CN201605829U - 一种建筑物顶升系统 - Google Patents

一种建筑物顶升系统 Download PDF

Info

Publication number
CN201605829U
CN201605829U CN2009202870028U CN200920287002U CN201605829U CN 201605829 U CN201605829 U CN 201605829U CN 2009202870028 U CN2009202870028 U CN 2009202870028U CN 200920287002 U CN200920287002 U CN 200920287002U CN 201605829 U CN201605829 U CN 201605829U
Authority
CN
China
Prior art keywords
jack
building
cushion block
height
interim cushion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009202870028U
Other languages
English (en)
Inventor
蓝戊己
林其荃
朱启华
杨晓妹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI EVOLUTION BUILDING SHIFT ENGINEERING Co Ltd
Original Assignee
SHANGHAI EVOLUTION BUILDING SHIFT ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI EVOLUTION BUILDING SHIFT ENGINEERING Co Ltd filed Critical SHANGHAI EVOLUTION BUILDING SHIFT ENGINEERING Co Ltd
Priority to CN2009202870028U priority Critical patent/CN201605829U/zh
Application granted granted Critical
Publication of CN201605829U publication Critical patent/CN201605829U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型公开了一种建筑物顶升系统,该顶升系统包括倒置于建筑物底部的千斤顶,还包括定位垫块、支撑件和辅助支撑物,定位垫块固定设于千斤顶的顶头上,作为千斤顶顶升的反力点;支撑件垫设于定位垫块和基础之间,辅助支撑物设于千斤顶两侧,用以在千斤顶顶升及收缸时进行从下往上交替垫高,从而实现建筑物的安全、稳定的循环顶升。

Description

一种建筑物顶升系统
技术领域
本实用新型涉及建筑物顶升技术,更具体地说,涉及一种建筑物顶升系统。
背景技术
目前,建筑物的顶升基本上都是通过液压千斤顶来进行的。顶升时,,将液压千斤顶倒置悬挂于需要顶升的建筑物上,通过千斤顶头部朝下顶住基础,给建筑物以反向升力,从而将建筑物顶升。由于千斤顶的行程有限,因此,在整个顶升过程中,必须在千斤顶与基础之间不断垫置临时支撑件。然而,如何使垫置的支撑物既能够满足建筑物不同顶升高度的需求,又能够保证顶升过程中的支撑稳定及牢固,是目前迫切需要解决的问题。
实用新型内容
针对现有技术中存在的上述缺点,本实用新型的目的是提供一种建筑物顶升系统,该顶升系统能够满足建筑物顶升高度的需求并保证顶升的稳定性。
为实现上述目的,本实用新型采用如下技术方案:
该建筑物顶升系统包括倒置于建筑物底部的千斤顶,还包括定位垫块、支撑件和辅助支撑物,定位垫块固定设于千斤顶的顶头上;支撑件垫设于定位垫块和基础之间,并与定位垫块相固定;辅助支撑物设于千斤顶两侧,并垫设于建筑物与基础之间。
所述的支撑件包括数个临时垫块和钢支撑,临时垫块的高度与千斤顶的行程相等,钢支撑的高度为临时垫块的高度的数倍。
所述的辅助支撑物也包括临时垫块和钢支撑,临时垫块的高度与千斤顶的行程相等,钢支撑的高度为临时垫块的高度的数倍。
所述的临时垫块以及钢支撑的上下端面均设有用于连接的螺栓孔。
在上述技术方案中,本实用新型的建筑物顶升系统包括倒置于建筑物底部的千斤顶,还包括定位垫块、支撑件和辅助支撑物,定位垫块固定设于千斤顶的顶头上,作为千斤顶顶升的反力点;支撑件垫设于定位垫块和基础之间,辅助支撑物设于千斤顶两侧,用以在千斤顶顶升及收缸时进行从下往上交替垫高,从而实现建筑物的安全、稳定的循环顶升。
附图说明
图1是本实用新型的建筑物顶升系统的使用状态图。
具体实施方式
下面结合附图和实施例进一步说明本实用新型的技术方案。
请结合图1所示,本实用新型的建筑物顶升系统10包括倒置于建筑物1底部的千斤顶11,还包括定位垫块12、支撑件13和辅助支撑物14,定位垫块12固定设于千斤顶11的顶头上;支撑件13垫设于定位垫块12和基础2之间,并与定位垫块12相固定;辅助支撑物14设于千斤顶11两侧,并垫设于建筑物1与基础2之间。支撑件13包括数个临时垫块15a和钢支撑16a,临时垫块15a的高度与千斤顶11的行程相等,钢支撑16a的高度大于临时垫块15a的高度。辅助支撑物14也包括临时垫块15b和钢支撑16b,临时垫块15b的高度与千斤顶11的行程相等,钢支撑16b的高度大于临时垫块15b的高度。并且临时垫块15a、15b以及钢支撑16a、16b的上下端面均设有用于连接的螺栓孔,用以相应的临时垫块之间、钢支撑之间、临时垫块与钢支撑以及临时垫块15a与定位垫块12相连接固定,可保证在顶升过程中的安全和稳定。
该顶升系统10的工作原理如下:
先将液压千斤顶11倒置悬挂于需要顶升的建筑物1上,通过千斤顶11头部朝下与定位垫块12上端通过螺栓固定,定位垫块12底部设于一作为支撑件13的临时垫块15a上,并通过螺栓固定;然后在千斤顶11两侧分别设置作为辅助支撑物14的临时垫块15b,并与建筑物1底部相抵;此时,通过千斤顶11进行顶升一个行程,然后在辅助支撑物14上增垫一临时垫块15b,然后松开定位垫块12与临时垫块15a的螺栓,并通过千斤顶11进行收缸,定位垫块12与千斤顶11一起上缩,此时建筑物1由辅助支撑物14的临时垫块15b承载,在定位垫块12上缩留出的空间内增垫一临时垫块15a,上端与定位垫块12连接固定;此时千斤顶11再次顶升,并重复上述步骤,通过交替增垫作为支撑件13和辅助支撑物14的临时垫块15a、15b,从而不断将建筑物1顶升至所需高度。另外,当临时垫块15a、15b垫置一定高度时,可采用钢支撑16a、16b替换相应数量的临时垫块15a、15b,从而有利于顶升的稳定性。
采用本实用新型的顶升系统10完全能够满足建筑物1顶升不同高度的需求,并保证了整个顶升过程中的安全和稳定。
本技术领域中的普通技术人员应当认识到,以上的实施例仅是用来说明本实用新型,而并非用作为对本实用新型的限定,只要在本实用新型的实质精神范围内,对以上所述实施例的变化、变型都将落在本实用新型的权利要求书范围内。

