CN1333139C - Column supported underground continuous wall - Google Patents
Column supported underground continuous wall Download PDFInfo
- Publication number
- CN1333139C CN1333139C CNB2006100350161A CN200610035016A CN1333139C CN 1333139 C CN1333139 C CN 1333139C CN B2006100350161 A CNB2006100350161 A CN B2006100350161A CN 200610035016 A CN200610035016 A CN 200610035016A CN 1333139 C CN1333139 C CN 1333139C
- Authority
- CN
- China
- Prior art keywords
- wall
- underground
- shallow
- basement
- supported
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
Description
技术领域technical field
本发明涉及一种建筑物地下连续墙,特别是涉及一种采用地下室逆作法施工的柱支式地下连续墙。The invention relates to an underground continuous wall of a building, in particular to a pillar-supported underground continuous wall constructed by a basement upside-down method.
背景技术Background technique
建筑物地下连续墙是一种应用于逆作法地下室结构施工的一种挡水挡土结构的基坑支护体系,由于它具有整体刚度大和防渗性能好的特点是地下室逆作法数种基坑支护技术中最常用的一种。The underground diaphragm wall of a building is a kind of foundation pit support system of a water-retaining and soil-retaining structure applied to the construction of the basement structure in the reverse method. One of the most commonly used support techniques.
在现有技术中,高层建筑多层地下室和其他多层地下结构常采用逆作法施工,即利用地下室的楼盖结构,包括梁、板、柱等和外墙结构作为基坑围护结构的水平支撑体系和围护体系,逆作法以基准层为界,基准层以下各层地下室自上而下施工,基准层以上各层可以同时自下而上施工,故称为逆作法。由于地下室逆作法须要确保由上至下建造的地下室具有足够的水平刚度,基坑变形甚少,因此,需要采用连续墙作为施工时由地面往下设置于不良土层挡土用的基坑支护体系。In the prior art, the multi-storey basements of high-rise buildings and other multi-storey underground structures are often constructed using the reverse construction method, that is, the floor structure of the basement, including beams, plates, columns, etc., and external wall structures are used as the level of the foundation pit enclosure structure. For the support system and the enclosure system, the base layer is used as the boundary in the reverse method, and the basement of each layer below the base layer is constructed from top to bottom, and the layers above the base layer can be constructed from bottom to top at the same time, so it is called the reverse method. Since the basement upside-down method needs to ensure that the basement built from top to bottom has sufficient horizontal rigidity and the deformation of the foundation pit is small, it is necessary to use a diaphragm wall as the foundation pit support for retaining soil in poor soil layers from the ground down during construction. protection system.
地下连续墙需要使用专用设备沿着深基础或地下构筑周边采用泥浆护壁开挖出一条具有一定宽度、厚度与深度的沟槽,其厚度达0.6米~1.2米,深度达十几米~几十米不等,根据建筑物的设计要求和地质情况来确定。在槽内设置钢筋笼,采用导管法在泥浆中浇筑混凝土,筑成数米宽的单元墙段,依次顺序施工,以某种接头方法将单元墙段连接成的一道连续的地下钢筋混凝土墙,以便基坑开挖时防渗、挡土,作为邻近建筑物基础的支护以及直接成为承受直接荷载的基础结构的一部分,通常地下连续墙要施工到比地下室底板深2米以上的岩层内。其不足之处是:The underground diaphragm wall needs to use special equipment to excavate a trench with a certain width, thickness and depth along the deep foundation or the surrounding of the underground structure with a mud retaining wall. It is determined according to the design requirements of the building and the geological conditions. A reinforcement cage is set in the groove, concrete is poured in the mud by the conduit method, and a unit wall section several meters wide is built, and the construction is performed sequentially, and a continuous underground reinforced concrete wall is formed by connecting the unit wall sections by a certain joint method, In order to prevent seepage and retain soil during the excavation of the foundation pit, as a support for the foundation of adjacent buildings and directly become a part of the foundation structure bearing direct loads, the underground diaphragm wall is usually constructed into the rock layer more than 2 meters deeper than the basement floor. Its disadvantages are:
(1)由于地下连续墙施工需要大型专用机械,槽段一般采用钻、冲孔成形,泥浆护壁,施工费用的成本较高。(1) Since the construction of the underground diaphragm wall requires large-scale special machinery, the groove section is generally formed by drilling and punching, and the wall is protected by mud, so the construction cost is relatively high.
(2)连续墙在坚硬土层及岩层中开挖成槽较困难,特别是岩层埋藏较浅即地质条件较好时,而又是多层地下室的情况下,入岩的增加费用很大,工程造价增加较大。(2) It is difficult for the diaphragm wall to excavate into grooves in hard soil and rock layers, especially when the rock layers are buried shallowly, that is, when the geological conditions are good, and in the case of a multi-layer basement, the increased cost of entering the rock is very large. The project cost increased greatly.
