CN201865114U - Protective structure for vegetation concrete side slope - Google Patents

Protective structure for vegetation concrete side slope Download PDF

Info

Publication number
CN201865114U
CN201865114U CN2010206168658U CN201020616865U CN201865114U CN 201865114 U CN201865114 U CN 201865114U CN 2010206168658 U CN2010206168658 U CN 2010206168658U CN 201020616865 U CN201020616865 U CN 201020616865U CN 201865114 U CN201865114 U CN 201865114U
Authority
CN
China
Prior art keywords
side slope
protective structure
slope
soil
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010206168658U
Other languages
Chinese (zh)
Inventor
魏永幸
秦小林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN2010206168658U priority Critical patent/CN201865114U/en
Application granted granted Critical
Publication of CN201865114U publication Critical patent/CN201865114U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The utility model discloses a protective structure for a vegetation concrete side slope, which aims to effectively prevent the side slope from collapsing and being damaged and is also beneficial to the growth of green plants on the side slope. The protective structure comprises concrete blocks (10) laid along the surface of the side slop and closing the surface of the side slop; each concrete block (10) is formed by compounding a porous loose layer (11) and a dense layer (12); holes (11a) arranged at intervals and extending downwardly and longitudinally from upper surfaces of the concrete blocks (10) are formed inside the porous loose layer (11); and planting soil is filled in the holes (11a). The protective structure has the benefits that the protective structure can effectively prevent rainwater from infiltrating the side slope, water flow from eroding the side slope, moisture of soil mass of the side slope from being vaporized and side slope from collapsing and being damaged, and is also beneficial to the growth of green plants on the side slope. The protective structure is particularly suitable for the protection of expansive soil side slopes requiring seepage control and moisture preservation, and can also be used for the protection of side slopes with other earthiness.

