CN101942841A - Method for constructing reversed beam type raft plate foundation - Google Patents

Method for constructing reversed beam type raft plate foundation Download PDF

Info

Publication number
CN101942841A
CN101942841A CN 201010506328 CN201010506328A CN101942841A CN 101942841 A CN101942841 A CN 101942841A CN 201010506328 CN201010506328 CN 201010506328 CN 201010506328 A CN201010506328 A CN 201010506328A CN 101942841 A CN101942841 A CN 101942841A
Authority
CN
China
Prior art keywords
reversed beam
foundation
reversed
constructing
raft plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010506328
Other languages
Chinese (zh)
Inventor
杜发兴
曹广晶
刘德富
晋良海
孙志禹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Three Gorges Corp
Original Assignee
China Three Gorges Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Three Gorges Corp filed Critical China Three Gorges Corp
Priority to CN 201010506328 priority Critical patent/CN101942841A/en
Publication of CN101942841A publication Critical patent/CN101942841A/en
Pending legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

The invention discloses a method for constructing a reversed beam type raft plate foundation, which comprises the following steps of: 1) leveling after the foundation is dug to a bearing stratum; 2) pouring a concrete cushion in an area outside a reversed beam according to laying off of a reversed beam working drawing to keep the bearing stratum undisturbed; and 3) digging a reversed beam foundation trench, after the reversed beam foundation trench is subjected to wall stabilizing, mounting reinforcing steel bars and pouring the concrete to obtain the reversed beam type raft plate foundation. The method for constructing the reversed beam type raft plate foundation provided by the invention realizes less disturbance in undisturbed soil of the bearing stratum when the reversed beam type raft plate foundation is constructed, erasures the bearing capacity of foundation soil, and solves the problem of non-uniform subsidence of a building caused by poor construction quality by the method for constructing a cushion course, then digging the reversed beam foundation trench and performing wall stabilizing on the reversed beam foundation trench.

Description

A kind of job practices of reversed beam formula raft foundation
Technical field
The present invention relates to a kind of foundation construction method, particularly a kind of job practices of reversed beam formula raft foundation.
Background technology
Reversed beam formula raft foundation is that independent foundation under column or strip foundation are all connected with the contact beam, integrated poured more below base plate.Adopt the beam type raft foundation when the inhomogeneous or ground of bearing capacity of foundation soil is weak in general.And beam type raft foundation buried depth is superficial, even can not buried depth formula basis.Building load is bigger, bearing capacity of foundation soil a little less than, often adopt concrete floor, bear building load, form raft foundation, its good integrity can well be resisted uneven settlement of foundation.
Yet because the form of structure of reversed beam formula raft foundation causes its difficulty of construction bigger, conventional job practices is easy to cause the disturbance of bearing stratum undisturbed soil, causes hidden danger of quality or accidents such as bearing capacity of foundation soil decline or unequal settlement of building.Many house excessive differential settlement causal investigation analyses are learnt that belong to the inconsiderate person of design and account for 21%, the person accounts for 70% to belong to the construction problem, belongs to applying unit mismanagement person and accounts for 9% according to units concerned.This shows, although the reason that accident produces is many-sided, wherein improves and note construction quality, then is the important measures of avoiding accident to take place.
Summary of the invention
Technical problem to be solved by this invention provides a kind of job practices of reversed beam formula raft foundation, to the disturbance of bearing stratum undisturbed soil, guarantees bearing capacity of foundation soil in the time of can reducing the construction of reversed beam formula raft foundation, prevents building generation differential settlement.
For solving the problems of the technologies described above, the technical solution adopted in the present invention is: a kind of job practices of reversed beam formula raft foundation may further comprise the steps:
1) examine to the bearing stratum flat at foundation excavation;
2) according to reversed beam working drawing laying-down, the regional concreting bed course beyond reversed beam is not subjected to disturbance with the protection bearing stratum;
3) excavation reversed beam foundation trench, reversed beam foundation trench carry out after Gu Bi handles reinforcing bar, concreting being installed;
By above-mentioned steps, obtain reversed beam formula raft foundation.
The excavation of reversed beam groove be operated in blinding concrete reach design strength 75% after carry out.
The Gu Bi of reversed beam groove is treated at reversed beam groove sidewall and floor and adopts saturated brick building.
The job practices of a kind of reversed beam formula raft foundation provided by the invention, carry out the reversed beam excavating foundation trench again by carrying out cushion construction earlier, and the method that cooperates reversed beam foundation trench Gu Bi to handle, when having realized reducing the construction of reversed beam formula raft foundation to the disturbance of bearing stratum undisturbed soil, guarantee bearing capacity of foundation soil, prevent the problem of the differential settlement of buildings that causes because of construction quality.
The specific embodiment
Certain dwelling house has 4 layers, 6 layers, 9 layers, 11 layers four kinds building forms, and area does not wait from 98 ㎡-248 ㎡, all dwelling houses are full elevator garden foreign-style house, pure frame, one lift with two users plank frame, its geology major part is a collapsible loess, it is dark that overburden cover reaches 15-25 rice.If excavate collapsible loess, then engineering quantity will increase greatly, and in order to save construction costs, design side has adopted reversed beam formula raft foundation, has so both saved investment, can satisfy the ground design specifications again.But the conventional job practices of reversed beam formula raft foundation, the undisturbed soil of interference bearing stratum greatly.In this example,, dig to the underground 6m degree of depth and be the bearing stratum on raft foundation floor and examine flatly, can carry out reversed beam groove excavation by inspection according to log sheet.Before reversed beam groove excavation, carry out the construction lofting line, mark reversed beam groove zone in addition, at these regional concreting bed courses, former design has the 30cm blinding concrete, strength grade C15, treat blinding concrete reach design strength 75% after, carry out the excavation work of reversed beam groove again, saturated brick building all adopted on reversed beam groove sidewall and floor, and, also can be used as the bed course of reversed beam simultaneously as building the concrete template disposably and permanently of reversed beam.Adopt the reversed beam formula raft foundation of above-mentioned steps construction, both satisfied the structural requirement of design, guaranteed that also soil supporting layer is not subjected to the artificial perturbation, also do not increase construction investment.

