CN202157575U - Multifunctional complex building applied to crossroads - Google Patents

Multifunctional complex building applied to crossroads Download PDF

Info

Publication number
CN202157575U
CN202157575U CN2011202623244U CN201120262324U CN202157575U CN 202157575 U CN202157575 U CN 202157575U CN 2011202623244 U CN2011202623244 U CN 2011202623244U CN 201120262324 U CN201120262324 U CN 201120262324U CN 202157575 U CN202157575 U CN 202157575U
Authority
CN
China
Prior art keywords
crossroad
crossroads
architecture noumenon
overline bridge
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011202623244U
Other languages
Chinese (zh)
Inventor
叶伯洪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011202623244U priority Critical patent/CN202157575U/en
Application granted granted Critical
Publication of CN202157575U publication Critical patent/CN202157575U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a multifunctional complex building applied to crossroads, which comprises a building body built in a central zone of the crossroads. Small motorway overline bridges are annularly arranged on the periphery of the outside of a wall body of the complex building higher than the ground, the small motorway overline bridges in all directions are respectively connected with ground lanes in the same directions in matched mode through upslope motorways and downslope motorways. Compared with the prior art, the multifunctional complex building applied to the crossroads has the advantages of bringing convenience to motor vehicles, nonmotor vehicles and pedestrians to rapidly pass the crossroads, greatly increasing passing speed of the vehicles and effectively easing jams at the crossroads. Simultaneously, the complex building is constructed by utilizing the space of the crossroads, thereby increasing number of parking places and commercial activity areas and fully using urban land resources.

Description

A kind of multifunctional comprehensive building that is applied to the crossroad
Technical field
The utility model relates to a kind of building structure, belongs to building technical field, refers in particular to a kind of multifunctional comprehensive building that is applied to the crossroad.
Background technology
Along with improving constantly of expanding economy and living standards of the people, increasing people uses the walking-replacing tool of automobile as trip, and it has brought huge convenience with quick for people's work and life, has also created great efficient and benefit.Yet increasing along with vehicle fleet size brought immense pressure to urban traffic.Simultaneously, because the construction of existing urban highway traffic does not catch up with the development of city paces, the clogging of phenomenon, particularly crossroad that Gucheng city street ubiquity is congested in traffic is on the rise, and rush-hour is particularly like this.On the other hand, urban land resource seriously lacks at present, and the parking lot does not reach necessary requirement far away, thereby the phenomenon that causes some automobiles disorderly to stop leaving about has further influenced the traffic environment that blocks up originally.Therefore, be badly in need of the problems referred to above are studied, make necessary improvement.
The utility model content
The purpose of the utility model is to overcome shortcoming of the prior art with not enough, provide a kind of effective alleviation crossroad block up problem, efficiently utilize the multifunctional comprehensive building that is applied to the crossroad of crossroad space resources.
To achieve these goals, the utility model is realized by following technical scheme:
A kind of multifunctional comprehensive building that is applied to the crossroad; Include architecture noumenon; Said architecture noumenon is built the central authorities area in the crossroad; Its body of wall outside is equipped with kart road overline bridge around being above the ground level, the kart road overline bridge of each direction is connected with track, equidirectional ground coupling with the descending motorway through the upgrade car road respectively.
Further, the track, all directions ground of the ground floor of said architecture noumenon and crossroad connects.
Further, the outside diagonal angle construction of the body of wall of said architecture noumenon has with architecture noumenon inside connects to enter the car slope and go out the car slope, enters the car slope and matees with kart road overline bridge respectively with the bottom that goes out the car slope and be connected, and top and architecture noumenon inside connect.
Further, each direction extends out said kart road overline bridge along the crossroad.
Further, overline bridge below in said kart road is People's Bank of China's stair, and People's Bank of China's stair connect kart road overline bridge and ground.
Further, said architecture noumenon inside is provided with parking lot, Catering Area, retail shop district.
The utility model compared with prior art; Its beneficial effect is: the utility model helps motor vehicle, bicycle and pedestrian can pass through the crossroad fast; Improve vehicle pass-through speed greatly, effectively alleviated the jam of crossroad, utilized space, crossroad construction building simultaneously; Increase parking space quantity and business activity district, made full use of urban land resource.
In order to understand the utility model more clearly, below accompanying drawings is set forth the specific embodiment of the utility model.
Description of drawings
Fig. 1 is the structural representation of watching attentively of the utility model.
Fig. 2 is the plan structure sketch map of the utility model.
Fig. 3 is the plan structure sketch map of People's Bank of China's stair.
The specific embodiment
Like Fig. 1,2, shown in 3; The said multifunctional comprehensive building that is applied to the crossroad of the utility model; Include architecture noumenon 1, said architecture noumenon 1 is built the central authorities area in the crossroad, and its body of wall outside is equipped with kart road overline bridge 11 around being above the ground level; The kart road overline bridge 11 of each direction matees with track, equidirectional ground through upgrade car road 12 and descending motorway 13 respectively and is connected, and kart road overline bridge each direction extends out along the crossroad; Further, the outside diagonal angle construction of its body of wall has with architecture noumenon inside connects to enter car slope 14 and go out car slope 15, enters car slope 14 and matees with kart road overline bridge 11 respectively with the bottom that goes out car slope 15 and be connected, and top and architecture noumenon 1 inside connect.Through upgrade car road 12 and descending motorway 13, the ground dilly of the crossroad of passing through can reach the kart road overline bridge 11 of architecture noumenon, and then fast through the crossroad, effectively alleviates the jam of crossroad; Simultaneously, through entering car slope 14 and go out car slope 15, the architecture noumenon 1 of can coming in and going out of the vehicle on the kart road overline bridge 11, but parked vehicles, commercial dealing etc. have made full use of the land resources of crossroad.
Preferably, the track, all directions ground of the ground floor of above-mentioned architecture noumenon 1 and crossroad connects; Overline bridge 11 belows, said kart road are People's Bank of China's stair 161~163, and People's Bank of China's stair 161~163 connect kart road overline bridge and ground, and the pedestrian can get into architecture noumenon inside, or pass through the crossroad through arriving kart road overline bridge on People's Bank of China's stair then; Said architecture noumenon 1 inside is provided with parking lot, Catering Area, retail shop district, gathers multi-function in integral whole.
The utility model is not limited to above-mentioned embodiment; If spirit and scope that the various changes or the modification of the utility model do not broken away from the utility model; If these are changed and modification belongs within the claim and equivalent technologies scope of the utility model, then the utility model also is intended to comprise these changes and modification.

