CN202012216U - Communication device with integral equipment room - Google Patents
Communication device with integral equipment room Download PDFInfo
- Publication number
- CN202012216U CN202012216U CN2011201046856U CN201120104685U CN202012216U CN 202012216 U CN202012216 U CN 202012216U CN 2011201046856 U CN2011201046856 U CN 2011201046856U CN 201120104685 U CN201120104685 U CN 201120104685U CN 202012216 U CN202012216 U CN 202012216U
- Authority
- CN
- China
- Prior art keywords
- machine room
- tower
- framework
- equipment room
- room framework
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to a wireless communication device, in particular to a communication device with an integral equipment room. The communication device with the integral equipment room comprises a tower body of a communication tower and an equipment room framework fixedly connected with the tower body. A weight-precasting foundation arranged on the ground is fixed at the bottom of the equipment room framework, a floor is arranged at the inner bottom of the equipment room framework, wall panels are arranged on the inner sides of the equipment room framework, a ceiling board is arranged at the inner top of the equipment room framework, and the floor, the wall panels and the ceiling board are all fixedly connected with the equipment room framework.. The equipment room framework of the communication device with the integral equipment room enables the integral equipment room to bear the load of the tower body by itself. Installment is simple, construction time is saved, and cost is low. Internal utilization space of the integral equipment room is effectively enlarged, and land is saved.
Description
Technical field
The utility model relates to a kind of radio communication device that is used for, and especially relates to a kind of monolithic machine room communicator.
Background technology
Along with people are more and more higher to the attention rate of network coverage face, operator adopts the mode of setting up communication tower to enlarge the area of network's coverage area in order to satisfy people to the requirement of the network coverage usually.An existing class communicator is at the inner communication equipment of placing of machine room, adopts communication tower that network is disposed then.Machine room only is to be used for depositing communication equipment, can not directly bear the load of communication tower body of the tower.
As shown in Figure 1, existing machine room 9 is used to deposit communication equipment, and machine room 9 is fixed by machine room base 10, and machine room 9 itself can't bear the load of communication tower body of the tower.
The utility model content
The utility model mainly is the problems such as load that can't bear communication tower at the machine room of an existing class communicator, provides a kind of machine room itself can bear body of the tower load, reduces production costs, saves the monolithic machine room communicator of floor space and set-up time.
The purpose of this utility model mainly is achieved by following proposal: a kind of monolithic machine room communicator, comprise the machine room framework that the body of the tower of communication tower is fixedlyed connected with body of the tower, described machine room base of frame is set with and is arranged in ground prefabricated counter weight type basis, the inside bottom surface of described machine room framework is provided with the floor, the side that is positioned at machine room framework inboard is provided with wallboard, the end face that is positioned at machine room framework inboard is provided with top board, and described floor, wallboard and top board all are connected with the machine room frame fixation.Machine room framework medial surface fixedly installs floor, wallboard and top board and constitutes a machine room, floor, wallboard and top board are arranged on the prefabricated counter weight type basis by the machine room frame fixation, need not and to fix on the ground simultaneously by machine room and the machine room framework that floor, wallboard and top board constitute, required member when having reduced fixedly, save cost of production, saved the duration of installing.Floor, wallboard and top board all connect and compose the monolithic machine room with the machine room frame fixation, have saved floor space, and the monolithic machine room can bear the load of communication tower body of the tower.In order to strengthen the bonding strength on machine room framework and ground, prefabricated counter weight type basis is set between machine room framework and ground, the machine room framework is by prefabricated counter weight type basic fixed on the ground.
As preferably, described machine room frame upper surface is provided with at least two diagonal braces, and described diagonal brace one end is fixedly installed on the machine room frame upper surface, and the other end is fixedly connected on the body of the tower.Diagonal brace is at least two, and an end of diagonal brace is fixed on the upper surface of machine room framework, and the other end is fixed on the body of the tower, and body of the tower is supported, and strengthens the bonding strength of body of the tower and machine room framework; And the verticality that can regulate body of the tower by the position that changes diagonal brace.
