supported underground continuous wall according to claim 1 is characterized in that: described shallow body of wall (11) highly is enough to cover whole bad solums.
3. column supported underground continuous wall according to claim 2 is characterized in that: described shallow wall section extend under the basement superstructure absolute altitude at bad soil body depth capacity place, is beneficial to the firm of support system.
4. column supported underground continuous wall according to claim 3, it is characterized in that: the height of described dark wall section is shallow wall section with down to place, the following rock stratum of base plate of foundation pit, and shallow wall section and dark wall section boundary are located in the scope of the 300~1500mm of basement superstructure absolute altitude under sentencing.
5. column supported underground continuous wall according to claim 4 is characterized in that: in described dark body of wall (12) part, every two adjacent posts prop up spacing between the body of wall in 10~30 meters scope.
6. column supported underground continuous wall according to claim 5 is characterized in that: in described dark body of wall (12) part, every two adjacent posts prop up spacing between the body of wall in 15~30 meters scope.
7. column supported underground continuous wall according to claim 5, it is characterized in that: pre-buried several are used to connect the reinforcing bar of inwall wall (6) on described diaphragm wall (1) inner face, described inwall wall (6) is close to the diaphragm wall moulding, the pre-buried reinforcing bar part of described diaphragm wall stretches in the inwall wall (6), when inwall wall (6) moulding by casting, be fixed on wherein, thereby make two bodies of wall in conjunction with as a whole.
8. column supported underground continuous wall according to claim 7, it is characterized in that: the pre-buried connecting reinforcement (7) that is used to connect inwall wall (6) on described diaphragm wall (1) inner face, the time will be embedded in the mode that the connecting reinforcement of basement diaphragm wall inner surface pulls out with " * " in advance and stretch in inwall wall (6) zone carrying out inwall wall (6) construction, be fixed on when building moulding wherein at inwall wall (6), inwall wall (6) is close to the diaphragm wall moulding, makes two bodies of wall in conjunction with as a whole under the effect of beard muscle.
9. according to claim 1 or 2 or 3 or 4 or 5 or 6 or 7 or 8 described column supported underground continuous walls, it is characterized in that: prop up at adjacent two posts of described dark body of wall (12) combined bolting and shotcrete combined member (2) is set between the body of wall, described combined bolting and shotcrete, comprise that using anchor pole (22) or soil nailing (21) to fix reaches sprayed mortar with steel mesh reinforcement on foundation pit side-wall, formation has the native thin wall construction that acts on of certain retaining.
10. column supported underground continuous wall according to claim 9 is characterized in that: first floor collar tie beam (51a) is installed on the top of the shallow body of wall section of diaphragm wall (1), and shallow body of wall (11) top is provided with longitudinal reinforcement, and (51a) links to each other with first floor collar tie beam; Remaining every layer collar tie beam is embedded in and waters into complete firm one in the inwall wall (6) in the lump.
CNB2006100350161A 2006-04-17 2006-04-17 Column supported underground continuous wall Expired - Fee Related CN1333139C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006100350161A CN1333139C (en) 2006-04-17 2006-04-17 Column supported underground continuous wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006100350161A CN1333139C (en) 2006-04-17 2006-04-17 Column supported underground continuous wall

Publications (2)

Publication Number Publication Date
CN1837514A true CN1837514A (en) 2006-09-27
CN1333139C CN1333139C (en) 2007-08-22

Family

ID=37015011

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006100350161A Expired - Fee Related CN1333139C (en) 2006-04-17 2006-04-17 Column supported underground continuous wall

Country Status (1)

Country Link
CN (1) CN1333139C (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101942841A (en) * 2010-10-14 2011-01-12 中国长江三峡集团公司 Method for constructing reversed beam type raft plate foundation
CN102619343A (en) * 2012-04-14 2012-08-01 中南大学 Reverse displacement and construction method of existing building cover
CN102733420A (en) * 2012-07-13 2012-10-17 中建八局第三建设有限公司 Pre-stage bottom plate construction method for enhancing protection on steel-bar joints in stage construction of basements
CN105756075A (en) * 2016-02-29 2016-07-13 山东电力工程咨询院有限公司 Horizontal bearing combined foundation based on piles and underground continuous wall and method
CN106120853A (en) * 2016-06-30 2016-11-16 中铁第四勘察设计院集团有限公司 A kind of inverted construction method of frame bridge
CN111720165A (en) * 2020-06-28 2020-09-29 重庆大学 Large-dip-angle coal seam gob-side entry retaining flexible entry protection method

