CN201785702U - 连续箱梁钢筋骨架吊装装置 - Google Patents

连续箱梁钢筋骨架吊装装置 Download PDF

Info

Publication number
CN201785702U
CN201785702U CN2010205345871U CN201020534587U CN201785702U CN 201785702 U CN201785702 U CN 201785702U CN 2010205345871 U CN2010205345871 U CN 2010205345871U CN 201020534587 U CN201020534587 U CN 201020534587U CN 201785702 U CN201785702 U CN 201785702U
Authority
CN
China
Prior art keywords
box girder
frame
lifting device
binding
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010205345871U
Other languages
English (en)
Inventor
董国亮
张凤华
李建军
李崇智
杨少宏
冯辉
陈春华
袁书强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 12th Bureau Group Co Ltd
Third Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
China Railway 12th Bureau Group Co Ltd
Third Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 12th Bureau Group Co Ltd, Third Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical China Railway 12th Bureau Group Co Ltd
Priority to CN2010205345871U priority Critical patent/CN201785702U/zh
Application granted granted Critical
Publication of CN201785702U publication Critical patent/CN201785702U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型涉及连续箱梁施工领域,具体为一种连续箱梁钢筋骨架吊装装置,解决现有箱梁钢筋骨架绑扎与支架搭设及箱梁外模安装不能同步施工,无法快速施工、保证绑扎质量等问题,包括由框架横梁和框架纵梁构成的整体框架,框架横梁上安装有耳板、贴板及吊杆,各吊杆上缠绕有起吊索,框架纵梁上搭设有吊具横梁,各吊具横梁之间固定纵向连接杆;还包含与钢筋骨架捆绑在一起的链条以及安装在每根链条上的花篮螺丝。结构简单、设计合理、操作简便、使用效果很好,优化了钢筋绑扎作业工作环境,提高了箱梁钢筋骨架绑扎的效率和质量,相应加快了箱梁施工的速度,同时减少了吊车的机械台班和施工人员的人工,适应目前铁路快速施工的整体形势。