(3)由于地下连续墙和逆作法技术的紧密联系,连续墙的成本高直接影响地下室逆作法技术的应用和推广,如何在确保基坑工程的安全又可缩短工期,同时又能控制工程造价,已成为影响逆作法技术发展的关键问题。(3) Due to the close connection between the underground diaphragm wall and the reverse method technology, the high cost of the diaphragm wall directly affects the application and promotion of the basement reverse method technology. How to ensure the safety of the foundation pit project can shorten the construction period and at the same time control the project cost , has become a key issue affecting the development of reverse technology.
发明内容Contents of the invention
本发明的目的在于提供一种在确保基坑工程的安全情况下既可缩短工期又能控制工程造价的柱支式地下连续墙。The object of the present invention is to provide a pillar-supported underground continuous wall which can shorten the construction period and control the construction cost under the condition of ensuring the safety of the foundation pit project.
本发明是一种采用地下室逆作法施工的柱支式地下连续墙,包括沿地下室周边设置的地下墙体,其特征是所述的地下墙体由浅墙体和深墙体组成,所述的浅墙体位于地下连续墙的上部,具有普通地下连续墙墙体结构,沿地下室周边形成闭合式墙体,用于地下室逆作法施工时的挡土、挡水、抗渗;所述深墙体位于浅墙体的下方,以间断方式设置柱支式嵌岩段的柱支墙体,用于支撑浅墙段和作为地下室楼板竖向支承结构构件,可有效控制地下连续墙上部结构的竖向变形。由于浅墙体减少了地下连续墙的高度,深墙体柱支墙体减少了造价高、难度大的地下连续墙入岩墙段的数量,从而可大大缩短工期和降低成本(参见图2、3)。The present invention is a pillar-supported underground continuous wall constructed by the upside-down method of the basement, which includes an underground wall arranged along the periphery of the basement. The wall is located on the upper part of the underground diaphragm wall, and has a common underground diaphragm wall structure, forming a closed wall along the periphery of the basement, which is used for retaining soil, retaining water, and impermeability during the reverse construction of the basement; the deep wall is located at Under the shallow wall, the column-supported rock-socketed section of the column-supported wall is set intermittently, which is used to support the shallow wall section and as a vertical supporting structural member of the basement floor, which can effectively control the vertical deformation of the upper structure of the underground continuous wall . Because the shallow wall reduces the height of the underground diaphragm wall, the deep wall pillar wall reduces the number of expensive and difficult underground diaphragm walls entering the rock wall, thereby greatly shortening the construction period and reducing costs (see Figure 2, 3).
本发明将地下连续墙分为浅墙体和深墙体两部分,在不良土体部位的浅墙体仍采用已有的地下连续墙结构,而在地质条件良好部位的深墙体则不再采用现有技术中的连续墙结构,而是采用了间断墙结构,这一技术方案是建立在地下室逆作法所具有的两大特点的基础上实现的。所述的两大特点是:(1)有土拱效应的存在;(2)逆作法地下连续墙的内撑得到保障,即地下连续墙、楼面梁、板以及柱形成的整体结构,利用其侧向刚度,对基坑侧向土压力起到一个较强的固定水平支撑效果。经过系统详尽地对本发明技术及概念进行大量的有限元数值仿真分析及监测数据验证和实际工程应用实践,证实了本发明的可行性。In the present invention, the underground diaphragm wall is divided into shallow wall and deep wall. The shallow wall at the position of unfavorable soil still adopts the existing underground diaphragm wall structure, while the deep wall at the position with good geological conditions is no longer The continuous wall structure in the prior art is adopted, but the discontinuous wall structure is adopted. This technical solution is realized on the basis of two major characteristics of the basement upside-down method. The two major features mentioned are: (1) the existence of the soil arch effect; (2) the internal support of the underground diaphragm wall is guaranteed in the reverse method, that is, the overall structure formed by the underground diaphragm wall, floor beams, slabs and columns, utilizes Its lateral stiffness has a strong fixed horizontal support effect on the lateral earth pressure of the foundation pit. The feasibility of the present invention is verified by systematically and exhaustively carrying out a large amount of finite element numerical simulation analysis, monitoring data verification and actual engineering application practice on the technology and concept of the present invention.
