CN203514918U - 带有爬梯装置的混凝土杆塔 - Google Patents
带有爬梯装置的混凝土杆塔 Download PDFInfo
- Publication number
- CN203514918U CN203514918U CN201320535921.9U CN201320535921U CN203514918U CN 203514918 U CN203514918 U CN 203514918U CN 201320535921 U CN201320535921 U CN 201320535921U CN 203514918 U CN203514918 U CN 203514918U
- Authority
- CN
- China
- Prior art keywords
- concrete
- steel pipe
- cat ladder
- pole
- ladder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 20
- 239000010959 steel Substances 0.000 claims abstract description 20
- 230000002493 climbing Effects 0.000 claims abstract description 13
- 241000282326 Felis catus Species 0.000 claims description 30
- 239000000725 suspension Substances 0.000 claims description 15
- 210000000282 Nails Anatomy 0.000 claims description 7
- 230000000875 corresponding Effects 0.000 claims description 4
- 239000000203 mixture Substances 0.000 claims description 3
- 238000004642 transportation engineering Methods 0.000 abstract description 4
- 230000005540 biological transmission Effects 0.000 abstract description 2
- 239000002131 composite material Substances 0.000 abstract description 2
- 238000009434 installation Methods 0.000 abstract 1
- 101700078171 KNTC1 Proteins 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 241001503987 Clematis vitalba Species 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 210000001699 lower leg Anatomy 0.000 description 1
Abstract
本实用新型涉及输电线路用杆塔的技术领域,要解决的技术问题是传统的杆塔不方便攀爬,登高作业者不便于工作,且重量较重,运输安装费用高,为解决上述问题,提供一种带有爬梯装置的混凝土杆塔,包括杆体,杆体的外壁上设置有一组抱箍,在抱箍一侧的外壁上设置有爬梯,所述杆体包括内钢管和外钢管,内钢管和外钢管之间设置有混凝土层。本实用新型能够方便登高作业者攀爬,保证施工人员高空作业操作方便及人身安全,并且采用钢管、混凝土层的复合结构,增加杆体的强度。
Description
带有爬梯装置的混凝土杆塔
技术领域
[0001] 本实用新型涉及输电线路用杆塔的技术领域,具体涉及一种带有爬梯装置的混凝土杆塔。
背景技术
[0002] 随着现代化电网建设和通信技术的不断高速发展,杆塔高度不断增加,随之杆段直径相应增大,用脚扣登杆只适用于杆直径小于40 mm以下电杆,从而对登高作业造成不便。现有的杆塔一般为混泥土杆塔,单纯的利用混凝土的杆塔在满足一定强度的情况下,重量较重,运输安装不方便,且费用较高。
发明内容
[0003] 本实用新型要解决的技术问题是传统的杆塔不方便攀爬,登高作业者不便于工作,且重量较重,运输安装费用高,为解决上述问题,提供一种带有爬梯装置的混凝土杆塔。
[0004] 本实用新型的技术方案是以下述方式实现的:
[0005] 一种带有爬梯装置的混凝土杆塔,包括杆体,杆体的外壁上设置有一组抱箍,在抱箍一侧的外壁上设置有爬梯,所述杆体包括内钢管和外钢管,内钢管和外钢管之间设置有混凝土层。
[0006] 所述抱箍至少设置两个以上,且为两个半圆形组成,并呈左右对称的,并在抱箍一侧的外壁设置抱箍挂件。
[0007] 所述爬梯包括爬梯管、设置在爬梯管上的脚钉及设置爬梯管两端上的爬梯挂件。
[0008] 所述脚钉从爬梯管中间穿过并与之固连。
[0009] 所述抱箍挂件与爬梯挂件对应设置,至少设置两组以上并通过螺栓固连。
[0010] 相对于现有技术,本实用新型采用爬梯,能够方便登高作业者攀爬,保证施工人员高空作业操作方便及人身安全,并且,本实用新型采用钢管、混凝土层的复合结构,增加杆体的强度,在加高杆体时,不需要对杆体加粗很多,减轻了杆体的重量,降低运输和安装的费用。
[0011] 附图说明
[0012] 图1是本实用新型的结构示意图。
[0013] 图2是沿图1中A-A线的剖视图。
[0014]图3是抱箍与爬梯及杆体连接示意图。
[0015] 图4是图3中A部分的放大图。
[0016] 图5是爬梯管与爬梯挂件连接示意图。
[0017] 其中,I是杆体,11是内钢管,12是外钢管,13是混凝土层,2是脚钉,3是抱箍,4是爬梯管,5是抱箍挂件,6是爬梯挂件。
具体实施方式[0018] 如附图所示,一种带有爬梯装置的混凝土杆塔,包括杆体1,杆体I的外壁上设置有一组抱箍3,在抱箍3 —侧的外壁上设置有爬梯,所述杆体I包括内钢管11和外钢管12,内钢管11和外钢管12之间设置有混凝土层13。
[0019] 所述抱箍3至少设置两个以上,且为两个半圆形组成,并呈左右对称的,并在抱箍3 一侧的外壁设置抱箍挂件5。