Description

连续箱梁钢筋骨架吊装装置
技术领域
本实用新型涉及连续箱梁施工领域,具体为一种连续箱梁钢筋骨架吊装装置。
背景技术
连续箱梁是桥梁跨越既有道路、水渠等重要方式之一,具有适用广泛、施工简单等特点。但由于许多工作在支架上方的箱梁外模中进行,施工场地受限,操作工人施工环境受限,进而影响箱梁施工质量,所以对其施工过程中的每一环节都必须要严格要求,尤其是箱梁钢筋骨架的绑扎,若控制不当,将严重影响箱梁内预应力管道的布设,进而影响整个箱梁的施工质量。钢筋绑扎间距和钢筋保护层控制是箱梁钢筋验收的重要项目。以前的施工方法都是在地面把钢筋加工好,等箱梁支架搭设且外模固定后,吊车吊装加工好的钢筋到外模中搭设脚手架进行绑扎。此种方法施工受场地限制,钢筋绑扎质量不能保证,且受工序的控制,几种工序无法同时展开,达不到快速施工要求。
发明内容
本实用新型为了解决现有箱梁钢筋骨架绑扎与支架搭设及箱梁外模安装不能同步施工,钢筋绑扎的工作空间场地狭小,无法快速施工和保证绑扎的质量等问题,提供一种大跨度、变截面的连续箱梁钢筋骨架吊装装置。
本实用新型是采用如下技术方案实现的:连续箱梁钢筋骨架吊装装置,包括由框架横梁和框架纵梁构成的整体框架,框架横梁上对称安装有耳板、固定在各耳板内侧的贴板及贯穿耳板、贴板的吊杆,各吊杆上缠绕有汇集到一点的起吊索,框架纵梁上间隔搭设有与其固定的吊具横梁,各吊具横梁之间固定若干纵向连接杆;还包含间隔与钢筋骨架捆绑在一起的链条以及安装在每根链条上的花篮螺丝。
采用本实用新型的结构设计,框架横梁和框架纵梁以及耳板、贴板、吊杆、起吊索构成与起吊机具(包括吊车及手拉葫芦)连接的框架结构,而吊具横梁、纵向连接杆、链条及花篮螺丝构成与钢筋骨架连接在一起的吊具,使用时,可通过手拉葫芦及链条将钢筋骨架的重量均匀的分布至吊具横梁和纵向连接杆上,维持钢筋骨架的重心稳定,然后通过框架结构及起吊机具进行钢筋骨架吊装工作。
与现有技术相比,本实用新型结构简单、设计合理、操作简便、使用效果很好,解决了支架搭设、箱梁外模安装和箱梁钢筋骨架绑扎同步施工,优化了钢筋绑扎作业工作环境,提高了箱梁钢筋骨架绑扎的效率和质量,相应加快了箱梁施工的速度,同时减少了吊车的机械台班和施工人员的人工,适应目前铁路快速施工的整体形势。
附图说明
图1为本实用新型用于起吊底腹板钢筋笼的使用状态图;
图2为本实用新型用于起吊顶板钢筋笼的使用状态图;
图3为本实用新型的俯视图;
图4为图1中框架横梁的结构示意图;
图5为图4的侧视图;
图中:1-框架横梁;2-框架纵梁;3-耳板;4-起吊索;5-吊具横梁;6-纵向连接杆;7-钢筋骨架;8-链条;9-贴板;10-吊杆。
具体实施方式
连续箱梁钢筋骨架吊装装置,如图1、2、3所示,包括由框架横梁1和框架纵梁2构成的整体框架,如图4、5所示,框架横梁1上对称安装有耳板3、固定在各耳板内侧的贴板9及贯穿耳板、贴板的吊杆10,各吊杆上缠绕有汇集到一点的起吊索4,框架纵梁2上间隔搭设有与其固定的吊具横梁5,各吊具横梁5之间固定若干纵向连接杆6;还包含间隔与钢筋骨架7捆绑在一起的链条8以及安装在每根链条上的花篮螺丝。
使用方法如下:
1、利用四台手拉葫芦将起吊索汇集到一点,采用一个吊点起吊,每根起吊索的迎角为60°,静拉力为5t;
2、箱梁钢筋骨架采用链条捆绑;
3、每根链条上挂花篮螺丝一件,用于调整起吊索的松紧;
4、如图1所示,底腹板钢筋骨架起吊时,用钢管穿入钢筋骨架内作为链条或花篮螺丝捆绑点;
5、如图2所示,顶板钢筋骨架起吊时,链条或花篮螺丝可直接系到钢筋交叉点。
6、吊车起吊时要通过花篮螺丝及起吊索调整,使钢筋骨架保持整体平衡,且通过捆绑钢筋骨架上的链条控制钢筋骨架的稳定和走向。

Claims (1)

1.一种连续箱梁钢筋骨架吊装装置,其特征是包括由框架横梁(1)和框架纵梁(2)构成的整体框架,框架横梁(1)上对称安装有耳板(3)、固定在各耳板内侧的贴板(9)及贯穿耳板、贴板的吊杆(10),各吊杆上缠绕有汇集到一点的起吊索(4),框架纵梁(2)上间隔搭设有与其固定的吊具横梁(5),各吊具横梁(5)之间固定若干纵向连接杆(6);还包含间隔与钢筋骨架(7)捆绑在一起的链条(8)以及安装在每根链条上的花篮螺丝。
CN2010205345871U 2010-09-19 2010-09-19 连续箱梁钢筋骨架吊装装置 Expired - Fee Related CN201785702U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205345871U CN201785702U (zh) 2010-09-19 2010-09-19 连续箱梁钢筋骨架吊装装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205345871U CN201785702U (zh) 2010-09-19 2010-09-19 连续箱梁钢筋骨架吊装装置