在地下室逆作法施工时,最先施工的是地下室四周的地下连续墙,同时在建筑物内部的有关位置(柱子或隔墙相交处等,根据需要计算确定)浇筑或打下中间支承桩和柱作为施工期间在底板封底之前承受上部结构自重和施下荷载的支撑,地下连续墙和桩柱完工后才自上而下地逐层进行基坑开挖和楼面梁、板的施工。先施工基准层的梁板楼面结构,形成四周的地下连续墙上部的第一道水平支撑,楼面结构的巨大水平刚度成为地下连续墙很大的支撑,随后利用地下连续墙挡土,逐层向下开挖土方和浇筑各层地下结构直至底板封底。在这个施工过程中,无论是否对地下连续墙加设临时水平支撑以平衡作用于地下连续墙上的土压力,在每完成一层楼盖梁板时,都会使地下连续墙形成多一道水平支撑,使得地下连续墙的内撑得到保障,即地下连续墙、楼面梁、板以及桩柱形成了一个刚度巨大的整体空间结构,可以对作用于地下连续墙上的侧向土压力起到一个较强的固定水平支撑效果。In the reverse construction of the basement, the first construction is the underground continuous wall around the basement, and at the same time, pour or lay down the intermediate support piles and columns at the relevant positions inside the building (the intersection of columns or partition walls, etc., calculated according to needs) During the construction period, before the base plate is sealed, it bears the self-weight of the upper structure and the support of the applied load. After the underground diaphragm wall and piles are completed, the excavation of the foundation pit and the construction of floor beams and slabs are carried out layer by layer from top to bottom. The beam-slab floor structure of the reference floor is constructed first to form the first horizontal support on the upper part of the surrounding underground diaphragm wall. The huge horizontal rigidity of the floor structure becomes a great support for the underground diaphragm wall. Excavate the earthwork layer by layer and pour the underground structure of each layer until the bottom plate is sealed. In this construction process, no matter whether temporary horizontal support is added to the underground diaphragm wall to balance the earth pressure acting on the underground diaphragm wall, every time a floor beam slab is completed, an additional horizontal support will be formed on the underground diaphragm wall , so that the internal support of the underground diaphragm wall is guaranteed, that is, the underground diaphragm wall, floor beams, slabs and piles form an overall space structure with huge rigidity, which can play a role in the lateral earth pressure acting on the underground diaphragm wall. Strong fixed horizontal support effect.
尽管每一个建筑施工的地质情况都不尽相同,但一般建筑施工的地质条件无外乎就包括两部分土体,一部分土体是位于地表上部的不良土体,含水透水性较强,土质疏松,代表土体稳定性的内摩擦角α(参见图1)较小,当以敞开方式进行基坑开挖时,容易造成土体滑坡,滑坡的角度与该土体的内摩擦角α相吻合。杂填土层、淤泥层、砂层、可塑粉质粘土层等均属于不良土体。另一部分土体为位于不良土体下方的良好土体,土(岩)质密实,强度硬度较高,透水性差甚至不透水,内摩擦角α较大,一般是强风化至中风化岩层和微风化岩层。不同地区的不良土体的深度会有所不同,根据我国南北地质差异情况来看,南、北方不良土体的深度差异可达二十~三十米之多,南方不良土体的深度较小,北方不良土体的深度较大。Although the geological conditions of each building construction are different, the geological conditions of general building construction include two parts of soil. One part of the soil is unfavorable soil located on the upper part of the ground, with strong water permeability and loose soil. , the internal friction angle α representing the stability of the soil (see Figure 1) is small, and when the foundation pit is excavated in an open manner, it is easy to cause soil landslides, and the angle of the landslide coincides with the internal friction angle α of the soil . Miscellaneous fill soil layers, silt layers, sand layers, plastic silty clay layers, etc. all belong to unfavorable soil bodies. The other part of the soil is good soil located under the bad soil. The soil (rock) is dense, high in strength and hardness, poor in water permeability or even impervious to water, and the internal friction angle α is relatively large. rock formations. The depth of unfavorable soil in different regions will be different. According to the geological differences between the north and the south of my country, the depth difference of unfavorable soil in the south and north can reach as much as 20 to 30 meters, and the depth of unfavorable soil in the south is smaller , the depth of unfavorable soil in the north is greater.
在地下室逆作法施工时,位于基坑上部的不良土体,由于有地下连续墙与楼面梁板、桩柱等形成的地下室整体结构,其刚度是巨大的,足以阻挡土层产生的滑移。因此,不良土体部位的基坑侧壁的滑移破坏是几乎不存在的。而在较好的土(岩)层部位继续向下开挖时,未开挖的下方土体作为裸露出来的基坑土体的支承点,而刚性体式的上部地下室则作为基坑上支承点,上下支撑后会在开挖面土体内形成土拱效应(参见图4),使得作用于该部位围护结构上的土压力合力较小,可以起到阻止无支撑的土体滑移、隆起的作用。在适宜的高度范围内采用本技术,可合理地利用较好土层本身的物理特性来达到自身稳定的效果,对该部位的挡土要求就能够大大降低,如果进入的是未风化或微风化岩层,甚至可以不必考虑挡土要求,再加上进入不透水土(岩)层后也不需有止水要求,在该部位的地下连续墙实际上只起承重的作用,所以,就无需所有墙段均嵌固入坚硬土层,只需以一定的间距设置柱支墙体,即可实现其承重和竖向支撑构件的作用,从而使在该部位省去大部分常规挡土墙构件成为可能。In the reverse construction of the basement, the unfavorable soil located on the upper part of the foundation pit has a huge rigidity due to the overall structure of the basement formed by the underground continuous wall, floor beams, piles, etc., which is sufficient to prevent the slippage of the soil layer . Therefore, the sliding damage of the side wall of the foundation pit in the unfavorable soil position is almost non-existent. And when the better soil (rock) layer continues to excavate downward, the unexcavated lower soil is used as the supporting point of the exposed foundation pit soil, and the upper basement of the rigid body is used as the upper supporting point of the foundation pit. , after being supported up and down, a soil arch effect will be formed in the soil body of the excavation surface (see Figure 4), so that the resultant force of earth pressure acting on the enclosure structure at this position is small, which can prevent the unsupported soil body from slipping and uplifting role. Using this technology within a suitable height range can reasonably use the physical properties of the better soil layer itself to achieve its own stabilization effect, and the requirements for retaining soil on this part can be greatly reduced. If the entry is unweathered or slightly weathered The rock strata may not even need to consider the soil retaining requirements, and after entering the impermeable soil (rock) layer, there is no need for water stop requirements. The underground diaphragm wall at this position actually only plays a load-bearing role, so there is no need for all The wall sections are all embedded in the hard soil layer, and only need to set the pillars at a certain distance to support the wall, so that the load-bearing and vertical support components can be realized, so that most of the conventional retaining wall components can be omitted in this position. possible.
