CN201562707U - 铅酸蓄电池的过桥结构 - Google Patents

铅酸蓄电池的过桥结构 Download PDF

Info

Publication number
CN201562707U
CN201562707U CN2009202148101U CN200920214810U CN201562707U CN 201562707 U CN201562707 U CN 201562707U CN 2009202148101 U CN2009202148101 U CN 2009202148101U CN 200920214810 U CN200920214810 U CN 200920214810U CN 201562707 U CN201562707 U CN 201562707U
Authority
CN
China
Prior art keywords
pole
bridge
gap
gap bridge
horizontal stripe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009202148101U
Other languages
English (en)
Inventor
陈敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Haibao Battery Technology Co., Ltd.
Original Assignee
SHANGHAI HAIBAO SPECIAL POWER CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI HAIBAO SPECIAL POWER CO Ltd filed Critical SHANGHAI HAIBAO SPECIAL POWER CO Ltd
Priority to CN2009202148101U priority Critical patent/CN201562707U/zh
Application granted granted Critical
Publication of CN201562707U publication Critical patent/CN201562707U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries

Landscapes

  • Connection Of Batteries Or Terminals (AREA)
  • Secondary Cells (AREA)

Abstract

本实用新型涉及铅酸蓄电池结构,特指一种铅酸蓄电池的过桥结构,所述过桥包括两个极柱,所述极柱并行排列,中间预留一间隙,所述两个极柱的一端分离开,另一端由一横条相连接,所述横条与极柱为一整体,横条中间位置设置有一预定深度的槽。本实用新型中过桥夹紧方便可靠,能减少焊接工作量,还可以严格控制堆铅厚度,准确把握烧焊时间,有效减少焊接工作量。

Description

铅酸蓄电池的过桥结构
技术领域
本实用新型涉及铅酸蓄电池结构,特指一种铅酸蓄电池的过桥结构。
背景技术
目前铅酸蓄电池中,单格和单格之间的过桥连接方式一般采用烧焊法。传统的烧焊是使用二个半圆的过桥,用钳子夹紧成圆形状,钳子上端有相应的杯套,再在上面烧焊堆铅以达到合适的厚度。该方法有以下缺点:对于大电池,夹紧比较困难,大电池需要比较大的导电截面,烧焊工作量较大;夹紧不可靠,定位不容易正确而造成的电池塑料壳和过桥接触,密封剂无法流入;堆铅厚度不容易控制,烧焊时间难以把握,烧焊时间长会造成漏铅,引起电池的短路,造成电池串格的现象,烧焊时间短则难以满足导电要求。
发明内容
本实用新型提供一种铅酸蓄电池的过桥结构,它夹紧方便可靠,能减少焊接工作量,还可以严格控制堆铅厚度,准确把握烧焊时间,有效减少焊接工作量。
为了达到上述目的,本实用新型采用如下方案:一种铅酸蓄电池的过桥结构,所述过桥包括两个极柱,所述极柱并行排列,中间预留一间隙,所述两个极柱的一端分离开,另一端由一横条相连接,所述横条与极柱为一整体,横条中间位置设置有一预定深度的槽。
优选地,所述过桥由两个过桥零件对接拼合而成。
优选地,所述过桥零件包括一个极柱,极柱上有一凸条,凸条位于极柱的一个侧面并凸出极柱此侧面,所述过桥零件通过凸条拼合在一起构成过桥,所述两个极柱拼合后,两个凸条拼合成所述横条,两个凸条以及极柱相对的侧面拼合形成所述间隙和槽。
优选地,所述极柱上形成所述槽的侧面为一预定深度的斜面。
采用本实用新型的过桥结构的铅酸蓄电池,在过桥焊接时,通过夹具可以很容易地夹紧,而且夹紧后比较牢固,定位准确;在过桥上预留的焊接用槽内堆满焊料再进行焊接,可以控制堆料厚度,准确把握焊接时间,减少了不必要的焊接时间。
附图说明
图1是本实用新型的结构示意图;
图2是本实用新型中过桥零件的示意图;
图3是本实用新型中焊接后结构示意图;
图4是本实用新型安装于铅酸电池中的部分剖示图。
附图标记:
1----过桥      2----间隙     3----横条     4----槽
5----过桥零件  51----极柱    52----凸条    53----斜面
6----电池外壳  61----隔板    7----密封剂
具体实施方式
参照图1,本实用新型的铅酸蓄电池的过桥1包括两个极柱51,极柱51并行排列,中间预留一间隙2,两个极柱51的一端分离开,另一端由一横条3相连接,所述横条3与极柱51为一整体,横条3中间位置设置有一预定深度的槽4。焊接时,先用夹具将两个极柱51夹持住,然后在槽4内堆放焊料,然后进行焊接直到达到要求为止。两个极柱51通过横条3连接,在夹紧的时候可以很方便地夹持住,而且极柱51定位也比较准确,不会有偏差;另外,槽4的深度可以控制,针对不同的过桥1要求设定不同的深度,堆放焊料时,可根据要求选择焊料堆放的深度,这样焊接时可以很容易控制焊料堆铅的厚度,以及焊接工作的时间,焊接完成后如图3所示,在横条3上即槽4内填满焊料,烧焊之后焊料与横条3成为一整体,焊料顶部与极柱51上带有斜面53的一个底面平齐。
另一个实施例,为了使过桥1制作方便,采用两个过桥零件5对接拼合而成。过桥零件5结构如图2中所示,过桥零件5包括一个极柱51,极柱51上延伸出有一凸条52,凸条52位于极柱51的一个侧面并凸出极柱51此侧面,过桥零件5通过凸条52拼合在一起构成过桥1,所述两个极柱51拼合后,两个凸条52拼合成所述横条3,两个凸条52以及极柱51相对的侧面拼合形成所述间隙2和槽4。这样,将过桥1分为两个过桥零件5分拆开,在生产上更为方便简捷。安装时,将两个过桥零件5对接,使它们上面的凸条52正对拼合,这样两个过桥零件5便拼合成一个完整的过桥1。焊接时,先用夹具将两个极柱51夹持住,然后在凸条52上堆放焊料,也即是在槽4内堆放焊料,然后进行焊接直到达到要求为止,与上述方式一致,焊接完成后如图3所示,两个凸条52组成的横条3上,槽4被焊料填满,与凸条52成为一整体,焊料顶部与极柱51上带有斜面53的一个底面平齐。
将本实用新型安装于电池中后,结构如图4中所示。将焊接完成后的过桥1倒置跨接于电池的两个单格之间的隔板61上,在电池外壳6与过桥1之间注入密封剂7,待密封剂7因化后将电池外壳6与过桥1一起倒转放平,即完成了过桥1与电池外壳6的安装。
本实用新型中,由于过桥1定位正确,加上有效的控制了凸条52拼合时的间隙2在合理的范围,可以看到密封剂7均匀的散布在过桥1的周围,保证了电池单格间的密封,避免了定位不正确而造成的电池塑料壳和过桥1接触,密封剂7无法流入,电池串格的现象。在过桥1上预留的焊接用的槽4内堆满焊料再进行焊接,可以控制堆料厚度,准确把握焊接时间,减少了不必要的焊接时间。

