CN101660660B - Novel installing method of gas cabinet - Google Patents
Novel installing method of gas cabinet Download PDFInfo
- Publication number
- CN101660660B CN101660660B CN2009101676326A CN200910167632A CN101660660B CN 101660660 B CN101660660 B CN 101660660B CN 2009101676326 A CN2009101676326 A CN 2009101676326A CN 200910167632 A CN200910167632 A CN 200910167632A CN 101660660 B CN101660660 B CN 101660660B
- Authority
- CN
- China
- Prior art keywords
- gas cabinet
- mast
- gas
- top board
- installation method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Gas-Insulated Switchgears (AREA)
Abstract
Description
技术领域technical field
本发明涉及一种大型干式煤气柜的安装方法。The invention relates to a method for installing a large dry-type gas tank.
背景技术Background technique
干式煤气柜是煤气柜的一种,这种施工装置应用于很多施工场所,根据施工要求的不同,干式煤气柜的规格大小也各不相同。常用的干式煤气柜安装方法是直接采用吊车或塔吊完成安装,但是,这种常规的安装方法只适用于容量较小、高度较低的煤气柜,对于大型干式煤气柜,特别是高度在50m以上的干式煤气柜,常用的吊车或塔吊因高度不够很难完成其安装任务。更重要的是,吊车或塔吊的使用会受到施工现场场地的限制,如果施工现场不能安装塔吊,或者不能使用吊车施工,那么煤气柜的安装便无法实施,而且采用吊车或塔吊的施工成本非常高,平均每天的施工成本甚至可以达到2万以上,一个大型干式煤气柜的安装常常需要一个月甚至更长时间,这样采用塔吊或吊车施工总的成本可能高达数十万,这就大大超过预算,使得增加施工方的成本,因此采用新的安装方法或采用新工艺是干式煤气柜安装的必然选择。Dry-type gas holder is a kind of gas holder. This construction device is used in many construction sites. According to different construction requirements, the specifications and sizes of dry-type gas holders are also different. The common installation method of dry-type gas tank is to use crane or tower crane to complete the installation directly. However, this conventional installation method is only suitable for gas tanks with small capacity and low height. For large dry-type gas tanks, especially the height of For dry-type gas tanks over 50m in height, it is difficult to complete the installation task by commonly used cranes or tower cranes due to insufficient height. More importantly, the use of cranes or tower cranes will be limited by the construction site. If tower cranes cannot be installed on the construction site, or cranes cannot be used for construction, then the installation of gas tanks cannot be implemented, and the construction cost of using cranes or tower cranes is very high. , the average daily construction cost can even reach more than 20,000 yuan, and the installation of a large dry-type gas tank often takes a month or even longer, so the total cost of using tower cranes or cranes for construction may be as high as hundreds of thousands, which greatly exceeds the budget , which increases the cost of the construction party, so adopting a new installation method or adopting a new process is an inevitable choice for dry gas cabinet installation.
发明内容Contents of the invention
本发明的目的在于提供一种煤气柜的安装方法,解决现有技术中存在的缺陷,在实现煤气柜安装的同时,弥补受施工场地的限制,从根本上降低施工成本。The purpose of the present invention is to provide a method for installing a gas holder, which can solve the defects in the prior art, and at the same time realize the installation of the gas holder, make up for the limitation of the construction site, and fundamentally reduce the construction cost.