本发明所述的浅墙体高度以实际地质中不良土体的深度为准,其高度应足以覆盖全部不良土体层,以保证浅墙段能充分起到挡水、挡土的作用。The height of the shallow wall in the present invention is based on the depth of the unfavorable soil in actual geology, and its height should be sufficient to cover all unfavorable soil layers, so as to ensure that the shallow wall section can fully play the role of retaining water and soil.
本发明所述的浅墙段最好能伸入到不良土体最大深度处的地下室楼盖标高之下,以利于保证支护体系的稳固。The shallow wall section of the present invention is preferably able to extend below the basement floor elevation at the maximum depth of the unfavorable soil body, so as to ensure the stability of the support system.
本发明所述的深墙段的高度为浅墙段以下至基坑底板以下岩层处,浅墙段和深墙段分界处宜设在地下室楼盖标高处以下的300~1500mm的范围内,优选范围是400~1000mm。The height of the deep wall section according to the present invention is from below the shallow wall section to the rock formation below the foundation pit floor, and the boundary between the shallow wall section and the deep wall section should be set within the range of 300-1500mm below the elevation of the basement floor, preferably The range is 400-1000mm.
本发明可以做以下的改进:在所述深墙体部分,每相邻的两个柱支墙体之间的间距在10~30米的范围内;优选范围是15~20米。The present invention can make the following improvements: in the deep wall part, the distance between every two adjacent pillar walls is in the range of 10-30 meters; the preferred range is 15-20 meters.
本发明可以做以下的改进:由于本发明深墙体的间断式柱支墙体,使浅墙体在深墙体的两柱支墙体之间的墙段成为悬空墙段,而浅墙体是将整个地下连续墙分多个单元宽度逐个施工成型而构成,每个单元墙体之间一般采用工字型钢或者类似的构件纵向接合,因此,为加强地下连续墙的横向强度,可将所述地下连续墙与地下室墙壁结合成一个整体,地下室墙壁简称为内壁墙,利用逐层施工而成的内壁墙所具有的横向钢筋结构提高地下连续墙悬空墙段的横向强度。具体技术措施是在所述地下连续墙内面上预埋多个用于连接内壁墙的钢筋,所述内壁墙紧贴地下连续墙成型,所述地下连续墙预埋的钢筋一部分伸入内壁墙中,在内壁墙浇注成型时被固定在其中,从而使两个墙体结合为一个整体。The present invention can be improved as follows: due to the discontinuous column-supported wall of the deep wall of the present invention, the wall section between the two column-supported walls of the shallow wall becomes a suspended wall section, and the shallow wall The entire underground diaphragm wall is formed by dividing the entire underground diaphragm wall into multiple unit widths, and the walls of each unit are generally joined longitudinally by I-shaped steel or similar components. Therefore, in order to strengthen the transverse strength of the underground diaphragm wall, all The underground diaphragm wall and the basement wall are combined into a whole. The basement wall is referred to as the inner wall for short. The transverse reinforcement structure of the inner wall constructed layer by layer is used to improve the transverse strength of the suspended wall section of the underground diaphragm wall. The specific technical measure is to pre-embed a plurality of steel bars used to connect the inner wall on the inner surface of the underground diaphragm wall, the inner wall is formed close to the underground diaphragm wall, and a part of the pre-embedded steel bars of the underground diaphragm wall extends into the inner wall , is fixed in it when the inner wall is poured, so that the two walls are combined into a whole.