Claims (4)

1.一种铅酸蓄电池的过桥结构,其特征在于,所述过桥包括两个极柱,所述极柱并行排列,中间预留一间隙,所述两个极柱的一端分离开,另一端由一横条相连接,所述横条与极柱为一整体,横条中间位置设置有一预定深度的槽。
2.根据权利要求1所述的过桥结构,其特征在于,所述过桥由两个过桥零件对接拼合而成。
3.根据权利要求2所述的过桥结构,其特征在于,所述过桥零件包括一个极柱,极柱上有一凸条,凸条位于极柱的一个侧面并凸出极柱此侧面,所述过桥零件通过凸条拼合在一起构成过桥,所述两个极柱拼合后,两个凸条拼合成所述横条,两个凸条以及极柱相对的侧面拼合形成所述间隙和槽。
4.根据权利要求3所述的过桥结构,其特征在于,所述极柱上形成所述槽的侧面为一预定深度的斜面。
CN2009202148101U 2009-12-16 2009-12-16 铅酸蓄电池的过桥结构 Expired - Lifetime CN201562707U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202148101U CN201562707U (zh) 2009-12-16 2009-12-16 铅酸蓄电池的过桥结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202148101U CN201562707U (zh) 2009-12-16 2009-12-16 铅酸蓄电池的过桥结构

Publications (1)

Publication Number Publication Date
CN201562707U true CN201562707U (zh) 2010-08-25

Family

ID=42627860

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202148101U Expired - Lifetime CN201562707U (zh) 2009-12-16 2009-12-16 铅酸蓄电池的过桥结构

Country Status (1)

Country Link
CN (1) CN201562707U (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102104136A (zh) * 2009-12-18 2011-06-22 上海海宝特种电源有限公司 铅酸蓄电池的过桥制作方法
CN102179654A (zh) * 2011-05-25 2011-09-14 施世伟 蓄电池过桥焊接夹具
CN102189324A (zh) * 2011-05-25 2011-09-21 施世伟 一种蓄电池过桥焊机
CN102208689A (zh) * 2011-04-29 2011-10-05 肇庆理士电源技术有限公司 一种铅酸蓄电池、其装配工艺及专用工具
CN103779530A (zh) * 2012-10-25 2014-05-07 天能电池(芜湖)有限公司 免焊过桥的电动车用电池结构
CN107452936A (zh) * 2017-09-04 2017-12-08 旭派电源有限公司 一种铅酸蓄电池的跨桥结构