Claims (6)

1. a multifunctional comprehensive building that is applied to the crossroad includes architecture noumenon, it is characterized in that:
Said architecture noumenon is built the central authorities area in the crossroad; Its body of wall outside is equipped with kart road overline bridge around being above the ground level, the kart road overline bridge of each direction is connected with track, equidirectional ground coupling with the descending motorway through the upgrade car road respectively.
2. according to the said a kind of multifunctional comprehensive building that is applied to the crossroad of claim 1, it is characterized in that:
The track, all directions ground of the ground floor of said architecture noumenon and crossroad connects.
3. according to the said a kind of multifunctional comprehensive building that is applied to the crossroad of claim 1, it is characterized in that:
The outside diagonal angle construction of the body of wall of said architecture noumenon has with architecture noumenon inside connects to enter the car slope and go out the car slope, enters the car slope and matees with kart road overline bridge respectively with the bottom that goes out the car slope and be connected, and top and architecture noumenon inside connect.
4. according to the said a kind of multifunctional comprehensive building that is applied to the crossroad of claim 1, it is characterized in that:
Each direction extends out said kart road overline bridge along the crossroad.
5. according to claim 1 or 4 said a kind of multifunctional comprehensive buildings that are applied to the crossroad, it is characterized in that: overline bridge below in said kart road is People's Bank of China's stair, and People's Bank of China's stair connect kart road overline bridge and ground.
6. according to the said a kind of multifunctional comprehensive building that is applied to the crossroad of claim 1, it is characterized in that:
Said architecture noumenon inside is provided with parking lot, Catering Area, retail shop district.
CN2011202623244U 2011-07-22 2011-07-22 Multifunctional complex building applied to crossroads Expired - Fee Related CN202157575U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202623244U CN202157575U (en) 2011-07-22 2011-07-22 Multifunctional complex building applied to crossroads

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202623244U CN202157575U (en) 2011-07-22 2011-07-22 Multifunctional complex building applied to crossroads

Publications (1)

Publication Number Publication Date
CN202157575U true CN202157575U (en) 2012-03-07

Family

ID=45765216

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202623244U Expired - Fee Related CN202157575U (en) 2011-07-22 2011-07-22 Multifunctional complex building applied to crossroads