本发明还可以进一步将首层圈梁安装于地下连续墙的浅墙体段的顶端,浅墙体顶端设有纵向钢筋,与首层圈梁相连,利用圈梁的横向强度来提高浅墙体的横向强度;其余的每层圈梁都嵌于地下连续墙内壁墙中一并浇灌成完整牢固的一体,使结合成一体的浅墙体悬空墙段与内壁墙成为连续深梁,进一步加强地下连续墙浅墙体悬空墙段的结构强度。The present invention can further install the first-floor ring beam on the top of the shallow wall section of the underground continuous wall, and the top of the shallow wall is provided with longitudinal steel bars, which are connected with the first-floor ring beam, and the transverse strength of the ring beam is used to improve the shallow wall. The other ring beams of each layer are embedded in the inner wall of the underground diaphragm wall and poured together to form a complete and firm one, so that the combined shallow wall suspended wall section and the inner wall become a continuous deep beam, further strengthening the underground The structural strength of the suspended wall section of the shallow wall body of the diaphragm wall.
本发明所述的地下连续墙在所有与楼面框架梁连接处,预埋PVC管,以便后工序凿开与框架梁连接,预埋件与横梁的钢筋笼固定牢固,可使楼面框架梁与地下连续墙刚性连接,改去以往使用钢梁盒预埋件的老方法,可以节省大量的钢材、简化工序。In the underground continuous wall according to the present invention, PVC pipes are pre-embedded at all joints with the floor frame beams so that the subsequent process can be cut open to connect with the frame beams. Rigid connection with the underground diaphragm wall, instead of the old method of using steel beam box embedded parts, can save a lot of steel and simplify the process.
本发明还可以做进一步的改进:在所述的深墙体相邻两个柱支墙体之间设置喷锚支护组合构件,即在地质条件良好时,利用上层支撑与开挖面土体间可形成有利的土拱效应,在每两个嵌入底板以下岩层的柱支墙段之间的基坑侧壁做喷锚支护,包括用锚杆或土钉固定将金属网在基坑侧壁上及喷射混凝土,形成具有一定挡土作用的薄墙结构。可在超过10米深的深层地下室基坑侧壁中应用,在超深基坑的逆作法施工中节省大量投资。The present invention can also be further improved: a spray-anchor support composite member is arranged between the two adjacent pillar walls of the deep wall, that is, when the geological conditions are good, the upper support and the excavation surface soil A favorable soil arch effect can be formed between the holes, and the side wall of the foundation pit between every two pillar wall sections embedded in the rock layer below the bottom plate is sprayed and anchored, including fixing the metal mesh on the side of the foundation pit with anchor rods or soil nails The wall and sprayed concrete form a thin wall structure with a certain soil retaining effect. It can be applied to the side walls of deep basement pits with a depth of more than 10 meters, and can save a lot of investment in the reverse construction of ultra-deep foundation pits.
本发明与现有技术相比,存在以下优点:Compared with the prior art, the present invention has the following advantages:
1,本发明采用包括浅墙体和深墙体结构的柱支式地下连续墙作为基坑围护构件,浅墙体应用常规的地下连续墙技术,结合深墙体的间隔设置的柱支式墙体,利用良好的土拱作用以及地下连续墙上部所具有的近似刚体的水平支撑的共同作用,既保证下层土体自身稳定的效果,又有效地减少了连续墙的深度和减少造价高、难度大的地下连续墙入岩墙段的数量,减少量达20%~40%,从而减少了材料用量和围护措施,缩短施工工期,大大降低了工程成本。1. The present invention adopts a column-supported underground diaphragm wall including shallow wall and deep wall structure as foundation pit enclosure components, and the shallow wall applies conventional underground diaphragm wall technology, combined with the column-supported underground diaphragm wall arranged at intervals of the deep wall. The wall, using the good soil arch effect and the similar rigid horizontal support on the upper part of the underground diaphragm wall, not only ensures the stability of the lower soil itself, but also effectively reduces the depth of the diaphragm wall and reduces the high cost, The quantity of the difficult underground diaphragm wall entering the rock wall is reduced by 20% to 40%, thereby reducing the amount of materials and enclosure measures, shortening the construction period, and greatly reducing the project cost.
2,本发明可将地下连续墙与地下室墙壁结合成一个整体,既加强了地下连续墙浅墙体悬空墙段的横向强度,又节省单独设立的围护墙,并可在用地范围内最大限度地扩大地下室有效使用面积;2. The present invention can combine the underground diaphragm wall and the basement wall into a whole, which not only strengthens the lateral strength of the suspended wall section of the shallow wall of the underground diaphragm wall, but also saves the separately established enclosure wall, and can maximize the space within the scope of land use. Greatly expand the effective use area of the basement;
3,本发明将首层或者每层圈梁和浅墙体悬空墙段处的内壁墙一并浇灌完整牢固结合为一体,设计上可以把柱支墙段看作悬吊墙体的支座,悬空墙段与内壁墙结合一体成为连续深梁,再由垂直方向的梁柱和锚杆来支撑,构成一个稳定的空间框架体系,很好地解决了单纯采用地下连续墙作基坑支护造价高的问题;3. In the present invention, the ring beams on the first floor or each floor and the inner wall at the suspended wall section of the shallow wall are poured together and integrated firmly. In design, the column-supported wall section can be regarded as the support of the suspended wall. The suspended wall section and the inner wall are combined to form a continuous deep beam, which is then supported by vertical beams and anchors to form a stable space frame system, which solves the problem of simply using the underground continuous wall as foundation pit support. high problem
4,本发明将地下连续墙结合喷锚支护组合构件,以较低的成本实现在深墙体间断空间处的挡土作用,可在超过10米深的深层地下室基坑侧壁中应用,在超深基坑的逆作法施工中节省大量投资。4. The present invention combines the underground diaphragm wall with the sprayed-anchor support composite component to realize the soil retaining effect at the discontinuous space of the deep wall at a lower cost, and can be applied to the side wall of the deep basement pit more than 10 meters deep. It saves a lot of investment in the reverse construction of ultra-deep foundation pit.
