CN201982112U - 一种施工拱顶钢架安装装置 - Google Patents
一种施工拱顶钢架安装装置 Download PDFInfo
- Publication number
- CN201982112U CN201982112U CN201120075191XU CN201120075191U CN201982112U CN 201982112 U CN201982112 U CN 201982112U CN 201120075191X U CN201120075191X U CN 201120075191XU CN 201120075191 U CN201120075191 U CN 201120075191U CN 201982112 U CN201982112 U CN 201982112U
- Authority
- CN
- China
- Prior art keywords
- steel frame
- steelframe
- construction
- guide rail
- arch crown
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
本实用新型涉及一种施工拱顶钢架安装装置,包括设在待安装钢架上的钢轨卡,所述的钢轨卡上端连接滑轮,滑轮为凹形,凹槽内设有滚轮,经滚轮连接导轨,所述的导轨为两段,一段为活动端,另一段为固定端,活动端与固定端之间设有合页,所述的导轨上端连接吊环,吊环下端设有凹形开口,吊环设在初支钢架拱顶上,所述的吊环沿初支钢架拱顶按3~5m间距设置多组。从而解决了隧道初期支护钢架安装的问题。具有方便、快速、安全的特点,是隧道、地铁等地下工程初期支护施工——拱顶钢架安装的有效工具。
Description
技术领域
本实用新型涉及一种隧道、地铁等地下工程初期支护施工——拱顶钢架安装工具,特别是一种施工拱顶钢架安装装置。
背景技术
在一般的隧道、地铁施工中,通常采用的是人工安装钢架,此种方法较为传统,其存在的问题是:1、钢架安装耗时较长,不利于隧道初期支护及早封闭;2、人工搬运、安装存在一定的安全风险。
实用新型内容
本实用新型其目的就在于提供一种施工拱顶钢架安装装置,具有方便、快速、安全的特点,是隧道、地铁等地下工程初期支护施工——拱顶钢架安装的有效工具。
实现上述目的而采取的技术方案,包括设在待安装钢架上的钢轨卡,所述的钢轨卡上端连接滑轮,滑轮为凹形,凹槽内设有滚轮,经滚轮连接导轨,所述的导轨为两段,一段为活动端,另一段为固定端,活动端与固定端之间设有合页,所述的导轨上端连接吊环, 吊环下端设有凹形开口,吊环设在初支钢架拱顶上,所述的吊环沿初支钢架拱顶按3~5m间距设置多组。
与现有技术相比,本实用新型的有益效果在于,
由于采用了吊杆、导轨、滑轮及钢轨卡将钢架吊起安装就位的结构设计,因而具有方便、快速、安全的特点,是隧道、地铁等地下工程初期支护施工——拱顶钢架安装的有效工具。
附图说明
下面结合附图对本实用新型作进一步详述。
图1为拱顶钢架安装装置结构示意图。
图2为本装置中吊环结构示意图。
图3为图2俯视图。
图4为本装置中导轨结构示意图。
图5为图4俯视图。
图6为本装置中滑轮结构示意图。
图7为图6侧视图。
具体实施方式
实施例,如图1~图7所示,包括设在待安装钢架6上的钢轨卡5,如图1所示,所述的钢轨卡5上端连接滑轮4,滑轮4为凹形,如图6所示,凹槽内设有滚轮10,经滚轮10连接导轨3,所述的导轨3为两段,如图4所示,一段为活动端7,另一段为固定端8,活动端7与固定端8之间设有合页9,所述的导轨3上端连接吊环2, 吊环2下端设有凹形开口,如图2所示,吊环2设在初支钢架拱顶1上,所述的吊环2沿初支钢架拱顶1按3~5m间距设置多组。
操作过程包括,
(1)在已经处初支完的初支钢架拱顶1按3~5m间距将吊环2焊接牢
固;
(2)根据上台阶的实际长度将导轨3安装在吊环2的下方,导轨3根据隧道钢架间距及实际上台阶长度通过合页9分为活动端7和固定端8;
(3)导轨3下方安装一滑轮4;
(4)滑轮4下方安装钢轨卡5;
(5)通过钢轨卡5将待安装钢架6卡住;
(6)推动待安装钢架6将其移动到待安装位置,打开合页9,使其不能继续向前移动,人工将两边的安装单元钢架用螺栓连接牢固;
(7)挂设第二层钢筋网片,喷射混凝土封闭钢架。
Claims (1)
1.一种施工拱顶钢架安装装置,包括设在待安装钢架(6)上的钢轨卡(5),其特征在于,所述的钢轨卡(5)上端连接滑轮(4),滑轮(4)为凹形,凹槽内设有滚轮(10),经滚轮(10)连接导轨(3),所述的导轨(3)为两段,一段为活动端(7),另一段为固定端(8),活动端(7)与固定端(8)之间设有合页(9),所述的导轨(3)上端连接吊环(2), 吊环(2)下端设有凹形开口,吊环(2)设在初支钢架拱顶(1)上,所述的吊环(2)沿初支钢架拱顶(1)按3~5m间距设置多组。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201120075191XU CN201982112U (zh) | 2011-03-21 | 2011-03-21 | 一种施工拱顶钢架安装装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201120075191XU CN201982112U (zh) | 2011-03-21 | 2011-03-21 | 一种施工拱顶钢架安装装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201982112U true CN201982112U (zh) | 2011-09-21 |