Claims (3)

1. the job practices of a reversed beam formula raft foundation is characterized in that may further comprise the steps:
1) examine to the bearing stratum flat at foundation excavation;
2) according to reversed beam working drawing laying-down, the regional concreting bed course beyond reversed beam is not subjected to disturbance with the protection bearing stratum;
3) excavation reversed beam foundation trench, reversed beam foundation trench carry out after Gu Bi handles reinforcing bar, concreting being installed;
By above-mentioned steps, obtain reversed beam formula raft foundation.
2. the job practices of a kind of reversed beam formula raft foundation according to claim 1 is characterized in that: the excavation of reversed beam groove be operated in blinding concrete reach design strength 75% after carry out.
3. the job practices of a kind of reversed beam formula raft foundation according to claim 1 is characterized in that: the Gu Bi of reversed beam groove is treated at reversed beam groove sidewall and floor and adopts saturated brick building.
CN 201010506328 2010-10-14 2010-10-14 Method for constructing reversed beam type raft plate foundation Pending CN101942841A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010506328 CN101942841A (en) 2010-10-14 2010-10-14 Method for constructing reversed beam type raft plate foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010506328 CN101942841A (en) 2010-10-14 2010-10-14 Method for constructing reversed beam type raft plate foundation

Publications (1)

Publication Number Publication Date
CN101942841A true CN101942841A (en) 2011-01-12

Family

ID=43435027

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010506328 Pending CN101942841A (en) 2010-10-14 2010-10-14 Method for constructing reversed beam type raft plate foundation

Country Status (1)

Country Link
CN (1) CN101942841A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102493483A (en) * 2011-12-10 2012-06-13 杨峥雄 Printing coater foundation
CN106087944A (en) * 2016-08-23 2016-11-09 福州市第三建筑工程公司 A kind of earth construction being applied to soft soil foundation and construction method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1837514A (en) * 2006-04-17 2006-09-27 陈星� Column supported underground continuous wall
US20060260238A1 (en) * 2002-11-18 2006-11-23 SISTEMAS INDUSTRIALIZADOS BARCONS, S.L., Poligono Industrial Las Salinas de Levante Refinement to the construction systems for structures in reinforced concrete or some other material of high-precision intergral modular forms
CN1958966A (en) * 2006-07-20 2007-05-09 廖河山 Underground consecutive sinking well type openweb wall body, and construction method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060260238A1 (en) * 2002-11-18 2006-11-23 SISTEMAS INDUSTRIALIZADOS BARCONS, S.L., Poligono Industrial Las Salinas de Levante Refinement to the construction systems for structures in reinforced concrete or some other material of high-precision intergral modular forms
CN1837514A (en) * 2006-04-17 2006-09-27 陈星� Column supported underground continuous wall
CN1958966A (en) * 2006-07-20 2007-05-09 廖河山 Underground consecutive sinking well type openweb wall body, and construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《硅谷》 20101008 张胜明、晋良海 一种持力层免扰动的反梁式筏基的施工方法 138 1-3 , 第19期 2 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102493483A (en) * 2011-12-10 2012-06-13 杨峥雄 Printing coater foundation
CN106087944A (en) * 2016-08-23 2016-11-09 福州市第三建筑工程公司 A kind of earth construction being applied to soft soil foundation and construction method thereof

Similar Documents

Publication Publication Date Title
CN106088650B (en) A kind of method and building suitable for building with brick-concrete structure underground increasing layer
CN101509261B (en) Method for pile plate base for ultra-high voltage electric power line steel tower on soft foundation
CN104895089B (en) Basement floor and the construction method of the cooperative permanent support system of support pile
CN101614019A (en) The multilayer underground structure next to existing building self-supporting construction method
CN2916024Y (en) Anti-deformation high-voltage line tower in subsidence area
CN106245927B (en) A kind of method and building suitable for frame structure building underground increasing layer
CN201321616Y (en) Deep foundation pit supporting, reinforcing, anti-seepage and waterproof structure
CN203160254U (en) Pit support structure
CN212294747U (en) Pipe jacking well structure
CN106522572B (en) Large space underpass construction method is constructed in the historical protective buildings object confined space
CN101942841A (en) Method for constructing reversed beam type raft plate foundation
CN106498957A (en) Steel sheet pile cofferdam construction platform and integral construction method
CN105821887A (en) Installing method for stand column pile constructed in pebble bed
CN206667263U (en) A kind of foundation pit supporting construction
CN201901876U (en) Steel sheet pile inversely-constructed foundation ditch supporting structure
CN106759493A (en) A kind of underground space existing ground iron winds booth underpinning structure and nested configuration
CN204023600U (en) Pillar crane composite base structure
CN201943076U (en) Combined foundation pit supporting structure
CN205134330U (en) Foundation fit base plate trades and props structure in dark excavation supporting construction
CN100593052C (en) Open cut foundation pit supporting and protecting method
CN105442616A (en) Support replacing method for bottom plate of mucky soil layer foundation pit in deep foundation pit supporting construction
CN103614999B (en) A kind of method of clump of piles deep hole construction under complex geological condition
CN205134382U (en) A post -cast strip force transfer device for foundation fit base plate trades and props
CN111287198A (en) Supporting structure of soft soil foundation pit and construction method thereof
CN205907688U (en) Manual hole digging pile construction is with self - leveling back pressure device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20110112