CN103334592B - 高耸建筑物外凸构筑物步进式滑升安装施工方法 - Google Patents
高耸建筑物外凸构筑物步进式滑升安装施工方法 Download PDFInfo
- Publication number
- CN103334592B CN103334592B CN201310256546.9A CN201310256546A CN103334592B CN 103334592 B CN103334592 B CN 103334592B CN 201310256546 A CN201310256546 A CN 201310256546A CN 103334592 B CN103334592 B CN 103334592B
- Authority
- CN
- China
- Prior art keywords
- jack
- control system
- convex structure
- construction method
- pin
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
一种高耸建筑物外凸构筑物步进式滑升安装施工方法,属于建筑安装技术领域。高耸建筑物施工完毕后,在高耸建筑物外侧设置轨道,在地面将外凸构筑物施工完毕,利用轨道和动力系统将外凸构筑物滑升至设计标高。优点在于,用步进式滑升方法安装,减少了大型吊装设备的使用,节约施工成本;减少高空作业,减少安全隐患。
Description
技术领域
本发明属于建筑施工技术领域,特别是提供了一种高耸建筑物外凸构筑物步进式滑升安装施工方法,适用于直型建筑物有外凸构筑物的工业与公共建筑工程的施工。
背景技术
建筑物造型的越来越多样化,建筑物外有独立外凸物的情况很多。一般外凸构筑物的施工均采用先制作,然后使用吊车安装的方法。
本施工方法提供一种全新的施工理念,不要大型吊装设备,采用简单的型钢、千斤顶、和电脑控制设备即可完成安装施工;此施工方法操作简单,节省大型吊装设备的应用,具有明显的经济效益。在高度较高和外凸构筑物重量较大的建筑物施工中应用此施工方法,效果尤为显著。
发明内容
本发明的目的在于提供一种高耸建筑物外凸构筑物步进式滑升安装施工方法,高耸建筑物施工完毕,然后采用工字钢、千斤顶、控制系统等组成的滑升系统,将外凸构筑物滑升至设计标高。具体工艺步骤如下:
1)首先施工高耸建筑物1和外凸构筑物2,然后进行外凸构筑物2的安装;
2)高耸建筑物1施工完毕,在高耸建筑物1外侧设置滑升装置,利用滑升装置将外凸构筑物2滑升至设计标高;
3)高耸建筑物1施工完毕,自地面至外凸构筑物2设计底标高处通长设置多根工字钢3;工字钢3上垂直间隔一个千斤顶4行程设一个销子5;每根工字钢3上设一个千斤顶4,千斤顶4用销子5固定在工字钢3上;相邻的千斤顶4分别与控制系统A6和控制系统B7相连;
4)滑升时,与控制系统A6相连的千斤顶4用销子5和工字钢3固定,控制系统A6启动,千斤顶4推动外凸构筑物2向上滑升;控制系统B7控制的千斤顶4附着在外凸构筑物2上,随外凸构筑物2上升;外凸构筑物2上升到一个千斤顶4的行程后,将附着在外凸构筑物2上的千斤顶4用销子5与工字钢3固定,打开推动外凸构筑物2向上滑升的千斤顶4;启动与控制系统B7相连的千斤顶4推动外凸构筑物2向上滑升;控制系统A6控制的千斤顶4附着在外凸构筑物2上,随外凸构筑物2上升;依次操作,将外凸构筑物2滑升至设计标高。
5)外凸构筑物滑升至设计标高后,固定好外凸构筑物,拆除滑升系统。
所述的滑升装置由工字钢3、千斤顶4、销子5、控制系统A6、控制系统B7构成。
在步骤3)中,控制系统A6、控制系统B7均是由电脑数据控制设备、数据线、液压机、液压管构成。
在步骤3)中,控制系统A6、控制系统B7均采用多媒体技术,对滑升全过程进行监控,发现偏差及时纠正,保证了滑升的安全。
在步骤3)中,工字钢3竖直间距一个千斤顶4行程设置一个销子5,对千斤顶4进行固定。
在步骤3)、4)中,滑升装置中千斤顶4分别由控制系统A6、控制系统B7两套系统控制。
在步骤4)中,滑升装置中控制系统A6、控制系统B7交叉启动。
在步骤4)中,滑升装置中千斤顶的滑升过程为步进式的行进方式。
在步骤4)中,滑升过程中多个液压机同时滑升,并且具有单点控制调整的功能,保证了滑升的稳定、安全。
本发明的有益效果
随着人们审美能力的提高,建筑物造型越来越多样化,建筑物外侧有外凸构筑物的情况越来越多。本发明的滑升施工方法与传统的吊车安装施工方法相比,,采用简单的型钢、千斤顶、电脑控制设备等普通方法即可完成高空、大型构筑物的施工,不使用大型吊装,节约施工成本;减少了大量的高空作业,减少安全隐患,降低现场安全事故的发生。
附图说明
下面结合附图和实施例对本发明进一步说明。
图1为高耸建筑物外凸构筑物滑升立面图。其中,高耸建筑物1、外凸构筑物2、工字钢3、千斤顶4、销子5、控制系统A 6、控制系统B 7。
图2为高耸建筑物外凸构筑物滑升平面图。
具体实施方式
(1)首先施工高耸建筑物1和外凸构筑物2。
(2)高耸建筑物1施工完毕,自地面至外凸构筑物2设计底标高处通长设置多根工字钢3。工字钢3上垂直间隔一个千斤顶4行程设一个销子5。每根工字钢3上设一个千斤顶4,千斤顶4用销子5固定在工字钢3上。相邻的千斤顶4分别与控制系统A6和控制系统B7相连。