As preferably, described prefabricated counter weight type basis comprises some precast concrete grade beams, and described some precast concrete grade beams are spaced.Prefabricated counter weight type basis is to be made of many precast concrete grade beams, and with precast concrete grade beam spaced apart arranged side by side, and the machine room framework on the prefabricated counter weight type basis is supported and fixes the structural strength height.
As preferably, described prefabricated counter weight type basis is connected with described machine room framework bolt.The machine room framework is connected with prefabricated counter weight type basis by bolt, makes machine room framework and prefabricated counter weight type basis detachable, is convenient to adjust the position of machine room framework.
As preferably, described body of the tower is the ascending/decending iron tower, and the bottom of described body of the tower is fixedly connected on a side of machine room framework.Body of the tower is the ascending/decending iron tower, ascending/decending iron tower bottom is that minor details body of the tower, middle part are the partial node body of the tower for base pitch body of the tower, top, each joint all is fixedly to enclose the trussed construction that structure forms by vertical side column, cross bar, the cross section of base pitch body of the tower is the thickest, the body of the tower cross sectional dimensions that makes progress then successively decreases successively, the body of the tower of lifting iron tower adopts sheathed successively mode to install, and drives cable wire by reel or hydraulic jack sheathed successively body of the tower is raised to certain altitude.Be positioned at the side that bottom base pitch body of the tower is fixed on the machine room framework, guarantee to save floor space under the prerequisite of network design.
As preferably, described body of the tower is provided with and is used for guiding adjusting device that body of the tower is led.Body of the tower is the sheathed successively valency that rises iron tower, between each joint the guiding adjusting device is set, and utilizes guiding device that each joint more than the base pitch body of the tower is led when mounted, the installation of the lifting tower of being convenient to communicate by letter, saves the engineering time.
Therefore, monolithic machine room communicator of the present utility model possesses following advantage: 1, the machine room framework can bear the load of body of the tower, machine room framework, floor, wallboard and top board constitute the monolithic machine room, the monolithic machine room is installed simple, with low cost, not only save floor space, and save installation period; 2, the communication tower body of the tower adopts sheathed successively ascending/decending iron tower, and on each joint body of the tower guiding device is set all, is convenient to body of the tower the reduction of erection time is installed; 3, between body of the tower and the machine room frame upper surface diagonal brace is set, supports body of the tower, strengthen the bonding strength between body of the tower and the machine room framework, and can adjust the verticality of body of the tower by the position that changes diagonal brace by diagonal brace; 4, the prefabricated counter weight type basis precast concrete grade beam that adopts a plurality of parallel interval to arrange, and be connected the firmness of enhancing machine room frame fixation with the machine room frame fixation by bolt.
Description of drawings
Accompanying drawing 1 is a kind of structural representation of machine room in the prior art;
Accompanying drawing 2 is a kind of structural representations of the present utility model;
Accompanying drawing 3 is a kind of structural representations when machine room framework inside is equipped with the floor in the utility model.
Illustrate: 1, body of the tower, 2, the machine room framework, 3, prefabricated counter weight type basis, 4, the floor, 5, wallboard, 6, top board, 7, guiding device, 8, diagonal brace, 9, machine room, 10, the machine room base.
The specific embodiment
Below by embodiment, and in conjunction with the accompanying drawings, the technical solution of the utility model is described in further detail.
