CN202509392U - Fast installing-dismounting city small car over-bridge - Google Patents
Fast installing-dismounting city small car over-bridge Download PDFInfo
- Publication number
- CN202509392U CN202509392U CN2012200898285U CN201220089828U CN202509392U CN 202509392 U CN202509392 U CN 202509392U CN 2012200898285 U CN2012200898285 U CN 2012200898285U CN 201220089828 U CN201220089828 U CN 201220089828U CN 202509392 U CN202509392 U CN 202509392U
- Authority
- CN
- China
- Prior art keywords
- bridge
- over
- city
- overline
- dismounting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000001681 protective effect Effects 0.000 claims description 16
- 238000004049 embossing Methods 0.000 claims description 7
- 238000010276 construction Methods 0.000 abstract description 8
- 229910000831 Steel Inorganic materials 0.000 abstract description 4
- 238000005516 engineering process Methods 0.000 abstract description 4
- 238000009434 installation Methods 0.000 abstract description 4
- 238000004519 manufacturing process Methods 0.000 abstract description 4
- 239000010959 steel Substances 0.000 abstract description 4
- 230000008901 benefit Effects 0.000 abstract description 2
- 230000000903 blocking effect Effects 0.000 description 6
- 230000000694 effects Effects 0.000 description 4
- 238000012544 monitoring process Methods 0.000 description 4
- 230000008520 organization Effects 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- 239000000047 product Substances 0.000 description 2
- 206010019233 Headaches Diseases 0.000 description 1
- 238000010923 batch production Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 239000012467 final product Substances 0.000 description 1
- 231100000869 headache Toxicity 0.000 description 1
- 230000035800 maturation Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model relates to a city over-bridge, in particular to a fast installing-dismounting city small car over-bridge, and belongs to the technical field of traffic facilities. The fast installing-dismounting city small car over-bridge comprises piers, connecting plates, subsection assembly type bridge bodies, connecting bolts and over-bridge guardrails. The connecting plates are arranged on lower sides of two ends of the subsection assembly type bridge bodies. The subsection assembly type bridge bodies are connected through the connecting plates and the connecting bolts to form an over-bridge body. The over-bridge body is supported by the piers and two sides of the over-bridge body are provided with the over-bridge guardrails. One or more driveway dividers are arranged on the over-bridge body. Embossed bridge panels cover the subsection assembly type bridge bodies. One end or two segments of the over-bridge body are provided with over-bridge high-limit plates. The fast installing-dismounting city small car over-bridge has the remarkable advantages that the technology of the steel structure is mature and safe and reliable, manufacture is convenient, standardized design can be carried out, production and manufacture are industrialized, on-site installation is fast, construction is convenient, construction period is short, influence on existing city traffics is little, protection of overall city layout is benefited, and construction cost is low and the like.
Description
Technical field
The utility model relates to
OnePlant the city kart overline bridge of city overline bridge, particularly a kind of quick mounting or dismounting, belong to the means of transportation technical field.
Background technology
Urban traffic blocking has become the hard nut to crack that China's most city is felt headache deeply.Increase severely the urban traffic blocking product of common problem and the technology of facility such as be on the rise also unspecially at present to China's private car quantity.From consulting actual the seeing of the common Transport Facility Construction in document and city, the conventional facility of some head it offs is like the concrete overpass bridge, wear tunnel etc. down; Complex structure, the construction period is long, involves great expense; Big to the existing normal traffic influence in city; Particularly carry out the Transport Facility Construction of this type routine property or transform very difficulty in the old town in some cities, that have even not possible, and the conventional facility function singleness of existing this type.
Cause the key issue of blocking up to have two, the one, peak period on and off duty vehicle pass-through quantity is big, and especially personal car or minibus cause the problem of seriously blocking up of crossroad; The 2nd, the traffic intersection great majority of the city of China, especially old town are level crossings, need the control of traffic lights signal can realize that vehicle is current in order.In addition, got into auto age to China, automobile has spreaded all over the reality in streets and lanes, and the sort of idea of attempting only to solve through several big highway constructions whole city's traffic congestion is obviously outdated.We must forward the starting point to every major trunk roads unimpeded in city from several viaducts, Express Order Wire and subway line; Even effectively passing through on subsidiary road, branch road and the whole road " face "; Promptly be put into the starting point on the traffic capacity that improves all roads in the whole city, make roads all in the road network of city all become the through street as far as possible by every possible means.