5,本发明主要用于三层以上地下室的设计和施工,已成功地运用于多个高层(超高层)建筑深基坑工程,得到了显著的经济效益,对深基坑逆作法设计及施工技术的发展及完善深基坑土体及结构受力机理的研究有重大的学术意义,而且在工程实践中有广泛的应用前景。5. The present invention is mainly used in the design and construction of basements with more than three floors. It has been successfully applied to deep foundation pit projects of many high-rise (super high-rise) buildings, and has obtained remarkable economic benefits. The reverse method design and construction of deep foundation pits The development of technology and the improvement of the research on the mechanism of deep foundation pit soil and structure have great academic significance, and have broad application prospects in engineering practice.
附图说明Description of drawings
图1为有水平支撑的地下连续墙的土压力示意图;Fig. 1 is the earth pressure schematic diagram of the underground diaphragm wall with horizontal support;
图2为本发明的实施例1的地下连续墙的俯视结构示意图;Fig. 2 is the top view structure schematic diagram of the underground continuous wall of embodiment 1 of the present invention;
图3为图2所示的地下连续墙与楼盖、梁、柱结合的地下室整体结构的1/4局部立体结构示意图;Fig. 3 is a 1/4 partial three-dimensional structural schematic diagram of the basement overall structure in which the underground diaphragm wall shown in Fig. 2 is combined with the floor covering, beams and columns;
图4为图2所示的地下连续墙与梁结合的1/4局部立体结构示意图;Fig. 4 is a 1/4 partial three-dimensional structural schematic diagram of the combination of the underground diaphragm wall and the beam shown in Fig. 2;
图5为本发明的实施例1显示下层土拱作用的地下室结构示意主视图;Fig. 5 is the schematic front view of the basement structure showing the arching action of the lower layer of soil in Embodiment 1 of the present invention;
图6为本发明的实施例2的地下室结构示意主视图;Fig. 6 is a schematic front view of the basement structure of
图7为图6所示的地下连续墙去掉负二层楼盖和内壁墙的立体结构图;Fig. 7 removes the three-dimensional structural diagram of the negative second floor floor and the inner wall for the underground diaphragm wall shown in Fig. 6;
图8为本发明的实施例2的地下连续墙与内壁墙连接的俯视结构示意图;Fig. 8 is a top view structural diagram of the connection between the underground diaphragm wall and the inner wall according to
图9为本发明的实施例2的地下连续墙与内壁墙连接的主视结构示意图;Fig. 9 is a schematic diagram of the front view of the connection between the underground diaphragm wall and the inner wall according to
图10为本发明的实施例2的地下连续墙与圈梁和楼面梁板连接的结构示意图。Fig. 10 is a schematic diagram of the connection between the underground continuous wall and the ring beam and the floor beam slab according to
具体实施方式Detailed ways
实施例1Example 1
如图2~5所示的一种采用地下室逆作法施工的柱支式地下连续墙是本发明实施例之一,包括沿地下室周边设置的地下墙体,其特征是所述的地下墙体由浅墙体11和深墙体12组成,所述的浅墙体11位于地下连续墙1的上部,具有普通地下连续墙墙体结构,沿地下室周边形成闭合式墙体,覆盖全部不良土体A,用于地下室逆作法施工时的挡土、挡水、抗渗。浅墙体与楼盖4、梁5及柱3结合构成的地下室上部结构,具有巨大的侧向刚度,所受的侧向土压力位移较小,可视作为土体的固定水平支撑。As shown in Figures 2 to 5, a pillar-supported underground continuous wall constructed by the reverse construction method of the basement is one of the embodiments of the present invention, which includes an underground wall arranged along the periphery of the basement, and is characterized in that the underground wall consists of shallow The
所述深墙体12从浅墙体的下方下伸至嵌岩,利用已完成的地下室上部结构作为上支座,坑底坚硬土(岩)作为下支座,在侧向土压力的作用下,形成土拱效应C而保证自身稳定,从而可省去此部分的挡水、挡土结构,以间断方式设置柱支式嵌岩段的柱支墙体,每相邻的两个柱支墙体之间的间距为18米,用于在地质条件良好的基坑土层部位B的支护,起支撑浅墙体11和作为地下室楼板竖向支承结构构件,有效控制地下连续墙上部结构的竖向变形。The
实施例2Example 2
如图6~10所示的柱支式地下连续墙是本发明的实施例之二,与上例不同的是,在地下连续墙深墙体12相邻的两个柱支墙体之间的间距为20米,在该间距中设置喷锚支护组合构件2,即在相邻的柱支墙体之间改用喷锚支护,即用土钉21将金属网固定在基坑侧壁上再喷射混凝土,形成具有一定挡土作用的薄墙结构。另外,还在浅墙体下部打入锚杆22,以进一步加强浅墙体的水平支撑。The column-supported underground diaphragm wall shown in Figures 6 to 10 is the second embodiment of the present invention. The difference from the previous example is that between two column-supported walls adjacent to the