Country Status (1)

Country Link
CN (1) CN202157575U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103114749A (en) * 2013-01-09 2013-05-22 梁嘉麟 Storied house with stereo garage arranged over intersection
CN103291099A (en) * 2013-01-09 2013-09-11 梁嘉麟 Dimensional garage arranged on upward side of intersection and provided with parking space reached by driver driving automobile
CN103375044A (en) * 2012-04-17 2013-10-30 魏元龙 Method for comprehensively constructing urban air highway by high-rise buildings and suspended cable-stayed bridge
CN103410066A (en) * 2013-08-26 2013-11-27 苏州大方特种车股份有限公司 Construction and transformation method of plane crossroad, and structure of plane crossroad
CN103452353A (en) * 2013-01-09 2013-12-18 梁嘉麟 Building or/and site platform elevated above driving road and provided with stereo garage and structure simplifying scheme thereof
CN113550185A (en) * 2021-08-02 2021-10-26 徐宝善 Zero red light interchange cross in Bolubao city

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103375044A (en) * 2012-04-17 2013-10-30 魏元龙 Method for comprehensively constructing urban air highway by high-rise buildings and suspended cable-stayed bridge
CN103114749A (en) * 2013-01-09 2013-05-22 梁嘉麟 Storied house with stereo garage arranged over intersection
CN103291099A (en) * 2013-01-09 2013-09-11 梁嘉麟 Dimensional garage arranged on upward side of intersection and provided with parking space reached by driver driving automobile
CN103452353A (en) * 2013-01-09 2013-12-18 梁嘉麟 Building or/and site platform elevated above driving road and provided with stereo garage and structure simplifying scheme thereof
CN103526964A (en) * 2013-01-09 2014-01-22 梁嘉麟 Stereo garage erected high above roadway and enabling driver to drive vehicle through single guiding lane to conduct parking
CN103452353B (en) * 2013-01-09 2016-06-29 中国计量大学 Overhead carriage way overhead and the building that is configured with multi-storied garage or/and place platform and structure reduction procedure thereof
CN103410066A (en) * 2013-08-26 2013-11-27 苏州大方特种车股份有限公司 Construction and transformation method of plane crossroad, and structure of plane crossroad
CN103410066B (en) * 2013-08-26 2016-05-04 苏州大方特种车股份有限公司 The building of grade crossing, remodeling method and structure thereof
CN113550185A (en) * 2021-08-02 2021-10-26 徐宝善 Zero red light interchange cross in Bolubao city

Similar Documents

Publication Publication Date Title
CN202157575U (en) Multifunctional complex building applied to crossroads
CN2921085Y (en) Double-X shape left turning overpass
CN202247573U (en) Urban crossroad flyover
CN203689700U (en) Pedestrian crossing facility
CN202323598U (en) Multifunctional overpass
CN101761007B (en) Improved tunnel concave bridge of traffic hub system for keeping intersection simultaneously smooth in sixteen directions
CN202466336U (en) Interchange overpass without traffic light
CN202181490U (en) Walkway driveway open ground combined overpass
CN102127886A (en) Multifunctional tunnel and road parking area
CN101575834A (en) Left-turning torodial flyover
CN204023341U (en) Hybrid double-layer multifunctional overpass bridge
CN201305804Y (en) Improved tunnel concave bridge of traffic hub system for keeping intersection smooth in sixteen directions
CN201241305Y (en) Tunnel type non-obstacle crossroad road structure
CN202163498U (en) Gate type bus
CN103452022A (en) Construction and transformation methods and structure of flyover junction
CN103898820A (en) Quasi rail transit road system
CN201942972U (en) Multifunctional tunnel and parking multiple-use building
CN202688814U (en) Traffic light-free fast transportation system arranged on city crossroad
CN202509392U (en) Fast installing-dismounting city small car over-bridge
CN201648901U (en) Road traffic system
CN202626783U (en) Multilayer roundabout flyover
CN2931557Y (en) Traffic lights free viaduct for automotive vehicles and non-automotive vehicles roadway crossing
CN204849503U (en) Underground bus station system suitable for city primary and secondary arterial highway intersection
CN2883463Y (en) Five-way overhead crossing bridge
CN201942971U (en) Multifunctional tunnel and road parking lot

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120307

Termination date: 20140722

EXPY Termination of patent right or utility model