As shown in Figure 2, a kind of monolithic machine room communicator comprises the body of the tower 1 of communication tower and the machine room framework 2 of fixedlying connected with body of the tower 1.The inboard ground of machine room framework 2 has been bolted to connection floor 4.Be positioned on the side of machine room framework 2 inboards and be fixed with wallboard 5, the end face that is positioned at machine room framework 2 inboards is fixed with top board 6.Machine room framework 2, floor 4, wallboard 5 and top board 6 constitute all-in-one-piece machine room, have not only increased the area that utilizes of all-in-one-piece machine room inside, and have reduced the floor space of whole equipment room.The bottom of machine room framework 2 fixes on the ground by prefabricated counter weight type basis 3.Prefabricated counter weight type basis 3 is to be arranged by 7 precast concrete grade beam parallel interval to form.Each root precast concrete grade beam is all fixedlyed connected with machine room framework 2 by bolt.Machine room framework 2 adopts angle steel and channel-section steel fixedly to enclose structure and forms, and not only can bear the load of body of the tower 1, and floor 4 directly is fixed on the machine room framework 2, need not to be connected with ground separately, has reduced installation component, reduces production costs the saving construction period.Body of the tower 1 bottom of communication tower is that base pitch body of the tower, top are that minor details body of the tower, middle part are the partial node body of the tower, each joint all is fixedly to enclose the trussed construction that structure forms by vertical side column, cross bar, the cross section of base pitch body of the tower is the thickest, the body of the tower cross sectional dimensions that makes progress then successively decreases successively, the body of the tower of lifting iron tower adopts sheathed successively mode to install, drive cable wire by reel or hydraulic jack sheathed successively body of the tower is raised to certain altitude, top is equipped with antenna holder.Guiding device 7 is installed on the sheathed successively body of the tower, when mounted each joint more than the base pitch body of the tower is led, improved the installation effectiveness of body of the tower 1, save the engineering time.The bottom of body of the tower 1 is fixed on a side of machine room framework 2, upper surface at machine room framework 2 is provided with 2 diagonal braces 8, and an end of diagonal brace 8 is by being bolted to machine room framework 2 upper surfaces, and the other end is fixed on the body of the tower 1, be used to support body of the tower 1, strengthen the bonding strength between body of the tower 1 and the machine room framework 2.
During installation, the precalculated position arrangement of job site is smooth, utilize rubble that the base surface of installing is leveled up, 7 precast concrete grade beam parallel interval are arranged and are fixed on the rubble.Machine room framework 2 is lifted on the precast concrete grade beam, is fixed by the position of machine room framework 2 and by bolt.On machine room framework 2 installed inside floors 4, wallboard 5 and top board 6 constitute all-in-one-piece machine room.The body of the tower 1 of lifting communication tower, body of the tower 1 is fixed on a side of machine room framework 2,2 diagonal braces 8 are installed between the upper surface of machine room framework 2 and body of the tower 1, not only can support body of the tower 1, strengthen the bonding strength between body of the tower 1 and the machine room framework 2, and can adjust the verticality of body of the tower 1 by the position of regulating diagonal brace.The lifting gear that utilizes body of the tower 1 to carry is promoted to required height with sheathed successively body of the tower 1.At the inner communication equipment of placing of all-in-one-piece machine room, the body of the tower 1 top support that fixes up an aerial wire.
The utility model adopts machine room framework 2, floor 4, wallboard 5 and the directly fixing mode of top board 6 to constitute all-in-one-piece machine room, make all-in-one-piece machine room self can bear body of the tower 1 load, install simple, save the engineering time, with low cost, and increased the inner usage space of all-in-one-piece machine room effectively, saved floor space.
Claims (6)
1. monolithic machine room communicator, the body of the tower that comprises communication tower, it is characterized in that, also comprise the machine room framework (2) of fixedlying connected with body of the tower (1), described machine room framework (2) bottom is set with and is arranged in ground prefabricated counter weight type basis (3), the inside bottom surface of described machine room framework (2) is provided with floor (4), be positioned at the inboard side of machine room framework (2) and be provided with wallboard (5), be positioned at the inboard end face of machine room framework (2) and be provided with top board (6), described floor (4), wallboard (5) is all fixedlyed connected with machine room framework (2) with top board (6).
2. monolithic machine room communicator according to claim 1, it is characterized in that, described machine room framework (2) upper surface is provided with at least two diagonal braces (8), and described diagonal brace (8) one ends are fixedly installed on machine room framework (2) upper surface, and the other end is fixedly connected on the body of the tower (1).
3. monolithic machine room communicator according to claim 1 and 2 is characterized in that described prefabricated counter weight type basis (3) comprises some precast concrete grade beams, and described some precast concrete grade beams are spaced.
4. monolithic machine room communicator according to claim 1 and 2 is characterized in that, described prefabricated counter weight type basis (3) is connected with described machine room framework (2) bolt.