如图6、8、9所示,地下连续墙浅墙体是将整个地下连续墙分多个单元宽度逐个施工成型而构成,每个单元墙体之间一般采用工字型钢13相接合,每个单元墙中均有钢桁架14和横向、竖向筋15和16。地下连续墙1与内壁墙6结合成一个整体,所述的内壁墙6紧贴着地下连续墙成型,其高度从浅墙体11顶端一直到深墙体12底端,内壁墙内设置同样设置有横向、竖向筋61和62,所不同的是横向筋61是连贯于整个墙体。内壁墙6在浅墙体11部位厚度较小,至深墙体12部位时,两个柱支墙体之间的浅墙体悬空墙体的下方,内壁墙6也紧贴着喷锚支护层成型,填满浅墙体悬空墙体下方的空间。As shown in Figures 6, 8, and 9, the shallow wall of the underground diaphragm wall is formed by dividing the entire underground diaphragm wall into multiple unit widths and constructing them one by one. The walls of each unit are generally joined by I-shaped steel 13. Steel trusses 14 and transverse and vertical ribs 15 and 16 are all arranged in each unit wall. The underground diaphragm wall 1 and the
如图9所示,在所述地下连续墙1内面上预埋许多用于连接内壁墙6的连接钢筋7,连接钢筋由一段钢筋构成,它以中间一小段为平直预埋段71预埋入浅墙体11中,预埋段两端向浅墙体内表面方向交叉折叠,在进行内壁墙施工时将该折叠两端72拉出以“×”的方式伸入至内壁墙区域内,在内壁墙浇筑成型时被固定在其中,内壁墙紧贴地下连续墙成型,在连接钢筋7的作用下使两个墙体结合为一个整体。内壁墙中设置有完整的竖向筋和横向钢筋,可提高浅墙体悬空墙段的横向强度。As shown in Figure 9, on the inner surface of the underground diaphragm wall 1, many connecting steel bars 7 for connecting the
如图6、7、10所示,地下室首层圈梁51a安装于地下连续墙的浅墙体段的顶端,浅墙体顶端设有纵向钢筋,与首层圈梁相连,利用圈梁的横向强度来提高浅墙体的横向强度;其余的每层圈梁51b都嵌于地下连续墙悬空墙段处内壁墙中一并浇灌成完整牢固的一体,使结合成一体的浅墙体悬空墙段与内壁墙成为连续深梁。As shown in Figures 6, 7, and 10, the
所述的地下连续墙在所有与楼面框架梁连接处,预埋PVC管和加强钢筋,以便凿出连接缺口,并使框架梁钢筋52伸入,可使楼面框架梁与地下连续墙刚性连接,改去以往使用钢梁盒预埋件的老方法,可以节省大量的钢材、简化工序。The underground diaphragm wall is pre-embedded with PVC pipes and reinforced steel bars at all joints with the floor frame beams, so that connection gaps are cut out, and the frame beam steel bars 52 are stretched in, which can make the floor frame beams and the underground diaphragm wall rigid. Connection, instead of the old method of using steel beam box embedded parts, can save a lot of steel and simplify the process.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNB2006100350161A CN1333139C (en) | 2006-04-17 | 2006-04-17 | Column supported underground continuous wall |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNB2006100350161A CN1333139C (en) | 2006-04-17 | 2006-04-17 | Column supported underground continuous wall |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN1837514A CN1837514A (en) | 2006-09-27 |
| CN1333139C true CN1333139C (en) | 2007-08-22 |
Family
ID=37015011
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CNB2006100350161A Expired - Fee Related CN1333139C (en) | 2006-04-17 | 2006-04-17 | Column supported underground continuous wall |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN1333139C (en) |
Families Citing this family (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101942841A (en) * | 2010-10-14 | 2011-01-12 | 中国长江三峡集团公司 | Method for constructing reversed beam type raft plate foundation |
| CN102619343B (en) * | 2012-04-14 | 2015-02-04 | 中南大学 | Reverse displacement and construction method of existing building cover |
| CN102733420B (en) * | 2012-07-13 | 2014-06-18 | 中建八局第三建设有限公司 | Pre-stage bottom plate construction method for enhancing protection on steel-bar joints in stage construction of basements |
| CN105756075A (en) * | 2016-02-29 | 2016-07-13 | 山东电力工程咨询院有限公司 | Horizontal bearing combined foundation based on piles and underground continuous wall and method |
| CN106120853B (en) * | 2016-06-30 | 2018-05-22 | 中铁第四勘察设计院集团有限公司 | A kind of inverted construction method of frame bridge |
| CN111720165A (en) * | 2020-06-28 | 2020-09-29 | 重庆大学 | A flexible roadway protection method for gob-side entry retention in large dip angle coal seams |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH02266015A (en) * | 1989-04-03 | 1990-10-30 | Takenaka Komuten Co Ltd | Constructing underground continuous wall |
| CN1180118A (en) * | 1997-05-15 | 1998-04-29 | 李宪奎 | Construction method for building foundation pit stope support |
| JPH116164A (en) * | 1997-06-17 | 1999-01-12 | Shimizu Corp | Underground structure construction method |
-
2006
- 2006-04-17 CN CNB2006100350161A patent/CN1333139C/en not_active Expired - Fee Related
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH02266015A (en) * | 1989-04-03 | 1990-10-30 | Takenaka Komuten Co Ltd | Constructing underground continuous wall |
| CN1180118A (en) * | 1997-05-15 | 1998-04-29 | 李宪奎 | Construction method for building foundation pit stope support |