Summary of the invention
That the purpose of the utility model is to provide a kind of and assembles fast, connects is simple, need not traffic lights control, reduce the city overline bridge of vehicle stand-by period in the intersection.
The technical scheme of the utility model is: a kind of city kart overline bridge of quick mounting or dismounting; Crossroad or other intersections at the urban traffic major trunk roads; Cooperate the organization and administration of traffic flow, adopting the assembling type steel structure method is that car or minibus provide the pass facility of crossing over the intersection specially.It comprises bridge pier 1, junction plate 2, sectional bridge body 3, connecting bolt 4 and day bridge protective railings 5.Sectional bridge body 3 two ends downsides are provided with junction plate 2, and the sectional bridge body 3 that will be no less than two sections as required connects and composes the overline bridge pontic through junction plate 2 and connecting bolt 4, and the overline bridge pontic is equipped with day bridge protective railings 5 through bridge pier 1 support, its both sides.
Said overline bridge pontic is provided with one or more track box stall 6.The concrete quantity of track box stall 6 is set according to actual needs, to reach the positive and negative two-way or multidirectional purpose that is open to traffic.
Be covered with embossing bridge deck 7 on the said sectional bridge body 3, embossing bridge deck 7 concavo-convex decorative patterns can play anti-skidding effect.
Overline bridge height limiting plate 8 is equipped with in the one or both ends of said overline bridge pontic, to play the effect of bridge on the non-dilly of restriction.
Billboard 9 and solar energy electronic display screen 10 (solar energy electronic display screen 10 comprises solar panels, charging circuit and battery for common solar powered electronic display) also are housed on the said day bridge protective railings 5.Billboard 9 can play the effect that commercial advertisement is showed in paid installation.Solar energy electronic display screen 10 is electric energy with conversion of solar energy and stores; Can be according to mainly playing great information that the demonstration needs public knows and issue public service ads or the monitoring result of traffic, environment being shown; In time, issue the effect of pollution condition such as air, noise for the public provides the urban traffic road conditions.
During use, according to the situation and the needs of intersection, city, after above-mentioned parts were accomplished in design and manufacturing, installed at the scene of transporting to.With connecting bolt 3 sectional bridge body 3 is connected in twos, the overline bridge pontic that forms a whole is erected on the bridge pier 1 and gets final product.For further strengthening the stability and the safety of overline bridge, can carry out reinforcement of weld again at the seam crossing that every section sectional bridge body 3 connects.Promptly constitute unidirectional or two-way two tracks (or multilane) multi-functional (car) overline bridge after the ancillary facility installation.When need alleviating left steering or right turn, can overline bridge be arranged on intersection left-hand rotation side or right-hand rotation side, be applicable to urban traffic intersection left steering or the big situation of right turn vehicle flowrate, for the car of left steering or right turn provides on the traffic light-free bridge current.In two intersections that major trunk roads cross of urban traffic, unimpeded completely for guaranteeing major trunk roads, also can set up upper and lower two-layer car overline bridge, the pressure during with alleviation peak, intersection.
The operating principle of the utility model is: the outstanding problem and the contradiction that cause urban traffic blocking to car; Rationally and effectively utilize existing road and space resources, the distinguishing feature that combines and avoid or alleviate urban traffic blocking with city overall traffic flow organization and administration.The utility model is in the crossroad of urban traffic major trunk roads or other intersections; Cooperate the organization and administration of traffic flow; Use the assembling type steel structure method as car or minibus the pass facility of crossing over the intersection to be provided specially; Kart needn't wait the traffic lights signal when this passage is current, other vehicles go under bridge under the control of traffic lights signal in the same old way.So improve the passage rate of this direction car greatly, reduced the congestion of this direction vehicle pass-through, also vacateed limited road simultaneously and take by bus and other vehicles and pass through, thereby solved or improved " bottle directly " problem of urban traffic.