Description

Plant cover concrete side slope protection structure
Technical field
The utility model relates to the side slope protection technical field, particularly a kind of plant cover concrete side slope protection structure.
Background technology
In construction such as railway, highway, water conservancy and urban construction, need side slope is taked the preventive works measure, to prevent the generation of side slope unstability disaster.Recently come, along with the fast development of economic construction, protecting slope ecology has become the developing direction of side slope protection technology.Existing protecting slope ecology measure mainly contains following several: (1) people's work post grass bank protection.Be by going into the worker simply sows grass seeds at side slope surface a kind of traditional slope plant safeguard procedures.Be used for slope height is not high, the gradient is slow and suitable careless class is grown soil property cutting and side slope of embankment more.Have construction characteristics such as simple, cheap.But because grass-seed is broadcast and removes inhomogeneously, grass-seed is easily washed away by rainwater, plants reasons such as careless survival rate is low, often do not reach satisfied side slope protection effect, and cause side slope diseases such as domatic coombe, the loss of table soil, and cause a large amount of slide slope disease regulation, reinstatement works, it is less to make this technology use in recent years.(2) skeleton vegetative protection.Be on side slope, to adopt stone to build by laying bricks or stones or the skeleton of shapes such as the criss-cross of concreting, arch, herringbone, in skeleton, banket then or earth bag is afforested.Generally speaking, stone-laying or concrete skeleton vegetative protection, polygon concrete hollow block vegetative protection are suitable for ratio of slope and delay in 1: 0.75 soil property and complete, highly weathered rock side slope, use this type of protection more at present on the engineering.(3) three dimensional network spraying and seeding afforesting protection.Be to utilize three dimensional network, utilize the effect of three dimensional network net bag simultaneously, be formed with the certain thickness soil layer that is beneficial to plant growing, and carry out the technology of side slope protection in conjunction with the hydraulic pressure technology of sowing grass seeds by duster as solid soil and the muscle material that prevents to wash away in early days.This method is applicable to that ratio of slope delays soil property and the comparatively serious rock cut slope of weathering in 1: 0.75.(4) ditching greening protection.Be on domatic by certain line-spacing hand excavation wedge shape ditch, backfill is suitable for the soil, nutriment, soil conditioner of grass-seed growth etc. in ditch, hangs three-dimension vegetative net then, the grass planting of sowing grass seeds by duster.Ditching green grass hand labor intensity height, construction slowly, but cost is lower, its suitable ratio of slope is suddenly in 1: 0.75, basement rock is the rock side slope or the soil-slope of the mud stone that is easy to excavate, shale, sandstone, mud stone alternating layers.(5) the organic material spraying and seeding afforesting protection of thick-layer.Also calling out-customer, soil is sowed grass seeds by duster, spray sowing, it is the organic substrate that to form by a certain percentage and to stir by organic soil, depot fertilizer, quick-acting fertilizer, cementing agent, water-loss reducer and coagulating agent and grass-seed, sowing grass seeds by duster by special spray seeder is hanging with on solid soil net domatic, form certain thickness, can growing plant the organic substrate layer.Gu native net is divided into wire gauze and geonet, adopts wire gauze more.Gu native Netcom cross anchor pole be fixed on domatic on.The protection of the organic material spraying and seeding afforesting of thick-layer is suitable for rock matter or the soil-slope that ratio of slope delays in location that 1: 0.5 and view are had relatively high expectations (as Expressway Service etc.).
There is the deficiency that can't prevent rainwater infiltration and slope soil water evaporates in above-mentioned protecting slope ecology measure.To soil property and the soft rock side slope of weathering, because of the softening soil body of rainwater infiltration, current erosion form coombe, easily cause the slope failure unstability, need take the engineering measure that prevents rainwater infiltration, prevents the current erosion; To expanding (rock) native side slope, also can cause side slope dehydration cracking because of the slope soil water evaporates, in the drying and watering cycle effect, the easier side slope unstable failure that causes need take to prevent the moist keeping measures of slope soil water evaporates.
The utility model content
Technical problem to be solved in the utility model provides a kind of plant cover concrete side slope protection structure, can avoid the side slope unstable failure effectively, also helps the growth of greening side slope plant.
The technical scheme that its technical problem that solves the utility model adopts is: plant cover concrete side slope protection structure of the present utility model, comprise along side slope surface and lay and seal domatic concrete block, it is characterized in that: described concrete block is by the porosity and looseness layer and dense layer is compound constitutes, porosity and looseness layer inside has the hole, cave by the downward longitudinal extension of concrete block upper surface at interval, filling planting soil in the hole, cave.
The beneficial effects of the utility model are, can prevent rainwater infiltration, current erosion side slope and slope soil water evaporates effectively, avoid the side slope unstable failure, also help the growth of greening side slope plant.
The utility model is particularly suitable for the protection of the swelled rock and soil side slope that needs antiseepage, preserve moisture, also can be used for other soil-slopes protection.
Description of drawings
This manual comprises following two width of cloth accompanying drawings:
Fig. 1 is the structural representation of the utility model plant cover concrete side slope protection structure;
Fig. 2 is the profile of concrete block in the utility model plant cover concrete side slope protection structure
Position shown in the figure and pairing mark: concrete block 10, porosity and looseness layer 11, hole, cave 11a, contact hole 11b, dense layer 12.
The specific embodiment
Below in conjunction with drawings and Examples the utility model is further specified.
With reference to Fig. 1, plant cover concrete side slope protection structure of the present utility model comprises along side slope surface and lays and seal domatic concrete block 10.With reference to Fig. 2, described concrete block 10 constitutes by porosity and looseness layer 11 and dense layer 12 are compound, porosity and looseness layer 11 inside have hole, the cave 11a by the downward longitudinal extension of concrete block 10 upper surfaces at interval, filling planting soil is for plant growing in the 11a of hole, cave, realize greening side slope, because the 11a water storage of hole, cave is functional, can form the environment of favourable plant growing.Because dense layer 12 bad hydraulic permeability, seal domatic back and form water barrier, play preventing the rainwater infiltration effect, prevent that rainwater is to slope erosion, be used for to play the effect that prevents the side slope water evaporates on the swelled rock and soil side slope, prevent that the swelled rock and soil side slope from causing slope failure because of the dehydration cracking.
With reference to Fig. 2, for helping plant growing, described porosity and looseness layer 11 inside have the contact hole 11b that neighboring holes 11a is communicated with.See figures.1.and.2, for ease of in side slope surface laying construction and enhanced stability, the end face of described concrete block 10 has the wedge shape docking structure.
Usually, concrete block 10 can adopt the prefabricated production of global formation, promptly earlier with common concreting dense layer 12, treats to build porosity and looseness layer 11 with foam concrete in the above again after dense layer 12 has certain intensity.Concrete block 10 can be processed to the rectangular block system product of different size, lays on side slope surface with convenient.