| JPH116164A (en) * | 1997-06-17 | 1999-01-12 | Shimizu Corp | Underground structure construction method |
Also Published As
| Publication number | Publication date |
|---|---|
| CN1837514A (en) | 2006-09-27 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104264688B (en) | Manually digging hole non-uniform pile support construction process | |
| CN101914925B (en) | Basement by using optimized composite prefabricated arch wall as external wall | |
| CN104018518B (en) | The method of prefabricated diaphragm wall and construction outer wall of basement and floor | |
| CN101418569B (en) | Optimized composite arch wall with combination of prefabricated arch, support and main structure | |
| CN102966119B (en) | Geogrid reinforced wall and construction method thereof | |
| CN205742213U (en) | Foundation pit supporting construction | |
| KR101960413B1 (en) | Structure construction method | |
| CN102966108A (en) | Construction method of deep foundation pit close to building and adopting underground structure as internal support | |
| CN103938634B (en) | A kind of deep foundation pit supporting structure and construction method | |
| CN105178327A (en) | Composite retaining structure of foundation pit project and construction method thereof | |
| CN101139839A (en) | Setting structure of ultra-deep foundation pit in high confined water area | |
| CN104452829A (en) | Piled raft foundation anti-floating structure and construction method | |
| CN110004991A (en) | Underground structure anti-floating system and construction method based on raised type tangs plate | |
| CN207092107U (en) | A kind of anti-subsidence structure using diaphram wall | |
| CN102116030A (en) | Combined bracing structure for foundation pit and construction method thereof | |
| CN104652444A (en) | Construction method for overall reverse operation of ultra-large type deep foundation pit center island type alternative earth excavation | |
| CN105040707A (en) | Combined densely-arrayed pile deep foundation pit supporting and enclosure structure used as basement external wall | |
| CN104727324B (en) | Irregular basement construction method for supporting | |
| CN204940298U (en) | A kind of Composite Enclosure Structure of base pit engineering | |
| CN212642730U (en) | Collapsible loess area tunnel passes people's air defense structure | |
| CN204311456U (en) | Foundation ditch strengthening structure | |
| CN110939139B (en) | Pile-sheet wall structure and construction method based on rigid contact of special-shaped retaining wall behind piles | |
| CN111877358B (en) | A support structure, building and construction method for a foundation pit with upper soil layer and lower soft rock | |
| CN107143149A (en) | A kind of existing masonry structure building sets up the construction method of basement | |
| CN105133645B (en) | The shaft main body structure of built-in lattice column and inverse make formula construction method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| EE01 | Entry into force of recordation of patent licensing contract |
Assignee: ARCHITECTURAL DESIGN Research Institute OF GUANGDONG PROVINCE Assignor: Cai Jian|Luo Chiyu|Sun Lijun|Ma Tianzhou|Ye Qunying|Lin Puqiang|Chen Xing|Xiang Qian|Chen Zongbi|Wu Jianying|Xu Jing|He Jinchao|Wang Jinfeng|Mo Haihong|Chen Ying Contract fulfillment period: 2007.10.18 to 2012.10.18 Contract record no.: 2009440000253 Denomination of invention: Column supported underground continuous wall Granted publication date: 20070822 License type: Exclusive license Record date: 20090414 |
|
| LIC | Patent licence contract for exploitation submitted for record |
Free format text: EXCLUSIVE LICENSE; TIME LIMIT OF IMPLEMENTING CONTACT: 2007.10.18 TO 2012.10.18; CHANGE OF CONTRACT Name of requester: GUANGDONG PROVINCE BUILDING DESIGN ACADEME Effective date: 20090414 |
|
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20070822 |