The beneficial effect of the utility model is: wearing construction schemes such as tunnel relatively under concrete overpass bridge or the employing, at first is to have steel work technology maturation, safe and reliable, easily manufactured; Can carry out standardized designs, batch production is manufactured, on-the-spot Fast Installation; Construct convenient, duration is short; Influence to existing urban traffic is little, helps to protect the city overall layout, the remarkable advantage that cost is lower; Secondly, easy to use, do not change conventional driving of people and current custom, the driver can also in time adjust traffic route through the traffic monitoring information, realizes certain traffic intelligent management; Its three, overline bridge can conveniently be removed when not required, and recycles, and cuts the waste; They are four years old; Through carrying out the decoration of bridge aesthetics, art; Ancillary facility is installed on overline bridge; Make overline bridge possess urban transportation facility art, traffic monitoring, Environmental Monitoring (like air, noise pollution), information issue (like the city early warning of major event), commercial advertisement multiple city management and cultural functions such as (sell the exhibition position with compensation, income are used for overline bridge and safeguard), this facility is fully used; At last, this product is easy to realize, is convenient to promote in each city, the whole nation.
Description of drawings
Fig. 1 is the structural representation of the utility model;
Fig. 2 is the connection sketch map of the utility model sectional bridge body;
Each label is among the figure: 1: bridge pier, 2: junction plate, 3: sectional bridge body, 4: connecting bolt, 5: day bridge protective railings, 6: track box stall, 7: embossing bridge deck, 8: overline bridge height limiting plate, 9: billboard, 10: the solar energy electronic display screen.
The specific embodiment
Below in conjunction with accompanying drawing and embodiment, the utility model is described further, but the content of the utility model is not limited to said scope.
Embodiment 1: shown in Fig. 1-2, a kind of city overline bridge of quick mounting or dismounting comprises bridge pier 1, junction plate 2, sectional bridge body 3, connecting bolt 4 and day bridge protective railings 5.Sectional bridge body 3 two ends downsides are provided with junction plate 2, and sectional bridge body 3 connects and composes the overline bridge pontic through junction plate 2 and connecting bolt 4, and the overline bridge pontic is equipped with day bridge protective railings 5 through bridge pier 1 support, its both sides.The overline bridge pontic is provided with a track box stall 6.Be covered with embossing bridge deck 7 on the sectional bridge body 3.One end of overline bridge pontic is equipped with overline bridge height limiting plate 8.Billboard 9 and solar energy electronic display screen 10 also are housed on it bridge protective railings 5.
Embodiment 2: shown in Fig. 1-2, a kind of city kart overline bridge of quick mounting or dismounting comprises bridge pier 1, junction plate 2, sectional bridge body 3, connecting bolt 4 and day bridge protective railings 5.Sectional bridge body 3 two ends downsides are provided with 2, five sections sectional bridge bodies 3 of junction plate and connect and compose the overline bridge pontic through junction plate 2 and connecting bolt 4, and the overline bridge pontic is equipped with day bridge protective railings 5 through bridge pier 1 support, its both sides.The overline bridge pontic is provided with two track box stalls 6.Be covered with embossing bridge deck 7 on the sectional bridge body 3.Overline bridge height limiting plate 8 is equipped with at the two ends of overline bridge pontic.On it bridge protective railings 5 solar energy electronic display screen 10 is housed also.
Embodiment 3: shown in Fig. 1-2, a kind of city kart overline bridge of quick mounting or dismounting comprises bridge pier 1, junction plate 2, sectional bridge body 3, connecting bolt 4 and day bridge protective railings 5.Sectional bridge body 3 two ends downsides are provided with 2, three sections sectional bridge bodies 3 of junction plate and connect and compose the overline bridge pontic through junction plate 2 and connecting bolt 4, and the overline bridge pontic is equipped with day bridge protective railings 5 through bridge pier 1 support, its both sides.The overline bridge pontic is provided with three track box stalls 6.Be covered with embossing bridge deck 7 on the sectional bridge body 3.One end of overline bridge pontic is equipped with overline bridge height limiting plate 8.Billboard 9 and solar energy electronic display screen 10 also are housed on it bridge protective railings 5.