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102104136A (zh) * 2009-12-18 2011-06-22 上海海宝特种电源有限公司 铅酸蓄电池的过桥制作方法
CN102104136B (zh) * 2009-12-18 2014-11-05 江苏苏中电池科技发展有限公司 铅酸蓄电池的过桥制作方法
CN102208689A (zh) * 2011-04-29 2011-10-05 肇庆理士电源技术有限公司 一种铅酸蓄电池、其装配工艺及专用工具
CN102208689B (zh) * 2011-04-29 2014-06-04 肇庆理士电源技术有限公司 一种铅酸蓄电池装配工艺及专用工具
CN102179654A (zh) * 2011-05-25 2011-09-14 施世伟 蓄电池过桥焊接夹具
CN102189324A (zh) * 2011-05-25 2011-09-21 施世伟 一种蓄电池过桥焊机
CN102189324B (zh) * 2011-05-25 2013-06-19 施世伟 一种蓄电池自动过桥焊机
CN103779530A (zh) * 2012-10-25 2014-05-07 天能电池(芜湖)有限公司 免焊过桥的电动车用电池结构
CN103779530B (zh) * 2012-10-25 2017-02-15 天能电池(芜湖)有限公司 免焊过桥的电动车用电池结构
CN107452936A (zh) * 2017-09-04 2017-12-08 旭派电源有限公司 一种铅酸蓄电池的跨桥结构

Similar Documents

Publication Publication Date Title
CN201562707U (zh) 铅酸蓄电池的过桥结构
CN103208633B (zh) 一种水平电池及其制造方法
CN207205644U (zh) 一种拱架连接板焊接限位装置
CN102104136B (zh) 铅酸蓄电池的过桥制作方法
CN201994384U (zh) 一种锂离子电池
CN104201299B (zh) 一种蓄电池
CN217983603U (zh) 一种穿壁焊点胶密封结构
CN201536123U (zh) 一种电池镍片及电池组
CN215644689U (zh) 一种卧式叠片电池盖板及其锂电池
CN203377310U (zh) 一种铅酸蓄电池的极柱
CN209896157U (zh) 一种电芯组的极柱连接结构和电芯组
CN204991878U (zh) 一种锂离子动力电池
CN204102961U (zh) 一种蓄电池
CN204088442U (zh) 一种蓄电池用焊端子模
CN205657133U (zh) 一种蓄电池极群铸焊夹具
CN203536507U (zh) 一种电池铅极柱与接线端子焊接结构
CN202495541U (zh) 圆柱型锂离子电池
CN201741745U (zh) 12v铅酸蓄电池单体连接极柱
CN206925489U (zh) 一种固定塔脚坂与主材焊接角度的定位模具
CN206820028U (zh) 一种全极耳方形锂电池
CN206846285U (zh) 一种排水性好的锌基合金锭
CN202134603U (zh) 一种防爬酸蓄电池端子槽
CN221087592U (zh) 一种锂电池模组点焊夹具
CN204289646U (zh) 电动助力车用智能铅酸蓄电池结构
CN203746923U (zh) 一种铅酸蓄电池槽盖

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SUZHONG BATTERY SCIENCE + TECHNOLOGY DEVELOPMENT C

Free format text: FORMER OWNER: SHANGHAI HAIBAO SPECIAL POWER SUPPLY CO., LTD.

Effective date: 20120924

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 201101 MINHANG, SHANGHAI TO: 226400 NANTONG, JIANGSU PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20120924

Address after: 226400 Rudong Road, Rudong Economic Development Zone, Jiangsu, China, No. 1, the Yalu River Road, New District, Nantong

Patentee after: Suzhong Battery Science & Technology Development Co., Ltd., Jiangsu

Address before: 201101, Lane 7761, Lane 188, middle spring road, Shanghai, Minhang District

Patentee before: Shanghai Haibao Special Power Co., Ltd.

C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 226400 Rudong Road, Rudong Economic Development Zone, Jiangsu, China, No. 1, the Yalu River Road, New District, Nantong

Patentee after: Jiangsu Haibao Battery Technology Co., Ltd.

Address before: 226400 Rudong Road, Rudong Economic Development Zone, Jiangsu, China, No. 1, the Yalu River Road, New District, Nantong

Patentee before: Suzhong Battery Science & Technology Development Co., Ltd., Jiangsu

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20100825