Claims (4)

1.一种建筑物顶升系统,包括倒置于建筑物底部的千斤顶,其特征在于:
还包括定位垫块、支撑件和辅助支撑物,定位垫块固定设于千斤顶的顶头上;支撑件垫设于定位垫块和基础之间,并与定位垫块相固定;辅助支撑物设于千斤顶两侧,并垫设于建筑物与基础之间。
2.如权利要求1所述的建筑物顶升系统,其特征在于:
所述的支撑件包括数个临时垫块和钢支撑,临时垫块的高度与千斤顶的行程相等,钢支撑的高度为临时垫块的高度的数倍。
3.如权利要求1所述的建筑物顶升系统,其特征在于:
所述的辅助支撑物也包括临时垫块和钢支撑,临时垫块的高度与千斤顶的行程相等,钢支撑的高度为临时垫块的高度的数倍。
4.如权利要求2或3所述的建筑物顶升系统,其特征在于:
所述的临时垫块以及钢支撑的上下端面均设有用于连接的螺栓孔。
CN2009202870028U 2009-12-30 2009-12-30 一种建筑物顶升系统 Expired - Fee Related CN201605829U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202870028U CN201605829U (zh) 2009-12-30 2009-12-30 一种建筑物顶升系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202870028U CN201605829U (zh) 2009-12-30 2009-12-30 一种建筑物顶升系统

Publications (1)

Publication Number Publication Date
CN201605829U true CN201605829U (zh) 2010-10-13

Family

ID=42950538

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202870028U Expired - Fee Related CN201605829U (zh) 2009-12-30 2009-12-30 一种建筑物顶升系统

Country Status (1)

Country Link
CN (1) CN201605829U (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102493674A (zh) * 2011-12-12 2012-06-13 广州市鲁班建筑集团有限公司 建筑物顶升系统
CN103046767A (zh) * 2012-12-20 2013-04-17 浙江省第一水电建设集团股份有限公司 Plc计算机槽身双控制同步顶升施工工法
CN103205940A (zh) * 2013-04-22 2013-07-17 成都建筑工程集团总公司 连续梁桥变坡比例交替顶升施工方法
CN103334592A (zh) * 2013-06-25 2013-10-02 北京首钢建设集团有限公司 高耸建筑物外凸构筑物步进式滑升安装施工方法
CN103572837A (zh) * 2012-07-30 2014-02-12 上海天演建筑物移位工程有限公司 一种建筑物顶升系统和顶升方法
CN103953199A (zh) * 2014-05-15 2014-07-30 中铁第四勘察设计院集团有限公司 一种长行程倒顶支垫顶升方法
CN110541582A (zh) * 2019-09-09 2019-12-06 河南文博建设工程有限公司 一种步进式建筑平移方法
CN110565544A (zh) * 2019-08-21 2019-12-13 上海天演建筑物移位工程股份有限公司 一种支座更换方法