Claims (3)

1. the plant cover concrete side slope protection is constructed, comprise along side slope surface and lay and seal domatic concrete block (10), it is characterized in that: described concrete block (10) is by porosity and looseness layer (11) and the compound formation of dense layer (12), porosity and looseness layer (11) inside has the hole, cave (11a) by the downward longitudinal extension of concrete block (10) upper surface at interval, hole, cave (11a) interior filling planting soil.
2. plant cover concrete side slope protection structure as claimed in claim 1, it is characterized in that: described porosity and looseness layer (11) inside has the contact hole (11b) that neighboring holes (11a) is communicated with.
3. plant cover concrete side slope protection structure as claimed in claim 1 or 2, it is characterized in that: the end face of described concrete block (10) has the wedge shape docking structure.
CN2010206168658U 2010-11-22 2010-11-22 Protective structure for vegetation concrete side slope Expired - Lifetime CN201865114U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206168658U CN201865114U (en) 2010-11-22 2010-11-22 Protective structure for vegetation concrete side slope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206168658U CN201865114U (en) 2010-11-22 2010-11-22 Protective structure for vegetation concrete side slope

Publications (1)

Publication Number Publication Date
CN201865114U true CN201865114U (en) 2011-06-15

Family

ID=44136274

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206168658U Expired - Lifetime CN201865114U (en) 2010-11-22 2010-11-22 Protective structure for vegetation concrete side slope

Country Status (1)

Country Link
CN (1) CN201865114U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102071695A (en) * 2010-11-22 2011-05-25 中铁二院工程集团有限责任公司 Protection construction of vegetation concrete side slope
CN102405747A (en) * 2011-08-16 2012-04-11 中国科学院武汉植物园 Method for planting evening primrose in side slope

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102071695A (en) * 2010-11-22 2011-05-25 中铁二院工程集团有限责任公司 Protection construction of vegetation concrete side slope
CN102405747A (en) * 2011-08-16 2012-04-11 中国科学院武汉植物园 Method for planting evening primrose in side slope
CN102405747B (en) * 2011-08-16 2013-01-23 中国科学院武汉植物园 Method for planting evening primrose in side slope

Similar Documents

Publication Publication Date Title
CN101818499B (en) Revegetation system on steep rocky slopes and implementing method thereof
CN108589743B (en) Ecological geogrid for slope protection
CN105230323B (en) A kind of growth-promoting binary stereoscopic configurations pattern against corrosion suitable for feldspathic sandstone small watershed
CN106759104B (en) Ecological slope protection structure and construction method
CN108221861A (en) A kind of ecological slope protection structure to prevent erosion and its construction method
CN104770257B (en) Method for recovering vegetation through micropore thin films
CN106869146A (en) A kind of careless blanket ecoscape slope protection system and construction method
CN107989051B (en) Ecological slope protection system with combination of grid slope protection, sand well water seepage and water guide slope
CN105178340A (en) Anti-scouring structure used for ecological regreening of rock slope and concrete material used for anti-scouring structure
CN110419284A (en) A kind of strand greenery patches salt discharge alkali construction technology
CN101622931B (en) Greening sloping surface for rock side slope facing wall and construction method thereof
CN201826318U (en) Simple ecological slope protecting structure for loose soil of road
CN103603316A (en) Ecological cement and geocell combination slope protection technology
CN107237334B (en) A kind of road foundation execavated rockmass frame gird type slope protection code builds the construction method of plant biological bag greening
CN201746828U (en) Geogrid enclosed type reinforced road embankment
CN110374054A (en) A kind of ecological slope protection consolidates soil structure and method
CN102071695A (en) Protection construction of vegetation concrete side slope
CN105532228A (en) Water-saving planting method for sand-binding green plants
CN114642134A (en) Sustainable flexible slope protection method and system for planting and greening high and steep side slope of arsenopyrite
CN205035814U (en) A scour prevention structure that is used for rock matter side slope ecological compound green
CN208121696U (en) Multifunctional and composite type ecological slope protection
CN107152012A (en) Sluice construction technique
CN111733834B (en) Composite type greening device for repairing and greening damaged mountain
CN201865114U (en) Protective structure for vegetation concrete side slope
CN106688800B (en) Water-retaining and fertilizer-retaining land reclamation method for tailing pond

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20110615

CX01 Expiry of patent term