5. monolithic machine room communicator according to claim 1 and 2 is characterized in that described body of the tower (1) is the ascending/decending iron tower, and the bottom of described body of the tower (1) is fixedly connected on a side of machine room framework (2).
6. monolithic machine room communicator according to claim 5 is characterized in that, described body of the tower (1) is provided with and is used for guiding device (7) that body of the tower is led.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201046856U CN202012216U (en) | 2011-04-12 | 2011-04-12 | Communication device with integral equipment room |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201046856U CN202012216U (en) | 2011-04-12 | 2011-04-12 | Communication device with integral equipment room |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202012216U true CN202012216U (en) | 2011-10-19 |
Family
ID=44782827
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011201046856U Expired - Lifetime CN202012216U (en) | 2011-04-12 | 2011-04-12 | Communication device with integral equipment room |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202012216U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104727589A (en) * | 2015-02-12 | 2015-06-24 | 江苏通鼎光棒有限公司 | Equipment and method for arranging VAD and OVD |
CN106049915A (en) * | 2016-08-05 | 2016-10-26 | 曙光信息产业(北京)有限公司 | Three-dimensional machine room |
-
2011
- 2011-04-12 CN CN2011201046856U patent/CN202012216U/en not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104727589A (en) * | 2015-02-12 | 2015-06-24 | 江苏通鼎光棒有限公司 | Equipment and method for arranging VAD and OVD |
CN104727589B (en) * | 2015-02-12 | 2017-04-12 | 江苏通鼎光棒有限公司 | Equipment and method for arranging VAD and OVD |
CN106049915A (en) * | 2016-08-05 | 2016-10-26 | 曙光信息产业(北京)有限公司 | Three-dimensional machine room |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101672102B (en) | Steel structural overhead ceiling construction platform | |
CN102080384B (en) | Construction method for mounting lifter on top plate of underground parking garage | |
CN203247868U (en) | Large-span steel structure construction temporary supporting frame | |
CN202012216U (en) | Communication device with integral equipment room | |
CN205557951U (en) | Novel local cast -in -place assembled coincide building roof boarding | |
CN204455842U (en) | Bridge precast beam plate girder erection frame | |
CN204001416U (en) | For the assemble type truss of the factory building of constructing | |
CN105625732B (en) | Superelevation overhanging steel structure truss support free construction method | |
CN208845309U (en) | The support platform and wind power generating set of tower | |
CN101660660B (en) | Novel installing method of gas cabinet | |
CN204626915U (en) | A kind of large span heavy in section truss is across interior assembling rack platform | |
CN204059901U (en) | A kind of high-altitude construction operation platform | |
CN202689498U (en) | Liftable scaffold for simple and easy building outer wall | |
CN202347846U (en) | Simple lifting setting stair steel moulding plate | |
CN204754150U (en) | Dish -type node formula scaffold | |
CN201915614U (en) | Integral electric climbing frame suitable for shear wall structure | |
CN203878957U (en) | Protective screen module unit | |
CN201526180U (en) | Tower mast with communication machine room | |
CN204920244U (en) | Supporting structure of large -span steel construction segmentation hoist and mount | |
CN204282788U (en) | Assembled fixed scaffold | |
CN207905333U (en) | Saddle combines Construction of Supporting hoistable platform | |
CN206288820U (en) | The mounting structure of the wall-attached frame of building hoist | |
CN202001787U (en) | Detachable ground anchor of tower crane | |
CN218149652U (en) | A shaped steel formwork that encorbelments for high altitude structure of encorbelmenting | |
CN205033395U (en) | Three components pre -installation concrete mixing main website device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 321017 Zhejiang Province, Jinhua City Road 298 Patentee after: And Communication Technology Co Ltd Address before: 321017 Zhejiang city of Jinhua province Jinhua City Road 298 Patentee before: Zhejiang Heqin Communication Engineering Co., Ltd. |
|
CP03 | Change of name, title or address | ||
CX01 | Expiry of patent term |
Granted publication date: 20111019 |
|
CX01 | Expiry of patent term |