Publications (1)

Publication Number Publication Date
CN201785702U true CN201785702U (zh) 2011-04-06

Family

ID=43817673

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205345871U Expired - Fee Related CN201785702U (zh) 2010-09-19 2010-09-19 连续箱梁钢筋骨架吊装装置

Country Status (1)

Country Link
CN (1) CN201785702U (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102605720A (zh) * 2012-03-30 2012-07-25 中铁四局集团第一工程有限公司 连续梁钢筋骨架绑吊装一体化施工装备及施工方法
CN107700362A (zh) * 2017-09-30 2018-02-16 中国建筑土木建设有限公司 连续梁节段腹板钢筋的吊装方法
CN114961274A (zh) * 2022-06-08 2022-08-30 中交第二航务工程局有限公司 块体式箱梁钢筋骨架装配方法
CN115976980A (zh) * 2022-11-30 2023-04-18 中铁四局集团有限公司 一种连续梁节段钢筋笼安装方法

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102605720A (zh) * 2012-03-30 2012-07-25 中铁四局集团第一工程有限公司 连续梁钢筋骨架绑吊装一体化施工装备及施工方法
CN102605720B (zh) * 2012-03-30 2013-12-11 中铁四局集团第一工程有限公司 连续梁钢筋骨架绑吊装一体化施工装备及施工方法
CN107700362A (zh) * 2017-09-30 2018-02-16 中国建筑土木建设有限公司 连续梁节段腹板钢筋的吊装方法
CN114961274A (zh) * 2022-06-08 2022-08-30 中交第二航务工程局有限公司 块体式箱梁钢筋骨架装配方法
CN115976980A (zh) * 2022-11-30 2023-04-18 中铁四局集团有限公司 一种连续梁节段钢筋笼安装方法
CN115976980B (zh) * 2022-11-30 2023-09-19 中铁四局集团有限公司 一种连续梁节段钢筋笼安装方法

Similar Documents

Publication Publication Date Title
CN201458596U (zh) 一种带有自拆卸装置的起重机
CN201785702U (zh) 连续箱梁钢筋骨架吊装装置
CN105621280B (zh) 安装和拆卸起重臂的装置和方法
CN106241618A (zh) 一种幕墙型材起吊装置
CN206590759U (zh) 可调节的预制梁钢筋骨架吊具
CN106592962A (zh) 一种大高差、大跨度劲性骨架外包混凝土模板施工方法及施工设备
CN104480863B (zh) 斜拉桥主塔施工的钢锚梁安装定位方法
CN207244452U (zh) 一种悬索桥散索鞍就位调整装置
CN102168483B (zh) 悬索柔性施工平台
CN102659043B (zh) 一种改进的塔式起重机扶墙杆拆卸装置
CN210439705U (zh) 一种预制混凝土叠合板吊装装置
CN109137747B (zh) 一种用于大跨度拱桥主梁施工的弹性吊架
CN103132702A (zh) 一种大跨度管桁架拔杆提升、空中施转就位施工方法
CN105484165B (zh) 一体化预应力张拉框架结构及其制作和使用方法
CN113928968A (zh) 吊架装置
CN206680994U (zh) 装配式钢筋笼下放架
CN203284126U (zh) 简易组合门架高空重物吊装装置
CN101695984B (zh) 中承式钢管混凝土拱桥拱下纵横梁的安装方法及吊具
CN101768925B (zh) 防落梁挡块的安装设备及其施工方法
CN209066293U (zh) 一种用于大跨度拱桥主梁施工的弹性吊架
CN203201149U (zh) 一种电动提升出料平台
CN201362571Y (zh) 吊装先拱后梁系杆拱桥的横梁的设备
CN210976551U (zh) 一种外挂防护架
CN206033014U (zh) 一种夹具式扒杆装置
CN110512853B (zh) 一种外挂防护架及其在高层建筑中的应用方法

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110406

Termination date: 20180919