Family
ID=44609575
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201120075191XU Expired - Fee Related CN201982112U (zh) | 2011-03-21 | 2011-03-21 | 一种施工拱顶钢架安装装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201982112U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103938653A (zh) * | 2014-05-14 | 2014-07-23 | 中铁二局股份有限公司 | 洞桩法钢管柱施工中钢管吊装方法 |
CN103953052A (zh) * | 2014-05-14 | 2014-07-30 | 中铁二局股份有限公司 | 一种洞桩法钢管柱施工方法 |
-
2011
- 2011-03-21 CN CN201120075191XU patent/CN201982112U/zh not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103938653A (zh) * | 2014-05-14 | 2014-07-23 | 中铁二局股份有限公司 | 洞桩法钢管柱施工中钢管吊装方法 |
CN103953052A (zh) * | 2014-05-14 | 2014-07-30 | 中铁二局股份有限公司 | 一种洞桩法钢管柱施工方法 |
CN103938653B (zh) * | 2014-05-14 | 2016-05-04 | 中铁二局工程有限公司 | 洞桩法钢管柱施工中钢管吊装方法 |
CN103953052B (zh) * | 2014-05-14 | 2016-05-25 | 中铁二局工程有限公司 | 一种洞桩法钢管柱施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104963301A (zh) | 用于墩顶梁段与桥墩拆除的拖拉平移下放装置及方法 | |
CN203961989U (zh) | 一种用于隧道短台阶法施工的全断面凿岩台架 | |
CN204402530U (zh) | 液压支架牵引调向运输回撤装置 | |
CN203702179U (zh) | 带通风管道的单线隧道衬砌台车 | |
CN204024676U (zh) | 一种新型隧洞混凝土钢模台车 | |
CN104453972A (zh) | 液压支架牵引调向运输回撤装置 | |
CN203684234U (zh) | 轨排施工吊装预留井支护结构 | |
CN204402559U (zh) | 一种大顶推力盾构机空推过洞用桁架式反力支座组 | |
CN201982112U (zh) | 一种施工拱顶钢架安装装置 | |
CN202832296U (zh) | 钻孔设备上的钻杆吊装装置 | |
CN204492831U (zh) | 地铁暗挖隧道横通道施工构件 | |
CN203855967U (zh) | 斜坡廊道钻灌台车 | |
CN105134270A (zh) | 一种综采工作面的支架回撤方法 | |
CN202560235U (zh) | 成型盾构隧道下部管片拆除装置 | |
CN208684247U (zh) | 一种预制节段用吊装装置 | |
CN203867198U (zh) | 高层钢结构转换层桁架的滑移设备 | |
CN202866653U (zh) | 钻机双主杆导轨式液压升降机构 | |
CN202850854U (zh) | 一种用于旋挖钻机的两级加压系统 | |
CN202687851U (zh) | 一种新型分体式天车 | |
CN202245861U (zh) | 可整体提升超高、大跨度、重型钢通廊的装置 | |
CN205025492U (zh) | 综采工作面管线自移小车装置 | |
CN101858165B (zh) | 塔桅结构分段套装、穿心抽出式整体安装技术 | |
CN103334592B (zh) | 高耸建筑物外凸构筑物步进式滑升安装施工方法 | |
CN104088665A (zh) | 暗挖车站钢管柱施工工艺 | |
CN204326981U (zh) | 一种用于煤层气车载钻机的直线导轨式倍速给进装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110921 Termination date: 20160321 |
|
CF01 | Termination of patent right due to non-payment of annual fee |