为了实现上述目的,本发明采用的技术方案如下:In order to achieve the above object, the technical scheme adopted in the present invention is as follows:
一种煤气柜的安装方法,其特征在于,包括以下步骤:1)采用塔吊搭建煤气柜支架,在煤气柜支架上安装活动型煤气柜顶板;2)在煤气柜支架上安装液压顶升装置,并将液压顶升装置与煤气柜顶板固定连接;3)在煤气柜顶板上安装桅杆吊;4)使用桅杆吊吊挂煤气柜各结构组件,并按照从下至上的顺序将各结构组件安装于煤气柜支架上,直到煤气柜结构组件安装到与煤气柜顶板接触;5)控制液压顶升装置上升,使煤气柜顶板在煤气柜支架上上升;6)液压顶升装置上升固定高度后停止,继续进行步骤4);7)循环执行步骤4)~6),直到煤气柜结构组件安装完毕;8)将煤气柜顶板与液压顶升装置拆开,将煤气柜顶板固定于煤气柜支架顶端,煤气柜安装完毕。A method for installing a gas cabinet, characterized in that it comprises the following steps: 1) using a tower crane to build a gas cabinet bracket, installing a movable gas cabinet top plate on the gas cabinet bracket; 2) installing a hydraulic jacking device on the gas cabinet bracket, And the hydraulic jacking device is fixedly connected to the top plate of the gas cabinet; 3) Install the mast crane on the top plate of the gas cabinet; 4) Use the mast crane to hang the structural components of the gas tank, and install the structural components on the 5) Control the hydraulic jacking device to rise, so that the gas cabinet top plate rises on the gas cabinet bracket; 6) The hydraulic jacking device stops after rising to a fixed height, Continue to step 4); 7) Repeat steps 4) to 6) until the gas cabinet structural components are installed; 8) Disassemble the gas cabinet top plate from the hydraulic jacking device, and fix the gas cabinet top plate to the top of the gas cabinet bracket, The gas cabinet is installed.
所述步骤8)完成后,直接拆卸桅杆吊,并通过煤气柜内部电梯运载桅杆吊结构组件。After the step 8) is completed, the mast crane is directly disassembled, and the structural components of the mast crane are carried by the elevator inside the gas cabinet.
所述桅杆吊包括行走小车、桅杆、支撑架、拉绳和卷扬机,所述支撑架固定于行走小车上,桅杆活动连接于行走小车的一条边上,卷扬机安装于行走小车上,拉绳一端穿过桅杆顶端、支撑架顶端后与卷扬机连接,另一端悬空。The mast crane includes a trolley, a mast, a support frame, a stay rope and a hoist, the support frame is fixed on the trolley, the mast is movably connected to one side of the trolley, the hoist is installed on the trolley, and one end of the stay rope passes through the trolley. After passing through the top of the mast and the top of the support frame, it is connected with the winch, and the other end is suspended in the air.
所述桅杆数量为2,两根桅杆的底端分别安装于行走小车一条边的两端,顶端相互连接于一点。The number of the masts is 2, and the bottom ends of the two masts are respectively installed on the two ends of one side of the trolley, and the tops are connected to each other at one point.
所述支撑架由四根支撑杆组成,四根支撑杆的底端分别固定于行走小车的四个角上,顶端相互连接于一点。The support frame is composed of four support rods, the bottom ends of the four support rods are respectively fixed on the four corners of the walking trolley, and the top ends are connected to each other at one point.
所述桅杆吊还设有与行走小车配套的行走轨道,所述行走轨道固定安装于煤气柜顶板上。The mast crane is also provided with a walking track matched with the traveling trolley, and the walking track is fixedly installed on the top plate of the gas cabinet.
所述行走轨道绕煤气柜顶板边缘一周,行走小车在行走轨道上移动,实现煤气柜各个侧面的结构组件的安装。The walking track goes around the edge of the top plate of the gas cabinet for one week, and the traveling trolley moves on the running track to realize the installation of the structural components on each side of the gas cabinet.
所述行走小车上还设有控制行走小车移动的电动机。The walking trolley is also provided with a motor for controlling the movement of the walking trolley.
所述卷扬机数量为2台。The number of hoists is 2.
所述拉绳悬空的一端设有用于吊挂煤气柜结构组件的吊钩。One end of the stay rope suspended in the air is provided with a hook for hanging the structural components of the gas cabinet.
所述煤气柜顶板上设有至少一个桅杆吊,具体数量可以根据实际需要进行设置,一般来说,设置两个桅杆吊已足够大多数施工需求。At least one mast crane is provided on the top plate of the gas tank, and the specific number can be set according to actual needs. Generally speaking, two mast cranes are sufficient for most construction needs.
本发明的原理为:利用液压顶升装置带动煤气柜顶板上升,在煤气柜顶板上设置桅杆吊,用于吊挂煤气柜的结构组件,采用煤气柜从底部向顶端逐层组装的方法,随着煤气柜顶板逐渐上升,煤气柜的侧壁便逐渐组装完毕。The principle of the present invention is: use the hydraulic jacking device to drive the top plate of the gas tank to rise, set a mast crane on the top plate of the gas tank to hang the structural components of the gas tank, and adopt the method of assembling the gas tank layer by layer from the bottom to the top. As the top plate of the gas cabinet rises gradually, the side walls of the gas cabinet are gradually assembled.