(3)滑升时,与控制系统A6相连的千斤顶4用销子5和工字钢3固定,控制系统A6启动,千斤顶4推动外凸构筑物2向上滑升;控制系统B7控制的千斤顶4附着在外凸构筑物2上,随外凸构筑物2上升。外凸构筑物2上升到一个千斤4的行程后,将附着在外凸构筑物2上的千斤顶4用销子5与工字钢3固定,打开推动外凸构筑物2向上滑升的千斤顶4。启动与控制系统B7相连的千斤顶4推动外凸构筑物2向上滑升;控制系统A6控制的千斤顶4附着在外凸构筑物2上,随外凸构筑物2上升。依次操作,将外凸构筑物2滑升至设计标高.
(4)外凸构筑物2滑升至设计标高后,固定好外凸构筑物2,拆除滑升系统。
Claims (7)
1.一种高耸建筑物外凸构筑物步进式滑升安装施工方法,其特征在于:
1)首先施工高耸建筑物(1)和外凸构筑物(2),然后进行外凸构筑物(2)的安装;
2)高耸建筑物(1)施工完毕,在高耸建筑物(1)外侧设置滑升装置,利用滑升装置将外凸构筑物(2)滑升至设计标高;
高耸建筑物(1)施工完毕,自地面至外凸构筑物(2)设计底标高处通长设置多根工字钢(3);工字钢(3)上垂直间隔一个千斤顶(4)行程设一个销子(5);每根工字钢(3)上设一个千斤顶(4),千斤顶(4)用销子(5)固定在工字钢(3)上;相邻的千斤顶(4)分别与控制系统A(6)和控制系统B(7)相连;
滑升时,与控制系统A(6)相连的千斤顶(4)用销子(5)和工字钢(3)固定,控制系统A(6)启动,千斤顶(4)推动外凸构筑物(2)向上滑升;控制系统B(7)控制的千斤顶(4)附着在外凸构筑物(2)上,随外凸构筑物(2)上升;外凸构筑物(2)上升到一个千斤顶(4)的行程后,将附着在外凸构筑物(2)上的千斤顶(4)用销子(5)与工字钢(3)固定,打开推动外凸构筑物(2)向上滑升的千斤顶(4);启动与控制系统B(7)相连的千斤顶(4)推动外凸构筑物(2)向上滑升;控制系统A(6)控制的千斤顶(4)附着在外凸构筑物(2)上,随外凸构筑物(2)上升;依次操作,将外凸构筑物(2)滑升至设计标高。
2.根据权利要求1所述的施工方法,其特征在于,所述的滑升装置由工字钢(3)、千斤顶(4)、销子(5)、控制系统A(6)、控制系统B(7)构成。
3.根据权利要求1所述的施工方法,其特征在于,在步骤2)中,控制系统A(6)、控制系统B(7)均是由电脑数据控制设备、数据线、液压机、液压管构成。
4.根据权利要求1所述的施工方法,其特征在于,在步骤2)中,工字钢(3)竖直间距一个千斤顶(4)行程设置一个销子(5),对千斤顶(4)进行固定。
5.根据权利要求1所述的施工方法,其特征在于,在步骤2)中,滑升装置中千斤顶(4)分别由控制系统A(6)、控制系统B(7)两套系统控制。
6.根据权利要求1所述的施工方法,其特征在于,在步骤2)中,滑升装置中控制系统A(6)、控制系统B(7)交叉启动。
7.根据权利要求1所述的施工方法,其特征在于,在步骤2)中,滑升装置中千斤顶的滑升过程为步进式的行进方式。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310256546.9A CN103334592B (zh) | 2013-06-25 | 2013-06-25 | 高耸建筑物外凸构筑物步进式滑升安装施工方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310256546.9A CN103334592B (zh) | 2013-06-25 | 2013-06-25 | 高耸建筑物外凸构筑物步进式滑升安装施工方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN103334592A CN103334592A (zh) | 2013-10-02 |
| CN103334592B true CN103334592B (zh) | 2015-05-13 |
Family
ID=49242794
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201310256546.9A Active CN103334592B (zh) | 2013-06-25 | 2013-06-25 | 高耸建筑物外凸构筑物步进式滑升安装施工方法 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN103334592B (zh) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104060842B (zh) * | 2014-07-08 | 2016-02-24 | 七冶建设有限责任公司 | 一种工业厂房钢屋盖整体倒装提升施工方法 |
| CN105781136B (zh) * | 2016-01-27 | 2017-11-17 | 汤跃超 | 等截面、锥形、台形体结构或构件加固的顶推作业方法 |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB1133315A (en) * | 1966-11-02 | 1968-11-13 | British Lift Slab Ltd | Jacking apparatus for use in building |