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02266015A (en) * 1989-04-03 1990-10-30 Takenaka Komuten Co Ltd Constructing underground continuous wall
CN1043263C (en) * 1997-05-15 1999-05-05 李宪奎 Construction method for building foundation pit stope support
JPH116164A (en) * 1997-06-17 1999-01-12 Shimizu Corp Construction method for underground structure

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101942841A (en) * 2010-10-14 2011-01-12 中国长江三峡集团公司 Method for constructing reversed beam type raft plate foundation
CN102619343A (en) * 2012-04-14 2012-08-01 中南大学 Reverse displacement and construction method of existing building cover
CN102733420A (en) * 2012-07-13 2012-10-17 中建八局第三建设有限公司 Pre-stage bottom plate construction method for enhancing protection on steel-bar joints in stage construction of basements
CN102733420B (en) * 2012-07-13 2014-06-18 中建八局第三建设有限公司 Pre-stage bottom plate construction method for enhancing protection on steel-bar joints in stage construction of basements
CN105756075A (en) * 2016-02-29 2016-07-13 山东电力工程咨询院有限公司 Horizontal bearing combined foundation based on piles and underground continuous wall and method
CN106120853A (en) * 2016-06-30 2016-11-16 中铁第四勘察设计院集团有限公司 A kind of inverted construction method of frame bridge
CN111720165A (en) * 2020-06-28 2020-09-29 重庆大学 Large-dip-angle coal seam gob-side entry retaining flexible entry protection method

Also Published As

Publication number Publication date
CN1333139C (en) 2007-08-22

Similar Documents

Publication Publication Date Title
CN105089061B (en) Ultra-deep foundation pit supporting method
CN101914925B (en) Basement by using optimized composite prefabricated arch wall as external wall
CN101435198B (en) Deep pit support reinforcing anti-seepage water stop composite structure
CN101092850A (en) Method and installation for rising building or historical building / cluster of historical building integrally
CN1958966A (en) Underground consecutive sinking well type openweb wall body, and construction method
CN101418569B (en) Optimization complex arch wall combining prefabricated arch leaf, support and major structure
CN104947682A (en) Foundation pit support construction method and device thereof
CN1333139C (en) Column supported underground continuous wall
CN103526781B (en) A kind of ancient architecture foundation integrated pallet base isolation reinforcement structure and construction method thereof
CN111749288B (en) Load-reducing heightening structure of existing retaining wall and construction method thereof
CN114457850B (en) Construction method for crossing existing subway cross section anti-floating system on open cut tunnel
CN113818300B (en) Sponge city ecological roadbed structure based on original road and construction method thereof
CN110306589B (en) Method for forming assembled reinforced earth retaining wall
CN201801843U (en) Overwater gravity type earth-retaining structure with anchoring structure
CN107503323A (en) A kind of method of construction of ecological revetment
CN104005414B (en) Large-size rebar cast in place concrete pile supports the constructional method of column
CN112942377A (en) Novel support shear-resistant structure and construction method thereof
CN105386779A (en) Arch column method for building large-scale underground structure in shallow buried rock stratums
CN216040465U (en) Ecological roadbed structure in sponge city based on original road
CN217053493U (en) Anti-floating system for crossing section of existing subway on open-cut tunnel
CN203603176U (en) Historic building foundation overall tray shock insulating and reinforcing structure
CN114109394B (en) Method for determining pile length of tunnel shallow-buried weak surrounding rock high-pressure jet grouting pile method ground surface reinforcement
CN212772394U (en) Underground building supporting system
CN211079770U (en) Anti-bump supporting structure of ballastless track high-speed railway
CN209584855U (en) Bridge major diameter precast concrete tubular column basis

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: ARCHITECTURAL DESIGN Research Institute OF GUANGDONG PROVINCE

Assignor: Cai Jian|Luo Chiyu|Sun Lijun|Ma Tianzhou|Ye Qunying|Lin Puqiang|Chen Xing|Xiang Qian|Chen Zongbi|Wu Jianying|Xu Jing|He Jinchao|Wang Jinfeng|Mo Haihong|Chen Ying

Contract fulfillment period: 2007.10.18 to 2012.10.18

Contract record no.: 2009440000253

Denomination of invention: Column supported underground continuous wall

Granted publication date: 20070822

License type: Exclusive license

Record date: 20090414

LIC Patent licence contract for exploitation submitted for record

Free format text: EXCLUSIVE LICENSE; TIME LIMIT OF IMPLEMENTING CONTACT: 2007.10.18 TO 2012.10.18; CHANGE OF CONTRACT

Name of requester: GUANGDONG PROVINCE BUILDING DESIGN ACADEME

Effective date: 20090414

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070822

CF01 Termination of patent right due to non-payment of annual fee