Claims (5)
1. a city kart overline bridge of installing and removing fast is characterized in that: comprise bridge pier (1), junction plate (2), sectional bridge body (3), connecting bolt (4) and day bridge protective railings (5); Sectional bridge body (3) two ends downside is provided with junction plate (2); Sectional bridge body (3) connects and composes the overline bridge pontic through junction plate (2) and connecting bolt (4), and the overline bridge pontic is equipped with a day bridge protective railings (5) through bridge pier (1) support, its both sides.
2. the city kart overline bridge of quick mounting or dismounting according to claim 1, it is characterized in that: said overline bridge pontic is provided with one or more track box stall (6).
3. the city kart overline bridge of quick mounting or dismounting according to claim 1 and 2 is characterized in that: be covered with embossing bridge deck (7) on the said sectional bridge body (3).
4. the city kart overline bridge of quick mounting or dismounting according to claim 3, it is characterized in that: overline bridge height limiting plate (8) is equipped with in the one or both ends of said overline bridge pontic.
5. the city kart overline bridge of quick mounting or dismounting according to claim 4 is characterized in that: on the said sky bridge protective railings (5) billboard (9) and solar energy electronic display screen (10) are housed also.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012200898285U CN202509392U (en) | 2012-03-12 | 2012-03-12 | Fast installing-dismounting city small car over-bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012200898285U CN202509392U (en) | 2012-03-12 | 2012-03-12 | Fast installing-dismounting city small car over-bridge |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202509392U true CN202509392U (en) | 2012-10-31 |
Family
ID=47061889
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012200898285U Expired - Fee Related CN202509392U (en) | 2012-03-12 | 2012-03-12 | Fast installing-dismounting city small car over-bridge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202509392U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103774544A (en) * | 2014-02-20 | 2014-05-07 | 苏州荣宝升城市建设有限公司 | Assembled temporary steel bridge |
CN105507164A (en) * | 2014-09-26 | 2016-04-20 | 任丘市永基建筑安装工程有限公司 | Method for installing prefabricated steel bridge |
-
2012
- 2012-03-12 CN CN2012200898285U patent/CN202509392U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103774544A (en) * | 2014-02-20 | 2014-05-07 | 苏州荣宝升城市建设有限公司 | Assembled temporary steel bridge |
CN105507164A (en) * | 2014-09-26 | 2016-04-20 | 任丘市永基建筑安装工程有限公司 | Method for installing prefabricated steel bridge |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103410066B (en) | The building of grade crossing, remodeling method and structure thereof | |
CN204530359U (en) | City multilayer loop island overpass bridge | |
CN105648864A (en) | Cross ring-type full-function interchange | |
CN201695288U (en) | Pedestrian and vehicular circulation separation crossed flyover | |
CN102268852A (en) | Two-phase implementation method of urban road transport system | |
CN104963252A (en) | Urban multilayer roundabout viaduct | |
CN202017171U (en) | Three-layer flyover for urban roads | |
CN202509392U (en) | Fast installing-dismounting city small car over-bridge | |
CN105239479A (en) | City multilayer-rotary-island-type overpass | |
CN102094370A (en) | City fast lane | |
CN204417943U (en) | A kind of crossroad short overpass bridge | |
CN200949196Y (en) | Omnidirectional interchange obstacle-free city overpass | |
CN105350416A (en) | Method for solving urban road traffic jam | |
CN2832895Y (en) | Multi-deck easily-dismountable full-stereo road traffic system | |
CN103452022B (en) | The building of intersection, remodeling method and structure thereof | |
CN203049395U (en) | Road system for achieving quasi-rail transit | |
CN202688814U (en) | Traffic light-free fast transportation system arranged on city crossroad | |
CN201704590U (en) | Overpass suitable for city crossroad | |
CN203498717U (en) | Interchange intersection structure | |
CN203639771U (en) | Totally-enclosed all-interchange rapid bus road system | |
CN2931557Y (en) | Traffic lights free viaduct for automotive vehicles and non-automotive vehicles roadway crossing | |
CN202072999U (en) | Integral type steel structure flyover | |
CN205368917U (en) | City multilayer rotary island formula overpass | |
CN201826568U (en) | Parking zone | |
CN202164518U (en) | Cross directional barrier-free overpass |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20121031 Termination date: 20160312 |