[0020] 所述爬梯包括爬梯管4、设置在爬梯管4上的脚钉2及设置爬梯管4两端上的爬梯挂件6。
[0021] 所述脚钉2从爬梯管4中间穿过并与之固连。
[0022] 所述抱箍挂件5与爬梯挂件6对应设置,至少设置两组以上并通过螺栓固连。
Claims (5)
1.一种带有爬梯装置的混凝土杆塔,包括杆体,杆体的外壁上设置有一组抱箍,在抱箍一侧的外壁上设置有爬梯,其特征在于:所述杆体包括内钢管和外钢管,内钢管和外钢管之间设置有混凝土层。
2.根据权利要求1所述的带有爬梯装置的混凝土杆塔,其特征在于:所述抱箍至少设置两个以上,且为两个半圆形组成,并呈左右对称的,并在抱箍一侧的外壁设置抱箍挂件。
3.根据权利要求2所述的带有爬梯装置的混凝土杆塔,其特征在于:所述爬梯包括爬梯管、设置在爬梯管上的脚钉及设置爬梯管两端上的爬梯挂件。
4.根据权利要求3所述的带有爬梯装置的混凝土杆塔,其特征在于:所述脚钉从爬梯管中间穿过并与之固连。
5.根据权利要求3或4所述的带有爬梯装置的混凝土杆塔,其特征在于:所述抱箍挂件与爬梯挂件对应设置,至少设置两组以上并通过螺栓固连。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320535921.9U CN203514918U (zh) | 2013-08-30 | 2013-08-30 | 带有爬梯装置的混凝土杆塔 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320535921.9U CN203514918U (zh) | 2013-08-30 | 2013-08-30 | 带有爬梯装置的混凝土杆塔 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203514918U true CN203514918U (zh) | 2014-04-02 |
Family
ID=50373870
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320535921.9U Expired - Fee Related CN203514918U (zh) | 2013-08-30 | 2013-08-30 | 带有爬梯装置的混凝土杆塔 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203514918U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105019820A (zh) * | 2015-07-10 | 2015-11-04 | 国网浙江省电力公司金华供电公司 | 一种绝缘步梯 |
CN109011423A (zh) * | 2018-06-26 | 2018-12-18 | 合肥海银杆塔有限公司 | 一种混凝土杆塔用攀爬防护装置 |
-
2013
- 2013-08-30 CN CN201320535921.9U patent/CN203514918U/zh not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105019820A (zh) * | 2015-07-10 | 2015-11-04 | 国网浙江省电力公司金华供电公司 | 一种绝缘步梯 |
CN105019820B (zh) * | 2015-07-10 | 2016-10-05 | 国网浙江省电力公司金华供电公司 | 一种绝缘步梯 |
CN109011423A (zh) * | 2018-06-26 | 2018-12-18 | 合肥海银杆塔有限公司 | 一种混凝土杆塔用攀爬防护装置 |
CN109011423B (zh) * | 2018-06-26 | 2020-05-01 | 合肥海银杆塔有限公司 | 一种混凝土杆塔用攀爬防护装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203514918U (zh) | 带有爬梯装置的混凝土杆塔 | |
CN203593556U (zh) | 高安全塔吊 | |
CN202467623U (zh) | 新型可拆分式爬梯 | |
CN203795939U (zh) | 一种电线杆 | |
CN203794505U (zh) | 一种内爬动臂塔式起重机的内爬钢梁倒运装置 | |
CN203022408U (zh) | 一种稳定电线杆的锚索拉绳结构 | |
CN202596568U (zh) | 攀登软梯用固锚 | |
CN204001927U (zh) | 输电钢管塔横担跨步拉手 | |
CN206051371U (zh) | 一种塔机标准节爬梯 | |
CN103334592B (zh) | 高耸建筑物外凸构筑物步进式滑升安装施工方法 | |
CN204001931U (zh) | 一种薄壁钢管杆塔 | |
CN204089035U (zh) | 一种输电线路杆塔攀登辅助工具 | |
CN203514915U (zh) | 方便攀爬的海砂混凝土杆塔 | |
CN202402221U (zh) | 一种具有攀爬装置的塔架 | |
CN205419584U (zh) | 一种用于塔式起重机软附着附墙框 | |
CN205804999U (zh) | 预制装配式建筑塔吊的连接结构 | |
CN201801267U (zh) | 大型起重设施简易载人装置 | |
CN204760881U (zh) | 一种输电线路钢管塔爬梯助手 | |
CN204738313U (zh) | 易攀爬市政检查井 | |
CN203377549U (zh) | 塔身附着小抱杆 | |
CN203029916U (zh) | 一种建筑物攀爬装置 | |
CN202808124U (zh) | 内升式吊笼升降机 | |
CN203701551U (zh) | 可拆卸式塔机人员通道 | |
CN216038334U (zh) | 一种抗风能力好的塔吊结构 | |
CN104110155B (zh) | 一种薄壁钢管杆塔及其加工与施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140402 Termination date: 20180830 |