与现有技术相比,本发明的优点在于:Compared with the prior art, the present invention has the advantages of:
一.本发明主要采用桅杆吊进行施工,桅杆吊安装于煤气柜顶板上,不占用额外场地,因此,不受施工场地影响。1. The present invention mainly uses a mast crane for construction, and the mast crane is installed on the top plate of the gas tank without occupying additional space, so it is not affected by the construction site.
二.本发明的施工成本只由桅杆吊以及其他一些小型设备造成,而桅杆吊的成本一般只需要2万左右,使用一个桅杆吊便可完成一个干式煤气柜的安装,因而施工成本大大降低。2. The construction cost of the present invention is only caused by the mast crane and some other small equipment, and the cost of the mast crane generally only needs about 20,000, and the installation of a dry gas tank can be completed by using a mast crane, so the construction cost is greatly reduced .
三.桅杆吊结构简单,组装、拆卸十分方便,施工过程的控制简单易操作。3. The structure of the mast crane is simple, the assembly and disassembly are very convenient, and the control of the construction process is simple and easy to operate.
本发明适合各种规格的煤气柜以及与此结构类似的构筑物的安装,尤其在大型煤气柜上,优势尤为明显。The invention is suitable for the installation of gas cabinets of various specifications and structures similar to the structure, especially on large gas cabinets, and has obvious advantages.
附图说明Description of drawings
图1为本发明的施工示意图。Fig. 1 is the construction schematic diagram of the present invention.
图2为本发明中桅杆吊的安装示意图。Fig. 2 is a schematic diagram of the installation of the mast crane in the present invention.
附图中标号对应名称:1-行走小车,2-桅杆,3-支撑杆,4-卷扬机,5-拉绳,6-电动机,7-行走轨道,8-吊钩,9-煤气柜顶板,10-煤气柜支架,11-液压顶升装置,12-内部电梯。The corresponding names of the labels in the accompanying drawings: 1-walking trolley, 2-mast, 3-support rod, 4-winch, 5-stay rope, 6-motor, 7-walking track, 8-hook, 9-gas tank top plate, 10-gas holder bracket, 11-hydraulic jacking device, 12-internal elevator.
具体实施方式Detailed ways
如图1、图2所示,一种煤气柜的安装方法,包括以下步骤:As shown in Figures 1 and 2, a method for installing a gas cabinet comprises the following steps:
1)采用塔吊或吊车搭建煤气柜支架10,然后在煤气柜支架10上安装活动型煤气柜顶板9。1) Use a tower crane or a crane to build a
2)在煤气柜支架10上安装液压顶升装置11,并将液压顶升装置11与煤气柜顶板9固定连接。2) Install a
液压顶升装置11与煤气柜顶板9之间还设有内部电梯12,方便人或设备通向煤气柜顶板上。An
3)在煤气柜顶板9上相对位置安装两台桅杆吊,每台桅杆吊控制其对应方向的煤气柜结构组件的起吊、安装;当遇到大型组件时,将两台桅杆吊移动到同一方向上的相邻位于,共同作用于组件上,通过双桅杆起吊。3) Install two mast cranes at opposite positions on the
4)安装步骤3)的方法用桅杆吊吊挂煤气柜各结构组件,并将各结构组件安装于煤气柜支架底部,直到煤气柜结构组件安装到与煤气柜顶板9接触。4) The method of installation step 3) hangs the structural components of the gas cabinet with a mast crane, and installs the structural components on the bottom of the gas cabinet bracket until the structural components of the gas cabinet are installed to contact with the
5)控制液压顶升装置11上升,使煤气柜顶板9在煤气柜支架10上上升。5) Control the
6)根据煤气柜总体设计高度,预设液压顶升装置11每次上升的高度,液压顶升装置11上升预设的高度后停止,继续进行步骤4)。6) According to the overall design height of the gas cabinet, preset the rising height of the
7)循环执行步骤4)~6),直到煤气柜结构组件安装完毕。7) Steps 4) to 6) are executed cyclically until the gas cabinet structural components are installed.