| CN201605829U (zh) * | 2009-12-30 | 2010-10-13 | 上海天演建筑物移位工程有限公司 | 一种建筑物顶升系统 |
| CN102108786A (zh) * | 2010-12-09 | 2011-06-29 | 浙江省天和建材集团有限公司 | 超大型建筑构件整体提升施工方法及其装置 |
| CN202509490U (zh) * | 2012-03-30 | 2012-10-31 | 中建三局建设工程股份有限公司 | 一种可带载分段拆解并可重复使用的钢-砼组合桩 |
-
2013
- 2013-06-25 CN CN201310256546.9A patent/CN103334592B/zh active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB1133315A (en) * | 1966-11-02 | 1968-11-13 | British Lift Slab Ltd | Jacking apparatus for use in building |
| CN201605829U (zh) * | 2009-12-30 | 2010-10-13 | 上海天演建筑物移位工程有限公司 | 一种建筑物顶升系统 |
| CN102108786A (zh) * | 2010-12-09 | 2011-06-29 | 浙江省天和建材集团有限公司 | 超大型建筑构件整体提升施工方法及其装置 |
| CN202509490U (zh) * | 2012-03-30 | 2012-10-31 | 中建三局建设工程股份有限公司 | 一种可带载分段拆解并可重复使用的钢-砼组合桩 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN103334592A (zh) | 2013-10-02 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102587646A (zh) | 智能化独立单元结构的液压顶升自爬模板系统 | |
| CN104563491B (zh) | 便捷液压自爬模板的使用方法 | |
| MX2021010866A (es) | Sistema de construccion de encofrado deslizante vertical con plataforma multifuncion, y metodo de construccion de un edificio con el mismo. | |
| CN204185120U (zh) | 移动式设备就位小车 | |
| CN203373983U (zh) | 一种随爬架升降卸料平台 | |
| CN205382488U (zh) | 一种水工混凝土坝体专用模板 | |
| CN103334592B (zh) | 高耸建筑物外凸构筑物步进式滑升安装施工方法 | |
| CN205063812U (zh) | 一种新型钻机 | |
| CN205134202U (zh) | 一种桥梁高强度支撑柱 | |
| CN204983173U (zh) | 一种钢结构梁柱连接节点 | |
| CN204625045U (zh) | 一种钢结构吊装用门型支架式吊装装置 | |
| CN203213019U (zh) | 长悬臂盖梁现浇施工支架体系 | |
| CN203867198U (zh) | 高层钢结构转换层桁架的滑移设备 | |
| CN204474202U (zh) | 大吨位钢构件整体吊装工装 | |
| CN105401598A (zh) | 一种逆作法自动降模系统吊装装置及其吊装方法 | |
| CN105625732A (zh) | 超高悬挑钢结构桁架无支撑施工方法 | |
| CN101858165A (zh) | 塔桅结构分段套装、穿心抽出式整体安装技术 | |
| CN203938396U (zh) | 一种工程吊装设备 | |
| CN204530479U (zh) | 一种桥梁顶升临时反力支撑装置 | |
| CN104416352B (zh) | 采用铰接式安装、拆除龙门吊的施工装置进行施工的方法 | |
| CN203499575U (zh) | 一种石油钻机的液压起升井架 | |
| CN203960752U (zh) | 桥梁高墩人员上下分节拼装式梯道 | |
| CN205531262U (zh) | 一种可自动升降钢结构施工平台 | |
| CN205476450U (zh) | 用于超高层电梯井竖向结构施工的凹式轻型自动提升模架 | |
| CN207226943U (zh) | 一种双横梁同步提升装置 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| PP01 | Preservation of patent right | ||
| PP01 | Preservation of patent right |
Effective date of registration: 20251029 Granted publication date: 20150513 |