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102493674A (zh) * 2011-12-12 2012-06-13 广州市鲁班建筑集团有限公司 建筑物顶升系统
CN102493674B (zh) * 2011-12-12 2013-12-11 广州市鲁班建筑集团有限公司 建筑物顶升系统
CN103572837A (zh) * 2012-07-30 2014-02-12 上海天演建筑物移位工程有限公司 一种建筑物顶升系统和顶升方法
CN103572837B (zh) * 2012-07-30 2016-08-10 上海天演建筑物移位工程有限公司 一种建筑物顶升方法
CN103046767A (zh) * 2012-12-20 2013-04-17 浙江省第一水电建设集团股份有限公司 Plc计算机槽身双控制同步顶升施工工法
CN103046767B (zh) * 2012-12-20 2015-01-21 浙江省第一水电建设集团股份有限公司 Plc计算机槽身双控制同步顶升施工工法
CN103205940B (zh) * 2013-04-22 2015-11-11 成都建筑工程集团总公司 连续梁桥变坡比例交替顶升施工方法
CN103205940A (zh) * 2013-04-22 2013-07-17 成都建筑工程集团总公司 连续梁桥变坡比例交替顶升施工方法
CN103334592A (zh) * 2013-06-25 2013-10-02 北京首钢建设集团有限公司 高耸建筑物外凸构筑物步进式滑升安装施工方法
CN103334592B (zh) * 2013-06-25 2015-05-13 北京首钢建设集团有限公司 高耸建筑物外凸构筑物步进式滑升安装施工方法
CN103953199B (zh) * 2014-05-15 2016-03-30 中铁第四勘察设计院集团有限公司 一种长行程倒顶支垫顶升方法
CN103953199A (zh) * 2014-05-15 2014-07-30 中铁第四勘察设计院集团有限公司 一种长行程倒顶支垫顶升方法
CN110565544A (zh) * 2019-08-21 2019-12-13 上海天演建筑物移位工程股份有限公司 一种支座更换方法
CN110541582A (zh) * 2019-09-09 2019-12-06 河南文博建设工程有限公司 一种步进式建筑平移方法
CN110541582B (zh) * 2019-09-09 2021-08-17 河南文博建设工程有限公司 一种步进式建筑平移方法

Similar Documents

Publication Publication Date Title
CN201605829U (zh) 一种建筑物顶升系统
CN201224671Y (zh) 储罐倒装安装的提升装置
CN203639095U (zh) 内边柱倒装法提升装置
CN205557338U (zh) 一种桥梁钢构支撑装置
CN101633483B (zh) 一种钢结构网架整体提升装置
CN107458990A (zh) 一种铝合金升降机底座支撑腿机构
CN217720221U (zh) 一种数据线加工用端子压接治具
CN202688862U (zh) 结合永久支座的三向调位系统
CN208917714U (zh) 一种用于装配式t梁桥支座更换的顶升反力装置
CN208218314U (zh) 一种自动化顶升装置
CN201605831U (zh) 一种建筑物顶升用钢支撑
CN115199883A (zh) 一种深井提水用潜水泵限位固定装置
CN213868319U (zh) 建筑物顶升装置
CN211813242U (zh) 一种钢性链提升装置
CN210313287U (zh) 一种应用在压力罐上的起重装置
CN204714398U (zh) 一种起重机加高装置
CN209324385U (zh) 巷道钢拱架顶升装置
CN203168450U (zh) 一种防倒书倾斜托板书架
CN206274000U (zh) 一种石油钻机井架用液压支架系统
CN206302078U (zh) 一种用于气体绝缘开关柜气箱装配的快捷装配支架
CN215518423U (zh) 一种桥梁养护顶升反力架
CN220667082U (zh) 一种钢结构网架顶升支座
CN208585997U (zh) 一种用于海洋工程的连续顶升垫块
CN214818073U (zh) 一种锅炉安装夹持装置
CN201449287U (zh) 毛重式包装秤安装支架

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101013

Termination date: 20181230

CF01 Termination of patent right due to non-payment of annual fee