8)将煤气柜顶板9与液压顶升装置11拆开,将煤气柜顶板9固定于煤气柜支架10顶端,煤气柜安装完毕。8) Disassemble the gas
所述步骤8)完成后,直接拆卸桅杆吊,并通过煤气柜内部电梯运载桅杆吊结构组件至地面。After the step 8) is completed, the mast crane is directly disassembled, and the structural components of the mast crane are carried to the ground by the elevator inside the gas cabinet.
所述桅杆吊包括行走小车1、两根桅杆2、支撑架、拉绳5和卷扬机4。所述支撑架固定于行走小车1上,两根桅杆2的底端分别活动连接于行走小车1的靠近煤气柜顶板9边缘的一条边的两端,顶端相互连接于一点;卷扬机4安装于行走小车1上,拉绳5采用钢丝绳,其一端穿过桅杆2顶端、支撑架顶端后与卷扬机4连接,另一端悬空吊挂一个吊钩8。吊钩8用于吊挂煤气柜的结构组件。The mast crane includes a
所述支撑架由四根支撑杆3组成,四根支撑杆3的底端分别固定于行走小车1的四个角上,顶端相互连接于一点。The support frame is composed of four
支撑杆3和桅杆2均为钢管。Both the
所述桅杆吊还设有与行走小车1配套的行走轨道7,行走轨道7的形状根据煤气柜的形状而定,固定安装于煤气柜顶板9边缘,并绕煤气柜顶板9边缘一周。行走小车1在行走轨道7上移动,实现煤气柜各个侧面的结构组件的安装。The mast crane is also provided with a walking track 7 matching with the
所述行走小车的移动由电动机6控制。The movement of the walking trolley is controlled by the
所述卷扬机4数量为2台。Described
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2009101676326A CN101660660B (en) | 2009-09-15 | 2009-09-15 | Novel installing method of gas cabinet |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2009101676326A CN101660660B (en) | 2009-09-15 | 2009-09-15 | Novel installing method of gas cabinet |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN101660660A CN101660660A (en) | 2010-03-03 |
| CN101660660B true CN101660660B (en) | 2011-01-05 |
Family
ID=41788850
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2009101676326A Active CN101660660B (en) | 2009-09-15 | 2009-09-15 | Novel installing method of gas cabinet |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN101660660B (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101893162B (en) * | 2010-07-23 | 2013-06-19 | 武汉一冶钢结构有限责任公司 | Construction method for gas holder and connection hooking apparatus for same |
| CN103274315B (en) * | 2013-04-28 | 2015-01-28 | 云南建工安装股份有限公司 | Installing and hoisting device for side plate and upright of gas chamber |
| CN106481967B (en) * | 2015-08-24 | 2019-01-11 | 华北冶建工程建设有限公司 | A kind of installation method of rubber diaphragm gas chamber |
| CN105366598A (en) * | 2015-09-28 | 2016-03-02 | 中国一冶集团有限公司 | Hydraulic lifting method for gas holder top |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN200971308Y (en) * | 2006-09-15 | 2007-11-07 | 中国第三冶金建设公司结构制造安装工程公司 | Multi-point digital control integral hoister for rubber sealed type gas storage cabinet thin wall cabinet top |
| CN201176372Y (en) * | 2008-03-31 | 2009-01-07 | 武汉钢铁(集团)公司 | Novel demountable traveling mast crane |
| CN101451647A (en) * | 2008-12-11 | 2009-06-10 | 中冶东北建设有限公司结构制造安装工程公司 | Dry type gas holder roof floating method |
-
2009
- 2009-09-15 CN CN2009101676326A patent/CN101660660B/en active Active
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN200971308Y (en) * | 2006-09-15 | 2007-11-07 | 中国第三冶金建设公司结构制造安装工程公司 | Multi-point digital control integral hoister for rubber sealed type gas storage cabinet thin wall cabinet top |
| CN201176372Y (en) * | 2008-03-31 | 2009-01-07 | 武汉钢铁(集团)公司 | Novel demountable traveling mast crane |
| CN101451647A (en) * | 2008-12-11 | 2009-06-10 | 中冶东北建设有限公司结构制造安装工程公司 | Dry type gas holder roof floating method |
Non-Patent Citations (3)
| Title |
|---|
| JP特开平2003-26285A 2003.01.29 |
| 刘洪武等.1万m3橡胶膜密封干式气柜液压提升倒装施工工艺.《石油工程建设》.2002,第28卷(第3期),25-27. * |
| 李海涛等.利用立柱分片正装2万m3干式气柜施工技术.《石油工程建设》.2007,第33卷(第4期),28-31. * |
Also Published As
| Publication number | Publication date |
|---|---|
| CN101660660A (en) | 2010-03-03 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102251486B (en) | A jacking support system and its construction technology for segmental installation of bridge towers | |
| CN205772984U (en) | A kind of hanging apparatus of monolithic steel truss | |
| CN102704676A (en) | Jacking formwork mechanism | |
| CN205688774U (en) | A kind of electric bridge scaffold | |
| CN101660660B (en) | Novel installing method of gas cabinet | |
| CN203877789U (en) | Lifting and conveying device for power equipment | |
| CN203474231U (en) | Steel bar tower safety hoisting device | |
| CN204455842U (en) | Bridge precast beam plate girder erection frame | |
| CN110577162A (en) | A method and device for flipping a climbing beam of an internal climbing tower crane | |
| CN203359889U (en) | Wall plate lifting and installation integrated operation platform | |
| CN201485204U (en) | Gas tank hanging device | |
| CN104555830A (en) | Novel method of inversion construction process of fixed top cylindrical vertical type storage tank | |
| CN209723550U (en) | A kind of lifting U-steel frame suitable for attachment type raise scaffold construction | |
| CN201660377U (en) | Special gantry crane for overlength and large-tonnage parts | |
| CN219031629U (en) | Lifting equipment for indoor plate installation | |
| CN205530308U (en) | Device suitable for deep water foundation construction double -walled steel cofferdam promotes and transfers | |
| CN104444810A (en) | Large plate turning construction method | |
| CN204434124U (en) | Tower machine is from the structure installing and certainly dismantle counterbalanced weight | |
| CN204416960U (en) | A kind of bipod mast Lift-on/Lift-off System being convenient to movement | |
| CN204714472U (en) | A kind of hydraulic lifting apparatus for storage tank inversion | |
| CN204324748U (en) | A kind of large-scale gas storage holder Steel Structure Installation hoisting device | |
| CN203890893U (en) | Supporting bracket for integral lifting of hollow slab girder | |
| CN202754777U (en) | Slide-resistant pile lifting construction platform | |
| CN201896016U (en) | Lifting basket device for storage tank maintenance | |
| CN205742959U (en) | A kind of lowering or hoisting gear relying on hydraulic lifting scaffold |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| EE01 | Entry into force of recordation of patent licensing contract |
Assignee: China MCC5 Group Corp., Ltd. Assignor: MCC Chenggong Construction Co., Ltd. Contract record no.: 2010510000035 Denomination of invention: Novel installing method of gas cabinet License type: Exclusive License Open date: 20100303 Record date: 20100611 |
|
| ASS | Succession or assignment of patent right |
Owner name: CHINA NO.5 METALLURGICAL GROUP CO., LTD. Free format text: FORMER OWNER: MCC CHENGGONG CONSTRUCTION CO., LTD. Effective date: 20100910 |
|
| C41 | Transfer of patent application or patent right or utility model | ||
| COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 610082 NO.8, SECTION 1 OF RENMIN NORTH ROAD, CHENGDU CITY, SICHUAN PROVINCETO: 610063 CHINA NO.5 METALLURGICAL GROUP CO., LTD., INDUSTRIAL PARK, JINJIANG DISTRICT, CHENGDU CITY, SICHUANG PROVINCE |
|
| TA01 | Transfer of patent application right |
Effective date of registration: 20100910 Address after: Jinjiang District Industrial Park in Chengdu city in Sichuan province 610063 Chinese Wuye Group Co. Ltd. Applicant after: China MCC5 Group Corp., Ltd. Address before: 610082 section 8, Renmin North Road, Sichuan, Chengdu Applicant before: MCC Chenggong Construction Co., Ltd. |
|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant |